CN205513972U - Hang wall structure and track, rail groove thereof - Google Patents

Hang wall structure and track, rail groove thereof Download PDF

Info

Publication number
CN205513972U
CN205513972U CN201620153482.9U CN201620153482U CN205513972U CN 205513972 U CN205513972 U CN 205513972U CN 201620153482 U CN201620153482 U CN 201620153482U CN 205513972 U CN205513972 U CN 205513972U
Authority
CN
China
Prior art keywords
track
wall
rail groove
wall construction
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620153482.9U
Other languages
Chinese (zh)
Inventor
黄诗达
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen top power supply technology Co., Ltd.
Original Assignee
黄诗达
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 黄诗达 filed Critical 黄诗达
Priority to CN201620153482.9U priority Critical patent/CN205513972U/en
Application granted granted Critical
Publication of CN205513972U publication Critical patent/CN205513972U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports Or Holders For Household Use (AREA)

Abstract

The utility model relates to a hang wall structure and track, rail groove thereof, the track is through first installation department and wall body or hang wall product Assembly, the rail groove is passed through the second installation department and is assembled mutually with hanging wall product or wall body, and the slip of track in through first loading and unloading portion follow with rail groove second loading and unloading portion in the sliding tray slidingtype assemble to by butt along butt in butt piece, accomplish spacingly. Like this, the product hangs on the wall body through track or rail groove, can keep product and wall body firmly to install, difficultly falls to damaging because of bumping, when the product was not hung on the wall body, track or rail groove surface were more level and more smooth, have guaranteed certain security.

Description

Hang wall construction and track, rail groove
Technical field
The application relates to mounting technique field, particularly relates to a kind of extension wall construction and track, rail groove.
Background technology
Typically, the extension wall mode of existing product generally uses and wall nail is first hammered into body of wall, then outside product is hung over The wall of dew nails on.This mode normally results in two problems, and one is that product passes through wall nail and is suspended on body of wall, Though can be smooth with surface of wall, insecure, easily touch down and damage;Two is when product does not hangs over wall Time on body, the wall nail exposed may produce injury because of child or the shock of adult, there is potential safety hazard.
Summary of the invention
The application is intended to solve one of above-mentioned technical problem the most to a certain extent.
According to the first aspect of the application, the application provides a kind of track hung in wall construction, including: it is used for The first installation portion assembled mutually with body of wall or extension wall product, and, there is the slip for the assembling of rail groove slidingtype Along and be positioned at described slip along end and for limiting first handling part abutting edge of sliding stroke, described the One installation portion assembles mutually with described first handling part.
Further, described first handling part have be positioned at two of sliding stroke both sides slips along and two support Connect edge.
Further, described first handling part have be positioned at one of sliding stroke side slip along and one support Connect edge.
Further, described first installation portion is by screwing togather or bonding mode and described body of wall or extension wall product phase Assembling.
According to the second aspect of the application, the application provides a kind of rail groove hung in wall construction, including: it is used for The second installation portion assembled mutually with extension wall product or body of wall, and, there is the slip for orbit sliding type assembling Groove and be positioned at described sliding tray end and for limiting second handling part abutting block of sliding stroke, described the Two installation portions assemble mutually with described second handling part.
According to the third aspect of the application, the application provides a kind of and hangs wall construction, including: track described above, And, rail groove described above.
Further, described extension wall construction includes: a described track, and, a described rail groove.
Further, described extension wall construction includes: two described tracks, and, two described rail grooves.
Further, described track matches with the length of described rail groove.
The application provides the benefit that:
By providing one to hang wall construction and track, rail groove, track is by the first installation portion and body of wall or extension Wall Product Assembly, rail groove is assembled with extension wall product or body of wall mutually by the second installation portion, and track is by first Sliding in handling part is assembled along with the sliding tray slidingtype in rail groove the second handling part, and by abutting along supporting It is connected to abut block, completes spacing.So, product is suspended on body of wall by track or rail groove, can keep producing Product are firmly installed with body of wall, it is not easy to damage because touching down;When product does not hangs on body of wall, track or rail Rooved face is more smooth, it is ensured that certain safety.
Accompanying drawing explanation
Fig. 1 be the embodiment of the present application one hang rail groove and the combination schematic diagram hanging wall product in wall construction.
Fig. 2 is the combination schematic diagram hanging wall construction middle orbit and body of wall of the embodiment of the present application one.
Fig. 3 is the combination schematic diagram hanging wall construction middle orbit and rail groove of the embodiment of the present application one.
Detailed description of the invention
Embodiments herein is described below in detail, and the example of described embodiment is shown in the drawings, wherein certainly Begin to same or similar label eventually represent same or similar element or there is the unit of same or like function Part.The embodiment described below with reference to accompanying drawing is exemplary, it is intended to be used for explaining the application, and not It is understood that as the restriction to the application.
In the description of the present application, it is to be understood that term " " center ", " longitudinally ", " laterally ", " length ", " width ", " thickness ", " on ", D score, "front", "rear", "left", "right", " vertically ", " level ", " top ", The orientation of the instruction such as " end " " interior ", " outward ", " clockwise ", " counterclockwise " or position relationship are for based on shown in accompanying drawing Orientation or position relationship, be for only for ease of description the application and simplify describe rather than instruction or hint The device of indication or element must have specific orientation, with specific azimuth configuration and operation, therefore can not It is interpreted as the restriction to the application.
Additionally, term " first ", " second " are only used for describing purpose, and it is not intended that instruction or hint relatively Importance or the implicit quantity indicating indicated technical characteristic.Thus, " first ", " second " are defined Feature can express or implicitly include one or more this feature.In the description of the present application, " multiple " are meant that two or more, unless otherwise expressly limited specifically.
In this application, unless otherwise clearly defined and limited, term " install ", " being connected ", " connection ", The term such as " fix " should be interpreted broadly, connect for example, it may be fixing, it is also possible to be to removably connect, or It is integrally connected;Can be to be mechanically connected, it is also possible to be electrical connection;Can be to be joined directly together, it is also possible to logical Cross intermediary to be indirectly connected to, can be the connection of two element internals.Ordinary skill people for this area For Yuan, above-mentioned term concrete meaning in this application can be understood as the case may be.
In this application, unless otherwise clearly defined and limited, fisrt feature second feature it " on " or it D score can include that the first and second features directly contact, it is also possible to includes that the first and second features are not directly to connect Touch but by the other characterisation contact between them.And, fisrt feature second feature " on ", " on Side " and " above " include that fisrt feature directly over second feature and oblique upper, or is merely representative of fisrt feature water Flat height is higher than second feature.Fisrt feature second feature " under ", " lower section " and " below " include that first is special Levy immediately below second feature and obliquely downward, or be merely representative of fisrt feature level height less than second feature.
Combine accompanying drawing below by detailed description of the invention the application is described in further detail.
Embodiment one:
Refer to Fig. 1-3, the application provides a kind of and hangs wall construction, including: track 1, and, rail groove 2. In the present embodiment, hang wall construction and include: the track 1 of two substantially parallel settings, and, two are the most flat The rail groove 2 that row is arranged.
Track 1 includes: for the first installation portion 11 with the assembling of body of wall 3 phase, and, have for rail groove 2 The slip of slidingtype assembling is along 121 and is positioned at slip along 121 ends and for limiting the abutting edge of sliding stroke First handling part 12 of 122, the first installation portion 11 and the first handling part 12 phase assembling, such as integral molding Or be spliced.
First handling part 12 has and is positioned at two of sliding stroke both sides slips and abuts along 122 along 121 and two.
First installation portion 11 by screw togather or the mode (mainly using screw-in version in the present embodiment) such as bonding with Body of wall 3 phase is assembled.
And rail groove 2 includes: for the second installation portion 21 with extension wall product 4 phase assembling, and, have for track 1 slidingtype assembling sliding tray 221 and be positioned at sliding tray 221 end and for limiting the abutting block of sliding stroke Second handling part 22 of 222, the second installation portion 21 and the second handling part 22 phase assembling, such as integral molding Or be spliced.
Second installation portion 21 is by screwing togather or the mode such as bonding and hang wall product 4 phase and assemble.
When specifically applying, track 1 matches with the length of rail groove 2.
Product is divided into two parts: track and rail groove.Track is scheduled on body of wall, when depositing product, will be with Track card is from top to bottom entered the orbit in groove by the product of rail groove, can be hung on body of wall by product;During taking-up, Product is detached from the bottom to top track, departs from body of wall.
By implementing the present embodiment, track is by the first installation portion and body of wall or extension wall Product Assembly, and rail groove leads to Cross the second installation portion and assemble mutually with hanging wall product or body of wall, and track by the slip in the first handling part along with Sliding tray slidingtype assembling in rail groove the second handling part, and by abutting along being connected to abutting block, complete limit Position.So, product is suspended on body of wall by track or rail groove, and product can be kept firmly to install with body of wall, It is not easy to damage because touching down;When product does not hangs on body of wall, track or rail rooved face are more smooth, it is ensured that Certain safety.
Embodiment two:
The present embodiment essentially consists in above-described embodiment difference:
In the present embodiment, the first handling part 12 has and is positioned at one of sliding stroke side slip along 121 and one Individual abutting is along 122.
Embodiment three:
The present embodiment essentially consists in above-described embodiment difference:
In the present embodiment, track 1 assembles with hanging wall product 4 phase, and rail groove 2 and body of wall 3 phase are assembled.
In the description of this specification, reference term " embodiment ", " some embodiments ", " an enforcement Example ", " some embodiments ", " example ", the description of " concrete example " or " some examples " etc. mean to combine should Specific features, structure, material or the feature that embodiment or example describe is contained at least one of the application In embodiment or example.In this manual, the schematic representation to above-mentioned term is not necessarily referring to identical Embodiment or example.And, the specific features of description, structure, material or feature can be any One or more embodiments or example combine in an appropriate manner.
Above content is to combine the further description that the application is made by specific embodiment, it is impossible to recognize Determine the application be embodied as be confined to these explanations.Ordinary skill for the application art For personnel, on the premise of conceiving without departing from the application, it is also possible to make some simple deduction or replace.

Claims (9)

1. the track hung in wall construction, it is characterised in that including: be used for and body of wall or extension The first installation portion that wall product assembles mutually, and, there is the slip edge for the assembling of rail groove slidingtype And be positioned at described slip along end and for limit sliding stroke abut edge the first handling part, Described first installation portion assembles mutually with described first handling part.
2. the as claimed in claim 1 track hung in wall construction, it is characterised in that described the One handling part has two slide edge and two the abutting edges being positioned at sliding stroke both sides.
3. the as claimed in claim 1 track hung in wall construction, it is characterised in that described the One handling part has slide edge and the abutting edge being positioned at sliding stroke side.
4. the as claimed in claim 1 track hung in wall construction, it is characterised in that described the One installation portion is by screwing togather or bonding mode assembles mutually with described body of wall or extension wall product.
5. the rail groove that a kind is hung in wall construction, it is characterised in that including: be used for and hang wall product Or the second installation portion that body of wall assembles mutually, and, there is the sliding tray for orbit sliding type assembling And it is positioned at described sliding tray end and for limiting second handling part abutting block of sliding stroke, Described second installation portion assembles mutually with described second handling part.
6. hang wall construction for one kind, it is characterised in that including: as any one of claim 1-4 Described track, and, rail groove as claimed in claim 5.
Hang wall construction the most as claimed in claim 6, it is characterised in that described extension wall construction bag Include: a described track, and, a described rail groove.
Hang wall construction the most as claimed in claim 6, it is characterised in that described extension wall construction bag Include: two described tracks, and, two described rail grooves.
Hang wall construction the most as claimed in claim 6, it is characterised in that described track is with described The length of rail groove matches.
CN201620153482.9U 2016-03-01 2016-03-01 Hang wall structure and track, rail groove thereof Active CN205513972U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620153482.9U CN205513972U (en) 2016-03-01 2016-03-01 Hang wall structure and track, rail groove thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620153482.9U CN205513972U (en) 2016-03-01 2016-03-01 Hang wall structure and track, rail groove thereof

Publications (1)

Publication Number Publication Date
CN205513972U true CN205513972U (en) 2016-08-31

Family

ID=56780197

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620153482.9U Active CN205513972U (en) 2016-03-01 2016-03-01 Hang wall structure and track, rail groove thereof

Country Status (1)

Country Link
CN (1) CN205513972U (en)

Similar Documents

Publication Publication Date Title
US4775129A (en) Wall hanger
RU2681865C1 (en) Kit of hanging system
BR112016007988B1 (en) FIXER
CN209400996U (en) Touch frame and touch display screen
CN205513972U (en) Hang wall structure and track, rail groove thereof
CN203970030U (en) A kind of hanging hook assembly
EP0386753A3 (en) Labelled gravity suspension container
CN205822670U (en) A kind of wallboard installation system
CN103741927B (en) A kind of floor board mounting structure
CN208875977U (en) Strengthened rail of window curtains connector and curtain rail with general applicability
CN207412096U (en) A kind of three door linkage shower houses
CN103774830B (en) A kind of floor mounting method
CN103438085B (en) The fixing device of added equipment
CN209103687U (en) A kind of novel shelf Sign Board
GB1573888A (en) Sub-frame elements for use in building construction
CN209202590U (en) Connection component and modular construction
CN202152994U (en) Embedded type installment rails with edges
CN209011474U (en) Wall built-up component and wallboard
CN207829263U (en) A kind of Integral ceiling module connection structure
CN106264033A (en) A kind of mechanical clamping type hook
CN205579666U (en) Electromagnetism stove and coil panel
CN207613676U (en) Kitchen article-holding device
CN205481793U (en) Slotted water heater stores pylon
CN205745675U (en) A kind of Cable hanger
CN208817040U (en) A kind of support platform of locator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20191104

Address after: 518000 floor 2, Lantian building, No.4 workshop, Kaitian Science Park, Fumin Industrial Zone, Pinghu community, Pinghu street, Longgang District, Shenzhen City, Guangdong Province

Patentee after: Shenzhen top power supply technology Co., Ltd.

Address before: 518000, Longgang District, Guangdong City, Pinghu District, Shenzhen street, Tian Tian Science Park, blue sky building

Patentee before: Huang Shida