CN205518910U - Anhydrous operation panel - Google Patents
Anhydrous operation panel Download PDFInfo
- Publication number
- CN205518910U CN205518910U CN201620353798.2U CN201620353798U CN205518910U CN 205518910 U CN205518910 U CN 205518910U CN 201620353798 U CN201620353798 U CN 201620353798U CN 205518910 U CN205518910 U CN 205518910U
- Authority
- CN
- China
- Prior art keywords
- upper strata
- operating board
- platform
- swash plate
- water
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model provides an anhydrous operation panel, including water supply system, upper operation panel and lower floor's ponding platform, upper operation panel is latticedly, and upper operation panel is located lower floor ponding bench side, and forms water catch bowl, upper operation panel connected set basin between upper operation panel and the lower floor's ponding platform, water supply system's play water end (W. E. ) is located upper operation panel top. Structure of operating platform is simple reliable, and manufacturing is convenient, low in manufacturing cost, and simultaneously, when carrying out the operation on this anhydrous operation panel, convenient operation, operation personnel need not dress unnecessary equipment can carry out the operation, and labour saving and time saving has improved the operating efficiency, simultaneously, waste water can not flow at will, and the operation panel surface does not have ponding, has the advantage of environmental protection.
Description
Technical field
This utility model relates to cleaning equipment field, in particular to a kind of waterless operation platform.
Background technology
Along with expanding economy, science and technology the most constantly improves now.But still have some industry needs
Manual work, such as industrial aspect need manual flushing tool, parts, agricultural planting aspect, need
Choose seeds, breeding, fishery and butcher market demand bath slaughter, dish etc. washed by dining room restaurant operation room.
As a example by bud seedling vegetable is planted, bud seedling vegetable seed first to be washed kind, bubble kind, dewatering, wet concentration kind, instrument,
Facility rinses, and sterilization etc. is required for operating at a specific platform or Work places water.
Inventor finds under study for action, traditional complete above-mentioned washing and cleaning operation during at least exist such as
Lower shortcoming:
One, certain operations mode are to operate on the ground in ditch, curved waist working expenditure
Expenses of labour power is very uncomfortable, and the efficiency of cleaning is low, wasting manpower and material resources;
Also having certain operations mode is to carry out on a platform, and waste water flows over, and staff must wear
Upper rubber boot work, and add cleaning cost, and meanwhile, arbitrarily the waste water of flowing easily pollutes environment, inconvenience
Collection, purification recycling in waste water.
The operating platform not havinging again waste water sinuous flow phenomenon can be operated by band water accordingly, it would be desirable to a kind of.
Utility model content
The purpose of this utility model is to provide a kind of waterless operation platform, and this operating platform simple in construction can
Leaning on, easy to use, meanwhile, during use, waste water will not flow everywhere, uses more environmentally-friendly, and
It is time saving and energy saving to use, and improves work efficiency.
Embodiment of the present utility model is achieved in that
Based on above-mentioned purpose, this utility model provides a kind of waterless operation platform, it include water system,
Upper strata operating board and lower floor's hydrops platform, wherein:
Described upper strata operating board is latticed, and described upper strata operating board is positioned at above described lower floor hydrops platform,
And between described upper strata operating board and described lower floor hydrops platform, forming water leg, described upper strata operating board is even
Logical described water leg;The water side of described water system is positioned at above the operating board of described upper strata.
In this utility model preferred embodiment, the described upper strata plate-shaped structure of operating board, described on
Being provided with multiple leaking hole on layer operation platform, each described leaking hole runs through the plate of described upper strata operating board
Face, multiple described leaking holes all connect described water leg.
In this utility model preferred embodiment, described lower floor hydrops platform includes multiple swash plate, adjacent
Described swash plate be connected, multiple described swash plates surround has the upper port being oppositely arranged and lower port
Column structure, the internal diameter of described upper port forms institute more than the internal diameter of described lower port, described upper port
Stating the notch of water leg, described upper strata operating board lid is loaded at described upper port, and described lower port connects
There is drainage pipeline.
In this utility model preferred embodiment, multiple described swash plates are set to four, each described
Swash plate is set square shape, including the first swash plate, the second swash plate and two the 3rd swash plates, the 3rd swash plate
Having the first limit and the second limit, the first swash plate is between two described first limits, and the first swash plate
Two limits be connected to two described first limits, the second swash plate between two described second limits,
And second two limits of swash plate be connected to two described second limits;Described lower port is positioned at same institute
State described first limit and the junction on described second limit of the 3rd swash plate.
In this utility model preferred embodiment, described water system includes faucet, the described fire hose
Head is by pipeline communication water source.
In this utility model preferred embodiment, described faucet includes multiple outlet, described water
Being provided with control valve on tap, described control valve beats on or off for control different described outlet
Close.
In this utility model preferred embodiment, described water system also includes fast water collecting nozzle, is used for
Connection water pipe.
In this utility model preferred embodiment, described waterless operation platform also includes main frame, described
Main frame is built by many shapes and is made, and described upper strata operating board and described lower floor hydrops platform divide
It is not installed on described main frame.
In this utility model preferred embodiment, described waterless operation platform also includes reinforcement, described
Reinforcement is installed on the top of described main frame, is used for supporting described upper strata operating board.
In this utility model preferred embodiment, described waterless operation platform also includes multiple locker,
The plurality of locker is respectively arranged in described main frame, and multiple described locker is positioned at described lower floor
The lower section of hydrops platform.
This utility model embodiment provides the benefit that:
In sum, this utility model provides a kind of waterless operation platform, and this operating board simple in construction can
Lean on, convenient processing and manufacture, low cost of manufacture, meanwhile, when this waterless operation platform carries out operation,
Easy to operate, operating personnel need not dress unnecessary equipment can carry out operation, time saving and energy saving, carries
High working performance;Meanwhile, waste water will not arbitrarily flow, and operating board surface does not has hydrops, has
The advantage of environmental protection.Specific as follows:
This waterless operation platform includes upper strata operating board and lower level operations platform, and upper strata operating board is latticed,
Upper strata operating board is positioned at above lower floor's hydrops platform, and upper strata operating board is the main place of operation, carries out clear
When washing operation, upper strata operating board operates.Waterless operation platform includes water system, makees
During industry, at water system introduce water, be then carried out action, current in cleaning process from
The upper lamination water platform downwards of layer operation platform, current will not accumulate on the operating board of upper strata, also will not from
Flow everywhere on layer operation platform, both do not polluted the environment, more environmentally-friendly during use.Because upper strata
Define water leg between operating board and lower floor's hydrops platform, i.e. can accumulate cleaning on lower floor's hydrops platform and produce
Raw waste water, waste water will not arbitrarily flow, and the Waste Water Centralized after collecting is easy to after getting up process.Due to
Waste water on the operating board of upper strata has flowed to water leg, and upper strata operating board does not has hydrops, it is not necessary to work
Persons wear's preventer, provides cost savings, and meanwhile, the action of staff is more flexible, whole
Operating process is time saving and energy saving.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of this utility model embodiment, below will be in embodiment
The required accompanying drawing used is briefly described, it will be appreciated that it is new that the following drawings illustrate only this practicality
Some embodiment of type, is therefore not construed as the restriction to scope, for ordinary skill
From the point of view of personnel, on the premise of not paying creative work, it is also possible to obtain other according to these accompanying drawings
Relevant accompanying drawing.
Fig. 1 is the top view of this utility model embodiment waterless operation platform;
Fig. 2 is the structural representation of this utility model embodiment waterless operation platform;
Fig. 3 is the top view of this utility model embodiment lower floor hydrops platform;
Fig. 4 is the view in A-A direction in Fig. 3;
Fig. 5 is the view in B-B direction in Fig. 3.
In figure:
Upper strata operating board 100, lower floor's hydrops platform 200, water leg 300, main frame 400,
Leaking hole 101, the first swash plate 102, the second swash plate 103, the 3rd swash plate 104, faucet 105,
Drainage pipeline 106, fast water collecting nozzle 107, reinforcement 108, locker 109, storage chamber 110, control
Valve 111 processed,
First limit 201, the second limit 202.
Detailed description of the invention
For making the purpose of this utility model embodiment, technical scheme and advantage clearer, below will knot
Close the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is carried out clearly
Chu, it is fully described by, it is clear that described embodiment is a part of embodiment of this utility model, and
It is not all, of embodiment.Generally herein described in accompanying drawing and this utility model embodiment of illustrating
Assembly can be arranged with various different configurations and design.
Therefore, detailed description not purport to the embodiment of the present utility model provided in the accompanying drawings below
Limit claimed scope of the present utility model, but be merely representative of selected reality of the present utility model
Execute example.Based on the embodiment in this utility model, those of ordinary skill in the art are not making creation
Property work premise under the every other embodiment that obtained, broadly fall into the scope of this utility model protection.
It should also be noted that similar label and letter represent similar terms, therefore, one in following accompanying drawing
A certain Xiang Yi the accompanying drawing of denier is defined, then need not it is carried out further in accompanying drawing subsequently
Definition and explanation.
In description of the present utility model, it should be noted that term " on ", the instruction such as D score
Orientation or position relationship are based on orientation shown in the drawings or position relationship, or this utility model is produced
The orientation usually put during product use or position relationship, be for only for ease of description this utility model and letter
Change and describe rather than indicate or imply that the device of indication or element must have specific orientation, Yi Te
Fixed azimuth configuration and operation, therefore it is not intended that to restriction of the present utility model.Additionally, term
" first ", " second ", " the 3rd " etc. are only used for distinguishing and describe, and it is not intended that indicate or hint
Relative importance.
In description of the present utility model, in addition it is also necessary to explanation, unless otherwise clear and definite regulation and limit
Fixed, term " is arranged ", " installation ", " being connected ", " connection " should be interpreted broadly, for example, it is possible to
It it is fixing connection, it is also possible to be to removably connect, or be integrally connected;Can be to be mechanically connected, also
It can be electrical connection;Can be to be joined directly together, it is also possible to be indirectly connected to by intermediary, Ke Yishi
The connection of two element internals.For the ordinary skill in the art, can manage with concrete condition
Solve above-mentioned term concrete meaning in this utility model.
Embodiment 1
Referring to Fig. 1-5, present embodiments provide a kind of waterless operation platform, waterless operation platform refers to
The upper surface of operating board does not has hydrops, and waste water will not be with being intended on waterless operation platform flowing, and it includes supplying
Water system, upper strata operating board 100 and lower floor's hydrops platform 200.
Referring to Fig. 1, upper strata operating board 100 is main working space, needs during article-cleaning
Carry out on upper strata operating board 100.Upper strata operating board 100 preferably employs stainless steel material and makes, stainless
The intensity of Steel material is high, corrosion-resistant, and the life-span of use is long, is difficult to, when long-time use, damage of getting rusty,
Change and the low cost of maintenance, save use cost.Upper strata operating board 100, in latticed, is i.e. gone up
Multiple leaking hole 101 it is provided with on layer operation platform 100, the on-demand setting of arrangement of leaking hole 101, can
To be uniformly distributed multiple leaking hole 101 on upper strata operating board 100, the discharge of waste water is convenient;Also may be used
To arrange different drainage cells on upper strata operating board 100, each drainage cell is provided with multiple leakage
Water hole 101, the on-demand setting of arrangement mode of multiple leaking holes 101 of each drainage cell, Ke Yicheng
Plum blossom-shaped, or arrange according to horizontally-arranged and vertical setting of types arrangement mode, add and select flexible and changeable man-hour,
It is easy to processing.
The on-demand setting of quantity of leaking hole 101, it is possible to ensure that waste water is discharged smoothly, and occur without
Accumulate the situation on upper strata operating board 100.The on-demand setting of shape of leaking hole 101, can be arranged
For circular port, square opening etc., it is simple to the flowing of waste water, it is clear that the diameter of leaking hole 101 is also
It is on-demand setting, adds man-hour flexible.Obviously, the shape of leaking hole 101 is according to the thing cleaned
The structure of product selects, it is ensured that article-cleaning is difficult to fall lower floor's hydrops platform 200 from leaking hole 101
On.
Leaking hole 101 has two end faces, and the first end face is positioned at the upper surface of upper strata operating board 100,
Second end face is positioned at the lower surface of upper strata operating board 100, and the waste water being i.e. positioned at upper strata operating board 100 leads to
Crossing leaking hole 101 and flowed to the lower surface of upper strata operating board 100, waste water flows along leaking hole 101,
Will not flee everywhere, not pollute the environment.For the ease of the processing of leaking hole 101, it is preferably arranged to,
Upper strata operating board 100 is set to platy structure, can be discoid, it is also possible to be rectangular plate-like, knot
Structure symmetry is good, it is simple to processes and installs.When upper strata operating board 100 arranges leaking hole 101,
Leaking hole 101 runs through upper strata operating board 100 along the direction, plate face being perpendicular to upper strata operating board 100, leakage
Water hole 101 easy to process, uses punching machine punch molding, improves the efficiency of processing.
Upper strata operating board 100 is set to platy structure, and upper strata operating board 100 has two be oppositely arranged
Individual plate face, it is simple to the installation of upper strata operating board 100, meanwhile, operating personnel is easy at upper strata operating board
Cleaning is carried out on 100.In order to ensure the fastness of upper strata operating board 100, in use
It is difficult to that deformation occurs, and then the normal use of impact, can arrange on upper strata operating board 100 and add consolidation
Structure, such as, arranges depressed part or protuberance on upper strata operating board 100, i.e. changes upper strata behaviour
The smoothness on the surface of station 100, can either improve the structural strength of upper strata operating board 100, meanwhile,
Upper surface at upper strata operating board 100 arranges concaveconvex structure, also has anti-skidding effect, staff
When upper strata operating board 100 works more safe and reliable, be difficult to skid.
Referring to Fig. 3, lower floor's hydrops platform 200 is mainly used in storing flowing on upper strata operating board 100
Waste water, lower floor's hydrops platform 200 has depressed part, i.e. after upper strata operating board 100 is installed, with lower floor
Defining water leg 300 between hydrops platform 200, upper strata operating board 100 lid fills the upper of water leg 300
Side, multiple leaking hole 101 connected set tanks 300, the waste water on upper strata operating board 100 passes through upper strata
Multiple leaking holes 101 on operating board 100 are flowed into the water in water leg 300, in water leg 300
After collecting, will not flow everywhere, not interfere with environment.
Lower floor's hydrops platform 200 includes that multiple swash plate, multiple swash plates surround column structure, and the most adjacent is oblique
Plate is connected, for cavity in the middle part of the column structure that multiple swash plates surround, cavity have two relative
End, is lower port and upper port, upper port and lower port and is respectively communicated with this cavity, upper port
Internal diameter more than the internal diameter of lower port, whole lower floor hydrops platform 200 in funnel-form, upper strata operating board 100
Lid is contained at upper port, and so, the waste water on upper strata operating board 100 flow to lower floor's hydrops platform 200
After, owing to lower floor's hydrops platform 200 is made up of multiple swash plates, therefore, waste water flows along swash plate, stream
Dynamic more convenient.Being communicated with drainage pipeline 106 at lower port, waste water is discharged by drainage pipeline 106,
Can be by waste water by be then exhausted from after purification mechanism, it is achieved that waste water again with, improve the energy
Utilization rate, save the energy.Meanwhile, the waste water after purifying is discharged in nature be difficult to impact
Environment, more environmentally-friendly.
Valve can also be set at drainage pipeline 106, being turned on or off of on-demand adjustment valve,
Operate more flexible.
In the alternative of this embodiment, lower floor's hydrops platform 200 in funnel-form, lower floor's hydrops platform 200
It is bent into by fanning strip, the simple in construction of lower floor's hydrops platform 200, convenient processing and manufacture, connects
Position few, decrease fixing operation, improve production efficiency.Lower floor's hydrops platform 200 uncovered
End is upper port, and the necking end of lower floor's hydrops platform 200 is lower port.The side face of lower floor's hydrops platform 200
For arc surface, side face is smooth, it is simple to the flowing of water, simultaneously, it is simple to the cleaning of lower floor's hydrops platform 200
Work.
Referring to Fig. 3, add man-hour actual, be preferably arranged to, multiple swash plates are set to four, often
Individual swash plate is set square shape, and four swash plates are respectively first swash plate the 102, second swash plate 103 and two
3rd swash plate 104, the 3rd swash plate 104 includes the 201, second limit, the first limit 202 and the 3rd limit, first
Swash plate 102 between two the first limits 201, and two limits of the first swash plate 102 respectively with two
First limit 201 connects, the second swash plate 103 between two the second limits 202, the second swash plate 103
Two limits be connected to two the second limits 202, one end of four swash plates accumulates lower port, i.e.
Lower port is positioned at four summits of the first limit 201 and the junction on the second limit 202, i.e. four swash plates and encloses
Having become lower port, two articles of limits that two the 3rd limits are upper port of two the 3rd swash plates 104, first is oblique
Plate 102 and the two other that limit is upper port not being connected with the 3rd swash plate 104 of the second swash plate 103
Limit, i.e. upper port include four edges.The simple in construction of whole lower floor hydrops platform 200, easy for installation,
Waste water flows along swash plate, is flowed out by lower port after flowing to lower port again, and the flowing of waste water is more square
Just.Meanwhile, the sound construction of lower floor's hydrops platform 200 is reliable, adds the structural strength of entirety.
Water system provides water resource for whole operating board, it is simple to the cleaning of article.Water system connects
Water source, is transported to the water at water source on operating board, concrete, and water system includes faucet 105,
Faucet 105 can connect tap water, it is also possible to is pulled water out by water pump and is communicated to faucet
105, it is achieved the conveying of water resource.Obviously, for the ease of controlling the flowing of water, on-demand the big of water is set
Little, control valve 111 can be installed on faucet 105, control faucet by control valve 111
The amount of flow of water or the unlatching of faucet 105, closedown at 105, easy to operate, practicality is higher.
Multiple outlet is set on faucet 105, for the ease of the use of water, can go out different
Flexible pipe is installed at the mouth of a river, so, during use, expands the scope of use, operation by dragging flexible pipe
Convenient.Obviously, control valve 111 is arranged on faucet 105, it is possible to control different water outlets
Being turned on or off of mouth, it is possible to save water source, use more flexible.
When faucet 105 needs to keep in repair or change, in order to ensure that waterless operation platform can be normal
Using, further, water system also includes fast water collecting nozzle, it is possible to the on-demand pipeline that replaces with, and uses
Time convenient and swift.
During actual installation, in order to ensure that upper strata operating board 100, lower floor's hydrops platform 200 are installed
After structural integrity, in the preferred version of the present embodiment, waterless operation platform also includes main frame 400,
Main frame 400 uses shape to build and makes, and main frame 400, in frame structure, saves material,
The structural strength of shape is high, can by being spirally connected, mode is fixing connects for welding etc., the master of composition
The sound construction of framework 400 is reliable, it is possible to the gravity born is big, safe and reliable.Lower floor's hydrops
Platform 200 is installed on main frame 400, easy for installation, then upper strata operating board 100 is installed on master
On framework 400, it is preferably arranged to, main frame 400 arranges mounting groove, directly by upper layer operation
Platform 100 is arranged in mounting groove, and the upper surface of upper strata operating board 100 is less than the upper table of main frame 400
Face, waste water is difficult to spill, and uses environmental protection.Meanwhile, upper strata operating board 100 can be from main frame 400
Upper taking-up, it is simple to lower floor's hydrops platform 200 is carried out.
Refer to Fig. 1, in order to improve the structural strength of upper strata operating board 100, be difficult to during use
Deformation, is preferably arranged to, arranges reinforcement 108 on main frame 400, and reinforcement 108 is arranged on
The top of main frame 400, after upper strata operating board 100 is arranged on main frame 400, reinforcement 108 is made
Becoming in the bottom of upper strata operating board 100, reinforcement 108 is set to metallic rod, and intensity is high, supports and makees
Make good use of.
Refer to Fig. 2, in main frame 400, storage chamber 110, locker 109 etc. can also be set, storage
Thing chamber 110 and locker 109 are positioned at the lower section of lower floor's hydrops platform 200, it is simple to the placement of article.Storage
Thing cabinet 109 is slidably connected with main frame 400, it is simple to the placement of article and taking.
The foregoing is only preferred embodiment of the present utility model, be not limited to this practicality new
Type, for a person skilled in the art, this utility model can have various modifications and variations.All
Within spirit of the present utility model and principle, any modification, equivalent substitution and improvement etc. made,
Within should be included in protection domain of the present utility model.
Claims (10)
1. a waterless operation platform, it is characterised in that include water system, upper strata operating board and under
Lamination water platform, wherein:
Described upper strata operating board is latticed, and described upper strata operating board is positioned at above described lower floor hydrops platform,
And between described upper strata operating board and described lower floor hydrops platform, forming water leg, described upper strata operating board is even
Logical described water leg;The water side of described water system is positioned at above the operating board of described upper strata.
Waterless operation platform the most according to claim 1, it is characterised in that described upper strata operating board
Plate-shaped structure, described upper strata operating board is provided with multiple leaking hole, and each described leaking hole runs through
The plate face of described upper strata operating board, multiple described leaking holes all connect described water leg.
Waterless operation platform the most according to claim 2, it is characterised in that described lower floor hydrops platform
Including multiple swash plates, adjacent described swash plate is connected, and multiple described swash plates surround to have and are oppositely arranged
Upper port and the column structure of lower port, the internal diameter of described upper port more than the internal diameter of described lower port,
Described upper port forms the notch of described water leg, and described upper strata operating board lid is loaded at described upper port,
Described lower port is communicated with drainage pipeline.
Waterless operation platform the most according to claim 3, it is characterised in that multiple described swash plates set
Being set to four, each described swash plate is set square shape, including the first swash plate, the second swash plate and two
3rd swash plate, the 3rd swash plate has the first limit and the second limit, and the first swash plate is positioned at two described first
Between limit, and two limits of the first swash plate are connected to two described first limits, and the second swash plate is positioned at
Between two described second limits, and two limits of the second swash plate are connected to two described second limits;
Described lower port is positioned at described first limit and the junction on described second limit of same described 3rd swash plate.
5. according to the waterless operation platform described in any one of claim 1-4, it is characterised in that described confession
Water system includes faucet, and described faucet passes through pipeline communication water source.
Waterless operation platform the most according to claim 5, it is characterised in that described faucet includes
Multiple outlets, described faucet is provided with control valve, and described control valve is used for controlling described in difference
The opening or closing of outlet.
Waterless operation platform the most according to claim 5, it is characterised in that described water system is also
Including fast water collecting nozzle, it is used for connecting water pipe.
Waterless operation platform the most according to claim 1, it is characterised in that described waterless operation platform
Also including main frame, described main frame is built by many shapes and is made, described upper strata operating board with
And described lower floor hydrops platform is respectively arranged in described main frame.
Waterless operation platform the most according to claim 8, it is characterised in that described waterless operation platform
Also include that reinforcement, described reinforcement are installed on the top of described main frame, be used for supporting described upper strata
Operating board.
Waterless operation platform the most according to claim 8, it is characterised in that described waterless operation platform
Also include that multiple locker, the plurality of locker are respectively arranged in described main frame, and multiple described
Locker is positioned at the lower section of described lower floor hydrops platform.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620353798.2U CN205518910U (en) | 2016-04-22 | 2016-04-22 | Anhydrous operation panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620353798.2U CN205518910U (en) | 2016-04-22 | 2016-04-22 | Anhydrous operation panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205518910U true CN205518910U (en) | 2016-08-31 |
Family
ID=56795996
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620353798.2U Expired - Fee Related CN205518910U (en) | 2016-04-22 | 2016-04-22 | Anhydrous operation panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205518910U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109859075A (en) * | 2018-12-26 | 2019-06-07 | 金峰 | A kind of hospital dining room is ordered information system |
-
2016
- 2016-04-22 CN CN201620353798.2U patent/CN205518910U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109859075A (en) * | 2018-12-26 | 2019-06-07 | 金峰 | A kind of hospital dining room is ordered information system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
MY154221A (en) | Flexible drainage cell | |
CN204762758U (en) | Environmental goose plant of planting | |
CN205518910U (en) | Anhydrous operation panel | |
CN205161394U (en) | Water conservation agricultural irrigation drips irrigation device | |
CN201212110Y (en) | Foam-making apparatus for promoting dissolve for washing powder | |
CN206693323U (en) | A kind of skeleton symbol is taken a shower water saving fixtures automatically | |
CN205577030U (en) | Household water -saving system | |
CN205390024U (en) | Fish tank water -changing device | |
CN201850594U (en) | Combined water saving device | |
CN204969352U (en) | Pickles rinsing device | |
CN211721383U (en) | Indoor planting system with multiple cultivation modes | |
CN203991414U (en) | Disposable blood perfusion device washer | |
CN203968968U (en) | Hippocampus culturing jar | |
CN203716231U (en) | Building centralized type bathroom wastewater deodorization utilization technology | |
CN207589997U (en) | A kind of sea cucumber outer surface high pressure washes away apparatus for eliminating sludge | |
CN202137154U (en) | Mushroom valve sheet cleaning device | |
CN108978778A (en) | A kind of energy conservation and environmental protection wash basin | |
CN204059477U (en) | Water economizer | |
CN211932066U (en) | Energy-efficient viscidity roe hatching apparatus | |
CN203683230U (en) | Constructed wetland treatment system adopting tube-well composite water distribution | |
CN215122944U (en) | Industrial hemp circulation water planting groove | |
CN209964888U (en) | Automatic hydrologic cycle breeding device of integral type | |
CN201529101U (en) | Cleaning machine of dining utensils | |
CN207862473U (en) | A kind of anode titanium basket cleaning machine of VCP copper plating production lines | |
CN207552068U (en) | A kind of washing water special processor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20180422 |