CN205472204U - Supplementary operating system of built -in guide rail - Google Patents

Supplementary operating system of built -in guide rail Download PDF

Info

Publication number
CN205472204U
CN205472204U CN201620258458.1U CN201620258458U CN205472204U CN 205472204 U CN205472204 U CN 205472204U CN 201620258458 U CN201620258458 U CN 201620258458U CN 205472204 U CN205472204 U CN 205472204U
Authority
CN
China
Prior art keywords
turns
wheels
wheelset
guide rail
prestress wire
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620258458.1U
Other languages
Chinese (zh)
Inventor
杨翼宾
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Siyuan smart Aviation Technology Co., Ltd
Original Assignee
Chengdu Siyuan Brother Science And Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Siyuan Brother Science And Technology Co ltd filed Critical Chengdu Siyuan Brother Science And Technology Co ltd
Priority to CN201620258458.1U priority Critical patent/CN205472204U/en
Application granted granted Critical
Publication of CN205472204U publication Critical patent/CN205472204U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a supplementary operating system of built -in guide rail, including iron tower, tian liang, hand -basket, prestress wire, concrete buttress, power equipment, wire rope and assembly pulley, the assembly pulley includes and the 1st turns to the wheelset, the 2nd turns to the wheelset, the 3rd turns to wheelset and fixed wheelset that the 3rd turns to the wheelset fixes on the upper portion of hand -basket, and the prestress wire passes the preformed hole of hand -basket, and wire rope passes power equipment in proper order, the 2nd turns to the wheelset, the 1st turns to the wheelset, the 3rd turns to wheelset and fixed wheelset. The device adopts wire rope as guide rail, and the cross -section is little, light in weight, installation and transportation convenience, adopt on the market fashioned product, saved welding process's process, it is automatic exceptionally straight behind the prestress wire prestress application, no jump, the straightness height that hangs down need not to correct jump during the installation, the simple to operate bug, since it is definitely straight after the prestress wire is exceptionally straight, can make elevating system move steadily very much during as elevating system operation guide rail.

Description

A kind of assistance for lifting system of included guide rail
Technical field
This utility model relates to a kind of assistance for lifting system, the assistance for lifting system of a kind of included guide rail.
Background technology
Aid-to-navigation light Tower System is to ensure that aircraft is smoothed out the visual navigational aids taking off, landing, slide under night and complicated weather condition, can be that pilot provides post position, direction and aligns guiding, so that pilot visually up in the case of safe landing, be that airport construction is indispensable.Existing aid-to-navigation light Tower System generally comprises five parts: 1, airfield aid, and it is arranged on tower body top, for pilot's night and complicated weather condition descend road, slide visual up in the case of safe landing.2, fragile stem, is used for preventing aircraft from unbalance bumping against airfield aid, reduces aircraft spoilage.3, navaid pylon, for airfield aid and the erection of fragile stem.4, fragile stem jacking system, for security maintenance and the maintenance of airfield aid, to reduce accident rate.5, hub circuit managing and control system, for transmission and the transmission of signal.Airfield aid in aid-to-navigation light Tower System is all contained on navaid pylon by fragile stem, so navaid pylon and the fragile stem irreplaceable auxiliary equipment that is airfield aid.For ensureing takeoff and landing; in general; airfield aid and fragile stem are the most periodically no less than 3 Maintenance and Repair; and the workload of this work is relatively big and danger is higher; device damage and personal injury (especially under the conditions of severe climate) often occur; so needing the assistance for lifting system of fragile stem; during to ensure in maintenance and to change; the height of airfield aid and fragile stem can be reduced, thus reduce accident rate, the personal safety ensureing attendant and the safe landing of aircraft.But, existing assistance for lifting cost performance is poor, and relative cost is high, and construction and installation use complexity, poor stability, it is impossible to meets and i.e. wants structural strength height, safeguards requirement easy to use again.
Utility model content
The purpose of this utility model is to provide the assistance for lifting system of a kind of included guide rail, with the problem solving to propose in above-mentioned background technology.
For achieving the above object, the following technical scheme of this utility model offer:
nullA kind of assistance for lifting system of included guide rail,Including steel tower、It beam、Hand basket、Prestress wire、Concrete buttress、Power-equipment、Steel wire rope and assembly pulley,Described assembly pulley includes that first turns to wheels、Second turns to wheels、3rd turns to wheels and fixing wheels,It beam is arranged on the top of steel tower,Concrete buttress is embedded in the underground on ground bottom steel tower,Hand basket is positioned at steel tower center,3rd turns to wheels to be fixed on the top of hand basket,Preformed hole it is provided with on hand basket,Prestress wire is through the preformed hole of hand basket,One end of prestress wire is connected with sky beam,The other end is connected with concrete buttress,First turns to wheels and fixing wheels to be each attached to the top of day beam,Second turns to wheels and power-equipment to be each attached to ground,Steel wire rope sequentially passes through power-equipment、Second turns to wheels、First turns to wheels、3rd turns to wheels and fixing wheels.
As further program of the utility model: concrete buttress uses the mode of one-piece casting to be connected with basis, concrete buttress and basis form an entirety.
As further program of the utility model: sky beam uses bolt to be connected with steel tower.
Compared with prior art, the beneficial effects of the utility model are: this device uses steel wire rope as guide rail, and cross section is little, lightweight, installs and convenient transportation;This device uses the product of molding on market, eliminates the process of welding processing;After prestress wire Shi Hanzhang the most exceptionally straight, without jump, perpendicularity is high, without correcting jump during installation, bug easy for installation;Due to prestress wire exceptionally straight after the most straight, as elevating mechanism run guide rail time elevating mechanism can be made to run the most steady.
Accompanying drawing explanation
Fig. 1 is the front view of the assistance for lifting system of included guide rail.
Fig. 2 is the top view of the assistance for lifting system of included guide rail.
Wherein: 1-steel tower, 2-fragile stem, 3-days beams, 4-hand basket, 5-prestress wire, 6-concrete buttress, 7-power-equipment, 8-steel wire rope, 9-first turns to wheels, and 10-second turns to wheels, 11-the 3rd to turn to wheels, 12-to fix wheels.
Detailed description of the invention
Below in conjunction with detailed description of the invention, the technical scheme of this patent is described in more detail.
nullRefer to Fig. 1-2,A kind of assistance for lifting system of included guide rail,Including steel tower 1、It beam 3、Hand basket 4、Prestress wire 5、Concrete buttress 6、Power-equipment 7、Steel wire rope 8 and assembly pulley,Described assembly pulley includes that first turns to wheels 9、Second turns to wheels 10、3rd turns to wheels 11 and fixing wheels 12,It beam 3 is arranged on the top of steel tower 1,Concrete buttress 6 is embedded in the underground on ground bottom steel tower 1,Hand basket 4 is positioned at steel tower 1 center,3rd turns to wheels 11 to be fixed on the top of hand basket 4,It is provided with preformed hole on hand basket 4,Prestress wire 5 is through the preformed hole of hand basket 4,One end of prestress wire 5 is connected with sky beam 3,The other end is connected with concrete buttress 6,First turns to wheels 9 and fixing wheels 12 to be each attached to the top of day beam,Second turns to wheels 10 and power-equipment 7 to be each attached to ground,Steel wire rope 8 sequentially passes through power-equipment 7、Second turns to wheels 10、First turns to wheels 9、3rd turns to wheels 11 and fixing wheels 12.Concrete buttress 6 uses the mode of one-piece casting to be connected with basis, and concrete buttress 5 and basis form an entirety.It beam 3 uses bolt to be connected with steel tower 1.
Operation principle of the present utility model is: steel tower 1 is connected with fragile stem 2 as the load end of whole system, hand basket 4, the uplift force that concrete buttress 6 brings after can balancing prestress wire 5 Shi Hanzhang;When prestress wire 5 socket on hand basket 4 and adjust in place after, Shi Hanzhang can ensure that the exceptionally straight stress of prestress wire 5, owing to prestress wire 5 two ends have more high-prestressed, one bigger cross recovering forces can be provided the middle part of prestress wire 5 is by lateral load when, ensure that hand basket 4 runs on planned orbit, owing to prestress wire 5 is flexible preferable under non-stress, transports and extremely convenient is installed;After Shi Hanzhang, prestress wire 5 is exceptionally straight, and rigidity is preferable, and need not debug and can remain linear state, solves the guide rail jump brought when conventional steel structure of guide-rail is installed and the problem such as guide rail linearity is the best due to alignment error;The lateral pull of power-equipment 7 can be converted to the power that hand basket 4 rises after the commutation of assembly pulley by steel wire rope 8.This device uses steel wire rope 8 as guide rail, and cross section is little, lightweight, installs and convenient transportation;This device uses the product of molding on market, eliminates the process of welding processing;After prestress wire 5 Shi Hanzhang the most exceptionally straight, without jump, perpendicularity is high, without correcting jump during installation, bug easy for installation;Due to prestress wire 5 exceptionally straight after the most straight, as elevating mechanism run guide rail time elevating mechanism can be made to run the most steady.
Above the better embodiment of this patent is explained in detail, but this patent is not limited to above-mentioned embodiment, in the ken that one skilled in the relevant art is possessed, it is also possible to various changes can be made on the premise of without departing from this patent objective.

Claims (3)

  1. null1. the assistance for lifting system of an included guide rail,It is characterized in that,Including steel tower、It beam、Hand basket、Prestress wire、Concrete buttress、Power-equipment、Steel wire rope and assembly pulley,Described assembly pulley includes that first turns to wheels、Second turns to wheels、3rd turns to wheels and fixing wheels,It beam is arranged on the top of steel tower,Concrete buttress is embedded in the underground on ground bottom steel tower,Hand basket is positioned at steel tower center,3rd turns to wheels to be fixed on the top of hand basket,Preformed hole it is provided with on hand basket,Prestress wire is through the preformed hole of hand basket,One end of prestress wire is connected with sky beam,The other end is connected with concrete buttress,First turns to wheels and fixing wheels to be each attached to the top of day beam,Second turns to wheels and power-equipment to be each attached to ground,Steel wire rope sequentially passes through power-equipment、Second turns to wheels、First turns to wheels、3rd turns to wheels and fixing wheels.
  2. The assistance for lifting system of included guide rail the most according to claim 1, it is characterised in that described concrete buttress uses the mode of one-piece casting to be connected with basis, concrete buttress and basis form an entirety.
  3. The assistance for lifting system of included guide rail the most according to claim 1 and 2, it is characterised in that described sky beam uses bolt to be connected with steel tower.
CN201620258458.1U 2016-03-31 2016-03-31 Supplementary operating system of built -in guide rail Active CN205472204U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620258458.1U CN205472204U (en) 2016-03-31 2016-03-31 Supplementary operating system of built -in guide rail

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620258458.1U CN205472204U (en) 2016-03-31 2016-03-31 Supplementary operating system of built -in guide rail

Publications (1)

Publication Number Publication Date
CN205472204U true CN205472204U (en) 2016-08-17

Family

ID=56649018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620258458.1U Active CN205472204U (en) 2016-03-31 2016-03-31 Supplementary operating system of built -in guide rail

Country Status (1)

Country Link
CN (1) CN205472204U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879066A (en) * 2018-07-11 2018-11-23 云南电网有限责任公司电力科学研究院 A kind of electric power pylon quickly mounts the device of communication base station antenna
CN113294022A (en) * 2021-05-06 2021-08-24 上海市机电设计研究院有限公司 Steel strand penetrating method utilizing wind power tower cylinder foundation prestressed cable preformed hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108879066A (en) * 2018-07-11 2018-11-23 云南电网有限责任公司电力科学研究院 A kind of electric power pylon quickly mounts the device of communication base station antenna
CN108879066B (en) * 2018-07-11 2020-06-16 云南电网有限责任公司电力科学研究院 Device for quickly hanging communication base station antenna on transmission tower
CN113294022A (en) * 2021-05-06 2021-08-24 上海市机电设计研究院有限公司 Steel strand penetrating method utilizing wind power tower cylinder foundation prestressed cable preformed hole

Similar Documents

Publication Publication Date Title
CN103924816B (en) A kind of mounting method of UHV transmission line wine glass-shaped steel tower
EP3825548B1 (en) Device for mounting wind turbine components and mounting method using said device
CN205472204U (en) Supplementary operating system of built -in guide rail
CN103510475A (en) Long-distance pushing construction method of thee-main-truss steel truss beam in single-connection and double-span modes without guide beam
CN204369360U (en) For the safety tongs pulling apparatus of gantry frame structure home lift
US10815687B2 (en) Wind turbine assembly system and associated method
CN106320182A (en) Suspension bridge bank slope beam section long sling swing-shifting mounting device and method
CN103266799B (en) Mast and installation technology thereof
CN105781210B (en) A kind of conical tower and its tool section assist punching construction method for lifting whole
CN102041782A (en) Multi-point pushing system of large-span steel truss girders and pushing process thereof
CN206052568U (en) The long hoist cable of suspension bridge bank slope beam section swings shifting erecting device
CN104532757A (en) Bi-directional traction vertical rotation construction device for cable-stayed bridge steel arch tower
CN204629404U (en) Gear-driven navigational lighting aid tower fragile stem jacking system
CN204629405U (en) Navigational lighting aid tower fragile stem jacking system
CN106542076A (en) A kind of supporting mechanism of the platform that anchors for captive balloon ground installation
CN110184898A (en) The steel skeleton segment of Cable stayed Bridge Main Tower anchorage zone and king-post construction method
CN210031517U (en) Be used for striding linear adjustment stop device of single track PC track roof beam of seat
CN103171970A (en) Rail installation system for high-altitude operation and installation method thereof
CN102795556A (en) Tower crane suspending connection stabilization mechanism used for emergency usage in tower crane jacking process
CN205243137U (en) Airport aid to navigation beacon operating system
CN205577583U (en) Salvage tower system and dismantle light -duty armful of pole immediately
EP4367393A1 (en) Wind turbine tower installation apparatus and method
CN209685232U (en) Balcony lift
CN204703073U (en) A kind of device ensureing spatial warping curve steel king-tower installation line style
CN103626009B (en) The safety guiding device in place of construction elevator cage and the installation method of cage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 610000 Chengdu, Sichuan Province, China (Sichuan) Free Trade Pilot Zone

Patentee after: CHENGDU SIYUAN BROTHER SCIENCE AND TECHNOLOGY CO., LTD.

Address before: 610000, No. 88, No. 5 Jitai Road, Chengdu High-tech Zone, Sichuan Province, No. 2, Building 31, No. 1

Patentee before: CHENGDU SIYUAN BROTHER SCIENCE AND TECHNOLOGY CO., LTD.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 32 / F, building 1, No. 199, Tianfu 4th Street, hi tech Zone, Chengdu, Sichuan 610041

Patentee after: Chengdu Siyuan smart Aviation Technology Co., Ltd

Address before: 610000 Chengdu, Sichuan Province, China (Sichuan) Free Trade Pilot Zone

Patentee before: CHENGDU SIYUAN BROTHER SCIENCE AND TECHNOLOGY Co.,Ltd.