CN205513556U - Movable substation overhauls insulating height bench - Google Patents

Movable substation overhauls insulating height bench Download PDF

Info

Publication number
CN205513556U
CN205513556U CN201620236175.7U CN201620236175U CN205513556U CN 205513556 U CN205513556 U CN 205513556U CN 201620236175 U CN201620236175 U CN 201620236175U CN 205513556 U CN205513556 U CN 205513556U
Authority
CN
China
Prior art keywords
bench
insulation
insulating
insulation bench
stool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620236175.7U
Other languages
Chinese (zh)
Inventor
胡戈飚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Pingxiang Power Supply Branch State Grid Jiangxi Electric Power Co Ltd
Priority to CN201620236175.7U priority Critical patent/CN205513556U/en
Application granted granted Critical
Publication of CN205513556U publication Critical patent/CN205513556U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Special Chairs (AREA)

Abstract

The utility model discloses a movable substation overhauls insulating height bench, it includes from last under according to high series arrangement's insulating bench (2) of first insulation bench (1), second and the third bench (4) that insulates at least, it all is provided with insulating fill up (5) on slipmat (3), the bench foot all to be provided with on the bench face of the insulating bench of first insulation bench, second, the insulating bench of third, be provided with on the front end bench foot of first insulation bench universal pulley (7), the end is provided with locating lever (9) in face of the bench of the insulating bench of second, the insulating bench of third, and the insulating bench middle part of second is provided with support frame (6), only need empty slightly, removes with regard to accessible handle and universal pulley, 2, whole length can be adjusted at any time, is suitable for different maintenance working altitude and different maintenance number and uses, 3, whole safety and stability nature improves greatly, is applicable to various bad weathers, has lightened to examine and repair day operation personnel's an operating pressure, and has not needed extra guard personnel.

Description

Movable transformer pack maintenance insulation height adjusting stool
Technical field
This utility model relates to station aid, particularly to movable transformer pack maintenance insulation height adjusting stool.
Background technology
Along with the development of China's power industry, nowadays in power construction, operation and service work, transformer station ascends a height (becoming requisite power tool in station works, it is reducing employee's operation intensity, is improving peace operation equipment Full production efficiency aspect has played highly important effect).Maintenance back work conventional in transformer station's operation typically has a word The types such as ladder (vertical ladder), double ladder, the soft stool of insulation.Yi shaped ladder is to be done limit by two terraced beams, and scansorial stepping on is crossed in centre Plate forms, and needs to rest on and carries out operation, although and double ladder need not by rest on fixing building or electric pole Carry out operation, but need chain to strain, and its security and stability is the highest, it is desirable to have special messenger's whole process helps ladder, and carries out monitoring, Helping ladder person also to need to wear a safety helmet, and the soft stool of presently used insulation is general only in indoor use, service work personnel climb Thereon during operation, owing to step is stepped on for a long time on pedal (cross bar), during upkeep operation, psychology and health bear pressure greatly, hold Easily divert one's attention to cause security incident.
Utility model content
For the problem existing for insulation bench in above-mentioned prior art, this utility model provides a kind of at station Work be easy to when using mobile, securely, width scalable, movable transformer pack applied widely maintenance insulation height Stool.
This utility model solves technical problem and the technical scheme is that movable transformer pack maintenance insulation height adjusting stool at least Including under upper according to high order arrangement the first insulation bench, the second insulation bench, the 3rd insulation bench, described first insulation Stool, the second insulation bench, the 3rd insulation bench stool surface on be provided with on slipmat, stool foot and be provided with felt pad, described first Being provided with Universal pulley on the front end stool foot of insulation bench, described second insulation bench, the stool surface front end of the 3rd insulation bench are provided with fixed Position bar, is provided with bracing frame in the middle part of the second insulation bench, it is spaced that described second insulation bench is supported on the first insulation bench both sides On support bar, described 3rd insulation bench is supported on bracing frame.
Further, it is provided with hog frame on front side of described insulation bench, described hog frame is provided with handle.
Further, the top of described first insulation bench is provided with guard rail.
Further, described support bar and bracing frame are arranged at intervals with positive stop strip.
The beneficial effects of the utility model: compared to existing technology, 1, only need to slightly topple over, so that it may by handle and universal cunning Wheel moves;2, entire length can regulate at any time, is suitable for different upkeep operation height and different maintenance number uses;3, whole Body security and stability is greatly improved, it is adaptable to various vile weathers, alleviates the operating pressure of maintenance day operating personnel, and is not required to Want extra guard.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present utility model.
In the drawings, 1, first insulation bench the 2, second insulation bench 3, slipmat the 4, the 3rd insulation bench 5, felt pad 6, bracing frame 7, Universal pulley 8, support bar 9, location bar 10, positive stop strip 11, handle 12, hog frame 13, Guard rail.
Detailed description of the invention
In order to make those skilled in the art be more fully understood that the technical solution of the utility model, combine tool below according to accompanying drawing Body embodiment describes in further detail this utility model.
As it is shown in figure 1, described movable transformer pack maintenance insulation height adjusting stool, the structures such as wooden, fiberglass can be used to make, At least include first insulation bench the 1, second insulation bench the 2, the 3rd insulation bench 4(not only according to high order's arrangement under upper It is limited to three-layer insulated stool, can increase and decrease at any time according to working depth), described first insulation bench, the second insulation bench, the 3rd insulation bench Be provided with slipmat 3(in stool surface and be provided with anti-skidding striped), be provided with felt pad 5 on stool foot, described first insulation Being provided with Universal pulley 7 on the front end stool foot of stool, described second insulation bench, the stool surface front end of the 3rd insulation bench are provided with location bar The length of 9(location bar is more than or equal to the distance between support bar and the width of bracing frame), arrange in the middle part of the second insulation bench Bracing frame 6, described second insulation bench is had to be supported on the first spaced support bar in insulation bench both sides 8, described 3rd insulation Stool is supported on bracing frame, and such structure can make the second insulation bench, the 3rd insulation bench shrink at any time, uses differing heights and not Work with the maintainer of number, applicable and incomprehensive work space, can easily move this practicality by Universal pulley Novel.
Preferably, in order to strengthen integrally-built intensity, being provided with hog frame 12 on front side of described insulation bench, hog frame is " △ " shape or X-shaped, service work personnel move for convenience, and described hog frame is provided with handle 11.
Preferably, in order to prevent service work personal height from falling, the top of described first insulation bench is provided with protection Safety rope etc. also can be fixed on guard rail by hurdle 13().
Preferably, although said structure can complete basic function of the present utility model, in order to prevent sleety weather exhausted Produce between edge stool and slide, described support bar and bracing frame are arranged at intervals with positive stop strip 10, so can be further by location Bar is fixed, and can regulate fixed position at any time.
Embodiment of above is only in order to illustrate the technical solution of the utility model and unrestricted, although with reference to specific embodiment This utility model is described in detail, it will be understood by those within the art that, can be to skill of the present utility model Art scheme is modified or equivalent, and without deviating from the spirit and scope of technical solutions of the utility model, it all should be contained In protective scope of the claims of the present utility model.

Claims (4)

1. movable transformer pack maintenance insulation height adjusting stool, it is characterised in that: it at least includes arranging according to high order under upper Row the first insulation bench (1), the second insulation bench (2) and the 3rd insulation bench (4), described first insulation bench, the second insulation bench, the 3rd It is provided with in the stool surface of insulation bench on slipmat (3), stool foot and is provided with felt pad (5), the front end of described first insulation bench Being provided with Universal pulley (7) on stool foot, described second insulation bench, the stool surface front end of the 3rd insulation bench are provided with location bar (9), the Being provided with bracing frame (6) in the middle part of two insulation benchs, described second insulation bench is supported on the first spaced support in insulation bench both sides On bar (8), described 3rd insulation bench is supported on bracing frame.
Movable transformer pack the most according to claim 1 maintenance insulation height adjusting stool, it is characterised in that: on front side of described insulation bench It is provided with hog frame (12), described hog frame is provided with handle (11).
Movable transformer pack the most according to claim 1 maintenance insulation height adjusting stool, it is characterised in that: described first insulation bench Top be provided with guard rail (13).
Movable transformer pack the most according to claim 1 maintenance insulation height adjusting stool, it is characterised in that: described support bar and Positive stop strip (10) it is arranged at intervals with on support.
CN201620236175.7U 2016-03-26 2016-03-26 Movable substation overhauls insulating height bench Expired - Fee Related CN205513556U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620236175.7U CN205513556U (en) 2016-03-26 2016-03-26 Movable substation overhauls insulating height bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620236175.7U CN205513556U (en) 2016-03-26 2016-03-26 Movable substation overhauls insulating height bench

Publications (1)

Publication Number Publication Date
CN205513556U true CN205513556U (en) 2016-08-31

Family

ID=56784822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620236175.7U Expired - Fee Related CN205513556U (en) 2016-03-26 2016-03-26 Movable substation overhauls insulating height bench

Country Status (1)

Country Link
CN (1) CN205513556U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106711819A (en) * 2016-12-28 2017-05-24 国家电网公司 Dual-purpose insulating height adjustable stool
CN107087922A (en) * 2017-06-30 2017-08-25 国网河南省电力公司内乡县供电公司 Insulation bench
CN107701091A (en) * 2017-09-28 2018-02-16 国网山东省电力公司青州市供电公司 Grid switching operation multifunction insulating tower wagon
CN109244905A (en) * 2018-09-21 2019-01-18 林清武 It is a kind of for ship can self-leveling electric power overhaul stool
CN110405714A (en) * 2019-08-21 2019-11-05 云南锡业股份有限公司铜业分公司 A kind of self-baking electrode operation insulated platform

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106711819A (en) * 2016-12-28 2017-05-24 国家电网公司 Dual-purpose insulating height adjustable stool
CN107087922A (en) * 2017-06-30 2017-08-25 国网河南省电力公司内乡县供电公司 Insulation bench
CN107701091A (en) * 2017-09-28 2018-02-16 国网山东省电力公司青州市供电公司 Grid switching operation multifunction insulating tower wagon
CN109244905A (en) * 2018-09-21 2019-01-18 林清武 It is a kind of for ship can self-leveling electric power overhaul stool
CN109244905B (en) * 2018-09-21 2019-12-03 诸暨易和项目投资有限公司 It is a kind of for ship can self-leveling electric power overhaul stool
CN110405714A (en) * 2019-08-21 2019-11-05 云南锡业股份有限公司铜业分公司 A kind of self-baking electrode operation insulated platform

Similar Documents

Publication Publication Date Title
CN205513556U (en) Movable substation overhauls insulating height bench
CN105257083A (en) Anti-climbing electric fence with alarming function
CN105375372A (en) Pole-mounted transformer inspection and maintenance rack
CN203242941U (en) Novel electric power overhaul frame
CN203270437U (en) Movable ladder for floating pier
CN206279875U (en) A kind of telescopic insulating protection fence
CN204290129U (en) A kind of New Type Isolating Switch repairing frame
CN205349212U (en) Electric power overhauls with device of ascending a height
CN205543952U (en) Professional equipment is strideed across to hydraulic pressure assembled
CN210217076U (en) Civil engineering safety scaffold
CN211899519U (en) Building construction removes operation platform
CN202090265U (en) Rubber asphalt production equipment
CN204485134U (en) A kind of portable secured band bracing or strutting arrangement
CN204103309U (en) A kind of composite type inspection platform
CN203545376U (en) Tower cylinder elevator
CN105257085A (en) Anti-climbing electric fence with alarming function
CN205092110U (en) Safe transformer rack
CN205153661U (en) Safety device of modified transmission line framework
CN104377578A (en) Low-voltage pole type power distribution cabinet operating platform
CN219672285U (en) Cable terminal steel pipe pole convenient to overhaul
CN202121251U (en) 220kV Li Xu line overhead earth wire overhauling plate ladder
CN210627621U (en) Permanent maintenance platform in isolator real operation place
CN201303221Y (en) Distribution transformer overhauling platform device on 10KV column
CN202073363U (en) Stereoscopic insulation fencing
CN214958272U (en) Safe cat ladder of transformer substation operation and maintenance usefulness

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160831

Termination date: 20180326