CN205548502U - Endoscope send water installation pincers way to connect - Google Patents
Endoscope send water installation pincers way to connect Download PDFInfo
- Publication number
- CN205548502U CN205548502U CN201620174975.0U CN201620174975U CN205548502U CN 205548502 U CN205548502 U CN 205548502U CN 201620174975 U CN201620174975 U CN 201620174975U CN 205548502 U CN205548502 U CN 205548502U
- Authority
- CN
- China
- Prior art keywords
- joint
- main joint
- valve core
- core seat
- water delivery
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Endoscopes (AREA)
Abstract
本实用新型公开了一种内窥镜送水装置钳道接头,包括主接头、压紧螺套、钳道口和送水接口,所述压紧螺套安装在主接头的一端外用于连接内窥镜,并在主接头连接压紧螺套的一端内装有密封套,所述主接头的另一端外装有钳道口用于连接钳类附件,所述送水接口安装在主接头的中部侧壁上,所述主接头连接钳道口的一端内装有第一阀芯座,在第一阀芯座内依次安装有鸭嘴式单向阀和钳道接头密封垫,并通过锁紧螺母锁紧在第一阀芯座的内腔中,所述钳道接头密封垫的内孔直径小于连接钳类附件的直径;所述送水接口通过第二阀芯座安装在主接头的中部侧壁上,在第二阀芯座的内腔中安装有鸭嘴式单向阀。防止水泵送水时钳道口出现泄漏,以及病人体内充气时胃和肠道的液体反流进送水管。
The utility model discloses a clamp channel joint of an endoscope water delivery device, which comprises a main joint, a compression screw sleeve, a clamp channel opening and a water delivery interface. The compression screw sleeve is installed outside one end of the main joint for connecting the endoscope. A sealing sleeve is installed inside one end of the main joint connected to the compression screw sleeve, and the other end of the main joint is equipped with a pliers gate for connecting pliers accessories. The water delivery interface is installed on the middle side wall of the main joint. The end of the main joint connected to the clamp channel is equipped with a first valve core seat, and a duckbill check valve and a clamp channel joint sealing gasket are installed in sequence in the first valve core seat, and are locked on the first valve core by a lock nut. In the inner cavity of the seat, the diameter of the inner hole of the clamp channel joint gasket is smaller than the diameter of the connecting clamp accessories; the water delivery interface is installed on the middle side wall of the main joint through the second valve core seat, and the second valve core A duckbill check valve is installed in the inner cavity of the seat. Prevents leaks from the jaws when the pump delivers water, and backflow of gastric and intestinal fluid into the delivery tube when the patient is inflated.
Description
技术领域 technical field
本实用新型涉及电子内窥镜技术领域,具体涉及一种电子内窥镜钳道口与内窥镜送水装置的接头结构。 The utility model relates to the technical field of electronic endoscope, in particular to a joint structure of an electronic endoscope clamp crossing and an endoscope water delivery device.
背景技术 Background technique
现有内窥镜送水装置钳道接头为三通管形式,主要由主接头、压紧螺套、钳道口和送水接口组成。压紧螺套安装在主接头的一端外用于连接内窥镜,在主接头连接压紧螺套的一端内装有密封垫,实现钳道接头与内窥镜的操作手柄密封。主接头的另一端外装有钳道口用于连接钳类附件,比如活检钳,钳类附件从钳道口插入,穿过主接头后再进入内窥镜操作手柄的钳道。送水接口安装在主接头的中部侧壁上,通过送水接口向内窥镜内送水。该三通管实现了送水和插活检钳等福建的同时进行,节省了病人检查时间,提高了医生检查效率。 Existing endoscope water delivery device clamp channel joint is a three-way pipe form, mainly is made up of main joint, compression screw sleeve, clamp channel mouth and water supply interface. The compression screw sleeve is installed outside one end of the main joint for connecting the endoscope, and a sealing gasket is installed in the end connected with the compression screw sleeve of the main joint to realize the sealing of the clamp channel joint and the operating handle of the endoscope. The other end of the main connector is equipped with a pliers port for connecting tong accessories, such as biopsy forceps. The pliers accessories are inserted from the pliers port, and then enter the pliers channel of the endoscope operating handle after passing through the main connector. The water delivery interface is installed on the middle side wall of the main joint, and water is delivered to the endoscope through the water delivery interface. The three-way tube realizes simultaneous water delivery and biopsy forceps insertion, which saves the examination time of the patient and improves the examination efficiency of the doctor.
但是,在使用过程中,出现了以下问题: However, during use, the following problems occurred:
(1)当水泵送水时,插附件的钳道口处由一个橡胶塞塞住以防止水从钳道口泄漏,但水泵送水时压力大,橡胶塞容易被送水时产生的压力冲开,从而导致送水失败,影响医生操作。 (1) When the water pump is sending water, the pincer opening of the plug-in accessory is blocked by a rubber plug to prevent water from leaking from the pinch opening, but the pressure is high when the water pump is sending water, and the rubber plug is easily washed away by the pressure generated during water delivery, resulting in water delivery. Failed, affecting the doctor's operation.
(2)当医生在病人体内充气时,充气后人体内气压高,此时就有肠胃里 的粘液、消化物等通过钳道接头反压进送水管内,污染送水管,影响医生使用。 (2) When the doctor inflates the patient's body, the air pressure in the human body will be high after inflation. At this time, the mucus and digested matter in the stomach will be back-pressed into the water supply pipe through the clamp joint, polluting the water supply pipe and affecting the doctor's use.
实用新型内容 Utility model content
本实用新型旨在提供一种内窥镜送水装置钳道接头,防止水泵送水时钳道口出现泄漏,以及病人体内充气时胃和肠道的液体反流进送水管。 The utility model aims to provide a clamp channel joint of an endoscope water delivery device, which can prevent the leakage of the clamp channel when the water pump sends water, and prevent the liquid from the stomach and intestinal tract from flowing back into the water delivery pipe when the patient's body is inflated.
为此,本实用新型所采用的技术方案为:一种内窥镜送水装置钳道接头,包括主接头、压紧螺套、钳道口和送水接口,所述压紧螺套安装在主接头的一端外用于连接内窥镜,并在主接头连接压紧螺套的一端内装有密封套,所述主接头的另一端外装有钳道口用于连接钳类附件,所述送水接口安装在主接头的中部侧壁上,所述主接头连接钳道口的一端内装有第一阀芯座,在第一阀芯座内依次安装有鸭嘴式单向阀和钳道接头密封垫,并通过锁紧螺母锁紧在第一阀芯座的内腔中,所述钳道接头密封垫的内孔直径小于连接钳类附件的直径;所述送水接口通过第二阀芯座安装在主接头的中部侧壁上,在第二阀芯座的内腔中安装有鸭嘴式单向阀。 For this reason, the technical solution adopted by the utility model is: a clamp channel joint of an endoscope water delivery device, including a main joint, a compression screw sleeve, a clamp channel mouth and a water supply interface, and the compression screw sleeve is installed on the main joint One end is used to connect the endoscope, and a sealing sleeve is installed on the end of the main joint connected to the compression screw sleeve. The other end of the main joint is equipped with a pliers gate for connecting pliers accessories. The water supply interface is installed on the main joint On the side wall of the middle part of the main joint, the first valve core seat is installed in the end of the main joint connected to the pincer channel mouth, and the duckbill type check valve and the pincer channel joint sealing gasket are sequentially installed in the first valve core seat, and are locked by locking The nut is locked in the inner cavity of the first valve core seat, and the diameter of the inner hole of the clamp channel joint sealing gasket is smaller than the diameter of the connecting clamp accessories; the water delivery interface is installed on the middle side of the main joint through the second valve core seat On the wall, a duckbill check valve is installed in the cavity of the second valve core seat.
作为上述方案的优选,所述压紧螺套与主接头通过双头螺纹拧紧,压紧螺套的外端收口部与密封垫的外端挤压贴合;所述第一阀芯座置于主接头内,第一阀芯座的外侧端通过钳道口挡住,且第一阀芯座与主接头之间设置有密封圈,防止水从第一阀芯座与主接头配合的地方溢出;所述主接头与钳道口、主接头与第二阀芯座、第二阀芯座与送水接口采用螺纹连接或扣位粘胶或塑料超声波焊接。优化结构布置,使整体结构紧凑,并确保密封。 As a preference of the above scheme, the compression screw sleeve and the main joint are tightened by double-ended threads, and the outer end of the compression screw sleeve and the outer end of the gasket are extruded and bonded; the first valve core seat is placed In the main joint, the outer end of the first valve core seat is blocked by the pincer crossing, and a sealing ring is arranged between the first valve core seat and the main joint to prevent water from overflowing from the place where the first valve core seat matches the main joint; The main joint and the pincer crossing, the main joint and the second valve core seat, and the second valve core seat and the water delivery interface are threaded or buckled by viscose or plastic ultrasonic welding. Optimize the structure layout to make the overall structure compact and ensure sealing.
进一步,所述送水接口为鲁尔圆锥接头。相应地,送水管一端为外圆锥接头,通过鲁尔接头连接保证了送水接口处的密封连接。 Further, the water delivery interface is a luer conical joint. Correspondingly, one end of the water delivery pipe is an outer conical joint, which is connected through a Luer joint to ensure a sealed connection at the water delivery interface.
本实用新型的有益效果: The beneficial effects of the utility model:
(1)在送水接口上增加第二阀芯座用于安装鸭嘴式单向阀,当医生给体内充气时,通过鸭嘴式单向阀来控制胃和肠道的液体反流进送水管; (1) A second valve core seat is added to the water supply interface to install a duckbill one-way valve. When the doctor inflates the body, the duckbill one-way valve is used to control the backflow of liquid from the stomach and intestinal tract into the water supply pipe ;
(2)在主接头连接钳道口的一端内增加第一阀芯座用于安装鸭嘴式单向阀和钳道接头密封垫,并通过锁紧螺母锁紧,当水泵送水且没使用附件时,主接头内的鸭嘴式单向阀起到截止水从钳道口泄漏的作用;当水泵送水且钳道口有附件插入时,附件使主接头内的鸭嘴式单向阀张开,这时密封的功能靠钳道接头密封垫密封,内孔直径小于连接钳类附件的直径,附件与钳道接头密封垫挤压形成密封,从而达到附件与送水功能同时使用的功能。 (2) The first valve core seat is added to the end where the main joint is connected to the clamp channel to install the duckbill check valve and the clamp channel joint gasket, and it is locked by the lock nut. When the water is pumped and no accessories are used , the duckbill one-way valve in the main joint plays the role of blocking water leakage from the jaws; when the water is pumped and an accessory is inserted into the jaws, the accessories will open the duckbill one-way valve in the main joint, at this time The sealing function is sealed by the gasket of the clamp channel joint. The diameter of the inner hole is smaller than the diameter of the connecting clamp accessory.
附图说明 Description of drawings
图1为本实用新型的剖视图。 Fig. 1 is a sectional view of the utility model.
图2为本实用新型的立体图。 Fig. 2 is a perspective view of the utility model.
图3为本实用新型的分解示意图。 Fig. 3 is an exploded schematic view of the utility model.
图4为本实用新型的使用状态图。 Fig. 4 is the use status diagram of the utility model.
具体实施方式 detailed description
下面通过实施例并结合附图,对本实用新型作进一步说明: Below by embodiment and in conjunction with accompanying drawing, the utility model is further described:
结合图1—图3所示,一种内窥镜送水装置钳道接头,主要由主接头1、压紧螺套2、钳道口3、送水接口4、密封套5、第一阀芯座6、鸭嘴式单向阀7、钳道接头密封垫8、锁紧螺母9、第二阀芯座10和密封圈11组成。 As shown in Fig. 1-Fig. 3, an endoscope water delivery device clamp channel joint mainly consists of a main joint 1, a compression screw sleeve 2, a clamp channel opening 3, a water supply interface 4, a sealing sleeve 5, and a first valve core seat 6 , Duckbill type one-way valve 7, pliers channel joint gasket 8, lock nut 9, second valve core seat 10 and sealing ring 11 are composed.
压紧螺套2安装在主接头1的一端外用于连接内窥镜12(结合图4所示),在主接头1连接压紧螺套2的一端内装有密封套5。主接头1的另一端外装有钳道口3用于连接钳类附件,如活检钳。送水接口4安装在主接头1的中部侧壁上,整个内窥镜送水装置钳道接头类似三通管的形式。以上所述与现有 结构相同,在此不再赘述。 The compression screw sleeve 2 is installed outside an end of the main joint 1 for connecting the endoscope 12 (shown in conjunction with FIG. 4 ), and a sealing sleeve 5 is housed in the end where the main joint 1 connects the compression screw sleeve 2 . The other end of the main connector 1 is equipped with a pincer opening 3 for connecting pincer accessories, such as biopsy forceps. The water delivery interface 4 is installed on the middle part side wall of the main joint 1, and the clamp channel joint of the whole endoscope water delivery device is similar to the form of a three-way pipe. The above description is the same as the existing structure, and will not be repeated here.
主接头1连接钳道口3的一端内装有第一阀芯座6,在第一阀芯座6内依次安装有鸭嘴式单向阀7和钳道接头密封垫8,并通过锁紧螺母9锁紧在第一阀芯座6的内腔中,钳道接头密封垫8的内孔直径小于连接钳类附件的直径,送水接口4通过第二阀芯座10安装在主接头1的中部侧壁上,在第二阀芯座10的内腔中安装有鸭嘴式单向阀7。设置第一阀芯座6和锁紧螺母9的目的,是为了安装有鸭嘴式单向阀7和钳道接头密封垫8。设置第二阀芯座10的目的是为了安装鸭嘴式单向阀7。 The end of the main joint 1 connected to the pincer channel 3 is equipped with a first valve core seat 6, and a duckbill check valve 7 and a pincer channel joint sealing gasket 8 are installed in the first valve core seat 6 in sequence, and through the lock nut 9 Locked in the inner cavity of the first valve core seat 6, the diameter of the inner hole of the clamp channel joint sealing gasket 8 is smaller than the diameter of the connecting clamp accessories, and the water delivery interface 4 is installed on the middle side of the main joint 1 through the second valve core seat 10 On the wall, a duckbill check valve 7 is installed in the cavity of the second valve core seat 10 . The purpose of setting the first valve core seat 6 and the lock nut 9 is to install the duckbill check valve 7 and the seal gasket 8 of the pincer joint. The purpose of setting the second valve core seat 10 is to install the duckbill check valve 7 .
最好是,压紧螺套2与主接头1通过双头螺纹拧紧,压紧螺套2的外端设置收口部,并通过收口部与密封套5的外端挤压贴合,达到钳道接头与内窥镜1的操作手柄的密封作用。第一阀芯座6置于主接头1内,第一阀芯座6的外侧端通过钳道口3挡住,且第一阀芯座6与主接头1之间设置有密封圈11,密封圈11共两个,沿主接头1的轴线间隔设置,起到双重密封的效果,防止水从第一阀芯座6与主接头1配合的地方溢出。主接头1与钳道口3、主接头1与第二阀芯座10、第二阀芯座10与送水接口4均是通过螺纹连接,也可以采用扣位粘胶或塑料超声波焊接的方式连接,扣位粘胶即卡扣连接后再通过粘胶的方式固定。 Preferably, the compression screw sleeve 2 and the main joint 1 are tightened by double-ended threads, and the outer end of the compression screw sleeve 2 is provided with a closing part, and the closing part is squeezed and fitted with the outer end of the sealing sleeve 5 to achieve the pincer channel. The sealing effect of the joint and the operating handle of the endoscope 1. The first valve core seat 6 is placed in the main joint 1, and the outer end of the first valve core seat 6 is blocked by the pincer channel opening 3, and a sealing ring 11 is arranged between the first valve core seat 6 and the main joint 1, and the sealing ring 11 There are two in total, which are arranged at intervals along the axis of the main joint 1 to play a double sealing effect and prevent water from overflowing from the place where the first valve core seat 6 cooperates with the main joint 1 . The main joint 1 and the pincer crossing 3, the main joint 1 and the second valve core seat 10, the second valve core seat 10 and the water supply interface 4 are all connected by threads, and can also be connected by buckle glue or plastic ultrasonic welding. The buckle glue means that the buckle is connected and then fixed by glue.
另外,送水接口4为鲁尔圆锥接头,相应地,送水管一端为外圆锥接头,通过鲁尔接头连接保证了送水接口处的密封连接。 In addition, the water delivery interface 4 is a Luer conical joint. Correspondingly, one end of the water delivery pipe is an outer conical joint, and the connection through the Luer joint ensures a sealed connection at the water delivery interface.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620174975.0U CN205548502U (en) | 2016-03-08 | 2016-03-08 | Endoscope send water installation pincers way to connect |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620174975.0U CN205548502U (en) | 2016-03-08 | 2016-03-08 | Endoscope send water installation pincers way to connect |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205548502U true CN205548502U (en) | 2016-09-07 |
Family
ID=56816554
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620174975.0U Expired - Lifetime CN205548502U (en) | 2016-03-08 | 2016-03-08 | Endoscope send water installation pincers way to connect |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205548502U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109833067A (en) * | 2017-11-28 | 2019-06-04 | 中国科学院沈阳自动化研究所 | A kind of balloon instrument and its application method |
| CN110251212A (en) * | 2019-06-20 | 2019-09-20 | 天津博朗科技发展有限公司 | A kind of Duckbill type check valve and detachable check valve quick coupling |
-
2016
- 2016-03-08 CN CN201620174975.0U patent/CN205548502U/en not_active Expired - Lifetime
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109833067A (en) * | 2017-11-28 | 2019-06-04 | 中国科学院沈阳自动化研究所 | A kind of balloon instrument and its application method |
| CN109833067B (en) * | 2017-11-28 | 2021-08-31 | 中国科学院沈阳自动化研究所 | Balloon device and method of using the same |
| CN110251212A (en) * | 2019-06-20 | 2019-09-20 | 天津博朗科技发展有限公司 | A kind of Duckbill type check valve and detachable check valve quick coupling |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205548502U (en) | Endoscope send water installation pincers way to connect | |
| CN204708808U (en) | A dual-channel endoscope | |
| CN210056095U (en) | A multifunctional endoscopic biopsy tunnel device | |
| CN219251122U (en) | An anal decompression device | |
| CN205924255U (en) | Stomach subtracts and holds anti -seepage device for sacculus | |
| CN107296994A (en) | Anti- infection enema syringe | |
| CN203885994U (en) | T-shaped tube with three channels | |
| CN110841161A (en) | occluded bronchial cannula | |
| CN207356061U (en) | A kind of endoscope overtube | |
| CN208927226U (en) | Single-use anti-reflux colorectal tube and enema device | |
| CN215023654U (en) | An enema tube for retention enema | |
| CN205612795U (en) | Disposable simple enema device | |
| CN204446940U (en) | The Sengstaken-Blakemore tube of modified form | |
| CN205215176U (en) | Intestines and stomach mirror washes or fills easily gets connecting device with easily inserting | |
| CN212575440U (en) | A new type of leak-proof drainage anal canal | |
| CN204337482U (en) | There is the gastrolavage tube of circular arc flexible head and air bag | |
| CN215461406U (en) | Novel nose bile duct joint Assembly | |
| CN217548009U (en) | Improved liquid perfusion pipeline of hysteroscope | |
| CN208611518U (en) | A device for insertion of a gastrointestinal tube during non-invasive face mask mechanical ventilation | |
| CN220025129U (en) | Venous hemostatic sleeve device | |
| CN223682881U (en) | Anti-leakage oxygen pillow | |
| CN223233112U (en) | Double-lumen uterine drainage tube with compression balloon | |
| CN221751955U (en) | A guide wire introduction cannula | |
| CN217745179U (en) | Shape-adapted adjustable ileum terminal fistulization tube assembly device | |
| CN221692270U (en) | A chest lavage converter |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Clamp joint of endoscope water supply device Effective date of registration: 20210126 Granted publication date: 20160907 Pledgee: Agricultural Bank of China Limited Chongqing Yubei sub branch Pledgor: CHONGQING JINSHAN SCIENCE & TECHNOLOGY (GROUP) Co.,Ltd. Registration number: Y2021500000004 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20220214 Granted publication date: 20160907 Pledgee: Agricultural Bank of China Limited Chongqing Yubei sub branch Pledgor: CHONGQING JINSHAN SCIENCE & TECHNOLOGY (GROUP) Co.,Ltd. Registration number: Y2021500000004 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Clamp joint of endoscope water supply device Effective date of registration: 20220627 Granted publication date: 20160907 Pledgee: Agricultural Bank of China Limited Chongqing Yubei sub branch Pledgor: CHONGQING JINSHAN SCIENCE & TECHNOLOGY (GROUP) Co.,Ltd. Registration number: Y2022500000034 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Date of cancellation: 20231020 Granted publication date: 20160907 Pledgee: Agricultural Bank of China Limited Chongqing Yubei sub branch Pledgor: Chongqing Jinshan Medical Technology Research Institute Co.,Ltd.|BEIJING ZHONGJIN SILICON VALLEY TECHNOLOGY CO.,LTD.|CHONGQING JINSHAN SCIENCE & TECHNOLOGY (GROUP) Co.,Ltd. Registration number: Y2022500000034 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| CP03 | Change of name, title or address |
Address after: 401120 18 neon Road, two Road Industrial Park, Yubei District, Chongqing Patentee after: Chongqing Jinshan Technology Group Co.,Ltd. Country or region after: China Address before: 401120 18 neon Road, two Road Industrial Park, Yubei District, Chongqing Patentee before: CHONGQING JINSHAN SCIENCE & TECHNOLOGY (GROUP) Co.,Ltd. Country or region before: China |
|
| CP03 | Change of name, title or address | ||
| CX01 | Expiry of patent term |
Granted publication date: 20160907 |
|
| CX01 | Expiry of patent term |