CN205469893U - Bagging apparatus is irritated to material - Google Patents

Bagging apparatus is irritated to material Download PDF

Info

Publication number
CN205469893U
CN205469893U CN201620231811.7U CN201620231811U CN205469893U CN 205469893 U CN205469893 U CN 205469893U CN 201620231811 U CN201620231811 U CN 201620231811U CN 205469893 U CN205469893 U CN 205469893U
Authority
CN
China
Prior art keywords
chute
plate
bagging apparatus
installing plate
reducing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620231811.7U
Other languages
Chinese (zh)
Inventor
朱广平
欧阳虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Dongxiang Intelligent Equipment Co ltd
Original Assignee
Changsha Taikang Packaging Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha Taikang Packaging Equipment Co ltd filed Critical Changsha Taikang Packaging Equipment Co ltd
Priority to CN201620231811.7U priority Critical patent/CN205469893U/en
Application granted granted Critical
Publication of CN205469893U publication Critical patent/CN205469893U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Basic Packing Technique (AREA)

Abstract

The utility model provides a bagging apparatus is irritated to material. Reducing that bagging apparatus is irritated to material includes mounting panel, support, links to each other and have accommodating space with the mounting panel gather materials the subassembly and with the reducing gathers materials subassembly bottom intercommunication and lift chute assembly that have the groove that gathers materials, the support is located the mounting panel and to gather materials subassembly slope of reducing, lift chute assembly includes chute mounting panel, first telescoping device and irritates the silo subassembly, the chute mounting panel with support sliding connection, first telescoping device one end fixing in the chute mounting panel, other end telescopic connection irritate the silo subassembly. Compared with the prior art, the utility model provides a bagging apparatus is irritated to material realizes the displacement of material is irritated to the secondary of irritating the silo subassembly, and the packing of automize in the accurate plastic bag that injects the material is not just influenced by plastic bag opening size of a dimension, carries high yield.

Description

Material fills bagging apparatus
Technical field
This utility model relates to automatically processing device technical field, particularly relates to a kind of Semen Arecae thing Material fills bagging apparatus.
Background technology
At present, under the propagation of betel nut culture, Semen Arecae becomes Speciality Foods, along with food With the increase of Semen Arecae crowd, Semen Arecae finished product sales volume and the output value are consequently increased.
In Semen Arecae production process, it has been automatization's processing that Semen Arecae pours into plastic bag packaging, The many employings of existing automatization material filling once fill, during virtual package, it may appear that plastic bag bag Dress openings of sizes differs, and one time material filling stroke is inadequate, causes because plastic bag packaging opening is the least, The Semen Arecae filling bag can not accurately be put in bag, and is scattered on the ground, and causing wastes and unhygienic, Affect material filling production efficiency, reduce yield rate.
Therefore, it is necessary to provide a kind of new material to fill bagging apparatus solve the problems referred to above.
Utility model content
The purpose of this utility model is to provide one to realize secondary material filling, is accurately poured into by material In Dai, the material of simple in construction fills bagging apparatus.
This utility model provides a kind of material to fill bagging apparatus, and described material fills bagging apparatus and includes installing Plate, support, be connected with installing plate and have the reducing of receiving space gather materials assembly and with described change Lifting chute bowl assembly that is that footpath gathers materials component bottom connection and that have material collecting tank, described is set up in Described installing plate and to described reducing gather materials assembly tilt, described lifting chute bowl assembly includes chute Installing plate, the first retractor device and material filling bowl assembly, described chute installing plate is sliding with described support Being dynamically connected, described first retractor device one end is immobilizated in described chute installing plate, and the other end stretches Connect described material filling bowl assembly.
Preferably, described first retractor device is pen cylinder.
Preferably, the described reducing assembly that gathers materials includes reducing hopper, aggregate bin installing plate and gathers materials Bucket assembly, described reducing hopper includes feeding mouth and discharging opening, described feeding mouth and described installation Plate connects, and described discharging opening bore is less than described feeding mouth bore, and described aggregate bin installing plate sets In described discharging opening, described aggregate bin assembly includes that fixed plate, turnover panel, receiving vat and second stretch Compression apparatus, described fixed plate and the described receiving vat of the hinged formation of turnover panel, described fixed plate is with described Aggregate bin installing plate connects, and described second retractor device is located at described discharging opening and described aggregate bin Installing plate opposite side, described second retractor device one end is immobilizated in described reducing hopper, the other end The described turnover panel of flexible connection.
Preferably, described second retractor device is tubular type electric magnet.
Preferably, described material filling bowl assembly includes chute, chute cover plate, right valve plate, left valve plate And opening device, described chute is immobilizated on described chute installing plate, and described chute cover plate lid sets In described chute, described right valve plate and left valve plate are hingedly connected to the two ends of described chute homonymy, Described opening device one end is fixedly arranged on described chute cover plate, the other end away from or close to described right valve Plate and left valve plate.
Preferably, described opening device includes twin shaft cylinder, push pedal, guide pillar and guide pillar chute, Described twin shaft cylinder includes fixing end and telescopic end, and described fixing end is immobilizated in described chute lid Plate, described telescopic end connects described push pedal, and the quantity of described guide pillar chute is two, sets respectively Closing on described chute cover plate side in described right valve plate and left valve plate, described push pedal is located at by described guide pillar With the described corresponding setting of guide pillar chute.
Preferably, described material filling bowl assembly also includes that seat fixed by the guide rail cooperated and guide rail, Described guide rail is located at described chute and is closed on described chute installing plate, and described guide rail is fixed seat and is located at institute State chute installing plate.
Preferably, described material filling bagging apparatus also includes three induction installations, described induction installation It is respectively arranged on described receiving vat interior towards described turnover panel, described chute cover plate pushes away towards described Plate, towards described right valve plate on described chute.
Preferably, described induction installation is proximity switch.
Compared with correlation technique, the material that this utility model provides fills bagging apparatus, has and has as follows Benefit effect:
One, described reducing gathers materials assembly and is connected with the bracket slide being fixed on described installing plate, real Now slip feeding for the first time, the material filling bowl assembly that described reducing gathers materials on assembly is by the first flexible dress Putting drive flexible, in fact second time slip feeding, the material of the most described material filling bowl assembly fills In the plastic bag entered, do not affected by plastic bag opening size size, increased material filling stroke, by Bin Bulky accurately pour in plastic bag, improve yield rate;
Two, material fills bagging apparatus and includes that reducing gathers materials assembly and lifting chute bowl assembly, it is achieved double end Twice material filling, the quantity of material filling is the most accurate, improves production efficiency, safety and sanitation, structure letter Single, easy to operate, reduce cost.
Accompanying drawing explanation
Fig. 1 is the structural representation that this utility model material fills bagging apparatus;
Fig. 2 is that in Fig. 1, reducing gathers materials the structural representation of assembly;
Fig. 3 is that in Fig. 2, reducing gathers materials the structural representation of aggregate bin assembly in assembly;
Fig. 4 is the structural representation of lifting chute bowl assembly in Fig. 1;
Fig. 5 is material filling bowl assembly decomposition texture schematic diagram in Fig. 4.
Detailed description of the invention
Below in conjunction with drawings and embodiments, the utility model is described in further detail.
The structural representation of bagging apparatus is filled please refer to Fig. 1, Fig. 1 this utility model material. Described material fill bagging apparatus 1 include installing plate 11, support 12, reducing gather materials assembly 13, rise Fall chute assembly 14 and induction installation 15.
Please refer to Fig. 1 and Fig. 2, during wherein Fig. 2 is Fig. 1, reducing gathers materials the structure of assembly Schematic diagram.Described installing plate 11 includes body 111 and through hole 112, and described reducing gathers materials group Part 13 includes reducing hopper 131, aggregate bin installing plate 132 and aggregate bin assembly 133, described Reducing hopper 131 is tubular structure, including feeding mouth 1311 and discharging opening 1312, described in go out Material mouth 1312 bore is less than described feeding mouth 1311 bore, it is simple to go out described in being concentrated on by Semen Arecae Material mouth 1312.Described feeding mouth 1311 is connected with described body 111, and with described through hole 112 Communicating, the body 111 of described installing plate 11 is located at by described support 12, and to described reducing collection Material assembly 13 tilts.
Please refer to Fig. 2 and Fig. 3, wherein, during Fig. 3 is Fig. 2, reducing gathers materials and collects in assembly The structural representation of hopper component.Described aggregate bin assembly 133 includes fixed plate 1331, turns over Plate 1332, receiving vat 1333 and the second retractor device 1334.Cutting of described fixed plate 1331 Face is triangle, and described turnover panel 1332 is articulated with a jiao of described fixed plate 1331 triangle, Described second retractor device 1334 one end is immobilizated in described reducing hopper 131, and the other end is for stretching Contracting end connects described turnover panel 1332, and described second retractor device 1334 is stretched, contracted, and drives described Turnover panel 1332 is opened around pin joint to described fixed plate 1331 or is closed, when closing, and described fixed plate 1331 form described receiving vat 1333, when described receiving vat 1333 is received with described turnover panel 1332 After collection arrives a number of Semen Arecae, described turnover panel 1332 is opened, and Semen Arecae is put into described material filling In bowl assembly 143, complete material filling for the first time.
Please refer to Fig. 1, Fig. 2 and Fig. 4, wherein, chute group is lifted during Fig. 4 is Fig. 1 The structural representation of part.Described lifting chute bowl assembly 14 and described reducing gather materials bottom assembly 13 Connection, is i.e. correspondingly arranged in below described discharging opening 1312.Described lifting chute bowl assembly 14 wraps Include chute installing plate the 141, first retractor device 142 and material filling bowl assembly 143.Described chute Installing plate 141 is slidably connected described support 12, and one end of described first retractor device 142 is solid Being held in described chute installing plate 141, the other end connects described material filling bowl assembly 143.
Please refer to Fig. 4 and Fig. 5, wherein, during Fig. 5 is Fig. 4, material filling bowl assembly decomposes knot Structure schematic diagram.Described material filling bowl assembly 143 includes chute 1431, chute cover plate 1432, the right side Seat fixed by valve plate 1433, left valve plate 1434, opening device 1435, guide rail 1436, guide rail 1437, slide block 1438 and material collecting tank 1439.
Described material filling bowl assembly 143 is immobilizated in described chute installing plate by described chute 1431 On 141, the most described chute installing plate 141 along described support 12 slide time, it is achieved described liter Fall chute assembly 14 entirety displacement downward or upward, meets described material filling bowl assembly 143 downward Material filling or upwards splicing, it is achieved the displacement of material filling for the first time.
Described slide block 1438 is immobilizated on described chute 1431, described first retractor device 142 For pen cylinder, its telescopic end connects described slide block 1438.Described first retractor device 142 Stretch, contract motion time, described slide block 1438 drive described material filling bowl assembly 143 downwards toward moulding Material filling or upwards splicing in described reducing gathers materials assembly 13 in pocket, it is achieved material filling for the second time Displacement.
In the present embodiment, described slide block 1438 is linear bearing, it is ensured that described material filling groove group Part 143 remains vertically rectilinear movement.The quantity of described slide block 1438 and described material filling groove The quantity of assembly is identical.
Described chute cover plate 1432 is covered on the front of described chute 1431, described right valve plate 1433 and left valve plate 1434 be hingedly connected to the two ends of described chute 1431 homonymy, i.e. described Homonymy end on two parallel surfaces of chute 1431.Described opening device 1435 one end is fixedly arranged on Described chute cover plate 1432, other end stretching motion: close to described right valve plate 1433 when stretching out With left valve plate 1434, described right valve plate 1433 and left valve plate 1434 separate to both sides, retract Time away from described right valve plate 1433 and left valve plate 1434, described right valve plate 1433 and left valve plate 1434 close up.
Specifically, described opening device 1435 include twin shaft cylinder 14351, push pedal 14352, Guide pillar 14353 and guide pillar chute 14354, described twin shaft 14351 includes fixing end 143511 With telescopic end 143512, described fixing end 143511 is immobilizated in described chute cover plate 1432, institute State telescopic end 143512 and connect described push pedal 14352, the quantity of described guide pillar chute 14354 It is two, is respectively arranged on described right valve plate 1433 and left valve plate 1434 closes on described chute cover plate 1432 sides, described guide pillar 14353 is located at described push pedal 14352 and described guide pillar sliding 14354 Corresponding it is equipped with.When the telescopic end 143512 of described twin shaft cylinder 14351 stretches out release When described push pedal 14352 moves down, the guide pillar 14353 in described push pedal 14352 is to bottom Move, drive the equidirectional displacement of guide pillar chute 14354 coordinated with described guide pillar 14353, the most in fact Existing described right valve plate 1433 and left valve plate 1434 are opened to both sides, and Semen Arecae pours in plastic bag, Complete second time material filling.Otherwise, when described right valve plate 1433 and left valve plate 1434 close, It is collectively forming described material collecting tank 1439 with described chute 1431 and chute cover plate 1432.
Described guide rail 1436 is circular shaft shape, and seat 1437 quantity fixed by described guide rail is two, point Not being immobilizated in the two ends of described guide rail 1436, a combination thereof is one group.Described guide rail 1436 and institute Stating chute 1431 to connect, described guide rail is fixed seat 1437 and is fixedly arranged on described chute installing plate 1432, Described twin shaft cylinder 14351 stretches, contract drive described material filling bowl assembly 143 upper and lower displacement time, institute State material filling bowl assembly 143 along the described upper and lower displacement of guide rail 1436, play guide effect, subtract Few clamping stagnation.
The quantity of described induction installation 15 is three, and one of them is located at described receiving vat 1333 In towards described turnover panel 1332, the quantity gathered materials in sensing described receiving vat 1333, when When reaching some, signal to control system (not shown), control system send and refer to Order opens or closes described turnover panel 1332 to described second retractor device 1334.Two other point Be not located at described chute cover plate 1432 towards described push pedal 14352 and described chute 1431 towards Described right valve plate 1433, the quantity gathered materials in sensing described material collecting tank 1439, and send Signal gives described control system, described control system send instructions to described twin shaft cylinder 14351, open or close described right valve plate 1433 and left valve plate 1434.
In the present embodiment, described second retractor device 1334 is tubular type electric magnet, and structure is tight Gather, volume is little, lightweight and stroke is long.
In the present embodiment, the gather materials quantity of assembly 13 of described reducing is two, is located at parallel On described installing plate 11, the quantity of corresponding described through hole 112 is also two, described lifting The quantity of chute assembly 14 is two, gathers materials bottom assembly 13 relative to being arranged at described reducing, And be fixed on described chute installing plate 141.Seat 1437 fixed by described guide rail 1436 and guide rail Quantity be two groups, with the described corresponding setting of lifting chute bowl assembly 14.
It should be noted that, in addition to above example, described reducing gather materials assembly 13 be three with On, the quantity of described lifting chute bowl assembly 14 is also more than three and gathers materials assembly with described reducing 13 are correspondingly arranged, and fall within this utility model protection domain equally.
Compared with correlation technique, the material that this utility model provides fills bagging apparatus, has and has as follows Benefit effect:
One, described reducing gathers materials assembly and is connected with the bracket slide being fixed on described installing plate, real Now slip feeding for the first time, the material filling bowl assembly that described reducing gathers materials on assembly is by the first flexible dress Putting drive flexible, in fact second time slip feeding, the material of the most described material filling bowl assembly fills In the plastic bag entered, do not affected by plastic bag opening size size, increased material filling stroke, by Bin Bulky accurately pour in plastic bag, improve yield rate;
Two, material fills bagging apparatus and includes that reducing gathers materials assembly and lifting chute bowl assembly, it is achieved double end Twice material filling, the quantity of material filling is the most accurate, improves production efficiency, safety and sanitation, structure letter Single, easy to operate, reduce cost.

Claims (9)

1. a material fills bagging apparatus, it is characterised in that includes installing plate, support and installs Plate is connected and has the reducing of receiving space and gathers materials assembly and gather materials component bottom even with described reducing Lifting chute bowl assembly that is logical and that have material collecting tank, described is set up in described installing plate and to described Reducing gather materials assembly tilt, described lifting chute bowl assembly includes chute installing plate, the first retractor device With material filling bowl assembly, described chute installing plate is connected with described bracket slide, the described first flexible dress Putting one end and be immobilizated in described chute installing plate, the other end is flexible connects described material filling bowl assembly.
Material the most according to claim 1 fills bagging apparatus, it is characterised in that described first Retractor device is pen cylinder.
Material the most according to claim 1 fills bagging apparatus, it is characterised in that described reducing The assembly that gathers materials includes reducing hopper, aggregate bin installing plate and aggregate bin assembly, described reducing hopper bag Including feeding mouth and discharging opening, described discharging opening bore is less than described feeding mouth bore, described feeding mouth Being connected with described installing plate, described aggregate bin installing plate is located at described discharging opening, described aggregate bin group Part includes fixed plate, turnover panel, receiving vat and the second retractor device, and described fixed plate and turnover panel are hinged Forming described receiving vat, described fixed plate is connected with described aggregate bin installing plate, and described second stretches Device is located at described discharging opening and described aggregate bin installing plate opposite side, described second retractor device one End is immobilizated in described reducing hopper, and the other end is flexible connects described turnover panel.
Material the most according to claim 3 fills bagging apparatus, it is characterised in that described second Retractor device is tubular type electric magnet.
Material the most according to claim 3 fills bagging apparatus, it is characterised in that described material filling Bowl assembly includes chute, chute cover plate, right valve plate, left valve plate and opening device, and described chute is solid Being held on described chute installing plate, described chute cover plate is covered on described chute, described right valve plate and Left valve plate is hingedly connected to the two ends of described chute homonymy, and described opening device one end is fixedly arranged on described Chute cover plate, the other end away from or close to described right valve plate and left valve plate.
Material the most according to claim 5 fills bagging apparatus, it is characterised in that described unlatching Device includes that twin shaft cylinder, push pedal, guide pillar and guide pillar chute, described twin shaft cylinder include fixing end And telescopic end, described fixing end is immobilizated in described chute cover plate, and described telescopic end connects described push pedal, The quantity of described guide pillar chute is two, be respectively arranged on described right valve plate and left valve plate close on described in slip Tank cover plate side, described guide pillar is located at described push pedal and the described corresponding setting of guide pillar chute.
Material the most according to claim 6 fills bagging apparatus, it is characterised in that described material filling Bowl assembly also includes that seat fixed by the guide rail cooperated and guide rail, and described guide rail is located at described chute and is faced Nearly described chute installing plate, described guide rail is fixed seat and is located at described chute installing plate.
Material the most according to claim 6 fills bagging apparatus, it is characterised in that described material Filling bagging apparatus and also include three induction installations, described induction installation is respectively arranged on court in described receiving vat Towards described push pedal on described turnover panel, described chute cover plate, towards described right valve on described chute Plate.
Material the most according to claim 8 fills bagging apparatus, it is characterised in that described sensing Device is proximity switch.
CN201620231811.7U 2016-03-24 2016-03-24 Bagging apparatus is irritated to material Expired - Fee Related CN205469893U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620231811.7U CN205469893U (en) 2016-03-24 2016-03-24 Bagging apparatus is irritated to material

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620231811.7U CN205469893U (en) 2016-03-24 2016-03-24 Bagging apparatus is irritated to material

Publications (1)

Publication Number Publication Date
CN205469893U true CN205469893U (en) 2016-08-17

Family

ID=56651512

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620231811.7U Expired - Fee Related CN205469893U (en) 2016-03-24 2016-03-24 Bagging apparatus is irritated to material

Country Status (1)

Country Link
CN (1) CN205469893U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105644813A (en) * 2016-03-24 2016-06-08 长沙泰康包装设备有限公司 Material bag filling device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105644813A (en) * 2016-03-24 2016-06-08 长沙泰康包装设备有限公司 Material bag filling device

Similar Documents

Publication Publication Date Title
CN204236789U (en) A kind of automatic packer of automatic Weighing
CN205469893U (en) Bagging apparatus is irritated to material
CN211685709U (en) Seed rapid packaging equipment
CN214397341U (en) Pig is fodder ration baling equipment for feed production
CN206031823U (en) Automatic weighing type sack filling machine
CN203601633U (en) Bag opening mechanism for automatic material packaging machine
CN209473520U (en) A kind of automatic weighing device of pressed candy
CN105644813B (en) Material fills bagging apparatus
CN205707421U (en) A kind of two-way filling apparatus of cement
CN203211791U (en) Charging hopper mechanism of packing machine
CN105059604A (en) Outlet hopper mechanism for packing machine
CN205770397U (en) A kind of Semen Benincasae meausring apparatus
CN204606756U (en) A kind of two sections of compacting type refuse buckets
CN210175174U (en) Rice quantitative packaging device
CN203865024U (en) Weighing and pre-pressing bagging machine
CN208484894U (en) A kind of wire-drawing protein pack drawing-in device
CN203211560U (en) Quantity controllable feeding hopper
CN207403431U (en) A kind of automatic feeder of hydraulic pressure core extruding machine
CN204137385U (en) Uncovered wrapping machine bucket
CN208661773U (en) A kind of oscillatory type medicine box
CN104527998A (en) Automatic weighing and packaging production line tailing processing system
CN211034122U (en) Material pouring mechanism of packaging machine
CN205150297U (en) Dosing balance
CN205203504U (en) Batching scale
CN211190061U (en) Powder adding machine for cosmetic production

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Zhu Guangping

Inventor after: OuYang Hu

Inventor after: Fei Yuexiang

Inventor before: Zhu Guangping

Inventor before: OuYang Hu

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 414400 B12, Miluo Industrial Park, Changsha Economic Development Zone, Miluo, Yueyang.

Patentee after: Hunan East phase Intelligent Technology Co.,Ltd.

Address before: 410600 Jinzhou North Road, Ningxiang high tech Industrial Park, Changsha, Hunan, 001

Patentee before: Changsha East phase Intelligent Technology Co.,Ltd.

Address after: 410600 Jinzhou North Road, Ningxiang high tech Industrial Park, Changsha, Hunan, 001

Patentee after: Changsha East phase Intelligent Technology Co.,Ltd.

Address before: 410151 008 D9, long Tang District, Xianglong Road, Changsha County, Changsha, Hunan.

Patentee before: CHANGSHA TAIKANG PACKAGING EQUIPMENT Co.,Ltd.

CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No.8, Zhixin Road, robot industrial base, Yuhua District, Changsha City, Hunan Province

Patentee after: Hunan Dongxiang Intelligent Equipment Co.,Ltd.

Address before: Hunan city of Yueyang province Miluo 414400 Changsha Bishi Town Economic Development Zone Miluo Industrial Park building B12

Patentee before: Hunan East phase Intelligent Technology Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817