CN205490608U - Automatic test equipment of railway signal controlgear - Google Patents
Automatic test equipment of railway signal controlgear Download PDFInfo
- Publication number
- CN205490608U CN205490608U CN201620155268.7U CN201620155268U CN205490608U CN 205490608 U CN205490608 U CN 205490608U CN 201620155268 U CN201620155268 U CN 201620155268U CN 205490608 U CN205490608 U CN 205490608U
- Authority
- CN
- China
- Prior art keywords
- test
- equipment
- testing
- railway signal
- communication protocol
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012360 testing method Methods 0.000 title claims abstract description 175
- 238000004891 communication Methods 0.000 claims abstract description 51
- 238000006243 chemical reaction Methods 0.000 claims abstract description 25
- 238000004088 simulation Methods 0.000 claims abstract description 21
- 238000005065 mining Methods 0.000 claims description 5
- 230000007704 transition Effects 0.000 claims 1
- 230000003993 interaction Effects 0.000 abstract description 3
- 230000001131 transforming effect Effects 0.000 abstract 1
- 238000007726 management method Methods 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000012356 Product development Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Landscapes
- Train Traffic Observation, Control, And Security (AREA)
Abstract
本实用新型涉及一种铁路信号控制设备自动化测试设备,包括依次连接的模拟测试机、网关装置和通信协议转换装置,还包括TB端子排,TB端子排的两端分别连接通信协议转换装置和被测设备。与现有技术相比,本实用新型在原有测试设备的基础上增加了TB端子排,方便接线,同时通信协议转换装置侧存在可以使模拟测试机与被测设备的各单元之间协议兼容,通过模拟并转换生成现场实际信息自动实现与被测对象的交互,实现自动测试,提高了测试效率,减少人工参与,提高测试的可信度。
The utility model relates to an automatic test equipment for railway signal control equipment, which comprises a simulation test machine, a gateway device and a communication protocol conversion device connected in sequence, and also includes a TB terminal row, and the two ends of the TB terminal row are respectively connected to the communication protocol conversion device and the passive device. testing equipment. Compared with the prior art, the utility model adds a TB terminal block on the basis of the original testing equipment, which is convenient for wiring. At the same time, the presence of the communication protocol conversion device can make the protocol compatible between the simulation testing machine and the units of the testing equipment. By simulating and transforming the actual information generated on-site, it can automatically realize the interaction with the measured object, realize automatic testing, improve the testing efficiency, reduce manual participation, and improve the credibility of the testing.
Description
技术领域technical field
本实用新型涉及一种铁路通信测试设备,尤其是涉及一种铁路信号控制设备自动化测试设备。The utility model relates to a railway communication test equipment, in particular to an automatic test equipment for railway signal control equipment.
背景技术Background technique
LKD2-T3列控中心产品是中国通号集团的信号产品,用于铁路客运专线上的信号控制,可在既有的客运专线铁路和未来新建的客运专线或城际高速铁路上应用。研发产品测试平台是验证产品满足设计需求、保证产品功能的一种重要手段,因此测试平台在产品研发和运行的生命周期内有重要意义。The LKD2-T3 train control center product is a signal product of CRSC Group, which is used for signal control on railway passenger dedicated lines, and can be applied on existing passenger dedicated railways and future new passenger dedicated lines or intercity high-speed railways. The R&D product test platform is an important means to verify that the product meets the design requirements and ensure product functions, so the test platform is of great significance in the life cycle of product development and operation.
LKD2-T2/T3自动化测试平台是针对LKD2-T3列控中心整机测试系统,测试对象包括输入输出采驱单元、LEU通信单元、轨道电路单元、以太网单元。本实用新型测试平台具有高度集成化,良好的人机交汇界面,可选的人工测试或自动测试,测试模拟机自动判定测试结果、自动生成测试报告。测试过程中可对故障位置精确定位,便于故障快速排除,整体提高了测试效率。The LKD2-T2/T3 automated test platform is aimed at the whole machine test system of the LKD2-T3 train control center. The test objects include the input and output mining drive unit, LEU communication unit, track circuit unit, and Ethernet unit. The test platform of the utility model has high integration, good man-machine interface, optional manual test or automatic test, and the test simulator can automatically determine test results and automatically generate test reports. During the test, the location of the fault can be precisely located, which facilitates rapid troubleshooting and improves the overall test efficiency.
实用新型内容Utility model content
本实用新型的目的就是为了克服上述现有技术存在的缺陷而提供一种铁路信号控制设备自动化测试设备。The purpose of this utility model is to provide an automatic testing equipment for railway signal control equipment in order to overcome the above-mentioned defects in the prior art.
本实用新型的目的可以通过以下技术方案来实现:The purpose of this utility model can be achieved through the following technical solutions:
一种铁路信号控制设备自动化测试设备,包括依次连接的模拟测试机、网关装置和通信协议转换装置,还包括TB端子排,所述TB端子排的两端分别连接通信协议转换装置和被测设备。An automatic test equipment for railway signal control equipment, including an analog testing machine, a gateway device, and a communication protocol conversion device connected in sequence, and also includes a TB terminal block, the two ends of the TB terminal block are respectively connected to the communication protocol conversion device and the device under test .
所述测试设备还包括用于通过模拟IO量对被测设备输入输出采驱单元进行测试、并将测试信息反馈至模拟测试机的PLC组合装置,所述PLC组合装置分别与网管装置和TB端子排连接。The test equipment also includes a PLC combination device for testing the input and output mining and driving units of the equipment under test by simulating the IO quantity, and feeding back the test information to the simulation test machine. The PLC combination device is connected with the network management device and the TB terminal respectively. connection.
所述网关装置包括第一交换机和第二交换机,所述第一交换机分别与模拟测试机、通信协议转换装置和PLC组合装置连接,所述第二交换机的一端与模拟测试机连接,另一端与被测设备的以太网单元连接。The gateway device includes a first switch and a second switch, the first switch is respectively connected with the analog testing machine, the communication protocol conversion device and the PLC combination device, one end of the second switch is connected with the analog testing machine, and the other end is connected with the analog testing machine. Ethernet unit connection of the device under test.
所述通信协议转换装置包括:The communication protocol conversion device includes:
BOK转换器,一端与网关装置连接,另一端通过TB端子排连接被测设备的LEU通信单元,用于实现以太网和RS422通信协议的转换;BOK converter, one end is connected to the gateway device, and the other end is connected to the LEU communication unit of the device under test through the TB terminal block, which is used to realize the conversion between Ethernet and RS422 communication protocols;
CANNET转换器,一端与网管装置连接,另一端通过TB端子排连接被测设备的轨道电路单元,用于实现以太网和CAN通信协议的转换。CANNET converter, one end is connected to the network management device, and the other end is connected to the track circuit unit of the equipment under test through the TB terminal block, which is used to realize the conversion between Ethernet and CAN communication protocols.
所述模拟测试机共设有两个,且两个模拟测试机均与网管装置连接。There are two simulation testing machines in total, and the two simulation testing machines are both connected to the network management device.
所述测试设备还包括24V直流电源,该24V直流电源与通信协议转换装置连接,并通过TB端子排与模拟测试机和网关装置连接。The test equipment also includes a 24V DC power supply, which is connected to the communication protocol conversion device, and connected to the analog test machine and the gateway device through the TB terminal block.
所述测试设备还包括显示装置,该显示装置与模拟测试机连接。The test equipment also includes a display device connected to the simulation test machine.
与现有技术相比,本实用新型具有以下优点:Compared with the prior art, the utility model has the following advantages:
1)在原有测试设备的基础上增加了TB端子排,方便接线,同时通信协议转换装置侧存在可以使模拟测试机与被测设备的各单元之间协议兼容,通过模拟并转换生成现场实际信息自动实现与被测对象的交互,实现自动测试,提高了测试效率,减少人工参与,提高测试的可信度。1) On the basis of the original test equipment, a TB terminal block is added to facilitate wiring. At the same time, there is a communication protocol conversion device on the side of the communication protocol conversion device, which can make the protocol compatible between the simulation test machine and the units of the tested equipment, and generate actual field information through simulation and conversion. Automatically realize the interaction with the tested object, realize the automatic test, improve the test efficiency, reduce manual participation, and improve the credibility of the test.
2)可用于标准配置或非标准配置的列控中心产品测试。2) It can be used for product testing of train control center with standard configuration or non-standard configuration.
3)为被测设备的以太网单元设计了独立的交换机,抗干扰能力强,稳定性好。3) An independent switch is designed for the Ethernet unit of the device under test, which has strong anti-interference ability and good stability.
4)模拟测试机共设有两个,可以同时对被测设备的多个单元进行测试,效率高。4) There are two simulation test machines, which can test multiple units of the device under test at the same time, with high efficiency.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
其中:1、显示装置,6、24V直流电源,201、模拟测试机,202模拟测试机,301、第一交换机,302第二交换机,401、BOK转换器,402、BOK转换器,501~504、PLC组合,701~702、CANNET转换器,801~806、TB组合。Among them: 1. Display device, 6. 24V DC power supply, 201. Simulation testing machine, 202 Simulation testing machine, 301. First switch, 302 Second switch, 401. BOK converter, 402. BOK converter, 501~504 , PLC combination, 701~702, CANNET converter, 801~806, TB combination.
具体实施方式detailed description
下面结合附图和具体实施例对本实用新型进行详细说明。本实施例以本实用新型技术方案为前提进行实施,给出了详细的实施方式和具体的操作过程,但本实用新型的保护范围不限于下述的实施例。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments. This embodiment is carried out on the premise of the technical solution of the utility model, and the detailed implementation and specific operation process are given, but the protection scope of the utility model is not limited to the following examples.
一种铁路信号控制设备自动化测试设备,用于对中国通号集团LKD2-T3列控中心整机功能检测,包括整机测试、故障点查找,自动生成测试报告等,该平台可测试LKD2-T3列控中心的轨道电路单元、LEU通信单元、输入输出采驱单元、以太网单元四大部分功能。如图1所示,包括依次连接的模拟测试机、网关装置和通信协议转换装置,还包括TB端子排,TB端子排的两端分别连接通信协议转换装置和被测设备。测试设备还包括24V直流电源6和显示装置1,24V直流电源6与通信协议转换装置连接,并通过TB端子排与模拟测试机和网关装置连接,显示装置1与模拟测试机连接。An automatic test equipment for railway signal control equipment, which is used to test the function of the whole machine of LKD2-T3 train control center of CRSC Group, including machine test, fault point finding, automatic generation of test reports, etc. The platform can test LKD2-T3 The track circuit unit, LEU communication unit, input and output drive unit, and Ethernet unit of the train control center have four major functions. As shown in Figure 1, it includes an analog test machine, a gateway device, and a communication protocol conversion device connected in sequence, and also includes a TB terminal block, and the two ends of the TB terminal block are respectively connected to the communication protocol conversion device and the device under test. The test equipment also includes a 24V DC power supply 6 and a display device 1. The 24V DC power supply 6 is connected to the communication protocol conversion device, and is connected to the analog testing machine and the gateway device through the TB terminal block, and the display device 1 is connected to the analog testing machine.
测试设备还包括用于通过模拟IO量对被测设备输入输出采驱单元进行测试、并将测试信息反馈至模拟测试机的PLC组合装置,PLC组合装置分别与网管装置和TB端子排连接,PLC组合装置由四个PLC组合501~504组成。The test equipment also includes a PLC combination device for testing the input and output mining and driving units of the tested equipment through analog IO, and feeding back the test information to the simulation test machine. The PLC combination device is respectively connected to the network management device and the TB terminal block. The combination device is composed of four PLC combinations 501-504.
网关装置包括第一交换机301和第二交换机302,第一交换机301分别与模拟测试机、通信协议转换装置和PLC组合装置连接,第二交换机302的一端与模拟测试机连接,另一端与被测设备的以太网单元连接。The gateway device includes a first switch 301 and a second switch 302, the first switch 301 is respectively connected with the simulation test machine, the communication protocol conversion device and the PLC combination device, one end of the second switch 302 is connected with the simulation test machine, and the other end is connected with the tested Ethernet unit connection of the device.
通信协议转换装置包括:The communication protocol conversion device includes:
BOK转换器401、402,一端与网关装置连接,另一端通过TB端子排连接被测设备的LEU通信单元,用于实现以太网和RS422通信协议的转换;BOK converters 401, 402, one end is connected to the gateway device, and the other end is connected to the LEU communication unit of the device under test through the TB terminal block, for realizing the conversion between Ethernet and RS422 communication protocols;
CANNET转换器701、702,一端与网管装置连接,另一端通过TB端子排连接被测设备的轨道电路单元,用于实现以太网和CAN通信协议的转换。One end of the CANNET converters 701 and 702 is connected to the network management device, and the other end is connected to the track circuit unit of the device under test through the TB terminal block, and is used to realize the conversion between Ethernet and CAN communication protocols.
模拟测试机共设有两个,且两个模拟测试机201、202均与网管装置连接。There are two simulation testing machines in total, and the two simulation testing machines 201 and 202 are both connected to the network management device.
测试模拟机201、测试模拟机202上安装有测试软件和相关驱动程序,是整个测试平台的核心,显示装置1提供人机交互界面。测试人员可通过测试界面进行测试操作并控制测试过程,测试软件通过第一交换机301、第二交换机302输出控制信息和回采LKD2-T3列控中心整机测试信息。测试模拟机201、测试模拟机202连接第一交换机301和第二交换机302、显示装置1、TB组合806。Test software and related drivers are installed on the test simulator 201 and test simulator 202, which are the core of the entire test platform, and the display device 1 provides a human-computer interaction interface. Testers can perform test operations and control the test process through the test interface, and the test software outputs control information through the first switch 301 and the second switch 302 and retrieves the whole machine test information of the LKD2-T3 train control center. The test simulator 201 and the test simulator 202 are connected to the first switch 301 and the second switch 302 , the display device 1 , and the TB combination 806 .
显示装置1是人机会界面的接口,给测试人员提供测试窗口,通过显示装置1测试人员下达测试输入命令。显示装置1与测试模拟机201、测试模拟机202、TB组合806相连。The display device 1 is an interface of the man-machine interface, which provides a test window for the tester, and the tester issues a test input command through the display device 1 . The display device 1 is connected to the test simulator 201 , the test simulator 202 , and the TB combination 806 .
第一交换机301、第二交换机302是本测试平台信息交换的枢纽,提供系统间的信息交互通信。第一交换机301、第二交换机302与测试模拟机201、测试模拟机202、BOK转换器401、BOK转换器402、PLC组合504、CANNET转换器701、CANNET转换器702、TB组合806相连。测试LKD2-T3列控中心以外网单元时,第二交换机302与以太网单元相连,模拟网络通信信号测试LKD2-T3列控中心以外网单元,同时将信息反馈给测试模拟机201。The first switch 301 and the second switch 302 are hubs for information exchange of the test platform, providing information exchange and communication between systems. The first switch 301 and the second switch 302 are connected with the test simulator 201, the test simulator 202, the BOK converter 401, the BOK converter 402, the PLC combination 504, the CANNET converter 701, the CANNET converter 702, and the TB combination 806. When testing the external network unit of the LKD2-T3 train control center, the second switch 302 is connected to the Ethernet unit, simulates network communication signals to test the external network unit of the LKD2-T3 train control center, and feeds back information to the test simulator 201 at the same time.
BOK转换器401、BOK转换器402与TB组合804、TB组合805、TB组合806相连,通过第一交换机301与测试模拟机201、测试模拟机202相连,模拟现场LEU通信、CTC通信,将422通信与以太网通信相互转换。BOK converter 401 and BOK converter 402 are connected to TB combination 804, TB combination 805, and TB combination 806, and are connected to test simulator 201 and test simulator 202 through the first switch 301 to simulate on-site LEU communication and CTC communication. Communication and Ethernet communication are converted to each other.
PLC组合501与TB组合801相连,PLC组合502与TB组合801和TB组合802相连,PLC组合503与TB组合802相连,PLC组合504与TB组合803相连,PLC组合501、PLC组合503、PLC组合503、PLC组合504依次串联,PLC组合504与第一交换机301相连,模拟现场的IO量测试LKD2-T3列控中心的输入输出单元,同时将测试信息反馈给测试模拟机201、测试模拟机202。PLC combination 501 is connected with TB combination 801, PLC combination 502 is connected with TB combination 801 and TB combination 802, PLC combination 503 is connected with TB combination 802, PLC combination 504 is connected with TB combination 803, PLC combination 501, PLC combination 503, PLC combination 503 and PLC combination 504 are serially connected in sequence, and the PLC combination 504 is connected to the first switch 301 to test the input and output unit of the LKD2-T3 train control center by simulating the IO quantity on site, and feed back the test information to the test simulator 201 and the test simulator 202 at the same time .
CANNET转换器701与TB组合804相连,CANNET转换器702与TB组合805相连,模拟ZPW-2000K移频信号测试LKD2-T3列控中心的轨道电路单元,同时将测试信息反馈给测试模拟机201、测试模拟机202。CANNET converter 701 is connected to TB combination 804, CANNET converter 702 is connected to TB combination 805, simulates the ZPW-2000K frequency shift signal to test the track circuit unit of LKD2-T3 train control center, and feeds back the test information to the test simulator 201, Test Simulator 202 .
24V直流电单元6将AC 220V转换DC 24V电源,与PLC组合、CANNET转换器相连,给PLC组合单元、CANNET转换器提供DC24V电源。The 24V direct current unit 6 converts the AC 220V into a DC 24V power supply, and connects with the PLC combination and the CANNET converter to provide DC24V power for the PLC combination unit and the CANNET converter.
TB组合801、TB组合802、TB组合803、TB组合804、TB组合805为本平台的测试接口,通过平台电缆与被测LKD2-T3列控中心的输入输出采驱单元、轨道电路单元、LEU通信单元相连;TB组合801、TB组合802、TB组合803将PLC组合单元产生的模拟IO量传递给被测LKD2-T3列控中心的输入输出单元,同时将反馈信号回传;TB组合804将BOK转换器401、BOK转换器402产生的模拟LEU、CTC信号传递给被测LKD2-T3列控中心的LEU通信单元,同时将反馈信号回传;TB组合805将CANNET转换器701、CANNET转换器702产生的模拟ZPW-2000K移频信号传递给被测LKD2-T3列控中心的规定电路通信单元,同时将反馈信号回传。TB combination 801, TB combination 802, TB combination 803, TB combination 804, and TB combination 805 are the test interfaces of this platform, through the platform cable and the input and output driving unit, track circuit unit, LEU of the LKD2-T3 train control center under test The communication units are connected; TB combination 801, TB combination 802, and TB combination 803 pass the analog IO quantity generated by the PLC combination unit to the input and output unit of the LKD2-T3 train control center under test, and return the feedback signal at the same time; TB combination 804 will The analog LEU and CTC signals generated by BOK converter 401 and BOK converter 402 are transmitted to the LEU communication unit of the LKD2-T3 train control center under test, and the feedback signal is returned at the same time; TB combination 805 transmits CANNET converter 701 and CANNET converter The analog ZPW-2000K frequency shift signal generated by 702 is transmitted to the specified circuit communication unit of the LKD2-T3 train control center under test, and the feedback signal is returned at the same time.
TB组合806为本平台的AC220电源接口,给显示装置1、测试模拟机201、测试模拟机202、第一交换机301、第二交换机302、BOK转换器401、BOK转换器402、24V直流电单元6提供稳定的AC220电源。TB combination 806 is the AC220 power interface of this platform, which is used for display device 1, test simulator 201, test simulator 202, first switch 301, second switch 302, BOK converter 401, BOK converter 402, 24V direct current unit 6 Provide stable AC220 power supply.
本实用新型测试过程具体如下:测试人员通过显示装置分别登录测试模拟机201、测试模拟机202,输入登录密码验证通过之后,在测试模拟机201、测试模拟机202上打开测试软件,通过测试界面经行测试操作。在测试软件启动过程中根据提示录入被测LKD2-T3列控中心硬件配置信息,软件启动完成后在界面上点击测试。The testing process of the present utility model is specifically as follows: the tester logs in the test simulator 201 and the test simulator 202 respectively through the display device, and after inputting the login password verification, opens the test software on the test simulator 201 and the test simulator 202, and passes through the test interface. Tested operation. During the startup process of the test software, enter the hardware configuration information of the LKD2-T3 train control center under test according to the prompts, and click Test on the interface after the software startup is completed.
测试模拟机201上的测试软件发出测试信息,通过以太网通信方式经过第一交换机301将测试信息转发给BOK转换器401、BOK转换器402,BOK转换器401、BOK转换器402将测试信息转换为422通信方式通过TB组合804接口测试LKD2-T3列控中心LEU通信单元TIU板的LEU功能和GS板的CTC功能,并回采LKD2-T3列控中心LEU通信单元的输出信息,测试软件解析测试结果并显示在测试软件界面上。The test software on the test simulator 201 sends test information, and the test information is forwarded to the BOK converter 401 and the BOK converter 402 through the first switch 301 through the Ethernet communication mode, and the BOK converter 401 and the BOK converter 402 convert the test information Test the LEU function of the TIU board of the LEU communication unit of the LKD2-T3 train control center and the CTC function of the GS board through the TB combination 804 interface for the 422 communication mode, and collect the output information of the LEU communication unit of the LKD2-T3 train control center, and analyze and test the test software The results are displayed on the test software interface.
测试模拟机201上的测试软件发出测试信息,通过以太网通信方式经过第一交换机301将测试信息转发给CANNET转换器701、CANNET转换器702,CANNET转换器701、CANNET转换器702将测试信息转换为CAN通信方式通过TB组合805接口测试LKD2-T3列控中心轨道电路单元的TC2板的轨道电路通信及编码功能,并回采LKD2-T3列控中心轨道电路单元的输出信息,测试软件解析测试结果并显示在测试软件界面上。The test software on the test simulator 201 sends test information, and the test information is forwarded to the CANNET converter 701 and the CANNET converter 702 through the first switch 301 through the Ethernet communication mode, and the CANNET converter 701 and the CANNET converter 702 convert the test information Test the track circuit communication and encoding function of the TC2 board of the track circuit unit of the LKD2-T3 train control center through the TB combination 805 interface for the CAN communication mode, and retrieve the output information of the track circuit unit of the LKD2-T3 train control center, and analyze the test results by the test software And displayed on the test software interface.
测试模拟机201上的测试软件发出测试信息,通过以太网通信方式经过第二交换机302测试LKD2-T3列控中心以太网单元的功能,并回采LKD2-T3列控中心以太网单元的输出信息,测试软件解析测试结果并显示在测试软件界面上。The test software on the test simulator 201 sends test information, and the function of the Ethernet unit of the LKD2-T3 train control center is tested through the second switch 302 through the Ethernet communication mode, and the output information of the Ethernet unit of the LKD2-T3 train control center is picked back, The test software analyzes the test results and displays them on the test software interface.
测试模拟机202上的测试软件发出测试信息,通过以太网通信方式经过第一交换机301将测试信息转发给PLC组合504控制模块,PLC组合501、PLC组合502、PLC组合503、PLC组合504将测试信息转换为IO输出量通过TB组合801、TB组合802、TB组合803接口测试LKD2-T3列控中心输入输出信号单元驱动板和采集板的驱采功能,并回采LKD2-T3列控中心输入输出信单元的输出信息,测试软件解析测试结果并显示在测试软件界面上。The test software on the test simulator 202 sends test information, and the test information is forwarded to the PLC combination 504 control module through the first switch 301 through the Ethernet communication mode, and the PLC combination 501, the PLC combination 502, the PLC combination 503, and the PLC combination 504 will test The information is converted into IO output. Through the TB combination 801, TB combination 802, and TB combination 803 interfaces, test the drive and mining functions of the input and output signal unit drive board and acquisition board of the LKD2-T3 train control center, and recover the input and output of the LKD2-T3 train control center. The output information of the letter unit, the test software analyzes the test results and displays them on the test software interface.
测试过程中测试软件界面实时显示测试信息及测试进度,包括通信通道信息、测试项目信息,测试完成后系统自动生产测试报告,保存在测试模拟机201或测试模拟机202内。During the test, the test software interface displays test information and test progress in real time, including communication channel information and test item information. After the test is completed, the system automatically produces a test report and saves it in the test simulator 201 or test simulator 202.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620155268.7U CN205490608U (en) | 2016-03-01 | 2016-03-01 | Automatic test equipment of railway signal controlgear |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620155268.7U CN205490608U (en) | 2016-03-01 | 2016-03-01 | Automatic test equipment of railway signal controlgear |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205490608U true CN205490608U (en) | 2016-08-17 |
Family
ID=56658916
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620155268.7U Expired - Fee Related CN205490608U (en) | 2016-03-01 | 2016-03-01 | Automatic test equipment of railway signal controlgear |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205490608U (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107479531A (en) * | 2017-07-31 | 2017-12-15 | 杭州电子科技大学 | The access device communication protocol frame format information of Embedded PLC remotely determines method |
CN108683558A (en) * | 2018-05-10 | 2018-10-19 | 中国铁路总公司 | Conformance Test Method for Railway Safety Communication Protocol |
CN112445194A (en) * | 2019-08-27 | 2021-03-05 | 上海铁路通信有限公司 | Automatic detection platform for input/output board of computer interlocking system |
CN116300829A (en) * | 2023-03-31 | 2023-06-23 | 沈阳铁路信号有限责任公司 | A kind of train control center whole machine test equipment and method |
-
2016
- 2016-03-01 CN CN201620155268.7U patent/CN205490608U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107479531A (en) * | 2017-07-31 | 2017-12-15 | 杭州电子科技大学 | The access device communication protocol frame format information of Embedded PLC remotely determines method |
CN107479531B (en) * | 2017-07-31 | 2019-08-20 | 杭州电子科技大学 | Remote determination method of communication protocol frame format information of embedded PLC access equipment |
CN108683558A (en) * | 2018-05-10 | 2018-10-19 | 中国铁路总公司 | Conformance Test Method for Railway Safety Communication Protocol |
CN108683558B (en) * | 2018-05-10 | 2020-08-04 | 中国铁路总公司 | Railway safety communication protocol consistency testing method |
CN112445194A (en) * | 2019-08-27 | 2021-03-05 | 上海铁路通信有限公司 | Automatic detection platform for input/output board of computer interlocking system |
CN116300829A (en) * | 2023-03-31 | 2023-06-23 | 沈阳铁路信号有限责任公司 | A kind of train control center whole machine test equipment and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111158348B (en) | A hardware maintenance and testing platform for subway vehicle signal control equipment | |
CN109379152B (en) | A simulation device for collecting electricity consumption information and diagnosing and evaluating equipment and its implementation method | |
CN207281579U (en) | Distribution power automation terminal auto testing instrument | |
CN205490608U (en) | Automatic test equipment of railway signal controlgear | |
CN112798897B (en) | Railway signal system simulation test device and simulation test method | |
CN103631147A (en) | Train network control system semi-physical comprehensive simulation test platform and test method | |
CN207249015U (en) | Distribution power automation terminal remote auto test device | |
CN114089719B (en) | Vehicle signal interface simulation verification method and device for TACS system | |
CN106959392A (en) | TAX detection means | |
CN103837785A (en) | Feeder automation detection and simulation system | |
CN114488847B (en) | Semi-physical simulation system of vehicle-mounted network control system | |
CN210244682U (en) | Electric power marketing simulation training system | |
CN206194228U (en) | Electric energy measurement analogue means | |
CN201741298U (en) | Train dispatching command system for electrified railway traction power supply simulate sand table | |
WO2024021372A1 (en) | Signal simulation tester based on railway signal simulation test and method thereof | |
CN115001136A (en) | Checking and checking system and method for accessing stock transformer substation monitoring information to centralized control station | |
CN105680441B (en) | Simulation based on stimulated replacement technology is to a device | |
CN110987487B (en) | CRH5 EMU reconnection simulation debugging device | |
CN206194227U (en) | Low meter analogue means of high confession | |
CN202886517U (en) | Testing device of power distribution terminal | |
CN109613358A (en) | CTC acquisition board test bench | |
CN201984659U (en) | Train in/out station simulate indication system for electrified railway traction power supply simulate sand table | |
CN114785681B (en) | Automatic checking and accepting system and method for monitoring information of transformer substation on-line equipment | |
CN206362871U (en) | TAX detection means | |
CN109193616A (en) | A kind of substation's telecontrol information distribution acceptance method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 |