CN205557965U - Steel construction conversion layer furred ceiling - Google Patents

Steel construction conversion layer furred ceiling Download PDF

Info

Publication number
CN205557965U
CN205557965U CN201620097497.8U CN201620097497U CN205557965U CN 205557965 U CN205557965 U CN 205557965U CN 201620097497 U CN201620097497 U CN 201620097497U CN 205557965 U CN205557965 U CN 205557965U
Authority
CN
China
Prior art keywords
steel
conversion layer
furred ceiling
muscle
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620097497.8U
Other languages
Chinese (zh)
Inventor
马有科
云卫涛
官瑞杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Haili Living Technology Co., Ltd
Original Assignee
Qingdao Haier Household Integration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Haier Household Integration Co Ltd filed Critical Qingdao Haier Household Integration Co Ltd
Priority to CN201620097497.8U priority Critical patent/CN205557965U/en
Application granted granted Critical
Publication of CN205557965U publication Critical patent/CN205557965U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a steel construction conversion layer furred ceiling, including I -steel owner girder steel, gypsum board, set up the conversion layer between I -steel owner girder steel and the gypsum board, the conversion layer includes in proper order from top to bottom that I -steel fastener, the first muscle, steel pipe, second of hanging hang muscle, main joist, false keel. The utility model discloses according to the adoption steel construction conversion layer of furred ceiling standard requirement novelty, the gypsum board is fixed to the adoption conversion layer, avoids the welding of I -steel owner girder steel, and hang the muscle simultaneously and adopt the silk to connect the construction with the I -steel, construction convenience, simple and direct, the firmness is high after the completion of constructing in addition.

Description

A kind of steel construction conversion layer furred ceiling
Technical field
This utility model relates to a kind of steel construction conversion layer furred ceiling.
Background technology
Construction quality and site safety civilized construction are required the highest by Modern Decorative engineering, and integral construction region is big, finishing class is high, interface is many and complicated, acceptance criteria is strict for decoration.Such as, being i-beam structure building for original structure end face, main joist hangs muscle and cannot take root supports, hangs muscle narrow with I-steel contact surface, and constructs and do not allow to be directly welded on I-steel, welds and is easily damaged main steel beam structure stability;In view of draught, the blast impact on top, construction it is also contemplated that fastness problem.It is badly in need of at present wanting a kind of suitably construction method to solve the problems referred to above.
Summary of the invention
This utility model provides a kind of steel construction conversion layer furred ceiling, and this conversion layer furred ceiling meets construction requirement, and easy construction, steadiness is high.
In order to solve above-mentioned technical problem, the technical solution of the utility model is:
A kind of steel construction conversion layer furred ceiling, including the main girder steel of I-steel, plasterboard, arranging conversion layer between the main girder steel of described I-steel and plasterboard, described conversion layer includes I-steel fastener the most successively, first hangs muscle, steel pipe, second hangs muscle, main joist, false keel.
Further, arranging connector between described main joist and false keel, described plasterboard is screwed on described false keel.
Further, described I-steel fastener is installed on the two ends of described I-steel main girder steel bottom.Described I-steel fastener is that I-steel customizes special wire connection fastener.
Further, described first upper end hanging muscle has screw thread, and is fixed on described I-steel fastener by nut, and lower end is fixed with described steel-pipe welding.
Described first upper end hanging muscle arranges double nut, increases steadiness.
Further, described second hangs muscle upper end fixes with described steel-pipe welding, and lower end is fixed with described main joist wire connection.
Further, described plasterboard is double-deck.
This utility model is according to the employing steel construction conversion layer of furred ceiling code requirement novelty, use conversion layer to fix plasterboard, it is to avoid the welding of the main girder steel of I-steel, hang muscle simultaneously and use wire connection construction with I-steel, easy construction, simple and direct, and rear firmness of having constructed is high.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Fig. 1 is the sectional view of steel construction conversion layer furred ceiling specific embodiment described in the utility model;
Fig. 2 is partial enlarged drawing at the A of Fig. 1;
Symbol in figure and explanation thereof:
1, the main girder steel of I-steel;2, double-deck plasterboard;3, I-steel fastener;4, first muscle is hung;41, double nut;5, steel pipe;6, second muscle is hung;7, main joist;8, false keel;9, connector.
Detailed description of the invention
In order to make the purpose of utility model, technical scheme and advantage clearer, below in conjunction with drawings and Examples, this utility model is described in further detail.Should be appreciated that embodiment described herein, only in order to explain this utility model, is not used to limit this utility model.
With reference to shown in Fig. 1, this embodiment is a kind of steel construction conversion layer furred ceiling, it is the former top of i-beam structure for original structure, including the main girder steel of I-steel 1, double-deck plasterboard 2, arranging conversion layer between the main girder steel of I-steel 1 and double-deck plasterboard 2, this conversion layer includes the most successively: I-steel fastener 3, first hangs muscle 4, steel pipe 5, second hang muscle 6, main joist 7, connector 9, false keel 8.Wherein, I-steel fastener 3 is installed on the two ends of I-steel main girder steel 1 bottom, and the first upper end hanging muscle 4 has screw thread, and be fixed on I-steel fastener 3 by double nut 41, lower end is welded and fixed with steel pipe 5, and the first upper end hanging muscle 4 arranges double nut 41, increases steadiness.Second hangs muscle 6 upper end is welded and fixed with steel pipe 5, and lower end is fixed with main joist 7 wire connection.Arranging connector 9 between main joist 7 and false keel 8, connector 9 is L-type, is wherein hooked on main joist 7, and the two ends of another side are provided with hook, and are hooked on false keel 8 by the hook at two ends.Double-deck plasterboard 2 is screwed on false keel 8.
Wherein, steel pipe 5 is square tube, and specification is 40mm*80mm, and square tube spacing is 800mm 1200mm;First hang muscle 4, the second diameter hanging muscle 6 is 8mm;Main joist 7 spacing 800mm 1200mm, false keel 8 spacing 300mm.
As in figure 2 it is shown, I-steel fastener 3 customizes special wire connection fastener for I-steel, its body having screwed hole, the bottom in card dress portion is provided with holding screw.When specifically applying, the edge part of parcel I-steel main girder steel 1 bottom, card dress portion, then first end of thread hanging muscle 4 is fixed through screwed hole by double nut 41, then is fastened on the main girder steel of I-steel 1 with holding screw.
Concrete construction method:
(1) I-steel fastener 3 is fixed on the main girder steel of I-steel 1;
(2) being hung muscle 4 by first be fixed on I-steel fastener 3 by double nut 41, first hangs that muscle 4 is suitable for reading must be fixed by double nut;
(3) first hang the employing of muscle 4 end opening is welded and fixed steel pipe 5;
(4) steel pipe 5 hangs muscle 6 according to job specfication welding second, is used for fixing main joist;
(5) second hang muscle 6 end opening is progressively installed main joist 7, connector 9, false keel 8 by construction technology.
In this embodiment, using the switching of I-steel fastener, it is to avoid the welding of the main girder steel of I-steel, first hang muscle and I-steel employing wire connection construction simultaneously, easy construction, rear firmness of having constructed is high, and the setting of steel pipe simultaneously adds the stability of structure.
The above, it it is only preferred embodiment of the present utility model, being not the restriction that this utility model is made other form, any those skilled in the art are changed possibly also with the technology contents of the disclosure above or are modified as the Equivalent embodiments of equivalent variations.But every without departing from technical solutions of the utility model content, any simple modification, equivalent variations and remodeling above example made according to technical spirit of the present utility model, still fall within the protection domain of technical solutions of the utility model.

Claims (7)

1. a steel construction conversion layer furred ceiling, including the main girder steel of I-steel, plasterboard, it is characterized in that: arrange conversion layer between the main girder steel of described I-steel and plasterboard, described conversion layer includes I-steel fastener the most successively, first hangs muscle, steel pipe, second hangs muscle, main joist, false keel.
Steel construction conversion layer furred ceiling the most according to claim 1, it is characterised in that: arranging connector between described main joist and false keel, described plasterboard is screwed on described false keel.
Steel construction conversion layer furred ceiling the most according to claim 1, it is characterised in that: described I-steel fastener is installed on the two ends of described I-steel main girder steel bottom.
Steel construction conversion layer furred ceiling the most according to claim 3, it is characterised in that: described first upper end hanging muscle has screw thread, and is fixed on described I-steel fastener by nut, and lower end is fixed with described steel-pipe welding.
Steel construction conversion layer furred ceiling the most according to claim 4, it is characterised in that: described first upper end hanging muscle arranges double nut.
Steel construction conversion layer furred ceiling the most according to claim 1, it is characterised in that: described plasterboard is double-deck.
Steel construction conversion layer furred ceiling the most according to claim 1, it is characterised in that: described second hangs muscle upper end fixes with described steel-pipe welding, and lower end is fixed with described main joist wire connection.
CN201620097497.8U 2016-02-01 2016-02-01 Steel construction conversion layer furred ceiling Expired - Fee Related CN205557965U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620097497.8U CN205557965U (en) 2016-02-01 2016-02-01 Steel construction conversion layer furred ceiling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620097497.8U CN205557965U (en) 2016-02-01 2016-02-01 Steel construction conversion layer furred ceiling

Publications (1)

Publication Number Publication Date
CN205557965U true CN205557965U (en) 2016-09-07

Family

ID=56821394

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620097497.8U Expired - Fee Related CN205557965U (en) 2016-02-01 2016-02-01 Steel construction conversion layer furred ceiling

Country Status (1)

Country Link
CN (1) CN205557965U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265872A (en) * 2018-01-26 2018-07-10 中建八局装饰工程有限公司 A kind of furred ceiling conversion layer main joist integrative installation technology method
CN116065750A (en) * 2023-03-06 2023-05-05 山西五建集团有限公司 Steel structure multifunctional hall wavy aluminum plate suspended ceiling and modularized installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108265872A (en) * 2018-01-26 2018-07-10 中建八局装饰工程有限公司 A kind of furred ceiling conversion layer main joist integrative installation technology method
CN116065750A (en) * 2023-03-06 2023-05-05 山西五建集团有限公司 Steel structure multifunctional hall wavy aluminum plate suspended ceiling and modularized installation method thereof
CN116065750B (en) * 2023-03-06 2023-06-06 山西五建集团有限公司 Steel structure multifunctional hall wavy aluminum plate suspended ceiling and modularized installation method thereof

Similar Documents

Publication Publication Date Title
CN205557965U (en) Steel construction conversion layer furred ceiling
CN206607737U (en) A kind of flash batten furred ceiling
CN209891528U (en) Steel frame conversion layer assembled mounting structure of ultrahigh space ceiling
CN204781543U (en) Double layer plaster tablet furred ceiling structure
CN106088514B (en) A kind of stone material dry suspending slabstone fixed structure with high anti-seismic function
CN206110589U (en) Stone cladding process slabstone fixed knot constructs with high anti -shock function
CN204826462U (en) Building upturned eaves subassembly
CN204112703U (en) A kind of treadle of false work with enhancing structure for building
CN202611077U (en) Light steel keel boom back supporting member
CN201406782Y (en) Baking paint keel hung ceiling system
CN207484991U (en) A kind of glass curtain wall monorail hoisting structure
CN204435859U (en) Be exclusively used in the moveable platform of high-rise concrete construction of lift well
CN206737245U (en) A kind of suspended ceiling reverse support structure
CN206110437U (en) Hung ceiling
CN206016296U (en) A kind of level chooses net anchor ring
CN205531257U (en) Installing support for building site
CN204899109U (en) Wall decoration board hang component futilely
CN204645368U (en) The dark keel of a kind of corridor
CN102758537A (en) Construction method for timberwork buildings
CN204781677U (en) No girder steel point type glass canopy
CN210949441U (en) Nail is fixed with hanging net to construction
CN206903029U (en) Furred ceiling gypsum molding line fixed structure
CN204403567U (en) One can have enough to meet the need concrete pump pipe fixing device
CN2191900Y (en) Cradle triangle support
CN211341692U (en) Anchor beam type hanging basket

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 266300 Youzhu Smart Home Industrial Park, Jiaozhou economic and Technological Development Zone, Qingdao, Shandong Province

Patentee after: Qingdao Haili Living Technology Co., Ltd

Address before: 266000 Haier Industrial Park, hi tech Industrial Park, Shandong, Qingdao

Patentee before: QINGDAO HAIER HOME INTEGRATION Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20210201