CN205483780U - But split grade beam formula moves rig loading device - Google Patents

But split grade beam formula moves rig loading device Download PDF

Info

Publication number
CN205483780U
CN205483780U CN201620052465.6U CN201620052465U CN205483780U CN 205483780 U CN205483780 U CN 205483780U CN 201620052465 U CN201620052465 U CN 201620052465U CN 205483780 U CN205483780 U CN 205483780U
Authority
CN
China
Prior art keywords
grade beam
grade
roof beam
loading device
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620052465.6U
Other languages
Chinese (zh)
Inventor
任小伟
罗强
刘宏亮
侯晓东
张瑞娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoji Oilfield Machinery Co Ltd
Original Assignee
Baoji Oilfield Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoji Oilfield Machinery Co Ltd filed Critical Baoji Oilfield Machinery Co Ltd
Priority to CN201620052465.6U priority Critical patent/CN205483780U/en
Application granted granted Critical
Publication of CN205483780U publication Critical patent/CN205483780U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model discloses a but split grade beam formula moves rig loading device, including the support of fixing edge on the well head gallery and the grade beam that removes in the gallery, the grade beam both ends are provided with a pneumatic winch respectively, and two pneumatic winch are connected through cable wire and grade beam both ends respectively, the grade beam be detachable structure, include along the roof beam I and the roof beam II of longitudinal center line both sides symmetry, roof beam I and roof beam II install on hydro -cylinder support both sides through a plurality of round pins axle respectively, connect otic placode fixed connection through the multiunit between roof beam I and the roof beam II, and surface mounting has the hydro -cylinder on the hydro -cylinder support. The utility model discloses a device, grade beam adopt the pneumatic winch both sides to pull the removal, realize utilizing bench drill machine loading device to carry out loading test to many bench drills machine, have improved loading device's utilization ratio, have reduced the repeated construction of test bench.

Description

Detachably beam type mobile drill charger
Technical field
This utility model belongs to mechanical equipment technical field, relates to one detachably beam type mobile drill and adds Carry and put.
Background technology
The rig that the oil-well rig designed first specially requires with user, it is necessary to carry out the load examination of rig Testing, test load is the specified maximum load of rig.
At present, grade beam churn charger is due to cheap, and simple in construction, is rig load test A kind of modal testing equipment in field, applies to load to rig substructure by the retraction of oil cylinder, ground beam type There is following characteristics: owing to the rig substructure of ground beam type test well mouth will be by load upwards when load test Load forces, for avoiding the stress of base to concentrate, therefore it is required that the contact area of grade beam and base is the bigger the better. The carrier bar of ground beam tester is typically middle narrow, and both sides are to increase the ratio that the contact area with base is done Wider, general width is at least more than 5 meters, and whole grade beam becomes dumbbell shaped;The oil cylinder loaded crouches at ordinary times Being placed in melt pit, when load test, oil cylinder is propped up and is placed on upright position.
In view of the feature of ground girder structure, traditional ground girder structure is by dumbbell structure and load cylinder Impact can not make movable type charger.The use time average one bench drill machine of charger is only There is time half a day, and the assembling test period of a bench drill machine was up to about two months, took test well head Time is oversize, causes the waste of test resource, and other test rig can only be waited in line.
Utility model content
The purpose of this utility model is to provide one detachably beam type mobile drill charger, solves In prior art beam type load testing machine move difficulty, the utilization rate of rig load test device is low, The problem that equipment cost is high.
This utility model be employed technical scheme comprise that, one detachably beam type mobile drill adds and carries Put, including be fixed on edge on well head tunnel bearing and in tunnel the grade beam of movement, grade beam two ends are respectively Being provided with an air hoist, two air hoists are connected with grade beam two ends by cable wire respectively;
Described grade beam is detachable structure, the beam I symmetrical including both sides along the longitudinal centerline and beam II; Beam I and beam II is arranged on cylinder support both sides by multiple bearing pins respectively, by many between beam I and beam II Group connects the fixing connection of otic placode, is provided with oil cylinder at cylinder support upper surface.
Detachably beam type mobile drill charger of the present utility model, is further characterized in that:
Oil cylinder is retracted to be less than during the end upper surface of grade beam.
The beneficial effects of the utility model are, load testing machine is divided into mobile grade beam 2 and hold-down support 1 two parts, bearing 1 makes the position being fixedly mounted to each test well head, the mobile employing of grade beam 2 Air hoist 3 both sides pull, and grade beam 2 slides on slide rail 4, can pass through when moving for ease of grade beam 2 Below bearing 1, load cylinder 7 not above grade beam 2 above, when otherwise moving with bearing interfere. It is thus desirable to load in grade beam 2 by oil cylinder 7, for this, grade beam 2 is made the ground girder construction of fractionation.Specifically Feature includes:
1) meet a set of charger multiple stage rig is loaded, save the construction cost of testing stand.
2) be arranged on traditional oil cylinder grade beam above compared with, reduce the setting height(from bottom) of oil cylinder, During rig load test, the height after oil cylinder is holded up also has substantial degradation, it is simple to oil cylinder head connects examination Test elevator, decrease the degree of depth of melt pit needed for grade beam.
Accompanying drawing explanation
Fig. 1 is the schematic top plan view of this utility model device;
Fig. 2 is the schematic front view of this utility model device;
Fig. 3 is that the grade beam in this utility model device moves schematic diagram;
Fig. 4 is the top view of the detachable grade beam in this utility model device;
Fig. 5 is the front view of the detachable grade beam in this utility model device.
In figure, 1. bearing, 2. grade beam, 3. air hoist, 4. slide rail, 5. connect otic placode, 6. cylinder support, 7. oil cylinder, 8. beam I, 9. beam II.
Detailed description of the invention
With detailed description of the invention, this utility model is described in detail below in conjunction with the accompanying drawings.
With reference to Fig. 1, Fig. 2, Fig. 3, structure of the present utility model is, including being fixed on edge on well head tunnel Bearing 1 and in tunnel the grade beam 2 of movement, bearing 1 fixed placement at each pressure testing well head to expand ground Beam 2 and the contact surface of rig pedestal;Grade beam 2 passes through tunnel (geosyncline) according to the load test demand of rig Move to each test well head, thus realize a set of load test device test multiple stage rig;Grade beam 2 two ends Being respectively arranged with an air hoist 3, two air hoists 3 are respectively by cable wire with grade beam 2 two ends even Connecing, the cooperation that pulls being moved horizontally through two 5t air hoists 3 of grade beam 2 realizes;
With reference to Fig. 4, Fig. 5, grade beam 2 is detachable structure, including the symmetry of both sides along the longitudinal centerline Beam I8 and beam II9;Beam I8 and beam II9 is arranged on cylinder support 6 both sides, beam by multiple bearing pins respectively Connect by many group connection otic placodes 5 are fixing between I8 and beam II9, be provided with at cylinder support 6 upper surface Oil cylinder 7.
When rig charger moves, beam I8 and beam II9 slides on bottom surface, tunnel slide rail 4.
(it is in low level and is referred to as sleeping dress) the upper table less than grade beam 2 when oil cylinder 7 is retracted to the end, it is simple to grade beam The movement of 2, during rig load test, holds up oil cylinder 7.
When grade beam 2 assembles, with beam I for assembling benchmark, first oil cylinder 7 is arranged on cylinder support 6 It is assembled into cylinder support assembly together, then cylinder support assembly is arranged on beam I, back rest II fills, Otic placode (using single bi-lug plate connected mode) between beam I with beam II is connected with latch.
Work process of the present utility model is:
Step 1: bearing 1 is arranged on each test well head, then by each rig needing to load according to this work Skill requires to be completed in each test well position, is ready for load test.
Step 2: start air hoist 3, is dragged to first well head needing test, oil cylinder 7 by grade beam 2 Prop up, carry out the load test of rig.
Step 3: after first test well oral examination has been tested, carry out the test of other well head successively.
Operation principle of the present utility model is:
This load testing machine is divided into mobile grade beam 2 and hold-down support 1 two parts, and grade beam 2 is in tunnel Mobile, the position being fixedly mounted to each test well head made by bearing 1.For ease of movement, load cylinder Grade beam 2, not above the upper surface of grade beam 2, is made detachable ground girder construction for this by 7, and oil cylinder is pacified It is contained in grade beam, thus reduces the setting height(from bottom) of oil cylinder 7, workmen when facilitating rig load test Operation.Grade beam 2 uses air hoist 3 both sides to pull movement, can realize utilizing a bench drill machine to add and carry Put and multiple stage rig is carried out load test, thus improve the utilization rate of loading equipemtn, decrease testing stand Repeated construction.

Claims (2)

1. a detachably beam type mobile drill charger, it is characterised in that:
Including be fixed on edge on well head tunnel bearing (1) and in tunnel the grade beam (2) of movement, ground Beam (2) two ends are respectively arranged with an air hoist (3), and two air hoists (3) pass through steel respectively Rope is connected with grade beam (2) two ends;
Described grade beam (2) is detachable structure, including the beam I (8) that both sides along the longitudinal centerline are symmetrical With beam II (9);Beam I (8) and beam II (9) is arranged on cylinder support (6) by multiple bearing pins respectively Both sides, connect, at oil cylinder by many groups connection otic placode (5) are fixing between beam I (8) and beam II (9) Bearing (6) upper surface is provided with oil cylinder (7).
Detachably beam type mobile drill charger the most according to claim 1, it is characterised in that: Described oil cylinder (7) is retracted to be less than during the end upper surface of grade beam (2).
CN201620052465.6U 2016-01-19 2016-01-19 But split grade beam formula moves rig loading device Expired - Fee Related CN205483780U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620052465.6U CN205483780U (en) 2016-01-19 2016-01-19 But split grade beam formula moves rig loading device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620052465.6U CN205483780U (en) 2016-01-19 2016-01-19 But split grade beam formula moves rig loading device

Publications (1)

Publication Number Publication Date
CN205483780U true CN205483780U (en) 2016-08-17

Family

ID=56671558

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620052465.6U Expired - Fee Related CN205483780U (en) 2016-01-19 2016-01-19 But split grade beam formula moves rig loading device

Country Status (1)

Country Link
CN (1) CN205483780U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106248489A (en) * 2016-08-31 2016-12-21 兰州兰石集团有限公司 Multifunctional drill pull test platform
CN107389368A (en) * 2017-08-01 2017-11-24 兰州兰石集团有限公司 A kind of multipurpose experiment loading unit
CN110346217A (en) * 2019-06-28 2019-10-18 宝鸡石油机械有限责任公司 A kind of load testing method and experimental rig of ocean double-wellhead derrick

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106248489A (en) * 2016-08-31 2016-12-21 兰州兰石集团有限公司 Multifunctional drill pull test platform
CN107389368A (en) * 2017-08-01 2017-11-24 兰州兰石集团有限公司 A kind of multipurpose experiment loading unit
CN110346217A (en) * 2019-06-28 2019-10-18 宝鸡石油机械有限责任公司 A kind of load testing method and experimental rig of ocean double-wellhead derrick

Similar Documents

Publication Publication Date Title
CN205483780U (en) But split grade beam formula moves rig loading device
CN103728178B (en) A kind of inflatable of post loads locating device and loads localization method
CN204530469U (en) A kind of novel high ferro truss bridge detecting vehicle
CN102023101A (en) Test stand of hydraulic bracket
CN206768618U (en) A kind of lowering or hoisting gear for bridge installation
CN108333057B (en) Lever type coal rock long-term creep test device
CN111908320A (en) Method for quickly converting steel wire rope for hoisting ultra-deep underground continuous wall
CN206367981U (en) It is a kind of to facilitate the hanging beam mechanism that separating component is lifted in shield auger
CN204439353U (en) A kind of ocean boat-carrying winch test platform
CN201000412Y (en) Building project bearing beam load test device
CN108362551B (en) Rock test triaxial pressure testing machine convenient to sample piece is changed
CN202273598U (en) Removable servo frame
CN210886965U (en) Integrated anchoring device for lifting hanging basket
CN204851299U (en) Colliery is combined in pit and is adopted working face hydraulic support loading device
CN208293326U (en) A kind of adaptive gauge rail lifting apparatus
CN110195447A (en) A kind of anchor pole pullout tests displacement observation device
CN110160817A (en) Electric block tests reinforcement poise system and its application method
CN201983982U (en) Tensile testing machine for petroleum drilling machine
CN201000413Y (en) Building project bearing beam loading composite girder steel test device
CN210260429U (en) Coal leveling device for railway carriage
CN212866926U (en) Movable supporting beam dismounting device
CN211172120U (en) Concrete pile bending test device
CN211819450U (en) Base for mine lower support withdrawing device
CN110029946B (en) Installation method of vertical lifting derrick
CN208902007U (en) Porous detection device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20170119

CF01 Termination of patent right due to non-payment of annual fee