CN205521080U - Installation frock of vertical cabin of aerogenerator switch board - Google Patents

Installation frock of vertical cabin of aerogenerator switch board Download PDF

Info

Publication number
CN205521080U
CN205521080U CN201620228338.7U CN201620228338U CN205521080U CN 205521080 U CN205521080 U CN 205521080U CN 201620228338 U CN201620228338 U CN 201620228338U CN 205521080 U CN205521080 U CN 205521080U
Authority
CN
China
Prior art keywords
cabin
frock
control cabinet
engine room
room control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620228338.7U
Other languages
Chinese (zh)
Inventor
王铭
吕笑岩
许奇武
胡亚楠
刘希凤
陆军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wu Weiyue
Original Assignee
BEIJING WANYUAN INDUSTRY CO LTD
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING WANYUAN INDUSTRY CO LTD filed Critical BEIJING WANYUAN INDUSTRY CO LTD
Priority to CN201620228338.7U priority Critical patent/CN205521080U/en
Application granted granted Critical
Publication of CN205521080U publication Critical patent/CN205521080U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Body Structure For Vehicles (AREA)

Abstract

The utility model belongs to the technical field of directly drive aerogenerator, concretely relates to installation frock of vertical cabin of aerogenerator switch board. Technical scheme does: welding stent is rectangular frame structure, and the outer edge of four rectangular frames is provided with perpendicular limit structure, and welding stent's shape and size and cabin switch board suit, set up the strengthening rib in welding stent's the long square frame, the welding of frock lug bilateral symmetry is in welding stent's both sides, and the position of frock lug is corresponding with 4 cabin hoisting points on the cabin. Beneficial effect: can realize cabin control cabinet 's installation under the condition of avoiding vertical cabin rotatory 180, reducible assembly process and staff reduce danger, improve the installation effectiveness. The lug through the cooperation with cabin cabinet body hoisting point can realize pinpointing, seamless butt joint, guaranteed assembly stability and size accuracy. Switch board installation frock intensity can be guaranteed to the groined type strengthening rib, avoids cabin cabinet body surface face control panel and button to damage.

Description

A kind of mounting tool of the vertical engine room control cabinet of wind-driven generator
Technical field
This utility model belongs to direct wind-driven generator technical field, is specifically related to a kind of wind-force and sends out The mounting tool of the vertical engine room control cabinet of motor.
Background technology
An existing simple in construction, novel appearance, easily manufactured quick wind-driven generator fillet welding in the vertical position Pick cabin, and during the transport assembling of vertical cabin, general half-twist accumbency is fixed on transport assembler Load onto.When assembling engine room control cabinet, due to weight, installation site and the machine of engine room control cabinet The restriction of narrow space in cabin, typically need to revolve turnback counterclockwise to looking up position again by cabin Putting, vertically being sling by engine room control cabinet is assemblied on machinery space bulkhead.Owing to cabin weighs tens tons, Being only fitting machine tank, revolve turnback only the highest dangerous and the most loaded down with trivial details Assembly process.Additionally, assembly machine tank from top to down, by engine room inside small space and structure Placement constraint is it is difficult to ensure that positioning precision, and easy appearance repeatedly adjusts the situation of location, operates Come pretty troublesome, also reduce work efficiency.Accordingly, it is desirable to provide a kind of wind-driven generator is vertical The mounting tool of engine room control cabinet, to solve the problems referred to above.
Summary of the invention
The purpose of this utility model is to install difficulty for the vertical engine room control cabinet of wind-driven generator Spend big technical problem, it is provided that the erector of the vertical engine room control cabinet of a kind of wind-driven generator Dress.
Realize the technical scheme of this utility model purpose:
The mounting tool of the vertical engine room control cabinet of a kind of wind-driven generator, including frock hanger, adds Strong muscle and welding support;Welding support is rectangular frame structure, rectangular four edges frame Outer is provided with vertical edge structure, and the shape and size of welding support adapt with engine room control cabinet; In the rectangular frame of welding support, reinforcement is set;The one group of symmetrical weldering two-by-two of frock hanger Being connected on the both sides of welding support, the position of frock hanger is relative with on cabin 4 cabin suspension centres Should.
The length of one or more vertical edge of described welding support is less than the weldering being secured to connection Connect rack frame length.
Described reinforcement is groined type layout.
Yielding rubber pad it is additionally provided with on described welding support.
Effect of the present utility model is:
In the case of this utility model can rotate 180 ° avoiding vertical cabin, it is achieved cabin Control the installation of cabinet, assembly process and staff can be reduced, reduce because needing tens tons of cabins The danger brought during rotating 180 degree, is greatly improved installation effectiveness, and switch board was by originally One day assembling 1 can assemble 9-10 platform by one day.
In this utility model, comprise four frock hangers, by with 4 suspension centres of cabin cabinet Coordinate, cabin cabinet mounting bracket bolt hole can be realized and determine with the accurate of pilot hole on machinery space bulkhead Position, slitless connection, it is ensured that the stability during switch board assembling and dimensional accuracy.
In this utility model, comprise groined type reinforcement, it is ensured that switch board mounting tool intensity Simultaneously, it is to avoid the damage of the button such as cabin cabinet granule surface contral panel and switch, at utmost The safety protecting switch board.
Accompanying drawing explanation
Fig. 1 is this utility model engine room control cabinet mounting tool schematic diagram.
Fig. 2 is application this utility model engine room control cabinet and mounting tool assembling schematic diagram.
Fig. 3 is application this utility model engine room control cabinet and mounting tool assembling elevational schematic view.
Fig. 4 is deposit position schematic diagram before the assembling of vertical cabin.
Fig. 5 is section engine room control cabinet side, vertical cabin schematic diagram.
In figure, the vertical cabin of 1-, 2-engine room control cabinet, 3-cabin suspension centre, 4-engine room control cabinet Installing rack, 5-engine room control cabinet mounting tool, 51-frock hanger, 52-reinforcement, 53-prevents Shake rubber blanket, 54-welding support.
Detailed description of the invention
With embodiment, this utility model is further described below in conjunction with the accompanying drawings.
Present embodiments provide the mounting tool of the vertical engine room control cabinet of a kind of wind-driven generator, its Shape and structure are as it is shown in figure 1, include frock hanger 51, reinforcement 52, Shockproof rubber pad 53 and welding support 54.
Welding support 54 is rectangular frame structure, uses angle steel to be welded, rectangular The outer of four edges frame is provided with vertical edge structure, can stop that engine room control cabinet 2 prevents from coming off;For It is easy to picking and placeing of engine room control cabinet 2, the wherein length of one or more vertical edge of welding support 54 Degree can be less than the rectangle frame length being secured to connection.The shape of welding support 54 and Size and engine room control cabinet 2 are to adaptation so that engine room control cabinet 2 can be blocked by vertical edge, real Now fix.
It is provided with the reinforcement 52 of groined type layout in the rectangular frame of welding support 54, adds While strong frock overall construction intensity, it is to avoid engine room control cabinet 2 granule surface contral panel and switch It is extruded breakage when assembling on button.
Yielding rubber pad 53, yielding rubber pad it is additionally provided with on the rectangular frame of welding support 54 On 53 contact surfaces being arranged in the welding support 54 directly contacted with engine room control cabinet 2, prevent Engine room control cabinet 2 finish paint comes off, and reduces the metal straight between engine room control cabinet 2 and mounting tool Connect friction.
Frock hanger 51 one group of symmetrical both sides being welded on welding support 54 two-by-two.4 Hanger location dimension in frock is corresponding with 4 suspension centres on cabin, can realize cabin control Cabinet 2 processed and the slitless connection in vertical cabin 1.
The material of mounting tool welding support 54 and reinforcement 52 is Q235B.
During assembling, first engine room control cabinet installing rack 4 is assembled with engine room control cabinet 2 in advance Become, then by fork truck, engine room control cabinet 2 be placed on engine room control cabinet mounting tool 5, By the mounting tool vertical edge of the present embodiment, engine room control cabinet 2 is fixed, such as Fig. 2 and Fig. 3 institute Show.Precalculated lifting rope length, and by the engine room control cabinet 2 assembled and the present embodiment Mounting tool (as shown in Figure 2) is placed on vertical cabin 1 rigging position (as shown in Figure 4) Underface, now with lifting rope through mounting tool hanger 51 and cabin suspension centre 3, four peaces The most corresponding four the cabin suspension centres 3 of dress frock hanger 51.By the lifting rope through cabin suspension centre 3 Move to specify position, by the bolt hole on engine room control cabinet installing rack 4 and the assembling on machinery space bulkhead Hole is accurately positioned, and by bolt, cabin cabinet 2 is fixed on the wall of cabin 1 i.e. installation and terminates, as Shown in Fig. 5, simple, accurate positioning, workable, practicality is high.
Obviously, those skilled in the art can carry out various change and modification to this utility model Without deviating from spirit and scope of the present utility model.If these amendments and modification belong to this practicality Within the scope of novel claim and equivalent technologies thereof, then this utility model is also intended to comprise this Including a little changes and modification.

Claims (5)

1. the mounting tool of the vertical engine room control cabinet of wind-driven generator, it is characterised in that: Including frock hanger (51), reinforcement (52) and welding support (54);Welding support (54) For rectangular frame structure, the outer of rectangular four edges frame is provided with vertical edge structure, welding The shape and size of support (54) adapt with engine room control cabinet (2);Welding support (54) Rectangular frame in reinforcement (52) is set;Frock hanger (51) two-by-two about one group right Claim the both sides being welded on welding support (54), on the position of frock hanger (51) and cabin 4 cabin suspension centres (3) are corresponding.
The installation of the vertical engine room control cabinet of a kind of wind-driven generator the most as claimed in claim 1 Frock, it is characterised in that: the length of one or more vertical edge of described welding support (54) is little In welding support (54) the frame length being secured to connection.
The installation of the vertical engine room control cabinet of a kind of wind-driven generator the most as claimed in claim 1 Frock, it is characterised in that: described reinforcement (52) is groined type layout.
The installation of the vertical engine room control cabinet of a kind of wind-driven generator the most as claimed in claim 1 Frock, it is characterised in that: it is additionally provided with yielding rubber pad (53) on described welding support (54).
The installation of the vertical engine room control cabinet of a kind of wind-driven generator the most as claimed in claim 1 Frock, it is characterised in that: the material of described welding support (54) and reinforcement (52) is Q235B。
CN201620228338.7U 2016-03-23 2016-03-23 Installation frock of vertical cabin of aerogenerator switch board Expired - Fee Related CN205521080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620228338.7U CN205521080U (en) 2016-03-23 2016-03-23 Installation frock of vertical cabin of aerogenerator switch board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620228338.7U CN205521080U (en) 2016-03-23 2016-03-23 Installation frock of vertical cabin of aerogenerator switch board

Publications (1)

Publication Number Publication Date
CN205521080U true CN205521080U (en) 2016-08-31

Family

ID=56783643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620228338.7U Expired - Fee Related CN205521080U (en) 2016-03-23 2016-03-23 Installation frock of vertical cabin of aerogenerator switch board

Country Status (1)

Country Link
CN (1) CN205521080U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826765A (en) * 2018-08-29 2019-05-31 国网辽宁省电力有限公司本溪供电公司 A kind of suspended structure for power control cabinet

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109826765A (en) * 2018-08-29 2019-05-31 国网辽宁省电力有限公司本溪供电公司 A kind of suspended structure for power control cabinet

Similar Documents

Publication Publication Date Title
CN104746887B (en) High-altitude plate installation mechanical system
CN104746864B (en) A kind of high-altitude construction robot operation plateform system
CN204531446U (en) High-altitude plate installation mechanical system
CN205521080U (en) Installation frock of vertical cabin of aerogenerator switch board
CN106143683A (en) Vehicle bridge mounting platform
CN105329767A (en) Aircraft hoisting appliance
CN104878918A (en) Rock-climbing type robot protective screen
CN201901515U (en) Special lifting device for ship cabin cleaning machinery
CN103663302A (en) L-type portal installation frame
CN103287989A (en) A gantry frame capable of moving in multiple directions
CN202529676U (en) Gantry crane and roof mounting rack
CN205906927U (en) Vehicle chassis assembles hoisting support
CN204826594U (en) High altitude is work platform system for construction robot
CN105000492B (en) Scissor-like jack with body paint defencive function
CN210499019U (en) Welding tool for lower support of crane
CN204170882U (en) Wheel hub coating hanger
CN203281458U (en) Workpiece suspension bracket
CN205929499U (en) A print platform for 3D printer
CN102887468A (en) Locomotive paint spraying workbench
CN205574301U (en) Aircraft ground air conditioning unit's mounting structure
CN205061331U (en) Case becomes hoist
CN205834583U (en) Frame entirety erects frock
CN204802898U (en) Pendulum leg fixing device and hoist
CN217350413U (en) Auxiliary lifting appliance for carrying
CN215479520U (en) Auxiliary device for lifting air pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20221018

Address after: No.8, Huancheng Road, Fengcheng Town, Tianzhu County, Qiandongnan Miao and Dong Autonomous Prefecture, Guizhou 556600

Patentee after: Wu Weiyue

Address before: 100176 Aerospace Science Park, No. 6, Jinxiu Street, Beijing Economic and Technological Development Zone, Daxing District, Beijing

Patentee before: BEIJING WANYUAN INDUSTRY Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

CF01 Termination of patent right due to non-payment of annual fee