CN205477759U - Long -range roof monitor platform of mine numeralization - Google Patents

Long -range roof monitor platform of mine numeralization Download PDF

Info

Publication number
CN205477759U
CN205477759U CN201620318200.6U CN201620318200U CN205477759U CN 205477759 U CN205477759 U CN 205477759U CN 201620318200 U CN201620318200 U CN 201620318200U CN 205477759 U CN205477759 U CN 205477759U
Authority
CN
China
Prior art keywords
mine
platform
roof
repeater box
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620318200.6U
Other languages
Chinese (zh)
Inventor
衡立文
段志文
张明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Refined Youth Colliery Of Sichuan Dazhu Coal And Electric Group Co Ltd
Original Assignee
Refined Youth Colliery Of Sichuan Dazhu Coal And Electric Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Refined Youth Colliery Of Sichuan Dazhu Coal And Electric Group Co Ltd filed Critical Refined Youth Colliery Of Sichuan Dazhu Coal And Electric Group Co Ltd
Priority to CN201620318200.6U priority Critical patent/CN205477759U/en
Application granted granted Critical
Publication of CN205477759U publication Critical patent/CN205477759U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Alarm Systems (AREA)

Abstract

The utility model discloses a long -range roof monitor platform of mine numeralization is connected to form by repeater box, central platform, display in proper order, is connected with deformation detection device, pressure measurement on the repeater box respectively, is used for detecting mine roof's deflection and pressure value respectively, being provided with transmission device on the repeater box, setting up remote -transmission module on the central platform, the repeater box passes through transmission device and is connected with remote -transmission module for information transmission to the central platform that the case was collected will suspend, still set up alarm device, data memory cell on the platform of center. The utility model discloses can long -range change and the be fashionable real -time understanding of pressure parameter value to mine roof to effectively improve the mine to the control ability of roof, to the design of equitable roof support, it has great effect to reduce the roof accident rate. To the production of guarantee mine safety, improve the mine safety benefit, there is the significance.

Description

Mine digitized long-range top board monitor supervision platform
Technical field
This utility model relates to a kind of coal mine inside ceiling panel supervising device.
Background technology
Safety in production is colliery industry primary productive force, and colliery industry is emphasizing safety in production always, because of coal-getter Make changeable in situation, complicated and diversified underground, how to ensure that production safety is always in the weight of coal mining industry it Weight.
The one of underground coal mining threatens greatly and comes from the roof caving in goaf and coal cutting roadway top board and base plate Change and displacement.Roof is complicated and changeable with base plate situation, and such as roof is with Sandy Silt, clay Rock is main situation, or this coal seam and top board are often by Erosion by ancient rivers, causes rock stratum diversity big etc., It it is all the reason of the top board change with base plate and displacement.
Under the conditions of prior art, the monitoring means of top board is fallen behind by coal mining mine for a long time, is formed without effect Supervisory systems, data acquisition is imperfect, not in time, and pole is unfavorable for roof control, to mine safety production band Carry out negative effect.How to develop rational roof control platform, it is achieved in real time monitoring, remotely control and Data Management Analysis function is to perfect the main bugbear of mine roof management system.
Utility model content
In order to solve the problems referred to above, this utility model provides a kind of mine digitized long-range top board monitor supervision platform.
This utility model is linked in sequence is formed by repeater box, central platform, display, and described repeater box divides Lian Jie there be device for detecting deformation, pressure-detecting device, be respectively used to detect deflection and the pressure of mine roof Force value;Being provided with transmitting device on repeater box, central platform arranges remote transmission module, repeater box passes through Transmitting device is connected with remote transmission module, for the information that interruption case is collected is transferred to central platform; Alarm device, data storage cell is also set up on central platform;Transmitting device is by transfer bus and remotely biography Defeated module connects.
Mine digitized long-range top board monitor supervision platform as above, specifically, described device for detecting deformation is Displacement probe;Pressure-detecting device is pressure transducer.
Mine digitized long-range top board monitor supervision platform as above, specifically, described central platform is data Processing server, data storage cell is computer hard disc.
Mine digitized long-range top board monitor supervision platform as above, specifically, described alarm device is acousto-optic Alarm device.
Mine digitized long-range top board monitor supervision platform as above, specifically, arrange in described central platform There is data analysis module, module, user management module, self diagnosis module, Reports module are set.
Beneficial effect: this utility model can be effectively improved the mine management and control ability to top board.Reasonable top board is propped up Protecting design, reducing roof accident rate has bigger effect.To ensureing mine safety production, improve mine safety effect Benefit, significant.By improving the management and control ability to Work places, worker's working environment can be effectively improved, There is bigger social benefit.
This utility model can remotely be understood with row during pressure parameter value in real time in change to mine roof.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
Detailed description of the invention
This utility model is linked in sequence is formed by repeater box, central platform, display, arranges collection in repeater box Data and the chip processing data, and supply unit is set, supply unit can be portable power source, it is also possible to According to mine field condition, existing power sourcing equipment in using mine.
Some repeater boxs are set in mine, in the most each section of tunnel, are respectively provided with multiple test point, each inspection Measuring point arranges a repeater box, then connects on repeater box and installs displacement probe, pressure transducer, is used for examining Survey deflection and the force value of mine roof.
Being provided with transmitting device on repeater box, the data after mainly being processed by chip are sent to by transfer bus Central platform, and received by the remote transmission module on central platform.Transfer bus by each repeater box with in Heart platform couples together.
Arranging remote transmission module on central platform, repeater box is connected with remote transmission module by transmitting device, For the information that interruption case is collected is transferred to central platform;Alarm device, number is also set up on central platform According to memory element;Transmitting device is connected with remote transmission module by transfer bus.
Described central platform is data processing server, is provided with data analysis module, setting in central platform Module, user management module, self diagnosis module, Reports module, perform data analysis computing respectively, according to User requires to carry out making setting by oneself, manages multiple user login information, system autodiagnosis computing, performs form The work such as generation.
Central platform by analyze with process after information be sent to computer hard disc and store, in order to transfer later or It is to share other platform.
Central platform is provided with acoustic-optic alarm, and the data arrived when displacement probe or pressure sensor monitoring are constituted After alarming value, central platform starts audible-visual annunciator immediately, reminds operator note and carry out emergent management. Here it is too fast that alarming value can be that displacement probe monitors top board displacement, or top board displacement is excessive, Trowel used for plastering is had to fall possibility.Or pressure that pressure sensor monitoring transmits to top board is excessive, beyond safety value, has Trowel used for plastering falls possibility.
By analyzing the data that this utility model monitors, more preferable top board and base plate design of its support side can be proposed Case, is further ensured that the safety in coal cutting roadway.
Above-mentioned for this utility model exemplary illustration, do not represent this utility model protection domain.

Claims (5)

1. mine digitized long-range top board monitor supervision platform, is linked in sequence is formed by repeater box, central platform, display, It is characterized in that, described repeater box is connected to device for detecting deformation, pressure-detecting device, respectively For detecting deflection and the force value of mine roof;Transmitting device it is provided with, on central platform on repeater box Arranging remote transmission module, repeater box is connected with remote transmission module by transmitting device, for interrupting case The information collected is transferred to central platform;Alarm device, data storage cell is also set up on central platform; Transmitting device is connected with remote transmission module by transfer bus.
2. mine digitized long-range top board monitor supervision platform as claimed in claim 1, it is characterised in that described change Shape detection device is displacement probe;Pressure-detecting device is pressure transducer.
3. mine digitized long-range top board monitor supervision platform as claimed in claim 1, it is characterised in that in described Heart platform is data processing server, and data storage cell is computer hard disc.
4. mine digitized long-range top board monitor supervision platform as claimed in claim 1, it is characterised in that described report Alarm device is acoustic-optic alarm.
5. mine digitized long-range top board monitor supervision platform as claimed in claim 1, it is characterised in that in described It is provided with data analysis module in heart platform, module, user management module, self diagnosis module, form are set Module.
CN201620318200.6U 2016-04-14 2016-04-14 Long -range roof monitor platform of mine numeralization Expired - Fee Related CN205477759U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620318200.6U CN205477759U (en) 2016-04-14 2016-04-14 Long -range roof monitor platform of mine numeralization

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620318200.6U CN205477759U (en) 2016-04-14 2016-04-14 Long -range roof monitor platform of mine numeralization

Publications (1)

Publication Number Publication Date
CN205477759U true CN205477759U (en) 2016-08-17

Family

ID=56640943

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620318200.6U Expired - Fee Related CN205477759U (en) 2016-04-14 2016-04-14 Long -range roof monitor platform of mine numeralization

Country Status (1)

Country Link
CN (1) CN205477759U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767668A (en) * 2017-02-10 2017-05-31 贵州大学 The measurement apparatus and measuring method of a kind of back pressure-bearing and deflection
CN107767625A (en) * 2017-10-23 2018-03-06 山西省交通科学研究院 A kind of highway goaf subgrade stability monitoring and pre-warning system and method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767668A (en) * 2017-02-10 2017-05-31 贵州大学 The measurement apparatus and measuring method of a kind of back pressure-bearing and deflection
CN107767625A (en) * 2017-10-23 2018-03-06 山西省交通科学研究院 A kind of highway goaf subgrade stability monitoring and pre-warning system and method

Similar Documents

Publication Publication Date Title
AU2017375855B2 (en) Acousto-electric and gas real-time automatic monitoring system and method for coal-rock dynamic disaster
Dai et al. Microseismic early warning of surrounding rock mass deformation in the underground powerhouse of the Houziyan hydropower station, China
CN103362553B (en) Coal mine underground safety comprehensive monitoring system based on fiber grating sensors
CN103233777B (en) A kind of roof safety ore pressure monitor method and device
CN202001063U (en) System for pre-warning water disaster of mine bottom plate
CN112302722B (en) Coal mine roadway multidirectional stress and deformation wireless monitoring and early warning method and system
CN203050785U (en) Mine micro-seismic monitoring system
CN201993473U (en) Microseismic monitoring system
CN205477759U (en) Long -range roof monitor platform of mine numeralization
CN102691520A (en) Monitoring system for heading face
CN103670362A (en) Mine hydraulic drilling rig monitoring system
Molina et al. Detection of gases and collapses in underground mines using WSN
CN115452216A (en) Coal mine tunnel optical fiber intelligent online monitoring system based on internet
CN110989018A (en) Goaf fire source position detection system and detection method based on natural potential method
CN213598023U (en) Multidirectional stress and deformation wireless monitoring and early warning system for coal mine tunnel
CN102852556A (en) Safety pre-warning system of mining equipment
CN205025504U (en) Displacement is met an emergency stock and is synthesized early warning system
CN102182515B (en) Method for magnetically monitoring and forecasting deep surrounding rock burst losslessly in real time
CN102691521A (en) Installation method for driving working face monitoring system
CN205644892U (en) Underground works safe risk perceptual arrangement that is under construction based on BIM
CN205477749U (en) Colliery anti -counterfeiting pushes up early warning device based on laser detection technology
CN102705012A (en) Monitoring system of coal roadway roof separation based on M-BUS
CN203335131U (en) Mine water disaster monitoring and forecasting system
CN104897213A (en) Sensor for monitoring waste rock pressure and gas parameter in goaf
CN210268562U (en) Digital display roof separation layer displacement alarm

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20170414