CN205489794U - General switch board of double -H groove weld PS - Google Patents

General switch board of double -H groove weld PS Download PDF

Info

Publication number
CN205489794U
CN205489794U CN201620272573.4U CN201620272573U CN205489794U CN 205489794 U CN205489794 U CN 205489794U CN 201620272573 U CN201620272573 U CN 201620272573U CN 205489794 U CN205489794 U CN 205489794U
Authority
CN
China
Prior art keywords
switch
ups
lightning protection
upd
power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620272573.4U
Other languages
Chinese (zh)
Inventor
里文淼
杨子军
李电元
于晖
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Heilongjiang Electric Power Co Ltd Training Center
State Grid Liaoning Electric Power Co Ltd
Original Assignee
State Grid Heilongjiang Electric Power Co Ltd Training Center
State Grid Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Heilongjiang Electric Power Co Ltd Training Center, State Grid Liaoning Electric Power Co Ltd filed Critical State Grid Heilongjiang Electric Power Co Ltd Training Center
Priority to CN201620272573.4U priority Critical patent/CN205489794U/en
Application granted granted Critical
Publication of CN205489794U publication Critical patent/CN205489794U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The utility model relates to a general switch board of double -H groove weld PS. Current single UPS system reliability is low. The utility model discloses its constitution includes: switch board main part (1), the part is kept watch on including 2 intelligence digital electric quantity appearance (2) to the commercial power, 6 individual pilot lamp (3), the switch part is including 1 commercial power dual power transfer switch (24), 2 individual UPS supply input master switch (4), 4 individual battery direct current switch (5), UPS host computer and UPD part are including the 1st UPS host computer (6), UPD part (7), the 2nd UPS host computer (12), the 2nd UPD part (13), the lightning protection part is including first lightning protection device switch (18), first lightning protection device (19), second lightning protection device switch (21), second lightning protection device (22), load switch portion divides including first load output switch (20), second load output switch (23). The utility model is used for general switch board of double -H groove weld PS.

Description

Double UPS Universal power distribution cabinet
Technical field:
This utility model relates to power cabinet field, is specifically related to a kind of double UPS ( Uninterruptible Power System ) universal power distribution cabinet.
Background technology:
Power distribution cabinet is the final stage device of distribution system, and power distribution cabinet uses, loop less occasion relatively decentralized in duty ratio , The electric energy of a certain for upper level controller switching equipment circuit is distributed to load nearby.This grade of equipment reply load provides protection, monitors and control.Existing list UPS System, does not possess duplex feeding, does not possesses " power supply redundancy ".Each rack does not possess dual power supply, and for important switching equipment and server, power supply reliability is low, and due to existing UPS It not rack, it is impossible to be installed in standard cabinet, console model can only be used to install, it is difficult to integrated, it is impossible to meet modular requirement so that calculator room equipment layout is chaotic. UPS Separating with power distribution cabinet, it is cumbersome that machine room stops power transmission operation, and easily maloperation.When former machine room Dual-power automatic switching to be realized is with double UPS Power supply, it is desirable to have following equipment cabinet: civil power input-output switch cabinet, Double-electric source automatic switching box, double UPS Mainframe, accumulator tank one or two (being determined by preparation time), UPS Output distribution cabinets etc., for middle-size and small-size machine room, take up an area big, the compactest, it is impossible to effectively to utilize machine room space, are not easy to computer lab management.
Summary of the invention:
The purpose of this utility model is to provide a kind of double UPS Universal power distribution cabinet.
Above-mentioned purpose is achieved through the following technical solutions:
A kind of double UPS Universal power distribution cabinet, its composition includes: power distribution cabinet main body, described power distribution cabinet main body include civil power monitoring section, power switching portion, UPS Main frame and UPD ( Unit Power Distribution ) partly, lightning protection part, load switch part, described civil power monitoring section includes 2 Platform intelligent digital electricity instrument, 6 Individual display lamp, described power switching portion includes 1 Individual civil power dual-power transfer switch, 2 Individual UPS Civil power input main switch, 4 Individual accumulator dc switch, described UPS Main frame and UPD Part includes first UPS Main frame, first UPD Partly, second UPS Main frame, second UPD Part, described lightning protection part includes the first lightning protection device switch, the first lightning protection device, the second lightning protection device switch, the second lightning protection device, and described load switch part includes the first load output switch, the second load output switch.
Described is double UPS Universal power distribution cabinet, described civil power dual-power transfer switch is positioned at the rear board of power distribution cabinet.
Described is double UPS Universal power distribution cabinet, described first UPD Part includes the first main path switch, the first by-pass switch, the first maintenance bypass switch, the first output switch.
Described is double UPS Universal power distribution cabinet, described second UPD Part includes the second main path switch, the second by-pass switch, the second maintenance bypass switch, the second output switch.
The beneficial effects of the utility model are:
This utility model UPS For double bus system, there is input-output switch cabinet a set of.Pass through dual bus UPS Power supply, be same electricity system for preventing accident power-off, front-end power system arranges two-way independence UPS Power supply is powered, and load is by two-way UPS System shared is powered task or two-way UPS System is respectively the load supplying of self.
This utility model dual bus electric power system can eliminate " "bottleneck" fault " hidden danger that possibly be present in electric power system, " the power supply redundancy ", " maintainable " of raising system, " can compatibilization ", it is ensured that information network obtains safer " high availability ".Using exchange UPS Power supply is in equipment is powered, and double bus system is current a kind of safest powering mode.
This utility model comprises in increasing power distribution cabinet newly UPS Civil power input switch, UPS Output switch, dc switch and load branch switch.Having certain intuitive and uniformity in operation, the probability producing maloperation is extremely low.
Power distribution cabinet main body described in the utility model by from top to bottom order be distributed as civil power monitoring section, power switching portion, UPS Main frame and UPD Partly, lightning protection part, described load output switch is 12 Road output switch.
Accompanying drawing illustrates:
Accompanying drawing 1 It it is structural representation of the present utility model.
Accompanying drawing 2 It it is accompanying drawing 1 Double UPS Universal power distribution cabinet system diagram.
Detailed description of the invention:
Embodiment 1 :
A kind of double UPS Universal power distribution cabinet, its composition includes: power distribution cabinet main body 1 , described power distribution cabinet main body include civil power monitoring section, power switching portion, UPS Main frame and UPD Partly, lightning protection part, described civil power monitoring section includes 2 Platform intelligent digital electricity instrument 2 6 Individual display lamp 3 , described power switching portion includes 1 Individual civil power dual-power transfer switch 24 2 Individual UPS Civil power input main switch 4 4 Individual accumulator dc switch 5 , described UPS Main frame and UPD Part includes first UPS Main frame 6 , first UPD Part 7 , second UPS Main frame 12 , second UPD Part 13 , described lightning protection part includes the first lightning protection device switch 18 , the first lightning protection device 19 , second lightning protection device switch 21 , the second lightning protection device 22 , described load switch part includes the first load output switch 20 , second load output switch 23
Embodiment 2 :
According to embodiment 1 Described is double UPS Universal power distribution cabinet, described civil power dual-power transfer switch is positioned at the rear board of power distribution cabinet.
Embodiment 3 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described first UPD Part includes the first main path switch 8 , the first by-pass switch 9 , the first maintenance bypass switch 10 , the first output switch 11
Embodiment 4 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described second UPD Part includes the second main path switch 14 , the second by-pass switch 15 , the second maintenance bypass switch 16 , the second output switch 17
Embodiment 5 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described civil power monitoring section includes power supply indicator 6 Individual, monitor whether the three phase mains of two-way civil power has electricity;Described intelligent digital electricity instrument 2 Platform (model: Shen, Shanghai electricity PD197E9S4 ), it is mainly used in monitoring the three-phase current of two-way civil power, voltage, power and frequency.
Embodiment 6 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described civil power dual-power transfer switch ATS Being positioned at after power distribution cabinet, model is HYCQ5M-100/3P .Main Function: when main power source (or stand-by power supply) breaks down ( As: have a power failure, under-voltage, overvoltage, disconnected phase, frequency shift (FS) ) And automatically switch to stand-by power supply (or main power source), it is ensured that the reliability of power supply and safety.
Embodiment 7 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described UPS Civil power input main switch: include two-way UPS Total input switch, for positive safe breaker of plastic casing, model: NM1-125S/3300-100A , connect civil power with UPS , play protection UPS Effect, when running into overload, short-circuit, under-voltage fault, can automatically disconnect.
Described accumulator dc switch: include four tunnel accumulator dc switch, is positive safe breaker of plastic casing, model: NM1-125S/3300-100A , connect UPS With accumulator, disconnecting this switch, accumulator can not discharge and recharge.
Embodiment 8 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described UPS Main frame and UPD Part: UPS For Ai Mosheng Liebert ITA 30kVA, Including UPS Main frame and input and output power supply unit UPD , totally two set.This part provides dual power supply for visual plant, UPS Main frame completes AC-DC-AC Conversion, connects between civil power and important load, provides high-quality power supply for load.Input and output power supply unit UPD Main path switch, by-pass switch, maintenance bypass switch and output switch being integrated in a unit, convenient operation, integrated level is high.
Embodiment 9 :
According to embodiment 1 Or 2 Described is double UPS Universal power distribution cabinet, described lightning protection part by thunder-prevention switch and SPD Surge Protector (lightning protection device) forms, totally two sets.Thunder-prevention switch is positive safe 3P Micro-chopper, model: NB7-3P C63A SPD Surge Protector model be Zhengzhou this irrigate SWU1-4P-60kA .This module is the most right UPS And connected equipment, protect in the surge running into indirect thunder and lightning and direct effects of lightning or other instantaneous overvoltages;Described load switch part is two-way UPS The load switch connected, is positive Thailand 2P Micro-chopper, model NB7-2P C25A , quantity is configured by actual demand.

Claims (4)

  1. null1. a double UPS universal power distribution cabinet,Its composition includes: power distribution cabinet main body,It is characterized in that: described power distribution cabinet main body includes civil power monitoring section、Power switching portion、UPS main frame and UPD part、Lightning protection part、Load switch part,Described civil power monitoring section includes 2 intelligent digital electricity instrument、6 display lamps,Described power switching portion includes 1 civil power dual-power transfer switch、2 UPS civil power input main switchs、4 accumulator dc switch,Described UPS main frame and UPD part include a UPS main frame、Oneth UPD part、2nd UPS main frame、2nd UPD part,Described lightning protection part includes the first lightning protection device switch、First lightning protection device、Second lightning protection device switch、Second lightning protection device,Described load switch part includes the first load output switch、Second load output switch.
  2. The most according to claim 1 pair of UPS universal power distribution cabinet, is characterized in that: described civil power dual-power transfer switch is positioned at the rear board of power distribution cabinet.
  3. The most according to claim 1 and 2 pair of UPS universal power distribution cabinet, is characterized in that: a described UPD part includes the first main path switch, the first by-pass switch, the first maintenance bypass switch, the first output switch.
  4. The most according to claim 1 and 2 pair of UPS universal power distribution cabinet, is characterized in that: the 2nd described UPD part includes the second main path switch, the second by-pass switch, the second maintenance bypass switch, the second output switch.
CN201620272573.4U 2016-04-05 2016-04-05 General switch board of double -H groove weld PS Expired - Fee Related CN205489794U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620272573.4U CN205489794U (en) 2016-04-05 2016-04-05 General switch board of double -H groove weld PS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620272573.4U CN205489794U (en) 2016-04-05 2016-04-05 General switch board of double -H groove weld PS

Publications (1)

Publication Number Publication Date
CN205489794U true CN205489794U (en) 2016-08-17

Family

ID=56646877

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620272573.4U Expired - Fee Related CN205489794U (en) 2016-04-05 2016-04-05 General switch board of double -H groove weld PS

Country Status (1)

Country Link
CN (1) CN205489794U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107222019A (en) * 2017-06-09 2017-09-29 郑州云海信息技术有限公司 A kind of electric power system and method for improving container data center Distribution level
CN109391028A (en) * 2018-11-08 2019-02-26 郑州云海信息技术有限公司 A kind of distribution structure and distribution method based on middle-size and small-size data center
CN111740489A (en) * 2020-07-28 2020-10-02 徐州海伦哲特种车辆有限公司 Redundant backup type uninterruptible power supply vehicle control device and control method
CN112928814A (en) * 2021-02-01 2021-06-08 杨俊杰 Compact UPS input/output protection device

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107222019A (en) * 2017-06-09 2017-09-29 郑州云海信息技术有限公司 A kind of electric power system and method for improving container data center Distribution level
CN109391028A (en) * 2018-11-08 2019-02-26 郑州云海信息技术有限公司 A kind of distribution structure and distribution method based on middle-size and small-size data center
CN111740489A (en) * 2020-07-28 2020-10-02 徐州海伦哲特种车辆有限公司 Redundant backup type uninterruptible power supply vehicle control device and control method
CN112928814A (en) * 2021-02-01 2021-06-08 杨俊杰 Compact UPS input/output protection device

Similar Documents

Publication Publication Date Title
CN205489794U (en) General switch board of double -H groove weld PS
CN104348183A (en) Power supplying system with multiple large-power high-voltage diesel generating sets in parallel operation
CN201328021Y (en) AC/DC synthesized integrated screen
CN205509651U (en) UPS cabinet
CN101673964B (en) Modular UPS integrated power distribution system
CN104169833A (en) Highly efficient power supply unit and method for supplying power using same
CN103001254B (en) Alternating current-direct current hybrid micro-grid system
CN104917286A (en) High-reliability continuous power supply device and method for whole cabinet
CN204258411U (en) A kind of intelligent UPS device
CN201466790U (en) Integrated power distribution system of modularized UPS
CN105226803A (en) The large-scale activity platform power system of redundant power distribution and method of supplying power to
CN102629777B (en) Standby power system of DC power source
CN102108527B (en) Method and system for supplying power to large aluminum electrolytic plant
CN204886390U (en) High pressure dual power supply's wiring circuit
CN101714776A (en) 10KV station electric control system of convertor station adopting selecting 2 from 3 logic
CN205176131U (en) Processing display module at power consumption information collection system module terminal
CN110556794B (en) Bus bar protection configuration method of multi-end hybrid direct current system
CN204103554U (en) A kind of Modular UPS
CN106026207A (en) Power supply system
CN201570895U (en) Microcomputer protection device with double power supply sources
CN205160193U (en) Power supply system of boiler machine supplying powder
CN207612116U (en) AC system dead electricity self-test device
CN204465138U (en) A kind of AC/DC integrated power-supply system
CN220066888U (en) Container distribution electrical structure
CN203691053U (en) High-risk power consumption user emergency power supply connection structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20190405