CN205501955U - 一种可更换的消能防冲装置 - Google Patents
一种可更换的消能防冲装置 Download PDFInfo
- Publication number
- CN205501955U CN205501955U CN201620321159.8U CN201620321159U CN205501955U CN 205501955 U CN205501955 U CN 205501955U CN 201620321159 U CN201620321159 U CN 201620321159U CN 205501955 U CN205501955 U CN 205501955U
- Authority
- CN
- China
- Prior art keywords
- energy dissipation
- energy
- bank
- dissipation
- energy dissipating
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Revetment (AREA)
Abstract
本实用新型提供的一种可更换的消能防冲装置,包括消能池、消能坎以及设置在消能坎外可更换的消能防冲装置,其特征在于:所述消能坎为钢筋混凝土结构,在钢筋混凝土结构浇筑时设置预埋件,所述预埋件与所述消能坎内部的钢筋相连,所述消能防冲装置包括包裹在消能坎外部的防护板,所述防护板上间隔设置有螺栓孔,所述防护板通过螺栓与消能坎中的预埋件连接,所述防护板与消能池接触的底部设置折边,折边上开设有螺栓孔,所述折边通过螺栓与消能池内设置的预埋件进行连接,所述防护板与消能坎之间设置缓冲材料,所述缓冲材料能消耗消能坎在消能过程中的能量,从而对消能坎起到保护作用。通过设置可拆卸的防护结构,利用缓冲层的设置,增加了消能坎的安全防护性能,提高了消能建筑物的使用寿命。
Description
技术领域
本实用新型涉及水利工程领域,具体而言,涉及一种可更换的消能防冲装置。
背景技术
在水利工程领域中,在河渠断面突然变化或流态变化的情况下,水流流速突变,对相应的河渠或水工建筑物产生一定的冲刷,为对这些建筑物进行必要的保护,往往设置消能池、消能坎等消能建筑物对水流的能量进行一定的消耗。
消能建筑物由于受到水流的冲刷,其结构往往损坏速度快,不及时进行必要的整修维护,其消能效果将会明显降低,为保证消能建筑物的正常消能效果,往往需要进行定期的整修,造价较高。
发明内容
针对上述技术问题,本实用新型提供一种可更换的消能防冲装置,通过设置可拆卸的防护结构,利用缓冲层的设置,增加了消能坎的安全防护性能,提高了消能建筑物的使用寿命。
本实用新型提供一种可更换的消能防冲装置,包括消能池、消能坎以及设置在消能坎外可更换的消能防冲装置,其特征在于:所述消能坎为钢筋混凝土结构,在钢筋混凝土结构浇筑时设置预埋件,所述预埋件与所述消能坎内部的钢筋相连,所述消能防冲装置包括包裹在消能坎外部的防护板,所述防护板上间隔设置有螺栓孔,所述防护板通过螺栓与消能坎中的预埋件连接,所述防护板与消能池接触的底部设置折边,折边上开设有螺栓孔,所述折边通过螺栓与消能池内设置的预埋件进行连接,所述防护板与消能坎之间设置缓冲材料,所述缓冲材料能消耗消能坎在消能过程中的能量,从而对消能坎起到保护作用。
作为优选,所述缓冲材料为橡胶,所述防护板为钢板。
作为优选,所述缓冲材料为橡胶,所述防护板为塑料板。
作为优选,所述消能坎的混凝土标号为C25。
通过设置上述结构,其有益效果为:通过设置螺栓连接方式,便于防护结构的更换维护;通过设置缓冲材料,提高了消能坎的消能效果及使用寿命。
附图说明
图1:消能防冲装置结构示意图。
附图标记说明:1-消能池,2-消能坎,3-消能防冲装置,4-预埋件,5-钢筋,6-防护板,7-螺栓孔,8-螺栓,9-折边,10-缓冲材料。
具体实施方式
以下以具体实施例为例,对本实用新型进行简单说明。
一种可更换的消能防冲装置,包括消能池1、消能坎2以及设置在消能坎2外可更换的消能防冲装置3,其特征在于:所述消能坎2为钢筋混凝土结构,在钢筋混凝土结构浇筑时设置预埋件4,所述预埋件4与所述消能坎2内部的钢筋5相连,所述消能防冲装置3包括包裹在消能坎2外部的防护板6,所述防护板6上间隔设置有螺栓孔7,所述防护板6通过螺栓8与消能坎2中的预埋件4连接,所述防护板6与消能池1接触的底部设置折边9,折边9上开设有螺栓孔7,所述折边9通过螺栓8与消能池1内设置的预埋件4进行连接,所述防护板6与消能坎2之间设置缓冲材料10,所述缓冲材料10能消耗消能坎2在消能过程中的能量,从而对消能坎2起到保护作用。
作为优选,所述缓冲材料10为橡胶,所述防护板6为钢板。
作为优选,所述缓冲材料10为橡胶,所述防护板6为塑料板。
作为优选,所述消能坎2的混凝土标号为C25。
通过设置上述结构,其有益效果为:通过设置螺栓连接方式,便于防护结构的更换维护;通过设置缓冲材料,提高了消能坎的消能效果及使用寿命。
以上仅是本实用新型的优选实施例,任何不脱离本发明构思的技术方案均应在本实用新型的具体保护范围内。
Claims (4)
1.一种可更换的消能防冲装置,包括消能池、消能坎以及设置在消能坎外可更换的消能防冲装置,其特征在于:所述消能坎为钢筋混凝土结构,在钢筋混凝土结构浇筑时设置预埋件,所述预埋件与所述消能坎内部的钢筋相连,所述消能防冲装置包括包裹在消能坎外部的防护板,所述防护板上间隔设置有螺栓孔,所述防护板通过螺栓与消能坎中的预埋件连接,所述防护板与消能池接触的底部设置折边,折边上开设有螺栓孔,所述折边通过螺栓与消能池内设置的预埋件进行连接,所述防护板与消能坎之间设置缓冲材料,所述缓冲材料能消耗消能坎在消能过程中的能量,从而对消能坎起到保护作用。
2.一种如权利要求1所述的可更换的消能防冲装置,其特征在于:所述缓冲材料为橡胶,所述防护板为钢板。
3.一种如权利要求1所述的可更换的消能防冲装置,其特征在于:所述缓冲材料为橡胶,所述防护板为塑料板。
4.一种如权利要求1所述的可更换的消能防冲装置,其特征在于:所述消能坎的混凝土标号为C25。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620321159.8U CN205501955U (zh) | 2016-04-11 | 2016-04-11 | 一种可更换的消能防冲装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620321159.8U CN205501955U (zh) | 2016-04-11 | 2016-04-11 | 一种可更换的消能防冲装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205501955U true CN205501955U (zh) | 2016-08-24 |
Family
ID=56713810
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620321159.8U Expired - Fee Related CN205501955U (zh) | 2016-04-11 | 2016-04-11 | 一种可更换的消能防冲装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205501955U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411855A (zh) * | 2018-03-07 | 2018-08-17 | 华北水利水电大学 | 一种混凝土护坡桩基础均衡传力装置及施工方法 |
CN110172955A (zh) * | 2019-06-26 | 2019-08-27 | 河南省水利第一工程局 | 一种多角度可调挑流消能装置及其施工方法 |
-
2016
- 2016-04-11 CN CN201620321159.8U patent/CN205501955U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108411855A (zh) * | 2018-03-07 | 2018-08-17 | 华北水利水电大学 | 一种混凝土护坡桩基础均衡传力装置及施工方法 |
CN108411855B (zh) * | 2018-03-07 | 2019-05-17 | 华北水利水电大学 | 一种混凝土护坡桩基础均衡传力装置及施工方法 |
CN110172955A (zh) * | 2019-06-26 | 2019-08-27 | 河南省水利第一工程局 | 一种多角度可调挑流消能装置及其施工方法 |
CN110172955B (zh) * | 2019-06-26 | 2020-12-08 | 河南省水利第一工程局 | 一种多角度可调挑流消能装置的施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205501955U (zh) | 一种可更换的消能防冲装置 | |
CN203782545U (zh) | 钢筋混凝土式桥墩 | |
CN205501956U (zh) | 一种带有消能凸块的消能桩结构 | |
CN204282294U (zh) | 一种浮式复合消波平台 | |
CN201169763Y (zh) | 一种橡胶坝防护板 | |
CN206708513U (zh) | 臭氧发生器的保护排水阀 | |
CN205501958U (zh) | 一种水电站前池进水口防护结构 | |
CN204703126U (zh) | 一种水利护坡网 | |
CN205100158U (zh) | 一种利用植被来防冲刷的生态加筋网 | |
CN204385687U (zh) | 无翼墙水闸布置形式 | |
CN207609003U (zh) | 一种园林排水装置 | |
CN102561262A (zh) | 模块式人造网状铺垫防冲刷装置及方法 | |
CN208219585U (zh) | 一种具有生态保护功能的护栏 | |
CN203021964U (zh) | 一种缓冲式沉浮箱 | |
Failer et al. | Merowe: The largest water resources Project under construction in Africa | |
CN203403394U (zh) | 一种加固型拦污浮排结构 | |
CN204061275U (zh) | 一种潜水泵保护座 | |
CN103663100B (zh) | 一种双工字型透水框架专用吊具 | |
CN205896558U (zh) | 海洋平台独立桩海管防护装置 | |
CN205530118U (zh) | 一种水利防洪的河流缓流速设备 | |
CN104405633B (zh) | 一种潜水泵保护座 | |
CN103708001A (zh) | 格栅 | |
CN203545447U (zh) | 一种双工字型透水框架专用吊具 | |
CN204357624U (zh) | 河流能量双管气压发电机 | |
CN203230619U (zh) | 新型叶轮 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 Termination date: 20170411 |