CN205479907U - Stifled waste fitting discharging's PVC sewer pipe is prevented in area - Google Patents

Stifled waste fitting discharging's PVC sewer pipe is prevented in area Download PDF

Info

Publication number
CN205479907U
CN205479907U CN201620232185.3U CN201620232185U CN205479907U CN 205479907 U CN205479907 U CN 205479907U CN 201620232185 U CN201620232185 U CN 201620232185U CN 205479907 U CN205479907 U CN 205479907U
Authority
CN
China
Prior art keywords
pipe
piston
push
maintenance pipe
rear end
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620232185.3U
Other languages
Chinese (zh)
Inventor
梁文辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Biyang Huixin plumbing equipment Co. Ltd.
Original Assignee
梁文辉
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 梁文辉 filed Critical 梁文辉
Priority to CN201620232185.3U priority Critical patent/CN205479907U/en
Application granted granted Critical
Publication of CN205479907U publication Critical patent/CN205479907U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a stifled waste fitting discharging's PVC sewer pipe is prevented in area belongs to the pipe fitting field, it has solved the trouble problem of current sewer pipe mediation. The utility model discloses a body that the PVC material was made, be equipped with the inspection hole on the body, still including overhauing the push -and -pull rod that pipe and front end were equipped with the piston, and be equipped with the locking cap of square groove, the push -and -pull rod rear end is fixed with the square groove tank bottom, it is connected with the inspection hole to overhaul the pipe front end, and the body axis is perpendicular with maintenance hollow shaft line, it is squarely to overhaul pipe rear end outer wall cross -section, and the locking cap passes through the square groove lid on overhauing the pipe rear end, and it is fixed through the fastener, the inside pipe wall setting is overhauld in the piston laminating, and place in on the inspection hole, and be equipped with the arcwall face that matches with pipe inner wall on the piston, and can be along overhauing the hollow shaft to overhauing intraductal push -and -pull piston through the push -and -pull rod, and near still respectively being equipped with a valve on the body of inspection hole both sides. This sewer pipe conveniently dredges to and blowdown after being convenient for dredge.

Description

PVC sewer pipe with anti-blocking blowdown apparatus
Technical field
This utility model belongs to pipe fitting technical field, relates to a kind of PVC sewer pipe with anti-blocking blowdown apparatus.
Background technology
When existing sewer pipe occurs blocking, need to dredge with longer steel wire rope, but steel wire rope touches Easily bend to tamper, cause dredging difficulty, it is therefore necessary to improve.
Summary of the invention
The purpose of this utility model is for the above-mentioned problems in the prior art, it is provided that one will not be right Proper drainage impacts, and can the quick and convenient PVC sewer pipe with anti-blocking blowdown apparatus carrying out dredging.
The purpose of this utility model can be realized by following technical proposal: a kind of PVC with anti-blocking blowdown apparatus Sewer pipe, the body made including PVC material, it is characterised in that: body is provided with manhole, also wraps Include maintenance pipe and front end is provided with the push-pull bar of piston, and be provided with the locking cap of square groove, push-pull bar rear end and side Groove bottom land is fixed, and maintenance pipe front end is connected with manhole, and body axis is vertical with maintenance pipe axis, maintenance Outer wall cross section, pipe rear end is square, and locking cap is covered on maintenance pipe rear end by square groove, and passes through securing member Fixing, piston laminating maintenance inside pipe wall is arranged, and is placed on manhole, and piston is provided with and inboard wall of tube body The arcwall face of coupling, and can along maintenance pipe axially through push-pull bar piston described in push-and-pull in maintenance pipe, And also it is respectively provided with a valve on the body of manhole both sides.
Due to piston laminating maintenance inside pipe wall arrange, be placed on manhole, and piston be provided with in body The arcwall face of wall coupling, therefore body proper drainage will not be impacted by piston, when blocking in body Time, close a valve and open another valve, push away in maintenance pipe axially through push-pull bar along maintenance pipe Draw piston, by air pressure to dredge body one end, the most respectively the state of two valves is exchanged, with dredging The body other end, can also pull out push-pull bar afterwards, drives piston together to extract out, makes the cake of sludge after dredging It is expelled directly out by maintenance pipe.
As preferably, described locking cap and maintenance pipe rear end are respectively equipped with hole, location and fixing hole, fastening Part is bolt, and bolt is each passed through hole, location and fixing hole and is fixed with maintenance pipe rear end by locking cap.
Therefore connect more stable, can guarantee that the arcwall face of piston mates with inboard wall of tube body simultaneously.
As preferably, described maintenance pipe is additionally provided with on connecting hole, and connecting hole detachably near back-end location Be bolted with pilot pin, and pilot pin end is stretched out from maintenance inside pipe wall.
Pilot pin serves the effect of location, it is to avoid pulled out by piston unintentionally.
As preferably, described piston is cased with sealing ring.
Serve good sealing effectiveness.
Compared with prior art, this utility model has the advantage that
Due to piston laminating maintenance inside pipe wall arrange, be placed on manhole, and piston be provided with in body The arcwall face of wall coupling, therefore body proper drainage will not be impacted by piston, when blocking in body Time, close a valve and open another valve, push away in maintenance pipe axially through push-pull bar along maintenance pipe Draw piston, by air pressure to dredge body one end, the most respectively the state of two valves is exchanged, with dredging The body other end, can also pull out push-pull bar afterwards, drives piston together to extract out, makes the cake of sludge after dredging It is expelled directly out by maintenance pipe.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Coding in figure is respectively as follows:
1, body;11, manhole;12, valve;2, maintenance pipe;21, fixing hole;22, connecting hole; 23, pilot pin;3, push-pull bar;31, piston;32, arcwall face;33, sealing ring;4, locking cap; 41, square groove;42, hole, location;43, bolt.
Detailed description of the invention
The following is specific embodiment of the utility model and combine accompanying drawing, the technical solution of the utility model is made Further description, but this utility model is not limited to these embodiments.
As it is shown in figure 1, the PVC sewer pipe of the anti-blocking blowdown apparatus of this band, the pipe made including PVC material Body 1, body 1 is provided with manhole 11, also includes that maintenance pipe 2 and front end are provided with the push-pull bar 3 of piston 31, And it being provided with the locking cap 4 of square groove 41, push-pull bar 3 rear end is fixed with square groove 41 bottom land, overhauls pipe 2 front end It is connected with manhole 11, and body 1 axis is vertical with maintenance pipe 2 axis, overhauls outer wall cross section, pipe 2 rear end It is square, and locking cap 4 is covered on maintenance pipe 2 rear end by square groove 41, and fixed by securing member, live Plug 31 laminating maintenance pipe 2 inwall is arranged, and is placed on manhole 11, and piston 31 is provided with and body 1 The arcwall face 32 of inwall coupling, and can be along maintenance pipe 2 axially through push-pull bar 3 push-and-pull in maintenance pipe 2 Piston 31, and also it is respectively provided with a valve 12 on the body 1 of manhole 11 both sides.
Further, locking cap 4 and maintenance pipe 2 rear end are respectively equipped with hole 42, location and fixing hole 21, tightly Firmware is bolt 43, and bolt 43 is each passed through hole 42, location and fixing hole 21 by locking cap 4 and maintenance pipe 2 rear ends fix.Maintenance pipe 2 is additionally provided with on connecting hole 22, and connecting hole 22 detachably near back-end location Be bolted with pilot pin 23, and pilot pin 23 end is stretched out from maintenance pipe 2 inwall.It is cased with close on piston 31 Seal 33.
Owing to piston 31 laminating maintenance pipe 2 inwall is arranged, it is placed on manhole 11, and sets on piston 31 Having the arcwall face 32 mated with body 1 inwall, therefore body 1 proper drainage will not be impacted by piston 31, When there is blocking in body 1, closing a valve 12 and opening another valve 12, along maintenance pipe 2 axle To by push-pull bar 3 push-and-pull piston 31 in maintenance pipe 2, by air pressure to dredge body 1 one end, afterwards Respectively the state of two valves 12 is exchanged, to dredge body 1 other end, push-pull bar can also be pulled out afterwards 3, drive piston 31 together to extract out, make the cake of sludge after dredging be expelled directly out by maintenance pipe 2.

Claims (4)

1. the PVC sewer pipe with anti-blocking blowdown apparatus, the body (1) made including PVC material, It is characterized in that: body (1) is provided with manhole (11), also include that maintenance pipe (2) and front end are provided with The push-pull bar (3) of piston (31), and it is provided with the locking cap (4) of square groove (41), push-pull bar (3) Rear end is fixed with square groove (41) bottom land, and maintenance pipe (2) front end is connected with manhole (11), and body (1) Axis is vertical with maintenance pipe (2) axis, and maintenance pipe outer wall cross section, (2) rear end is square, and locking cap (4) Being covered on maintenance pipe (2) rear end by square groove (41), and fixed by securing member, piston (31) is fitted Maintenance pipe (2) inwall is arranged, and is placed on manhole (11), and piston (31) is provided with and body (1) The arcwall face (32) of inwall coupling, and can overhaul along maintenance pipe (2) axially through push-pull bar (3) Pipe piston (31) described in (2) interior push-and-pull, and the body (1) near manhole (11) both sides is upper also It is respectively provided with a valve (12).
The PVC sewer pipe of the anti-blocking blowdown apparatus of band the most according to claim 1, it is characterised in that: It is respectively equipped with hole, location (42) and fixing hole (21) on described locking cap (4) and maintenance pipe (2) rear end, Securing member is bolt (43), and bolt (43) is each passed through hole, location (42) and fixing hole (21) will Locking cap (4) fixes with maintenance pipe (2) rear end.
The PVC sewer pipe of the anti-blocking blowdown apparatus of band the most according to claim 1, it is characterised in that: Described maintenance pipe (2) is additionally provided with connecting hole (22) near back-end location, and connecting hole (22) is upper removable That unloads is bolted with pilot pin (23), and pilot pin (23) end is stretched out from maintenance pipe (2) inwall.
The PVC sewer pipe of the anti-blocking blowdown apparatus of band the most according to claim 1, it is characterised in that: It is cased with sealing ring (33) on described piston (31).
CN201620232185.3U 2016-03-19 2016-03-19 Stifled waste fitting discharging's PVC sewer pipe is prevented in area Expired - Fee Related CN205479907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620232185.3U CN205479907U (en) 2016-03-19 2016-03-19 Stifled waste fitting discharging's PVC sewer pipe is prevented in area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620232185.3U CN205479907U (en) 2016-03-19 2016-03-19 Stifled waste fitting discharging's PVC sewer pipe is prevented in area

Publications (1)

Publication Number Publication Date
CN205479907U true CN205479907U (en) 2016-08-17

Family

ID=56651620

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620232185.3U Expired - Fee Related CN205479907U (en) 2016-03-19 2016-03-19 Stifled waste fitting discharging's PVC sewer pipe is prevented in area

Country Status (1)

Country Link
CN (1) CN205479907U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119720A (en) * 2017-11-14 2018-06-05 武汉船用机械有限责任公司 A kind of influent stream pipeline
CN109024861A (en) * 2018-08-24 2018-12-18 普雷沃流体控制科技(芜湖)有限公司 A kind of sewage pipe anti-clogging valve

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108119720A (en) * 2017-11-14 2018-06-05 武汉船用机械有限责任公司 A kind of influent stream pipeline
CN109024861A (en) * 2018-08-24 2018-12-18 普雷沃流体控制科技(芜湖)有限公司 A kind of sewage pipe anti-clogging valve

Similar Documents

Publication Publication Date Title
CN205479907U (en) Stifled waste fitting discharging's PVC sewer pipe is prevented in area
CN205412585U (en) Gas drainage dross removal mechanism
CN107882585A (en) To drilling integrate draining gas pumping integrated apparatus under one kind
CN205475538U (en) Stifled PVC sewer pipe is prevented to high efficiency
CN206000568U (en) Pneumatic positive/negative-pressure automatic bleeder
CN213793290U (en) Skylight water pipe detects auxiliary device
CN205836836U (en) A kind of traction apparatus detaching structure
CN102235133B (en) Opening system for pressure relief windows
CN211010081U (en) Self-sealing mud valve
CN208109596U (en) PCCP pipeline pressure test tool pipe
CN114483161A (en) Coal mine drilling gas spraying prevention device and construction method
CN209348216U (en) Composite filter element
CN208571081U (en) Trough pipe double-bellmouth connector
CN207555041U (en) A kind of IBC barrels of quick coupling
CN205475537U (en) PVC sewer pipe
CN206278522U (en) Oil-water well test-manufactures anti-splash device
CN210142022U (en) Goaf gas production drainage device
CN104190141B (en) Rotary drum pressure mud device
CN210194786U (en) Pipeline dredging gun
CN205101586U (en) Decompression is pneumatic to be connected
US20150096234A1 (en) Door lock system for debris tank
CN220930220U (en) Stainless steel gate valve with wire opening
CN214005857U (en) Civil building water supply and drainage pipeline capable of dredging and draining water
CN215522104U (en) One-way flow check valve
CN106516481B (en) Oil-water well test-manufactures anti-splash device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Sun Yuelin

Inventor after: Liu Jiaming

Inventor before: Liang Wenhui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170901

Address after: 463700 Biyang Industrial Park, Zhumadian, Henan

Patentee after: Biyang Huixin plumbing equipment Co. Ltd.

Address before: 362400 Fujian County, Anxi County, Chengxiang town cents after the Village Court House No. 1

Patentee before: Liang Wenhui

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20180319