CN205551003U - New installation of stifled pipe of waste filling mediation - Google Patents

New installation of stifled pipe of waste filling mediation Download PDF

Info

Publication number
CN205551003U
CN205551003U CN201620007421.1U CN201620007421U CN205551003U CN 205551003 U CN205551003 U CN 205551003U CN 201620007421 U CN201620007421 U CN 201620007421U CN 205551003 U CN205551003 U CN 205551003U
Authority
CN
China
Prior art keywords
pipeline
filling
valve
accident
forcing press
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620007421.1U
Other languages
Chinese (zh)
Inventor
孔贺
张新国
王昌祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201620007421.1U priority Critical patent/CN205551003U/en
Application granted granted Critical
Publication of CN205551003U publication Critical patent/CN205551003U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Paper (AREA)

Abstract

The utility model provides a new installation of stifled pipe of waste filling mediation belongs to colliery mining with filling field. The device mainly includes forced press, pull -out type press, pipeline control valve, fills the pipeline, thick liquid valve, connection elbow, spare pipeline are arranged to the accident. During filling stifled pipe, fill the pipeline with forced press and upper portion and be connected through filling the return bend, the pull -out type press is connected with spare pipeline, and coupling part passes through resistance -increasing packing ring, fastening bolt and increases seal for pipe joints nature, closes through pipeline control valve realization lower part pipeline, and spare pipeline opens. During normally filling, dump the pull -out type press, accident row thick liquid valve passes through fastening bolt with spare pipeline, the resistance -increasing packing ring is connected. During stifled pipe occurence of failure, through pressure differential about in forced press and the pull -out type press combined action increase pipeline to the mediation of realization pipeline has reduced the waste of filling the ground paste, has practiced thrift and has filled the cost, and mining with filling is significant to the colliery.

Description

A kind of new equipment of waste filling dredging plugging
Technical field
The utility model belongs to coal mine filling exploitation field, is specifically related to a kind of a kind of new equipment solving filling mining vertical pipeline jam accident.
Background technology
For realizing the safe efficient exploitation of " three times " coal resources, it is necessary to the series of problems exposing filling mining carries out in-depth study.Solid-liquid two-phase flow slip pipeline pipeline jam accident, being one needs further investigation and the technical barrier solved all the time with in practice in theory.Impurity removing is mixed into outside line clogging, and major part filling shaft plugging then occurs isolation precipitation to cause due to slip.
Prior art mainly utilizes top filling pipe water flood, pressurization to solve vertical pipeline jam accident, but there is certain drawback in existing method.Such as, water flood can not be solved the serious pipeline jam accident of bulky grain by influence of hydraulic pressure;It is big to there is pressure in pressurization, and danger coefficient is high, the problem of filling slurry waste.Existing method all can not reclaim slip, causes filling slurry to waste, adds filling cost.Therefore, the new equipment studying a kind of waste filling dredging plugging can be that on-the-spot pipeline jam accident solves to provide correct guidance.
Summary of the invention
In order to solve above-mentioned problems of the prior art, the utility model proposes the new equipment of a kind of waste filling dredging plugging, this monitoring device realizes pipe-dredging by the way of two-way pressure machine acts on increase pressure reduction jointly.
The utility model provides the new equipment of a kind of waste filling dredging plugging, and its technical scheme includes:
The new equipment of a kind of waste filling dredging plugging, including forced forcing press, pull-out type forcing press, pipeline control valve, rotating valve, valve roating sphere, filling pipeline, accident pulp-expelling valve, bridge piece, increasing resistance packing ring, fastening bolt, backup line.
Described forced forcing press is connected with top filling pipe;Described pull-out type forcing press is connected with standby pipes;Described control valve can realize pipeline conducting and Guan Bi;The described resistance packing ring that increases can increase frictional force between bridge piece, keeps seal for pipe joints;Described accident pulp-expelling valve is tightened in filling standby pipes during filling pipe turns on.
Further, filling bend pipe is connected with filling shaft by fastening bolt, increasing resistance packing ring, thus is ensured seal for pipe joints by above-mentioned forced forcing press.
Further, pull-out type forcing press is connected with backup line, by sealing in pipeline by above-mentioned pull-out type forcing press by fastening bolt, increasing resistance packing ring, it is achieved pressure reduction up and down.
Further, described pipeline control valve is a kind of device that can control pipeline opening and closing, and pipeline control valve is made up of equal diameter hollow ball, rotating valve, during plugging, lower pipeline control valve being closed, upper tube control valve is opened, it is achieved pipeline conducting between two-way pressure machine.
The new equipment of described a kind of waste filling dredging plugging jointly acts on upper and lower pressure reduction in increasing pipeline by two-way pressure machine, it is achieved bulky grain, difficult conducting pipeline jam accident.Upper valve being closed after pipeline conducting, bottom valve opening decreases the wasting of resources again.
Further, described accident pulp-expelling valve is the flange identical with internal diameter of the pipeline of one side projection, has bolt hole at accident pulp-expelling valve another side periphery, by fastening bolt, increases the resistance packing ring realization connection with backup line.Design accident pulp-expelling valve end is prominent can increase the friction between accident pulp-expelling valve and backup line, prevents upper pressure from increasing damage accident pulp-expelling valve.
Further, above-mentioned each line connection realizes pipeline sealing by increasing resistance pad washer, fastening screw, it is ensured that upper and lower end parts pressure reduction in pipeline.
The Advantageous Effects that the utility model brings:
Compared with prior art, the utility model employing is forced, pull-out type forcing press jointly acts on and dredges plugging, upper and lower pressure reduction on the one hand increasing pipeline, advantageously accounts for slip and occurs precipitation to isolate the bulky grain pipeline jam accident caused;On the other hand, valve is controlled by closing lower pipeline, open backup line and control valve, forming single loop in can realizing pipeline, backup line control valve closed after pipeline is dredged, lower pipeline control valve is opened, the forced forcing press in top works on, thus it is delivered to filling operation face by remaining filling slurry in pipeline, effectively reduce the waste of filling slurry, save filling cost.
Accompanying drawing explanation
The present invention will be further described in detail with detailed description of the invention below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation of the new equipment of a kind of waste filling of the utility model dredging plugging;
Fig. 2 be a kind of waste filling of the utility model dredging plugging new equipment in the structural representation of installation accident pulp-expelling valve;
Fig. 3 be a kind of waste filling of the utility model dredging plugging new equipment in the structural representation of pipeline control valve;
Fig. 4 be a kind of waste filling of the utility model dredging plugging new equipment in the structural representation of accident pulp-expelling valve;
In figure, 1, forced forcing press;2, pull-out type forcing press;3, pipeline control valve;31, rotating valve;32, valve roating sphere;4, filling pipeline;5, resistance packing ring is increased;6, bridge piece;7, fastening bolt;8, accident pulp-expelling valve;9, backup line;
Detailed description of the invention
The utility model proposes the new equipment of a kind of waste filling dredging plugging, in order to make the purpose of this utility model, technical scheme and advantage become apparent from, clearly, below with reference to specific embodiment, the utility model is further described.
Shown in Fig. 1-4, the new equipment of a kind of waste filling of the utility model dredging plugging, mainly includes forced forcing press, pull-out type forcing press, pipeline control valve, rotating valve, valve roating sphere, filling pipeline, accident pulp-expelling valve, bridge piece, increasing resistance packing ring, fastening bolt, backup line.
Set the bolt hole of 4 φ 10mm at described each pipeline junction, by increasing resistance packing ring 5, pipeline is connected by fastening bolt 7.
When filling pipeline generation pipeline jam accident, first will be pressed into formula forcing press 1 by increasing resistance packing ring 5, fastening bolt 7 couples together with bridge piece 6 one end, is simultaneously connected with bend pipe 6 other end and is connected by increasing resistance packing ring 5, fastening bolt 7 with filling pipeline 4, thus it is airtight with upper pipe to realize forcing press.
During normal filling, described backup line 9 end is provided with accident pulp-expelling valve 8, its end is standing shape (as shown in Figure 4), this design increases pipeline and backup line inwall frictional force, improves pipeline explosion-proof during normal filling, it is ensured that filling security.
By accident pulp-expelling valve 8 removal when pipeline jam accident occurs, pull-out type forcing press 2 is connected with backup line 9 by increasing resistance packing ring 5, fastening bolt 7, thus is realized pipeline closed.
Described pipeline control valve 3 top is with rotating valve 31, and inside is the hollow valve roating sphere 32 identical with filling pipeline 4 internal diameter, (see Fig. 3), is realized the rotation of valve roating sphere 32 by rotating valve 31, and then realizes pipeline unlatching and Guan Bi.
By spanner, the pipeline control valve 3 of filling pipeline 4 bottom is closed when pipeline jam accident occurs, the pipeline control valve 3 on backup line 9 top is opened, on the premise of lower pipeline closes, realize the conducting of upper and lower pipeline, prevent forcing press air-flow from reducing pipeline sealing by lower pipeline circulation.
Opening with pull-out type forcing press 2 by described forced forcing press 1 simultaneously, increase pressure reduction in pipeline, solution filling plugging precipitates because of slip, there is bulky grain difficulty conducting accident;After filling pipeline turns on, the pipeline control valve 3 on backup line 9 top is closed, the pipeline control valve 3 of filling pipeline 4 bottom is opened, in making conducting pipeline, slip flows along normal filling circuit, owing to pipeline jam accident result in the precipitation of slip, upper pressure machine can be used to pressurize, ensure being normally carried out of filling operation, thus avoid the waste of filling slurry, save filling cost.Further, since this device is Guan Bi pipeline up and down, improve the security of filling pipeline conducting.
After pipeline turns on, on the premise of the control valve 3 on backup line 9 top is closed, by pull-out type forcing press 2 removal, accident pulp-expelling valve 8 is arranged on backup line 9 end.
Should be understood that; those of ordinary skill in the art is under enlightenment of the present utility model; in the case of without departing from the utility model scope of the claimed protection, it is also possible to making the various deformation such as replacement, simple combination, the scope that is claimed of the present utility model should be as the criterion with claims.

Claims (5)

1. the new equipment of a waste filling dredging plugging, including forced forcing press, pull-out type forcing press, pipeline control valve, filling pipeline, accident pulp-expelling valve, bridge piece, increase resistance packing ring, described forced forcing press is connected with top filling pipe, described pull-out type forcing press is connected with backup line, described control valve includes rotating valve and hollow valve roating sphere identical with internal diameter of the pipeline, pipeline conducting and Guan Bi can be realized, the described resistance packing ring that increases can increase frictional force between bridge piece, keep seal for pipe joints, described accident pulp-expelling valve is the flange lid of tip protrusion.
The new equipment of a kind of waste filling the most according to claim 1 dredging plugging, it is characterized in that: described forced forcing press is positioned at filling earth's surface, occur to be coupled together by fastening bolt with forced forcing press by filling shaft by filling bend pipe during filling pipeline jam accident, by increasing resistance packing ring increase pipeline closed between described forced forcing press and filling bend pipe.
The new equipment of a kind of waste filling the most according to claim 1 dredging plugging, it is characterized in that: described pull-out type forcing press is positioned at bottom filling shaft and is connected with backup line by fastening bolt with backup line, between backup line and pull-out type forcing press, it is lined with increasing resistance packing ring increases frictional force between the two, increase pipeline closed, it is ensured that pressure differential between the upper and lower two ends of pipeline simultaneously.
The new equipment of a kind of waste filling the most according to claim 1 dredging plugging, it is characterized in that: described pipeline control valve top is rotating valve, inside is valve roating sphere isodiametric with pipeline, valve roating sphere hollow, the rotation that can be realized valve roating sphere by rotating valve realizes pipeline opening and closing.
The new equipment of a kind of waste filling the most according to claim 1 dredging plugging, it is characterised in that: described accident pulp-expelling valve is a kind of backup line end flange dish, by fastening bolt, increases the resistance packing ring realization connection with backup line;Design accident pulp-expelling valve end is prominent can increase the friction between accident pulp-expelling valve and standby pipes, and during preventing top filling, manifold pressure increases pressure damage accident pulp-expelling valve.
CN201620007421.1U 2016-01-07 2016-01-07 New installation of stifled pipe of waste filling mediation Expired - Fee Related CN205551003U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620007421.1U CN205551003U (en) 2016-01-07 2016-01-07 New installation of stifled pipe of waste filling mediation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620007421.1U CN205551003U (en) 2016-01-07 2016-01-07 New installation of stifled pipe of waste filling mediation

Publications (1)

Publication Number Publication Date
CN205551003U true CN205551003U (en) 2016-09-07

Family

ID=56823779

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620007421.1U Expired - Fee Related CN205551003U (en) 2016-01-07 2016-01-07 New installation of stifled pipe of waste filling mediation

Country Status (1)

Country Link
CN (1) CN205551003U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185415A (en) * 2018-05-09 2019-08-30 中国科学院深海科学与工程研究所 Petroleum pipeline dredging system and dredging method
CN112978203A (en) * 2021-02-24 2021-06-18 襄阳和同利输送设备有限公司 Curved type splicing type sealing coal dropping pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110185415A (en) * 2018-05-09 2019-08-30 中国科学院深海科学与工程研究所 Petroleum pipeline dredging system and dredging method
CN110185415B (en) * 2018-05-09 2024-05-03 中国科学院深海科学与工程研究所 Petroleum pipeline dredging system and petroleum pipeline dredging method
CN112978203A (en) * 2021-02-24 2021-06-18 襄阳和同利输送设备有限公司 Curved type splicing type sealing coal dropping pipe

Similar Documents

Publication Publication Date Title
CN102561977B (en) High-pressure high-flow water burst hole drilling safety system, mounting process thereof and service process
CN104481580B (en) A kind of down-hole coal bed mash gas pumping drilling restorative procedure and the device of use thereof
CN205551003U (en) New installation of stifled pipe of waste filling mediation
CN205225131U (en) Hole digger is prevented spouting by sleeve pipe
CN204039979U (en) A kind of spilled water hole plugging device
CN205422624U (en) Coal seam infusion hole packer
CN201649099U (en) Grout injector metal casting
CN104564105A (en) Device and method for grouting and reinforcing secondary casing pipe of coal seam floor
CN207213171U (en) A kind of push-bench export & import sealing device
CN104110014B (en) Floating body flap valve
CN209261528U (en) One kind having pressure big flow water burst grouting plugging device
CN205955688U (en) Closed water pressure of reverse proper motion stopper device that blocks water
CN202500521U (en) High-pressure large flow water inrush borehole safety system
CN201318191Y (en) Central dewatering device for pumping drilling hole
CN215408747U (en) Drainage drilling integrated hole sealing and connecting device
CN206785711U (en) A kind of shaft seal structure of dredger slush pump
CN205045812U (en) Mechanical equipment tapping device and removal breaker
CN212317902U (en) Safe and environment-friendly slurry filling device for well drilling
CN217813489U (en) Anti-gushing device for shield machine in water-rich stratum
CN219119206U (en) Orifice closing device and shock wave generating system
CN202338669U (en) Coal mine paste filling overpressure unloading valve
CN203867516U (en) Grouting hole packer with air exhaust pipeline
CN204457843U (en) A kind of coal seam flooding hole sealing device
CN206738762U (en) A kind of oily gas industrial pipe screw thread attachment means
CN215257073U (en) Special balanced brake valve for excavator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160907

Termination date: 20170107