CN205531954U - Structure is adorned to assembled shear force wall body behind exterior window - Google Patents
Structure is adorned to assembled shear force wall body behind exterior window Download PDFInfo
- Publication number
- CN205531954U CN205531954U CN201620083033.1U CN201620083033U CN205531954U CN 205531954 U CN205531954 U CN 205531954U CN 201620083033 U CN201620083033 U CN 201620083033U CN 205531954 U CN205531954 U CN 205531954U
- Authority
- CN
- China
- Prior art keywords
- window
- impeller
- woodbox
- interior
- side fascia
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model discloses a structure is adorned to assembled shear force wall body behind exterior window, it includes the window position outdoor partial siphonal lobe slab muscle of side fascia and many connecting reinforcement all around that the ligature was being reserved, acanthus leaf department has built the concrete outside, outside the acanthus leaf and treat the side fascia indoor portion's of construction interior acanthus leaf between install sandwich heated board, by siphonal lobe inboard wall, polylith window woodbox is installed at the interval in the space that with filling heated board medial surface and the interior acanthus leaf outer wall of treating the construction formed, many connecting reinforcement insert in the interior acanthus leaf of treating the construction after passing perpendicularly and corresponding the window woodbox that sets up, the window position side fascia indoor portion ligature of reserving all around have internal lobe slab muscle including and acanthus leaf department pour the concrete, the setting locates all around with prefabricated exterior wall board window at the window frame of window department that each window woodbox is fixed to link to each other. This structure seal is good.
Description
Technical field
The utility model relates to exterior window mounting structure, particularly relates to assembling structure after fabricated shear wall system exterior window.
Background technology
Assembled architecture has become building trend now, and along with being widely popularized of assembled architecture, associated construction technology is not yet
Disconnected improvement.For the installation of fabricated shear wall system exterior window, generally having two ways, one is window frame prepacking method, will
Window frame is directly contained on precast wall panel in advance in factory, and its advantage is that quality is relatively reliable, decreases the field installation procedure of door and window;
But it is big that shortcoming is finished product protection difficulty, and adaptive deformation ability is low.Second method is window frame after loading, uses at precast wall panel
The structure of middle built-in wooden brick, using woodbox as tie point, fills window frame afterwards, and this method is applied more at present.Precast wall panel window
The pre-buried connected mode of frame is still continuously improving and is innovating.
Summary of the invention
The purpose of this utility model is to overcome the deficiency of prior art, it is provided that a kind of simple in construction is the most stable, airtight
Property good and a kind of fabricated shear wall system exterior window of simple operation after assembling structure.
In order to achieve the above object, the technical solution adopted in the utility model is:
Assembling structure after a kind of fabricated shear wall system exterior window, it includes that colligation is outdoor at the Side fascia of reserved the window's position surrounding
The siphonal lobe slab muscle of part and many connection reinforcing bars of the connector as window woodbox to be installed, many described connection steel
Muscle impeller part outside be vertically arranged with the window wall of corresponding position and described many be connected reinforcing bar impeller part outside with
The part being located in window woodbox to be installed is arranged substantially perpendicular to each other, has poured concrete at described outer impeller, outside impeller with
Sandwiched heat insulation board is installed between the interior impeller of Side fascia indoor section to be onstructed and is reserving installation window wood near window side
The space of brick, in the space formed by described outer impeller inwall, sandwiched heat insulation board inner side end and interior impeller outer wall to be onstructed
Interior interval is provided with polylith window woodbox, and many described connection reinforcing bars insert after passing perpendicularly through the window woodbox being correspondingly arranged and wait to execute
In the interior impeller of work, the Side fascia indoor section in reserved the window's position surrounding is banded with internal lobe slab muscle and waters at interior impeller
Having built concrete, described interior impeller protrudes setting at window than outer impeller, is arranged on the window frame at window and precast wall panel
At window surrounding, each window woodbox is fixedly linked, in the gap between described window frame and interior impeller, outer impeller and window woodbox
It is filled with polyurethane foams, at the gap that described window frame intersects with outer impeller and interior impeller, is equipped with marine glue jointing.
Compared with prior art, the utility model has the advantages that
The woodbox that connects installing window frame in this structure is arranged on prefabricated panel in the way of prepackage precast wall panel pours when
In, fixed by the connection bar connecting pre-installed in impeller outside and anchor in interior impeller, polylith built-in wooden brick be clipped in outer impeller,
In the space that sandwich heat preservation version and interior impeller are formed, interval is installed, and treats that all built-in wooden bricks install, carries out outer impeller and execute
Work, the installation of this built-in wooden brick is the most simple and efficient, and the installation of window frame can be made to become simple, again will not be prefabricated
The wallboard construction stage delays the too much time, and provides the selection space to window frame, can meet the various window frames meeting size
Installation requirement.By bar connecting built-in wooden brick, after making window frame install, globality is strong, firm stable.The outer impeller of interior impeller
To the prominent 5-8mm of window, connecting gap and use foaming agent to coordinate marine glue to seal, seal is good.
Accompanying drawing explanation
Fig. 1 be utility model a kind of fabricated shear wall system exterior window after the planar structure schematic diagram of assembling structure;
Fig. 2 is the upper window edge structure longitudinal profile schematic diagram in the structure shown in Fig. 1;
Fig. 3 is the lower window edge structure longitudinal profile schematic diagram in the structure shown in Fig. 1;
Fig. 4 is the window side structure level generalized section in the structure shown in Fig. 1.
Detailed description of the invention
Below in conjunction with specific embodiment, the utility model is described in detail.
Assembling structure after a kind of fabricated shear wall system exterior window of the present utility model as shown in drawings, it includes that colligation is reserved
The outer impeller 1-1 reinforcing bar of the Side fascia outdoor section of the window's position surrounding and the connector as window woodbox 3 to be installed
Many connect reinforcing bar 2, and many described connection reinforcing bar 2 impeller 1-1 outside parts are vertically arranged with the window wall of corresponding position
And many described connection reinforcing bar 2 impeller 1-1 outside parts are perpendiculared to one another with the part being located in window woodbox 3 to be installed
Arrange, at described outer impeller 1-1, poured concrete, outside impeller 1-1 and the interior impeller of Side fascia indoor section to be onstructed
Sandwiched heat insulation board 4 is installed between 1-2 and is reserving the space installing window woodbox near window side, by described outer impeller
In the space that 1-1 inwall, sandwiched heat insulation board 4 inner side end and interior impeller 1-2 outer wall to be onstructed are formed, interval is provided with polylith
Window woodbox 3, many described connection reinforcing bars 2 insert interior impeller to be onstructed after passing perpendicularly through the window woodbox 3 being correspondingly arranged
In 1-2, the part that many described connection reinforcing bars 2 are located in window woodbox 3 is excellent with the angle of the part inserting interior impeller 1-2
Choosing for 135 degree, due to connection reinforcing bar be to be processed and formed at one time, use 135 degree of crotches, both can play anchorage effect, again
The installation of built-in wooden brick can not be hindered;Side fascia indoor section in reserved the window's position surrounding is banded with interior impeller 1-2 reinforcing bar
And at interior impeller 1-2, having poured concrete, described interior impeller 1-2 protrudes setting than outer impeller 1-1, preferably at window
Protrusion distance is 5-8mm, makes directly to contact with window frame at interior impeller window, then beats anti-at the gap that window frame intersects with interior impeller
Watertight sealing, improves the seal of window frame surrounding;It is arranged on each window at the window frame 5 at window and precast wall panel window surrounding
Mouth woodbox 3 is fixedly linked, as expansion bolt 6 can be used to be fixedly linked, at described window frame 5 and interior impeller, outer impeller and window
It is filled with polyurethane foams 7 in gap between mouth woodbox 3, intersects with outer impeller and interior impeller at described window frame 5
Marine glue 8 jointing it is equipped with at gap.
The construction method of this structure is as follows:
(1) outer impeller 1-1 reinforcing bar many of colligation at reserved the window's position surrounding colligation Side fascia outdoor section connect reinforcing bar 2
As the connector of window woodbox 3 to be installed, many described connection reinforcing bar 2 impeller 1-1 outside parts and corresponding position
Window wall be vertically arranged and described many connect reinforcing bar 2 impeller 1-1 outside part and be located in window to be installed wood
The part of brick 3 is arranged substantially perpendicular to each other;
(2) concrete at outer impeller 1-1 is poured;
(3) sandwiched heat insulation board 4 is installed between impeller 1-1 and the interior impeller 1-2 of Side fascia indoor section to be onstructed outside and is leaning on
Nearly window side reserves the space installing window woodbox;
(4) by described outer impeller 1-1 inwall, sandwiched heat insulation board 4 inner side end and interior impeller 1-2 outer wall shape to be onstructed
In the space become, polylith window woodbox 3 is installed at interval, and many described connection reinforcing bars 2 are passed perpendicularly through the window being correspondingly arranged
Insert in interior impeller 1-2 to be onstructed after woodbox 3, the part that described many connection reinforcing bars 2 are located in window woodbox 3 with
In inserting, the angle of the part of impeller 1-2 is preferably 135 degree, is to be processed and formed at one time owing to connecting reinforcing bar, uses 135 degree
Crotch, both can play anchorage effect, and can not hinder again the installation of built-in wooden brick;
(5) impeller 1-2 reinforcing bar pour at interior impeller 1-2 mixed in the Side fascia indoor section colligation of reserved the window's position surrounding
Solidifying soil, described interior impeller 1-2 protrudes setting than outer impeller 1-1 at window, and preferably protruding distance is 5-8mm, in making
Directly contact with window frame at impeller window, then beat waterproof gasket cement at the gap that window frame intersects with interior impeller, improve window frame four
The seal in week;
(6) expansion bolt 6 is used to be connected with each window woodbox 3 at precast wall panel window surrounding window frame 5 fixing;
(7) use polyurethane foams 7 to fill the gap between window frame 5 and interior impeller, outer impeller and window woodbox 3, fill
After full, play marine glue 8 jointing at window frame 5 with outer impeller and interior impeller intersection.
Claims (3)
1. assembling structure after a fabricated shear wall system exterior window, it is characterised in that: it includes that colligation is at reserved the window's position
The siphonal lobe slab muscle of the Side fascia outdoor section of surrounding and many connection steel of the connector as window woodbox to be installed
Muscle, many described connection reinforcing bar impeller parts outside are vertically arranged and described many with the window wall of corresponding position
Connect reinforcing bar impeller part outside arranged substantially perpendicular to each other with the part being located in window woodbox to be installed, at described outer impeller
Place has poured concrete, is provided with sandwiched heat insulation board also outside between the interior impeller of impeller and Side fascia indoor section to be onstructed
Near window side reserving install window woodbox space, by described outer impeller inwall, sandwiched heat insulation board inner side end with
And interval is provided with polylith window woodbox in the space of interior impeller outer wall formation to be onstructed, many described connection reinforcing bars are vertical
Insert in interior impeller to be onstructed after the window woodbox being correspondingly arranged, indoor at the Side fascia of reserved the window's position surrounding
Part is banded with internal lobe slab muscle and has poured concrete at interior impeller, and described interior impeller protrudes at window than outer impeller
Arrange, be arranged on each window woodbox at window frame at window and precast wall panel window surrounding and be fixedly linked, at described window frame and
It is filled with polyurethane foams, at described window frame and outer impeller in gap between interior impeller, outer impeller and window woodbox
And it is equipped with marine glue jointing at the gap intersected of interior impeller.
Assembling structure after fabricated shear wall system exterior window the most according to claim 1, it is characterised in that: many described companies
The angle connecing the reinforcing bar part being located in window woodbox and the part inserting interior impeller is 135 degree.
Assembling structure after fabricated shear wall system exterior window the most according to claim 1 and 2, it is characterised in that: described is interior
Impeller protrudes 5-8mm than outer impeller at window.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620083033.1U CN205531954U (en) | 2016-01-27 | 2016-01-27 | Structure is adorned to assembled shear force wall body behind exterior window |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620083033.1U CN205531954U (en) | 2016-01-27 | 2016-01-27 | Structure is adorned to assembled shear force wall body behind exterior window |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205531954U true CN205531954U (en) | 2016-08-31 |
Family
ID=56772231
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620083033.1U Expired - Fee Related CN205531954U (en) | 2016-01-27 | 2016-01-27 | Structure is adorned to assembled shear force wall body behind exterior window |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205531954U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436972A (en) * | 2016-12-05 | 2017-02-22 | 上海市城市建设设计研究总院 | Prefabricated PCFexternal wall board with window frame and installing method thereof |
CN112982722A (en) * | 2021-02-07 | 2021-06-18 | 中国建筑第八工程局有限公司 | Mounting structure of window in prefabricated wall and construction method thereof |
-
2016
- 2016-01-27 CN CN201620083033.1U patent/CN205531954U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106436972A (en) * | 2016-12-05 | 2017-02-22 | 上海市城市建设设计研究总院 | Prefabricated PCFexternal wall board with window frame and installing method thereof |
CN112982722A (en) * | 2021-02-07 | 2021-06-18 | 中国建筑第八工程局有限公司 | Mounting structure of window in prefabricated wall and construction method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205894390U (en) | Compound incubation exterior sheathing and take wall body of compound incubation exterior sheathing | |
CN105781010B (en) | A kind of combined wall board and its cast in place and precast construction | |
CN205531954U (en) | Structure is adorned to assembled shear force wall body behind exterior window | |
CN110761322A (en) | Cast-in-place pipe gallery side wall horizontal construction joint reinforcing structure and construction method thereof | |
CN107119901A (en) | The cast-in-place system of formwork structure and shear wall and construction method of shear wall angle node | |
CN110424598A (en) | A kind of assembling frame out-hung panel technical system and its construction method | |
CN206888506U (en) | The cast-in-place system of formwork structure and shear wall of shear wall angle node | |
CN105672811B (en) | Method is filled after a kind of fabricated shear wall system exterior window | |
CN211817446U (en) | Prefabricated window of wafing down board and have prefabricated window of wafing down structure of wafing board | |
CN109386070A (en) | A kind of assembled steel frame external wall system and its construction method | |
CN108374437A (en) | A kind of basement interconnecting part anticracking crack structure | |
CN205742542U (en) | Precast concrete peripheral protective sandwich type wall panel mounts connection construction structure | |
CN209494050U (en) | A kind of connection structure of assembled steel frame exterior wall and structural column | |
CN107152037B (en) | Poured band of outer wall of basement construction method | |
CN109723141A (en) | Support construction and its construction method at a kind of fabricated construction conversion layer | |
CN205024733U (en) | Fixing device for advanced water stop | |
CN112982722A (en) | Mounting structure of window in prefabricated wall and construction method thereof | |
CN110387984A (en) | The flexible connecting structure and method of inwall and main structure | |
CN209891374U (en) | Supporting structure at assembled structure conversion layer | |
CN207905590U (en) | A kind of assembled outside window sill seepage-proof structure system | |
CN112982808A (en) | Improved dark beam type full prefabricated plate structure and preparation method thereof | |
CN208685813U (en) | A kind of plug-in parapet connecting node construction of clear-water concrete | |
CN208934012U (en) | A kind of poured band of outer wall of basement structure | |
CN101560859B (en) | Construction process of pressure injection seam filling for opening of window and door in building and universal auxiliary frame or side frame | |
CN110387982A (en) | The flexible connecting structure and method of inwall and main structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20170127 |
|
CF01 | Termination of patent right due to non-payment of annual fee |