CN205532670U - End hydraulic support - Google Patents
End hydraulic support Download PDFInfo
- Publication number
- CN205532670U CN205532670U CN201620033632.2U CN201620033632U CN205532670U CN 205532670 U CN205532670 U CN 205532670U CN 201620033632 U CN201620033632 U CN 201620033632U CN 205532670 U CN205532670 U CN 205532670U
- Authority
- CN
- China
- Prior art keywords
- base
- back timber
- dais
- hinged
- connecting rod
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses an end hydraulic support, include from preceding backward in proper order the articulated back timber, respectively the bearing is at the hydraulic prop of each back timber below and connect the base at the hydraulic prop lower extreme, the back timber rear end of last a lesson is articulated to have the shielding roof beam, screens that the rear end of roof beam is articulated to have the connecting rod, is equipped with between connecting rod and the base with the dais, the bottom that adds the dais is connected on the base, the top that adds the dais is articulated each other with the bottom of connecting rod. The utility model discloses the greater part subunit that well end hydraulic support utilized traditional end hydraulic support is as the basis, through install the range of coming increase shielding roof beam liftable with the dais additional between connecting rod and base to make the bearing height of each section back timber must ether high, thereby adapt to the requirement of new working face crossheading height, consequently the utility model provides a high not enough condition of rising of back timber among the prior art.
Description
Technical field
This utility model relates to a kind of end hydraulic support.
Background technology
At present, mining end hydraulic support is arranged in tunnel and work surface intersection, in order to supporting termination top board, provides sufficient arrangement space for termination fully-mechanized mining equipment and hydraulic power unit and power distribution station etc., and completes roadway roof coal and put coal operation, it is achieved termination mechanization.The existing end hydraulic support such as Chinese patent literature CN202467882 U(day for announcing is on October 3rd, 2012) disclosed " three one group of frame face end supports ", including base and on the back timber that supported by hydraulic vertical prop, back timber has two joints, and it is the most hinged, hydraulic vertical prop between each joint back timber and base all has two groups and time interval, the rear end of back timber is hinged with caving shield, caving shield passes through on the two groups of rod hinge connections of time interval crotch platform on rear side of base, with under the thrusting action of hydraulic vertical prop, termination top board is held out against on the end face in tunnel by back timber, realize the support to tunnel end face.But usually owing to being actually needed in coal production; return airway height often changes, and highly increases above original end hydraulic support bearing height allowed band, causes existing equipment to use; generally require redesign, manufacture new end hydraulic support, cause the waste of resource.
Utility model content
The purpose of this utility model is to provide a kind of end hydraulic support, it is intended to solve the situation that in prior art, the wicking height of back timber is not enough.
In order to realize object above, in this utility model, the technical scheme of end hydraulic support is as follows:
End hydraulic support, including hydraulic prop below each back timber of the most hinged back timber, respectively support and the base that is connected to hydraulic prop lower end, the top beam rear end of final section is hinged with caving shield, the rear end of caving shield is hinged with connecting rod, it is equipped with between connecting rod and base and adds dais, the bottom adding dais is connected on base, and the bottom at the top and connecting rod that add dais is hinged.
The rear side of base is convexly equipped with crotch platform, and crotch platform is provided with the base connecting hole being added dais by stud connection, adds the top of dais and is provided with and increases connecting hole by stud connection connecting rod, and the shape increasing connecting hole is identical with the aperture of base connecting hole.
The list group hydraulic prop support that the most previous joint back timber is alignd by left and right and is parallel to each other, and it is equipped with oscillating arm mechanisms between the most previous joint back timber and base, oscillating arm mechanisms includes the upper pendulum bar being hinged on the downside of back timber and the draft link being hinged on base, and the lower end of upper pendulum bar is hinged with the upper end of draft link.
Before oscillating arm mechanisms is in hydraulic prop.
In oscillating arm mechanisms, upper and lower fork forms folding chevron, and the tip of chevron is forward.
Based in this utility model, end hydraulic support utilizes most of parts of tradition end hydraulic support, the liftable amplitude of caving shield is increased by installing dais between connecting rod and base additional, so that respectively the bearing height of joint back timber can obtain ether height, thus adapt to the requirement of new return airway height, the situation that during therefore this utility model solves prior art, the wicking height of back timber is not enough.
Accompanying drawing explanation
Fig. 1 is the structural representation of embodiment of the present utility model;
Fig. 2 is the structural representation adding dais in Fig. 1;
Fig. 3 is the right view of Fig. 2.
Detailed description of the invention
The embodiment of end hydraulic support in this utility model: as shown in Figure 1 to Figure 3, including the first the most hinged back timber 1, second back timber 2 and the 3rd back timber 3, wherein the first back timber 1 passes through the first hydraulic prop 4 and swing-bar mechanism support on base 10, second back timber 2 passes through the second hydraulic prop 5 support on base 10, 3rd back timber 3 passes through the 3rd hydraulic prop 6 support on base 10, and it is hinged with caving shield 7 in the rear end of the 3rd back timber 3, the rear end of caving shield 7 is hinged with the connecting rod 8 of two groups of time intervals, the lower end of two connecting rods 8 is connected on base 10 by adding dais.Add dais have two and be arranged symmetrically in the left and right sides of base 10, two add dais be all by the left and right sides win in succession and bridge be fixed on two win in succession between coaming plate surround surround box pedestal 9, the top of box pedestal 9, bottom all offer pedestal connecting hole low after height before two, the aperture of four pedestal connecting holes is identical, and the axial connecting line parallelogram of these four pedestal connecting holes, and define and be in the two pedestal connecting holes at box pedestal 9 top for increasing connecting hole 91, being in two pedestal connecting holes bottom box pedestal 9 is base connecting hole 92.Base connecting hole 92 passes through stud connection on rear side of base 10 on the crotch platform 11 of projection, to realize box pedestal 9 fixing on base 10.Increase connecting hole 91 to join in the bottom of connecting rod 8 with hinge, to realize box pedestal 9 and the handing-over of connecting rod 8.
First hydraulic prop 4 and the 3rd hydraulic prop 6 the most vertically stretch, with pushing tow the first back timber 1 and the 3rd back timber 3 vertical lift respectively.Before swing-bar mechanism is in the first hydraulic prop 4.Swing-bar mechanism is made up of the draft link 42 of the upper pendulum bar 41 being hinged on the downside of the first back timber 1 with the upside being hinged on base 10, the lower end of upper pendulum bar 41 and the upper end of draft link 42 are hinged, and the hinge between upper pendulum bar 41 and draft link 42 arches upward forward, so that upper pendulum bar and draft link can be folded into most advanced and sophisticated V-arrangement forward and fold arm.
Second hydraulic prop 5 has two groups and is symmetrically arranged, and often organizing the second hydraulic prop 5 has two, and two second hydraulic props 5 are from bottom to top at fore-and-aft direction reversed dip.
In the present embodiment, first back timber the 1, second back timber 2 and the 3rd back timber 3 of end hydraulic support assemble according to existing support assembling mode, then two-box type pedestal 9 is respectively assembled on the crotch platform 11 of former base 10, and be attached with hinge, then connecting rod 8 is arranged on the top of box pedestal 9, reaches add high-base 10 and support the effect of whole height.
In the above-described embodiments, dais is added by arranging, at the end, top, the pedestal connecting hole that shape position identical, relative is identical, it is achieved increasing between crotch platform and connecting rod, in other embodiments, this is added dais and can also be fixed on base by modes such as welding, rivetings.
Claims (5)
1. end hydraulic support, including hydraulic prop below each back timber of the most hinged back timber, respectively support and the base that is connected to hydraulic prop lower end, the top beam rear end of final section is hinged with caving shield, the rear end of caving shield is hinged with connecting rod, it is characterized in that, being equipped with between connecting rod and base and add dais, the bottom adding dais is connected on base, and the bottom at the top and connecting rod that add dais is hinged.
End hydraulic support the most according to claim 1, it is characterized in that, the rear side of base is convexly equipped with crotch platform, crotch platform is provided with the base connecting hole being added dais by stud connection, adding the top of dais to be provided with and increase connecting hole by stud connection connecting rod, the shape increasing connecting hole is identical with the aperture of base connecting hole.
End hydraulic support the most according to claim 1 and 2, it is characterized in that, the list group hydraulic prop support that the most previous joint back timber is alignd by left and right and is parallel to each other, and it is equipped with oscillating arm mechanisms between the most previous joint back timber and base, oscillating arm mechanisms includes the upper pendulum bar being hinged on the downside of back timber and the draft link being hinged on base, and the lower end of upper pendulum bar is hinged with the upper end of draft link.
End hydraulic support the most according to claim 3, it is characterised in that before oscillating arm mechanisms is in hydraulic prop.
End hydraulic support the most according to claim 3, it is characterised in that in oscillating arm mechanisms, upper and lower fork forms folding chevron, the tip of chevron is forward.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620033632.2U CN205532670U (en) | 2016-01-14 | 2016-01-14 | End hydraulic support |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620033632.2U CN205532670U (en) | 2016-01-14 | 2016-01-14 | End hydraulic support |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205532670U true CN205532670U (en) | 2016-08-31 |
Family
ID=56764822
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620033632.2U Expired - Fee Related CN205532670U (en) | 2016-01-14 | 2016-01-14 | End hydraulic support |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205532670U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252732A (en) * | 2018-03-26 | 2018-07-06 | 中国矿业大学(北京) | A kind of transition bracket that can be realized top-coal caving face end and put coal |
-
2016
- 2016-01-14 CN CN201620033632.2U patent/CN205532670U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108252732A (en) * | 2018-03-26 | 2018-07-06 | 中国矿业大学(北京) | A kind of transition bracket that can be realized top-coal caving face end and put coal |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205532670U (en) | End hydraulic support | |
CN104494404A (en) | Novel roof and side lap joint structure | |
CN201606010U (en) | M-shaped headframe support system of sheave platform in shape of a ladder | |
CN205950596U (en) | Triangle -shaped circle pipe truss preparation frock bed -jig | |
CN218235145U (en) | Safety support device for coal mining of coal seam corner coal | |
CN203568222U (en) | Side wall reinforcing structure of rectangular coal scuttle | |
CN201934115U (en) | Ultra-large mining height hydraulic support | |
CN205387845U (en) | Large -scale steel coal scuttle of combo box posture | |
CN104533490B (en) | Stable type left-and-right type end socket support | |
CN204310665U (en) | A kind of modularization truss without support staircase increased based on tilting section | |
CN204492858U (en) | A kind of crowned section tunnelling suspension device | |
CN216342258U (en) | Large-expansion-ratio hydraulic support | |
CN208184762U (en) | Seperated advance timbering pedestal | |
CN203374294U (en) | Safety walking ladder of large dip angle hydraulic support | |
CN207161140U (en) | Fill servicing unit | |
CN203021217U (en) | Inside climbing base joint of inside climbing type tower crane and tower crane with same | |
CN207944935U (en) | A kind of groover support device | |
CN205876369U (en) | Great mining height face hydraulic bracket transition rack | |
CN104989439B (en) | Hydraulic support stable car device | |
CN201202480Y (en) | Integral top beam | |
CN215727262U (en) | Shield segment testing device | |
CN203925552U (en) | A kind of longitudinal and lateral stability governor motion that is applicable to light-duty simple integrative mining hydraulic support | |
CN203271791U (en) | Integrally-placed hydraulic support | |
CN203248180U (en) | Hydraulic support with caving shield hinged with middle part of top beam | |
CN202673315U (en) | Three-beam support device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20170114 |
|
CF01 | Termination of patent right due to non-payment of annual fee |