CN205561975U - Exempt from to paddle foldable interim water gauge of installation - Google Patents

Exempt from to paddle foldable interim water gauge of installation Download PDF

Info

Publication number
CN205561975U
CN205561975U CN201620313950.4U CN201620313950U CN205561975U CN 205561975 U CN205561975 U CN 205561975U CN 201620313950 U CN201620313950 U CN 201620313950U CN 205561975 U CN205561975 U CN 205561975U
Authority
CN
China
Prior art keywords
water gauge
main
horizon bar
paddle
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620313950.4U
Other languages
Chinese (zh)
Inventor
吕耀光
陈金浩
黄士稳
丁奕
胡永成
胡琳
吴珍梅
敖谦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Hydrological Management Center
Original Assignee
Zhejiang Hydrology Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Hydrology Bureau filed Critical Zhejiang Hydrology Bureau
Priority to CN201620313950.4U priority Critical patent/CN205561975U/en
Application granted granted Critical
Publication of CN205561975U publication Critical patent/CN205561975U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

The utility model relates to an exempt from to paddle foldable interim water gauge of installation, it is big to solve the current interim water gauge installation degree of difficulty, and the poor stability is unfavorable for that the hydrology patrols the problem of developing smoothly of work such as survey, the emergent motor -driven test of the hydrology. This device is including the main water gauge of vertical setting and vice water gauge, is connected through main horizon bar between the upper end of vice water gauge and the blade of main water gauge, is connected through pair horizon bar between the lower extreme of main water gauge and the blade of pair water gauge, and the interconnect of main water gauge, main horizon bar, vice water gauge, vice horizon bar locates to be articulatedly, constitutes folding four -bar linkage. The utility model discloses utilize folding main water gauge and vice water gauge structure, the installation that need not to paddle during the installation water gauge utilizes vice water gauge to expand to carry on the low water level state and measures, during the high water level again the recoverable pair of water gauge utilize main water gauge to measure, simple to operate measures in a flexible way reliable.

Description

Exempt from the collapsible interim water gauge installed of paddling
Technical field
This utility model relates to a kind of hydrologic survey equipment, exempts from, particularly to a kind of, the collapsible interim water gauge installed of paddling.
Background technology
Interim water gauge refers at the provisional water level observation device without setting up on water-level observation facility or the river cross-section beyond existing water gauge observation scope.In recent years, developing by leaps and bounds of economic society proposes requirements at the higher level to hydrologic survey work, particularly widelys popularize with in popularization what patrol gauging, hydrology emergency mobile were test, and setting up interim water gauge is all requisite important step.
It is the improvement for vertical type water gauge mostly that current water gauge improves, if China Patent Publication No. is " a kind of Water rule plate ", " resistance type flexible electronic water gage " of Publication No. CN102928047A of CN1332359A, " the reflective rustless steel water gauge pile " etc. of Publication No. CN103438958A, it is all to improve for material or automation function etc. on vertical type water gauge, and the rare device being directed to interim water gauge.
The interim water gauge currently used mostly use wooden water gauge by stake add water blade combination be made.Such interim water gauge, when setting up, needs many people to paddle and enters korneforos and have the region of certain depth of water, taps the mode by stake top with hammer and will lean on and squeeze into riverbed bottom stake;In installation process, it is difficult to Levelling operation, and it is big to install danger coefficient at pluvial age.The mounting means of paddling of such interim water gauge also limit the length of single water gauge, thus limits the water-level observation scope of single water gauge, and many interim water gauges need to be set up to increase water level range.Such interim water gauge operationally less stable, easily being destroyed by rush of water by flood, the seriality of hydrologic survey and degree of accuracy are all difficult to be protected.In sum, existing interim water gauge cannot meet the new demand of new period hydrologic survey job development, is unfavorable for carrying out smoothly of the work such as patrol gauging, hydrology emergency mobile test.
Summary of the invention
It is big that the purpose of this utility model is to solve existing interim water gauge installation difficulty, and poor stability is unfavorable for the problem carried out smoothly of the work such as patrol gauging, hydrology emergency mobile test, it is provided that a kind of exempts from the collapsible interim water gauge installed of paddling.
This utility model solves its technical problem and be the technical scheme is that a kind of collapsible interim water gauge exempted to paddle and install, including the main water gauge being vertically arranged and secondary water gauge, it is connected by main horizon bar between upper end and the blade of main water gauge of secondary water gauge, it is connected by secondary horizon bar between the lower end of main water gauge with the blade of secondary water gauge, main water gauge, main horizon bar, secondary water gauge, the place of being connected with each other of secondary horizon bar are hinged, form folding quadric chain.Under deployed condition, main horizon bar and secondary horizon bar are in horizontal level, and secondary water gauge is positioned at the side of main water gauge and less than main water gauge.When therefore installing, it is not necessary to paddle, select the ground of relatively flat on riverbank, the bottom of main water gauge fixed on the ground, and make secondary water gauge towards side, river course, main water gauge installation.When water level is relatively low, pair water gauge launches to extend downwardly into measurement water level in water;When river water level increases to need main water gauge to carry out reading, secondary water gauge can be folded and regain, utilize main water gauge reading.
As preferably, it is provided with location bar between described main horizon bar and main water gauge, location bar is obliquely installed, in the middle part of location bar lower end and main horizon bar hinged, main water gauge is provided with the chute extended up and down, bar upper end, location is slidably arranged in chute, and when bar upper end, location is positioned at chute bottom, main horizon bar is horizontal.Location pole pair horizon bar open position carries out spacing, it is ensured that main horizon bar level during deployed condition.
As preferably, the Upper vertical of described chute is offered, and lower end is to secondary water gauge one lateral buckling.Avoid positioning bar upper end dieback.
As preferably, described main water gauge is provided with, towards the side opening of secondary water gauge, the groove that the secondary water gauge of receiving folds.
As preferably, the upper end of the most through main water gauge of described groove, main horizon bar includes two parallel shafts, and main horizon bar one end is articulated with the both sides outer wall of main water gauge blade, the other end is articulated with the both sides outer wall of secondary water gauge upper end, under folded state, the upper end of secondary water gauge is beyond the upper end of main water gauge.Folding and the process of expansion, main horizon bar two bar status does not swing in the external sync of main water gauge and secondary water gauge both sides, it is to avoid interfere.
As preferably, secondary horizon bar includes that two parallel shafts, secondary horizon bar one end are articulated with the both sides inwall of main water gauge groove lower end, and the other end is articulated with the outer wall of secondary water gauge blade both sides, and under folded state, secondary horizon bar is taken in the groove of main water gauge with secondary water gauge.Secondary two shafts of horizon bar be arranged in parallel, and during folding, secondary water gauge is embedded between two shafts, it is to avoid produces and interferes.
As preferably, described main horizon bar one end hinged with main water gauge continues to extend along main horizon bar axis direction, forms manipulator's handle.
As preferably, described main water gauge is provided with circular bubble.
As preferably, the bottom of described main water gauge is provided with leveling base plate, and leveling base plate connects ground by the steel nail that buries.
As preferably, the lower end of described secondary water gauge is connected by dismountable adaptor prolongation water gauge.
This utility model utilizes folding main water gauge and secondary Water gage structure, launches to carry out low water level state measurement without installation of paddling, utilization pair water gauge when installing water gauge;May utilize again main water gauge during high water level to measure, easy for installation, measure flexibility and reliability.
Accompanying drawing explanation
Fig. 1 is this utility model one structure deployed condition schematic diagram.
Fig. 2 is this utility model deployed condition side-looking structural representation.
Fig. 3 is this utility model folded state side-looking structural representation.
In figure: the most main water gauge, 2. secondary water gauge, the most main horizon bar, 4. secondary horizon bar, 5. location bar, 6. slide-bar, 7. integral type jointed shaft, the most split type jointed shaft, 9. circular bubble, 10. leveling base plate, 11. bury steel nail, 12. adaptors, 13. extend water gauge, 14. chutes, 15. grooves, 16. manipulator's handles.
Detailed description of the invention
Below by specific embodiment and combine accompanying drawing this utility model is further illustrated.
Embodiment: a kind of collapsible interim water gauge installed of paddling of exempting from, as shown in Figure 1.This device includes main water gauge 1 and the pair water gauge 2 being vertically arranged, it is connected by main horizon bar 3 between upper end and the blade of main water gauge 1 of secondary water gauge 2, it is connected by secondary horizon bar 4 between the lower end of main water gauge 1 with the blade of secondary water gauge 2, main water gauge, main horizon bar, secondary water gauge, the place of being connected with each other of secondary horizon bar are hinged, form folding quadric chain.As shown in Figure 2, location bar 5 it is provided with between main horizon bar 1 and main water gauge 3, location bar is obliquely installed, bar lower end, location is hinged in the middle part of both sides with main horizon bar 3 respectively by split type jointed shaft 8, and main water gauge 1 is provided with the chute 14 extended up and down, the two sides of the through main water gauge of chute, bar 5 upper end, location is provided with slide-bar 6, slide-bar is slidably arranged in chute, and when slide-bar is positioned at chute bottom, main horizon bar is exactly in horizontal level.The top of chute is for vertically to offer, and the bottom of chute is to the arc bending of secondary water gauge side.
Main water gauge is provided with groove 15 towards the side opening of secondary water gauge, the through whole main water gauge in groove 15 upper end.The vertical section on chute top is positioned at outside groove, it is to avoid when folding, slide-bar produces with secondary water gauge and interferes.As it is shown in figure 1, main horizon bar 3 closed-in construction that to be two shafts parallel, main horizon bar 3 uses split type jointed shaft 8 hinged with the two side of main water gauge;Main horizon bar 3 uses integral type jointed shaft 7 to run through the upper end thereof of secondary water gauge two side and secondary water gauge, one end that main horizon bar 3 is connected with main water gauge continues to extend formation manipulator 16, two shafts are also connected by the upwards 90 degree of bendings of the end of manipulator's handle by cross bar, form downward draw-in groove, during folding, draw-in groove obvolvent is in the outside of main water gauge, and secondary water gauge upper end is higher than main water gauge upper end after folding.Secondary horizon bar 4 includes two parallel shafts, secondary horizon bar one end is articulated with the both sides inwall of main water gauge groove lower end, the other end is articulated with the outer wall of secondary water gauge blade both sides, under folded state, secondary horizon bar is taken in the groove of main water gauge with secondary water gauge, and secondary horizon bar two bar body lays respectively between both sides and the groove cell wall of secondary water gauge.
The blade of main water gauge 1 is provided with circular bubble 9.The bottom of main water gauge is provided with leveling base plate 10, and leveling base plate is provided with the bury steel nail 11 fixing with ground.The lower end of secondary water gauge is connected by dismountable adaptor 12 prolongation water gauge 13, can choose whether that installation extends water gauge according to the height of actual water level.
During installation, select the ground of relatively flat on the riverbank in river course, main water gauge is fixed on the ground and carries out leveling, make main water gauge keep vertical state, and keep secondary water gauge side towards river course.When river water level is relatively low, secondary water gauge is utilized to measure water level, as in figure 2 it is shown, under deployed condition, bar upper end, location is slipped to the bottom of chute, main horizon bar and secondary horizon bar and is horizontally situated, and secondary water gauge reaches in the water body in river course from the side of main water gauge is lateral;When the river course water surface increases to the height of main water gauge, secondary water gauge can be folded and regain, main water gauge is utilized to measure water level, as it is shown on figure 3, under folded state, bar upper end, location slides into the top of chute, and in the groove of the pair water gauge main water gauge of income, and the top of pair water gauge is higher than the top of main water gauge, two shafts of main horizon bar are positioned at outside main water gauge two side, and two shafts of secondary horizon bar are embedded between both sides outer wall and the groove inner wall of secondary water gauge.

Claims (10)

1. exempt from the collapsible interim water gauge installed of paddling for one kind, it is characterized in that, including the main water gauge being vertically arranged and secondary water gauge, it is connected by main horizon bar between upper end and the blade of main water gauge of secondary water gauge, it is connected by secondary horizon bar between the lower end of main water gauge with the blade of secondary water gauge, main water gauge, main horizon bar, secondary water gauge, the place of being connected with each other of secondary horizon bar are hinged, form folding quadric chain.
The collapsible interim water gauge installed of exempting to paddle the most according to claim 1, it is characterized in that: between described main horizon bar and main water gauge, be provided with location bar, location bar is obliquely installed, in the middle part of location bar lower end and main horizon bar hinged, main water gauge is provided with the chute extended up and down, bar upper end, location is slidably arranged in chute, and when bar upper end, location is positioned at chute bottom, main horizon bar is horizontal.
The collapsible interim water gauge installed of exempting to paddle the most according to claim 2, it is characterised in that: the Upper vertical of described chute is offered, and lower end is to secondary water gauge one lateral buckling.
4. paddle the collapsible interim water gauge installed according to exempting from described in claim 1 or 2 or 3, it is characterised in that: described main water gauge is provided with towards the side opening of secondary water gauge and accommodates the groove that secondary water gauge folds.
The collapsible interim water gauge installed of exempting to paddle the most according to claim 4, it is characterized in that: the upper end of the most through main water gauge of described groove, main horizon bar includes two parallel shafts, main horizon bar one end is articulated with the both sides outer wall of main water gauge blade, the other end is articulated with the both sides outer wall of secondary water gauge upper end, under folded state, the upper end of secondary water gauge is beyond the upper end of main water gauge.
The collapsible interim water gauge installed of exempting to paddle the most according to claim 4, it is characterized in that: secondary horizon bar includes two parallel shafts, secondary horizon bar one end is articulated with the both sides inwall of main water gauge groove lower end, the other end is articulated with the outer wall of secondary water gauge blade both sides, under folded state, secondary horizon bar is taken in the groove of main water gauge with secondary water gauge.
7. paddle the collapsible interim water gauge installed according to exempting from described in claim 1 or 2 or 3, it is characterised in that: described main horizon bar one end hinged with main water gauge continues to extend along main horizon bar axis direction, formation manipulator's handle.
8. according to exempting from described in claim 1 or 2 or 3 paddle install collapsible interim water gauge, it is characterised in that: described main water gauge is provided with circular bubble.
9. according to exempting from described in claim 1 or 2 or 3 paddle install collapsible interim water gauge, it is characterised in that: the bottom of described main water gauge is provided with leveling base plate, leveling base plate by bury steel nail connect ground.
10. paddle the collapsible interim water gauge installed according to exempting from described in claim 1 or 2 or 3, it is characterised in that: there is prolongation water gauge the lower end of described secondary water gauge by the connection of dismountable adaptor.
CN201620313950.4U 2016-04-15 2016-04-15 Exempt from to paddle foldable interim water gauge of installation Active CN205561975U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620313950.4U CN205561975U (en) 2016-04-15 2016-04-15 Exempt from to paddle foldable interim water gauge of installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620313950.4U CN205561975U (en) 2016-04-15 2016-04-15 Exempt from to paddle foldable interim water gauge of installation

Publications (1)

Publication Number Publication Date
CN205561975U true CN205561975U (en) 2016-09-07

Family

ID=56807931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620313950.4U Active CN205561975U (en) 2016-04-15 2016-04-15 Exempt from to paddle foldable interim water gauge of installation

Country Status (1)

Country Link
CN (1) CN205561975U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7025133B2 (en) 2017-06-06 2022-02-24 積水化学工業株式会社 Field sensor

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7025133B2 (en) 2017-06-06 2022-02-24 積水化学工業株式会社 Field sensor

Similar Documents

Publication Publication Date Title
CN206638629U (en) A kind of underwater bridge pier detection means
CN205561975U (en) Exempt from to paddle foldable interim water gauge of installation
CN203534596U (en) Portable high-precision template perpendicularity detection device
CN105423880B (en) A kind of method for hanging main push-towing rope measurement deflection of bridge span
CN111005412A (en) Centering device, structure and installation method for pile foundation reinforcement cage installation
CN203113388U (en) Device for detecting hole digging pile hole-forming quality
CN214149510U (en) Water level detection device for hydraulic design of port channel
CN105953698A (en) Floor thickness measuring tool and measuring method
CN217331126U (en) Bridge foundation settlement difference observation device
CN203514368U (en) Side slope detection work platform
CN207423709U (en) A kind of concrete rigidity detection device
CN214843214U (en) Water depth detection device for underwater surveying and mapping
CN213517148U (en) Cement for hydraulic engineering antidetonation detection device that collapses
CN108982249A (en) Prevent the lever direct shear apparatus and its test method of upper and lower shear box relative tilt
CN114858112A (en) River course revetment safety integrated monitoring station and monitoring method thereof
CN104266633B (en) Reinforced concrete pole vertical gauge and the method to electric pole correction
CN210108371U (en) Engineering survey sighting rod
CN210070889U (en) Dam crest core wall horizontal displacement monitoring devices
CN209231341U (en) A kind of working performance of self-compacting concrete test device
CN208073518U (en) A kind of mine anti-collapse safety alarm device of borehole wall attaching type
CN106088538A (en) Window frame auxiliary installation device
CN208026267U (en) A kind of levelling rod placement handle
CN207231460U (en) The mounting structure of engineering surveying instrument Sopwith staff
CN207891875U (en) A kind of detection soil nailing
CN205209499U (en) Construct perpendicular detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 310009, Hangzhou, Zhejiang city on the road 72 St.

Patentee after: Zhejiang Hydrological Management Center

Address before: 310009, Hangzhou, Zhejiang city on the road 72 St.

Patentee before: ZHEJIANG HYDROLOGY BUREAU

CP01 Change in the name or title of a patent holder