CN205475137U - Novel escape canal that can found fast - Google Patents
Novel escape canal that can found fast Download PDFInfo
- Publication number
- CN205475137U CN205475137U CN201620131905.7U CN201620131905U CN205475137U CN 205475137 U CN205475137 U CN 205475137U CN 201620131905 U CN201620131905 U CN 201620131905U CN 205475137 U CN205475137 U CN 205475137U
- Authority
- CN
- China
- Prior art keywords
- lag body
- shaped
- connector
- rib bar
- cell body
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Sewage (AREA)
Abstract
The utility model provides a novel escape canal that can found fast, its U -shaped basin module that includes a plurality of interconnect, U -shaped basin module includes open -top's U -shaped cell body, but the both ends of U -shaped cell body are provided with accordant connection's first connecting piece, second connecting piece respectively, and the opening and the grid accordant connection of U -shaped cell body install the stiffener subassembly on the U -shaped cell body, the stiffener subassembly includes that a plurality of cross sections are for the main rib pole of U -shaped with vice rib pole that two adjacent main rib pole detachably linked together, bottom and both sides that the main rib pole set up and matchd joint U -shaped cell body along the length direction interval of U -shaped cell body, vice rib pole extends and the detachably joint along the length direction of U -shaped cell body the main rib pole with the lateral part of U -shaped cell body. The utility model has the advantages of simple structure, with low costs, construction cycle be short, easily found.
Description
Technical field
This utility model relates to hydraulic engineering field, be specifically related to a kind of can the novel gutter of rapid build.
Background technology
In correlation technique, the method frequently with cast in situs builds gutter, and this method cost is high, and construction complexity is long in time limit,
Consumptive material is many, easily causes the pollution to surrounding, and needs a large amount of construction formwork.
Utility model content
For the problems referred to above, for avoiding above-mentioned deficiency, this utility model provide a kind of low cost, duration short, can rapid build
Novel gutter.
The purpose of this utility model realizes by the following technical solutions:
Provide a kind of can the novel gutter of rapid build, it includes multiple interconnective U-shaped tank module, described U-shaped
Tank module includes that open-topped U-lag body, the two ends of described U-lag body are respectively arranged with the first connection that can mate connection
Part, the second connector, the opening of U-lag body is connected with grid coupling, U-lag body is provided with bracing piece assembly;Described add
Strong bar assembly includes the main rib bar that multiple cross section is U-shaped and the secondary rib bar being removably joined together by adjacent two main rib bars,
Described main rib bar is spaced setting the bottom mating joint U-lag body and both sides, described secondary rib along the length direction of U-lag body
Bar extends and is releasably coupled described main rib bar and the sidepiece of described U-lag body along the length direction of U-lag body.
Wherein, the both sides medium position of described main rib bar is provided with and mates, with described secondary rib bar, the link slot engaged.
Wherein, after adjacent two U-shaped tank modules are engaged by the first connector, the second connector, can be further at joint
Pour binding material, with the gap at sealing engagement.
Further, described secondary rib bar is detachably connected with the bar clamp for supporting U-lag body when casting concrete.Institute
Stating bar clamp and include screw rod, nut, pad and the base of fixed engagement U-lag body, the bottom of described screw rod is set to arrow shaped,
The top of screw rod is adjustably connected on base by another nut, and the both sides of described base are provided with and engage with described secondary rib bar
Flange.Described nut and gasket ring are around described screw rod, for standing screw to subsurface.
Further, when needs vertically connect two U-shaped tank modules, can the U-shaped of a U-shaped tank module wherein
The sidepiece of cell body offers the U-shaped opening that can engage with the first connector or the second connector.
Preferably, the cross section of described first connector and the second connector is all U-shaped, the bottom centre of described first connector
Position is provided with projection, and the bottom of described second connector is provided with the connecting hole engaged with described protruding coupling.
The beneficial effects of the utility model are:
1, simple in construction, it is not necessary to a large amount of construction formworks and pour material, low cost;
2, open-topped U-lag body is set, the two ends of U-lag body be respectively arranged with can mate connection the first connector,
Second connector, thus realize the quick connection between adjacent two U-shaped tank modules, reduction of erection time;
3, arranging bracing piece assembly, wherein bracing piece assembly includes main rib bar that multiple cross section is U-shaped and by adjacent two masters
The secondary rib bar that rib bar is removably joined together, secondary rib bar is detachably connected with for supporting U-lag when casting concrete
The bar clamp of body, consequently facilitating the installation that bar clamp is on U-lag body, accelerates the speed that ditch builds.
Accompanying drawing explanation
The utility model is described in further detail to utilize accompanying drawing, but the embodiment in accompanying drawing is not constituted any limit of the present utility model
System, for those of ordinary skill in the art, on the premise of not paying creative work, it is also possible to obtain according to the following drawings
Other accompanying drawing.
Fig. 1 is the structural representation of this utility model U-shaped tank module.
Reference:
U-lag body the 1, first connector the 2, second connector 2', grid 3, main rib bar 4, secondary rib bar 5, link slot 6, steel
Muscle folder 7, screw rod 8, nut 9, pad 10, base 11, flange 12.
Detailed description of the invention
With the following Examples this utility model is further described.
Seeing Fig. 1, the present embodiment the novel gutter of rapid build can include multiple interconnective U-shaped tank module, described
U-shaped tank module includes open-topped U-lag body 1, and the two ends of described U-lag body 1 are respectively arranged with can mate connection
First connector the 2, second connector 2', the opening of U-lag body 1 is connected with grid 3 coupling, U-lag body 1 is provided with and adds
Strong bar assembly;Described bracing piece assembly includes main rib bar 4 that multiple cross section is U-shaped and by detachable for adjacent two main rib bars 4
The secondary rib bar 5 that links together, described main rib bar 4 is spaced along the length direction of U-lag body 1 and arranges and mate joint U
The bottom of shape cell body 1 and both sides, described secondary rib bar 5 extends along the length direction of U-lag body 1 and is releasably coupled described
Main rib bar 4 and the sidepiece of described U-lag body 1.
Wherein, the both sides medium position of described main rib bar 4 is provided with and mates, with described secondary rib bar 5, the link slot 6 engaged.
Wherein, the cross section of described first connector 2 and the second connector 2' is all U-shaped, the bottom of described first connector 2
Center is provided with projection, and the bottom of described second connector 2' is provided with the connecting hole engaged with described protruding coupling.
Wherein, described secondary rib bar 5 is detachably connected with the bar clamp 7 for supporting U-lag body 1 when casting concrete.
Described bar clamp 7 includes screw rod 8, nut 9, pad 10 and the base 11 of fixed engagement U-lag body 1, described screw rod 8
Bottom is set to arrow shaped, and the top of screw rod 8 is adjustably connected on base 11 by another nut, described base 11
Both sides are provided with the flange 12 engaged with described secondary rib bar 5.Described nut 9 and pad 10, around described screw rod 8, are used for fixing spiral shell
Bar 8 is to subsurface.
Wherein, after adjacent two U-shaped tank modules are engaged by first connector the 2, second connector 2', can enter at joint
One step pours binding material, with the gap at sealing engagement.
Last it should be noted that, above example is only in order to illustrate the technical solution of the utility model, rather than to this utility model
The restriction of protection domain, although having made to explain to this utility model with reference to preferred embodiment, the ordinary skill people of this area
Member should be appreciated that and can modify the technical solution of the utility model or equivalent, without deviating from this utility model skill
The spirit and scope of art scheme.
Claims (5)
1. can the novel gutter of rapid build, it is characterized in that, including multiple interconnective U-shaped tank modules, described U
Shape tank module includes open-topped U-lag body, and the two ends of described U-lag body are respectively arranged with can mate the first of connection
Connector, the second connector, the opening of U-lag body and grid coupling connect, and U-lag body is provided with bracing piece assembly;
Described bracing piece assembly includes main rib bar that multiple cross section is U-shaped and is removably joined together by adjacent two main rib bars
Secondary rib bar, described main rib bar along U-lag body length direction be spaced arrange and mate engage U-lag body bottom and two
Side, described secondary rib bar extends and is releasably coupled described main rib bar and described U-lag body along the length direction of U-lag body
Sidepiece.
The most according to claim 1 a kind of can the novel gutter of rapid build, it is characterized in that, described secondary rib bar removably connects
It is connected to the bar clamp for supporting U-lag body when casting concrete.
The most according to claim 1 a kind of can the novel gutter of rapid build, it is characterized in that, two middle side parts of described main rib bar
Position is provided with mates, with described secondary rib bar, the link slot engaged.
The most according to claim 1 a kind of can the novel gutter of rapid build, it is characterized in that, described first connector and second
The cross section of connector is all U-shaped.
The most according to claim 4 a kind of can the novel gutter of rapid build, it is characterized in that, the bottom of described first connector
Center is provided with projection, and the bottom of described second connector is provided with the connecting hole engaged with described protruding coupling.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620131905.7U CN205475137U (en) | 2016-02-20 | 2016-02-20 | Novel escape canal that can found fast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620131905.7U CN205475137U (en) | 2016-02-20 | 2016-02-20 | Novel escape canal that can found fast |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205475137U true CN205475137U (en) | 2016-08-17 |
Family
ID=56678585
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620131905.7U Expired - Fee Related CN205475137U (en) | 2016-02-20 | 2016-02-20 | Novel escape canal that can found fast |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205475137U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320499A (en) * | 2016-11-08 | 2017-01-11 | 苏州爱拼金属制品有限公司 | Trench |
-
2016
- 2016-02-20 CN CN201620131905.7U patent/CN205475137U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106320499A (en) * | 2016-11-08 | 2017-01-11 | 苏州爱拼金属制品有限公司 | Trench |
CN106320499B (en) * | 2016-11-08 | 2019-06-11 | 江苏爱拼环保科技有限公司 | A kind of ground groove |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109537851A (en) | A kind of method for prefabricating of assembled pipe well | |
CN203756193U (en) | Steel end template of dual-hinged overturning-applicable tunnel lining trolley | |
CN103775105A (en) | Double hinge joint turnover type tunnel lining trolley steel end mold | |
CN205475137U (en) | Novel escape canal that can found fast | |
CN207812625U (en) | Special-shaped gutter template integrated apparatus | |
CN208293613U (en) | A kind of city integrated piping lane Quick Release die set device of running type | |
CN209040349U (en) | A kind of ring muscle fastening shear wall structure being easily installed | |
CN205046844U (en) | Clear water concrete window steel form structure device that wafts | |
CN204781944U (en) | A mode structure of infilled wall constructional column | |
CN105178593B (en) | Fill the mold method and structure of wall construction post | |
CN203654739U (en) | Built-up plate | |
CN207376642U (en) | A kind of additional elevator is to a point prefabricated assembled basis | |
CN109372248A (en) | A kind of wall column formwork and its nodal wood type reinforcement means | |
CN209991003U (en) | Assembled concrete pump pipe fixing device that can have enough to meet need | |
CN212294380U (en) | Novel cast-in-place outrigger of light structure | |
CN211690363U (en) | Unilateral formwork supporting fastener | |
CN211691355U (en) | A construction platform for high slope construction usefulness | |
CN208701979U (en) | Steel bar truss floor support plate and combination floor support plate | |
CN209308417U (en) | A kind of quick production and for building half prefabricated system automatically docked | |
CN208870060U (en) | A kind of spliced cofferdam baffle | |
CN202627275U (en) | Keel structure for dry-hanging stone curtain walls | |
CN202914109U (en) | Integral type lining system of light-section cable tunnel | |
CN217601256U (en) | Culvert wall body monolithic casting moving platform | |
CN210370713U (en) | Inverted arch longitudinal water stop fixing device | |
CN213014319U (en) | Frame format slope protection skeleton subassembly |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20180220 |
|
CF01 | Termination of patent right due to non-payment of annual fee |