CN205484231U - Gas distributor - Google Patents

Gas distributor Download PDF

Info

Publication number
CN205484231U
CN205484231U CN201620108913.XU CN201620108913U CN205484231U CN 205484231 U CN205484231 U CN 205484231U CN 201620108913 U CN201620108913 U CN 201620108913U CN 205484231 U CN205484231 U CN 205484231U
Authority
CN
China
Prior art keywords
gas
sample
valve
instrument
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620108913.XU
Other languages
Chinese (zh)
Inventor
邵铮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaoning Huake Petroleum Apparatus Science & Technology Co ltd
Original Assignee
Liaoning Huake Petroleum Apparatus Science & Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaoning Huake Petroleum Apparatus Science & Technology Co ltd filed Critical Liaoning Huake Petroleum Apparatus Science & Technology Co ltd
Priority to CN201620108913.XU priority Critical patent/CN205484231U/en
Application granted granted Critical
Publication of CN205484231U publication Critical patent/CN205484231U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model provides a gas distributor, relates to the supporting device of an air supply, the structure group of distributor becomes including front panel structure, rear panel gas circuit structure, gas distributor inner structure, handle (1) of front panel structure is fixed at the instrument anteriorly, and the manometer is fixed at the instrument anteriorly respectively with the table ring, and screw cap fixes on the panel for the surge damping valve, gas sample for the change -over valve screw cap fix on the panel, the flowmeter is fixed in the instrument front portion with two nuts, the switch formula that cut straightly is installed and is inlayed in casing the place ahead, the rear at the instrument is fixed through locking female leading directly to with the nut to total hydrocarbon component sample gas drain (18) of rear panel gas circuit structure, the export of CO2 sample gas (20), gross sample gas drain (23), the import of well site sample gas (24), air intlet (25), hydrogen import (26). Gas distributor adjusts flow stability, can provide the air supply of various flows according to different grade type gas chromatograph's needs, to sample gas, air, H2 pressure and flow control.

Description

A kind of gas distributor
Technical field
This utility model relates to a kind of source of the gas corollary apparatus, particularly relates to a kind of gas distributor.
Background technology
Gas distributor mainly provides the corollary equipment of various sources of the gas to gas chromatograph, and current apparatus manufacturer provides Instrument instability of flow in gas assigning process, cause experimental result accurate, it is unnecessary to add for whole experiment Error;Only have single sample pump, the abnormal work load considerably increasing laboratory technician occurs.
Summary of the invention
The purpose of this utility model is to provide a kind of gas distributor, and this gas distributor is opened by and off switch, blowback Pass, sample pump etc. form, this utility model gas distributor regulation stability of flow, can be according to the need of dissimilar gas chromatograph There is provided the source of the gas of various flow, to sample gas, air, H2Pressure and Flow-rate adjustment.
The purpose of this utility model is achieved through the following technical solutions:
A kind of gas distributor, the structure composition of described allotter includes front-panel structure, rear board gas circuit structure, gas Inner skeleton structure;It is anterior that the handle of front-panel structure is fixed on instrument, and it is anterior that Pressure gauge is fixed on instrument with table ring respectively, Pressure maintaining valve thread cap is fixed on panel, and gas sample switching valve thread cap is fixed on panel, and effusion meter is solid with two nuts It is scheduled on instrument anterior, switchs direct insertion installation and be embedded in housing front;The total hydrocarbon component sample gas emptying of rear board gas circuit structure Mouth, the outlet of CO2 sample gas, gross sample gas drain, well site sample gas inlet, air intlet, hydrogen inlet are led directly to by locknut Be fixed on the rear of instrument with nut, total hydrocarbon sample gas drain, component sample gas drain, hydrogen outlet, air outlet slit, CO2 steel cylinder gas import, component steel cylinder gas import, total hydrocarbon steel cylinder gas import are fixed on the rear of instrument, power supply through two general nuts Socket with two countersink head screw spiral shells instrument in the wings downside;Gas distributor internal components composition includes accurate needle valve, quarter Degree needle valve and pressure maintaining valve are fixing onboard by thread cap, and import sample pump is fixed on bottom instrument with four screws, pressure Sensor is fixed on bottom instrument with two screws, and pressure solenoid valve is fixed on bottom instrument with two screws, alarm buzzer Fixing onboard with thread cap, Switching Power Supply is fixed on Instrument shell with two screws.
Described a kind of gas distributor, described front panel includes handle, Hydrogen Vapor Pressure table, air pressure gauge, gross sample Atmospheric pressure table, gross sample atmospheric pressure pressure maintaining valve, total hydrocarbon sample gas Pressure gauge, total hydrocarbon sample gas pressure stabilized valve, component sample gas Pressure gauge, component sample gas pressure maintaining valve, vacuum meter, SP Pressure gauge, gas sample switching valve, component total hydrocarbon sample gas gauge, sample Switch pump, blowback switch, on and off switch.
Described a kind of gas distributor, described rear board gas circuit includes total hydrocarbon sample gas drain, total hydrocarbon component sample Gas drain, component sample gas drain, the outlet of CO2 sample gas, hydrogen outlet, air outlet slit, gross sample gas drain, well site Sample gas inlet, air intlet, hydrogen inlet, CO2 steel cylinder gas import, component steel cylinder gas import, total hydrocarbon steel cylinder gas import, power supply The accurate needle valve of line socket, gross sample gas emptying, total hydrocarbon fuel gas emptying precision metallic diaphragm pressure maintaining valve, CO2 sample gas go out Mouth scale needle valve, air precision metallic diaphragm pressure maintaining valve, H2 precision metallic diaphragm pressure maintaining valve, component sample emptying scale needle-like Valve, total hydrocarbon samples emptying scale needle valve, import sample pump, import stainless steel pressure sensor, import three-way pressure electromagnetic valve, Alarm buzzer, Switching Power Supply.
Advantage of the present utility model with effect is:
1. this utility model gas distributor uses the Stress control of multistage voltage stabilizing and Flow-rate adjustment and Switching Power Supply composition System and flow negative pressure alarm control system, the flow of gas can be made such as to change can warning reminding make adjustment to maintain in time Stablizing of output flow and pressure, simultaneously equipped with two import sample pumps, simple to operate, regular maintenance is convenient, duty and Breakdown judge is directly perceived, and service life of equipment is long, stable, safe and reliable, is fully able to meet the gas of domestic and international model, manufacturer production Chromatography uses.
2. this utility model gas distributor is by and off switch, blowback switch, sample pump, various fine adjustment valve, air Pressure gauge, Hydrogen Vapor Pressure table, total hydrocarbon sample pressure table, component sample air gauge, air pressure switching valve (seven lead to valve), multiple filter And the composition such as relay, to sample gas, air, H2Pressure and Flow-rate adjustment, equipment regulation stability of flow, can be according to dissimilar Gas chromatograph need to provide the source of the gas of various flow.
Accompanying drawing explanation
Fig. 1 is gas distributor front-panel structure figure;
Fig. 2 is rear board gas circuit structure figure;
Fig. 3 is gas distributor internal components figure;
The figure of gas distributor inner air path shown in Fig. 4;
Gas distributor internal circuit diagram shown in Fig. 5.
Detailed description of the invention
Below in conjunction with embodiment, this utility model is described in detail.
Shown in Fig. 1, front panel is configured with handle 1;Hydrogen Vapor Pressure table 2;Air pressure gauge 3;Gross sample atmospheric pressure table 4;Always Sample gas pressure stabilized valve 5;Total hydrocarbon sample gas Pressure gauge 6;Total hydrocarbon sample gas pressure stabilized valve 7;Component sample atmospheric pressure table 8; Component sample gas pressure maintaining valve 9;Vacuum meter 10;SP Pressure gauge 11;Gas sample switching valve 12(seven leads to valve), it is mainly used in switching total hydrocarbon The degassing of steel cylinder sample, component steel cylinder sample, CO2 steel cylinder sample, mud electricity and air;Component total hydrocarbon sample gas gauge 13: be mainly used in Display component and total hydrocarbon sample gas total flow;Sample pump switch 14: control the start and stop of sample pump;Blowback switch 15: use In blowback outdoor gas pipeline.Outdoor pipeline is carried out, is placed on ON position.(now it is necessary to turn off sample pump.Normal well logging Time be placed on OFF);On and off switch 16 controls the partial power of allocation unit sample pump and electromagnetic valve.Handle 1 is with two M4 spiral shells It is anterior that silk is fixed on instrument, and it is anterior that Pressure gauge 2,3,4,6,8,10,11 is fixed on instrument with M50 table ring respectively, pressure maintaining valve 5,7,9 Being fixed on panel with M13 thread cap, gas sample switching valve 12 M20 thread cap is fixed on panel, and effusion meter 13 is with two M13 It is anterior that nut is fixed on instrument, and switch 14,15,16 direct insertion installations are embedded in housing front, and above is then the front panel of instrument Structure.
Shown in Fig. 2, rear board gas circuit is configured with TG SAMPLE OUT: total hydrocarbon sample gas drain 17, TG CHR SAMPLE DIS OUT: total hydrocarbon component sample gas drain 18, CHR SAMPLE OUT: component sample gas drain 19, CO2 SAMPLE OUT: CO2 sample gas outlet 20, H2 OUT: hydrogen outlet 21, AIR OUT: air outlet slit 22, TOTAL SAMPLE EXH: gross sample gas drain 23, WELL SAMPLE IN: well site sample gas inlet 24, AIR IN : air intlet 25, H2 IN: hydrogen inlet 26, CO2 CAL IN: CO2 steel cylinder gas import 27, CHR CAL IN: group Divide steel cylinder gas import 28, TG CAL IN: total hydrocarbon steel cylinder gas import 29, power cord jack 30, the accurate needle-like of gross sample gas emptying Valve 31, total hydrocarbon fuel gas emptying precision metallic diaphragm pressure maintaining valve 32, CO2 sample gas go out scale needle valve 33, air precision gold Belong to diaphragm pressure maintaining valve 34, H2 precision metallic diaphragm pressure maintaining valve 35, component sample is vented scale needle valve 36, the emptying of total hydrocarbon samples is carved Degree needle valve 37, import sample pump 38, import stainless steel pressure sensor 39, import three-way pressure electromagnetic valve 40, warning buzzing Device 41, Switching Power Supply 42.
Shown in Fig. 2, gas distributor rear board gas circuit structure is configured with total hydrocarbon component sample gas drain 18, CO2 sample Gas outlet 20, gross sample gas drain 23, well site sample gas inlet 24, air intlet 25, hydrogen inlet 26 are led directly to by locknut The rear of instrument, total hydrocarbon sample gas drain 17, component sample gas drain 19, hydrogen outlet 21, sky it is fixed on nut M8 Gas outlet 22, CO2 steel cylinder gas import 27, component steel cylinder gas import 28, total hydrocarbon steel cylinder gas import 29 are fixed through two general nut M8 At the rear of instrument, supply socket 30 with two countersink head screw spiral shells instrument in the wings downside, above for structure after instrument.
Shown in Fig. 3, gas distributor internal components figure, accurate needle valve 31, scale needle valve 33,36,37 and pressure maintaining valve 32,34,35 being fixed onboard by M13 thread cap, import sample pump 38 is fixed on bottom instrument with four M4 screws, and pressure passes Sensor 39 is fixed on bottom instrument with two M4 screws, and pressure solenoid valve 40 is fixed on bottom instrument with two M4 screws, reports to the police Buzzer 41 is fixing onboard with M13 thread cap, and Switching Power Supply 42 is fixed on Instrument shell with two M4 screws.It it is more than instrument The internal structure of device.
Shown in Fig. 4, gas distributor inner air path figure.Shown in Fig. 5, gas distributor internal circuit diagram.During use, by instrument Device takes out from packing crates, is placed on appointment position;Connect the power line after instrument, connect supply socket, each parts Parameter adjustment, air pressure gauge and pressure maintaining valve regulation parameter size: dispatch from the factory and be adjusted to 3.0 Kg/cm2;Control method: use hand-screw Dynamic " air pressure pressure maintaining valve ", observes the numerical value of allocation unit front panel " air pressure gauge ", until the numerical value of regulation;Hydrogen Atmospheric pressure table and pressure maintaining valve regulation parameter size: dispatch from the factory and be adjusted to 3.8 Kg/cm2;Control method: with the dynamic " Hydrogen Vapor Pressure of hand-screw Pressure maintaining valve ", observe the numerical value of allocation unit front panel " air pressure gauge ", until the numerical value of regulation;Gross sample atmospheric pressure Table and pressure maintaining valve regulation parameter size: dispatch from the factory and be adjusted to 0.8 Kg/cm2;Control method: dynamic " gross sample atmospheric pressure is steady with hand-screw Pressure valve ", observe the numerical value of allocation unit front panel " gross sample atmospheric pressure table ", until the numerical value of regulation;Total hydrocarbon sample gas Pressure gauge and pressure maintaining valve regulation parameter size: dispatch from the factory and be adjusted to 0.4 Kg/cm2;Control method: by dynamic " the total hydrocarbon sample gas of hand-screw Pressure stabilized valve ", observe the numerical value of allocation unit front panel " total hydrocarbon sample gas Pressure gauge ", until the numerical value of regulation;Group Point sample gas Pressure gauge and pressure maintaining valve regulation parameter size: dispatch from the factory and be adjusted to 0.4 Kg/cm2;Control method: by the dynamic " group of hand-screw Divide sample gas pressure stabilized valve ", observe the numerical value of allocation unit front panel " component sample atmospheric pressure table ", until the numerical value of regulation Till;Gas sample switching valve (seven lead to valve) is used for switching total hydrocarbon steel cylinder sample, component steel cylinder sample, CO2 steel cylinder sample, the degassing of mud electricity and sky Gas.During normal well logging, permutator is placed on sample gas position.When using total hydrocarbon steel cylinder sample (demarcating for total hydrocarbon, verification etc.), turn Change switch and be placed on total hydrocarbon position;Use component steel cylinder sample (demarcating, verification etc.) for component;Permutator is placed on component position. Use CO2 steel cylinder sample (for CO2 verification etc.);Permutator is placed on CO2 position.When cleaning drawer sample gas pipeline, conversion is opened Pass is placed on air level.Component total hydrocarbon sample gas gauge display component and total hydrocarbon sample gas total flow.It is in total hydrocarbon and component When sample gas pressure is constant, being vented needle-valve by component sample gas, (the two needle-valve is at allotter for total hydrocarbon sample gas emptying needle-valve In), component sample air tube valve and total hydrocarbon sample gas needle-valve (the two needle-valve is in chromatograph) control.Show in normal condition It is shown as 500-700ml/min;Sample gas flow valve and regulation parameter size: generally 300-500ml/min;Control method: adjust Joint CO2 sample gas needle-valve, with the flow of flowmeter survey allocation unit rear board CO2 gas outlet, until the numerical value of regulation;Gross sample Product gas emptying needle-valve and regulation, regulation sample gas emptying situation, can turn off, concrete emptying situation sees sample gas feelings in system Condition.Principle: ensure total pressure, total hydrocarbon sample gas pressure, the component sample atmospheric pressure of sample gas and reach to CO2 analyser flow After setting, scalable emptying needle-valve.Component sample gas emptying needle-valve and regulation parameter size: generally regulate this valve and put Empty flow is about 300ml/min;Measuring method: measuring this flow can have 2 approach, measures the emptying of rear board with effusion meter Value;Turn off total hydrocarbon sample gas emptying needle-valve, see " gross sample air-flow gauge " reading on dispenser panel.This valve has three functions: One is for regulating the sample gas flow to measured portions pipe;Two is the regulation sample gas speed to measured portions pipe;Three is to adjust Joint and total hydrocarbon sample gas lock in time, i.e. sample gas arrives measured portions pipe and total hydrocarbon assessor at the same time.Total hydrocarbon sample Product gas emptying needle-valve and regulation parameter size: generally regulating this valve emptying flow is about 300ml/min;Measurement side Method: measuring this flow can have 2 approach, measures the emptying value of rear board with effusion meter;Turn off component sample gas emptying needle-valve, see " gross sample air-flow gauge " reading on dispenser panel.

Claims (3)

1. a gas distributor, it is characterised in that the structure composition of described allotter includes front-panel structure, rear board gas circuit Structure, gas distributor internal structure;It is anterior that the handle (1) of front-panel structure is fixed on instrument, and Pressure gauge is solid with table ring respectively Being scheduled on instrument anterior, pressure maintaining valve thread cap is fixed on panel, and gas sample switching valve thread cap is fixed on panel, effusion meter It is fixed on instrument with two nuts anterior, switchs direct insertion installation and be embedded in housing front;The total hydrocarbon group of rear board gas circuit structure Point sample gas drain (18), CO2 sample gas outlet (20), gross sample gas drain (23), well site sample gas inlet (24), Air intlet (25), hydrogen inlet (26) are fixed on the rear of instrument, total hydrocarbon sample gas drain by the straight-through nut of locknut (17), component sample gas drain (19), hydrogen outlet (21), air outlet slit (22), CO2 steel cylinder gas import (27), component steel Bottle gas import (28), total hydrocarbon steel cylinder gas import (29) are fixed on the rear of instrument through two general nuts, and supply socket (30) is with two Individual countersink head screw spiral shell is in instrument downside in the wings;Gas distributor internal components composition includes accurate needle valve (31), scale pin Type valve and pressure maintaining valve are fixing onboard by thread cap, and import sample pump (38) is fixed on bottom instrument with four screws, pressure Sensor (39) is fixed on bottom instrument with two screws, and pressure solenoid valve (40) is fixed on bottom instrument with two screws, report Alert buzzer (41) is fixing onboard with thread cap, and Switching Power Supply (42) is fixed on Instrument shell with two screws.
A kind of gas distributor the most according to claim 1, it is characterised in that described front panel includes handle (1), hydrogen Pressure gauge (2), air pressure gauge (3), gross sample atmospheric pressure table (4), gross sample atmospheric pressure pressure maintaining valve (5), total hydrocarbon sample pressure Power table (6), total hydrocarbon sample gas pressure stabilized valve (7), component sample atmospheric pressure table (8), component sample gas pressure maintaining valve (9), vacuum Table (10), SP Pressure gauge (11), gas sample switching valve (12), component total hydrocarbon sample gas gauge (13), sample pump switch (14), anti- Blowing switch (15), on and off switch (16).
A kind of gas distributor the most according to claim 1, it is characterised in that described rear board gas circuit includes total hydrocarbon samples Gas drain (17), total hydrocarbon component sample gas drain (18), component sample gas drain (19), CO2 sample gas go out (20), hydrogen Gas outlet (21), air outlet slit (22), gross sample gas drain (23), well site sample gas inlet (24), air intlet (25), hydrogen Gas import (26), CO2 steel cylinder gas import (27), component steel cylinder gas import (28), total hydrocarbon steel cylinder gas import (29), power cord jack (30), the accurate needle valve (31) of gross sample gas emptying, total hydrocarbon fuel gas emptying precision metallic diaphragm pressure maintaining valve (32), CO2 sample Product gas goes out scale needle valve (33), air precision metallic diaphragm pressure maintaining valve (34), H2 precision metallic diaphragm pressure maintaining valve (35), component Sample emptying scale needle valve (36), total hydrocarbon samples emptying scale needle valve (37), import sample pump (38), import rustless steel pressure Force transducer (39), import three-way pressure electromagnetic valve (40), alarm buzzer (41), Switching Power Supply (42).
CN201620108913.XU 2016-02-03 2016-02-03 Gas distributor Expired - Fee Related CN205484231U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620108913.XU CN205484231U (en) 2016-02-03 2016-02-03 Gas distributor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620108913.XU CN205484231U (en) 2016-02-03 2016-02-03 Gas distributor

Publications (1)

Publication Number Publication Date
CN205484231U true CN205484231U (en) 2016-08-17

Family

ID=56674465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620108913.XU Expired - Fee Related CN205484231U (en) 2016-02-03 2016-02-03 Gas distributor

Country Status (1)

Country Link
CN (1) CN205484231U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254026A (en) * 2018-01-26 2018-07-06 上海正帆科技股份有限公司 Valve member current divider box
CN108508120A (en) * 2018-04-12 2018-09-07 大连世有电力科技有限公司 The quantitative inlet duct of chromatography online monitoring system for transformer oil

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108254026A (en) * 2018-01-26 2018-07-06 上海正帆科技股份有限公司 Valve member current divider box
CN108254026B (en) * 2018-01-26 2024-03-22 上海正帆科技股份有限公司 Valve split-flow box
CN108508120A (en) * 2018-04-12 2018-09-07 大连世有电力科技有限公司 The quantitative inlet duct of chromatography online monitoring system for transformer oil
CN108508120B (en) * 2018-04-12 2023-09-19 大连世有电力科技有限公司 Quantitative air inlet device for transformer oil chromatographic online monitoring system

Similar Documents

Publication Publication Date Title
CN102183284B (en) Liquid flow standard calibration device
CN205484231U (en) Gas distributor
CN104330278A (en) Vacuum generator performance detection equipment and detection method
CN112808016B (en) Membrane module testing device, membrane module testing system and membrane module testing method
CN104375529B (en) A kind of control pressurer system of engine nozzle experiment
CN105444969A (en) Machine for testing automatic operation performance and leakage of fuel gas solenoid valve
CN107727388A (en) A kind of air valve flow testing system
CN210953723U (en) Dust aerosol generating device for checking dust measuring instrument
CN203905925U (en) High-pressure natural gas well mouth pilot production device
CN107741296B (en) Automatic pressure sensor debugging device with electric proportional valve
CN205529058U (en) High -purity hydrogen gas generator
CN216647170U (en) MFC verifying attachment for semiconductor manufacture
CN202676378U (en) Detection system for fuel gas pressure regulator
CN211576491U (en) Detection apparatus for shunt subassembly
CN209700979U (en) Airline carriers of passengers main cabin hydroelectric facility combined test stand
CN108043323A (en) A kind of compact high precision gas proportioning device
CN201103730Y (en) Corrosion resistant scale overflow valve used for high-pressure small-flow equipment
CN103292878A (en) Calibrating device for high-pressure natural gas flow meter
CN203494410U (en) Automatic flow-adjusted gas mixer
CN203745048U (en) Automatic calibration device of mass flow rate regulator
CN203532944U (en) Pressure regulator valve position transmitting device
CN208595953U (en) Gas flow measurement calibration facility
CN203838030U (en) Density measuring device for dense-medium coal dressing suspension liquid
RU176750U1 (en) AIR SAMPLING UNIT
CN203162237U (en) Gas pressure regulation valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20170203