- CN205464234U CN205464234U CN201620241661.8U CN201620241661U CN205464234U CN 205464234 U CN205464234 U CN 205464234U CN 201620241661 U CN201620241661 U CN 201620241661U CN 205464234 U CN205464234 U CN 205464234U
- Authority
- CN
- China
- Prior art keywords
- pendulum groove
- boss
- groove body
- pendulum
- continuous casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Casting Support Devices, Ladles, And Melt Control Thereby (AREA)
Abstract
The utility model provides a pendulum groove that is used for package splashproof steel accident in middle of continuous casting, it includes: set up in the pendulum groove body of centre package mouth of a river below for the packet flow is inferior in the middle of the continuous casting opens when watering starting and crash handling, and package beam molten steel does not get into in the continuous casting crystallizer in the middle of the drainage, pendulum groove body in the form of slot, the cell wall one end of pendulum groove body is opened there is beam steel water flow outlet, be formed with first boss on the tank bottom of pendulum groove body, wherein, when use in the pendulum groove, first boss is just right the middle package mouth of a river. The utility model discloses an above -mentioned technical scheme has alleviateed middle packet of beam molten steel ballistic pendulum groove greatly and has spattered the steel condition, has avoided spattering the steel and has glued middle package accident. The installation is simple, in the aspect of the use, maneuverability is strong.
Description
Technical field
This utility model belongs to metallurgical production continuous casting technology field, particularly relates to a kind of for continuous casting production
The pendulum groove of splashproof steel accident.
Background technology
At present, conticaster uses sizing slide block tundish to support the use pendulum groove, and the Main Function of pendulum groove is out
When watering starting and accident, drain tundish beam molten steel does not enter in crystallizer, it is ensured that normal production operation,
Reduce the generation of production accident, but frequently occur pendulum groove and spatter steel and seriously glue tundish production accident, pendulum groove this
Body becomes the risk factor that an impact produces.
Up to now, not yet there is the open report of the device of continuous casting production splashproof steel accident pendulum groove.Metallurgical
Produce the application that continuous casting technology field does not has the device of continuous casting production splashproof steel accident pendulum groove yet.
Utility model content
In order to solve problems of the prior art, this utility model provides a kind of in the middle of continuous casting
The pendulum groove of bag splashproof steel accident, its pendulum groove includes: be arranged at the pendulum groove body below continuous casting intermediate inlet,
Time open when watering starting and accident treatment for continuous casting production stream, the drain tundish beam molten steel not company of entrance
In casting crystallizer;Described pendulum groove body is in the form of slot, and the cell wall of the one end being positioned at described pendulum groove body has
Beam steel flow exports, and the bottom land of described pendulum groove body is formed the first boss, wherein, described pendulum groove
During application, described first boss is just to described middle water containing opening.
In pendulum groove as above, it is preferable that built by laying refractory slab on described bottom land resistance to form bottom land
Fire bed, the end face of described refractory slab upwards swell formed along described pendulum groove body length direction extend institute
State the first boss.
In pendulum groove as above, it is preferable that described refractory slab includes along described tundish beam molten steel
Impact zone refractory slab that drain direction sets gradually and downstream refractory slab;Formed on described impact zone refractory slab
Having described first boss, described downstream refractory slab is connected with described impact zone refractory slab to form described bottom land
Flame retardant coating.
In pendulum groove as above, it is preferable that built by laying refractory brick on the medial surface of described cell wall with shape
Becoming cell wall flame retardant coating, the top of described refractory brick bends in the groove that described pendulum groove body is formed.
In pendulum groove as above, it is preferable that the angle that the top of described refractory brick is formed with described bottom land
For acute angle.
In pendulum groove as above, it is preferable that be positioned at described refractory slab upper surface middle part and be formed along described
The second boss that the length direction of pendulum groove body extends, described first boss is positioned at the top of described second boss
On face;Described refractory brick is embedded between side and the medial surface of described cell wall of described second boss.
In pendulum groove as above, it is preferable that fill out between side and the described refractory brick of described second boss
Fill and be sealed with refractory material.
In pendulum groove as above, it is preferable that the vertical section of described first boss is semicircle.
In pendulum groove as above, it is preferable that one end of described pendulum groove body is rotatably provided in continuous casting
Between on bag crossbeam, the other end of described pendulum groove body is provided with action bars.
In pendulum groove as above, it is preferable that the section of described second boss is rectangle.
In sum, what this utility model brought has the beneficial effect that:
Significantly reduce tundish beam molten steel ballistic pendulum groove and spatter steel situation, it is to avoid spattering steel glues tundish thing
Therefore.Simple, use is installed, workable.
Accompanying drawing explanation
A kind of pendulum groove for continuous casting production splashproof steel accident that Fig. 1 provides for this utility model embodiment
Pendulum groove body construction schematic diagram;
A kind of dome brick that Fig. 2 provides for this utility model embodiment, impact zone refractory slab, downstream refractory slab,
Impact zone refractory brick and the assembled schematic diagram of downstream refractory brick;
The structural representation of a kind of impact zone refractory slab that Fig. 3 provides for this utility model embodiment;
Fig. 4 is by scheming for the structure of a kind of impact zone refractory brick that this utility model embodiment provides;
A kind of pendulum groove for continuous casting production splashproof steel accident that Fig. 5 provides for this utility model embodiment
Operating diagram;
A kind of beam impact schematic diagram that Fig. 6 provides for this utility model embodiment;
Wherein, in figure, symbol description is as follows:
1 pendulum groove body, 11 cell walls, 12 bottom lands, 121 first boss, 10 beam steel flow outlet, 2
Continuous casting production, 21 continuous casting intermediate inlets, 3 tundish beam molten steel, 4 continuous cast molds, 5 molten steel
Collecting tank, 6 action bars, 7 continuous casting production crossbeams, 71 collars, 72 axles, 81 impact zone refractory slabs,
811 first boss, 812 second boss, 82 downstream refractory slabs, 91 dome bricks, 92 impact zone refractory brick,
93 downstream refractory brick.
Detailed description of the invention
With detailed description of the invention, this utility model is described in further details below in conjunction with the accompanying drawings.
As shown in figs. 1 to 6, this utility model embodiment provides a kind of for continuous casting production splashproof steel thing
Therefore pendulum groove, comprising: pendulum groove body 1.Pendulum groove body 1 is in the form of slot, such as rectangular channel.It is positioned at pendulum
Beam steel flow outlet 10 is had on the cell wall 11 of one end of groove body 1.Continuous casting production stream is opened and is watered
When starting and accident treatment, pendulum groove body 1 is arranged at below continuous casting intermediate inlet 21, in drain
Between outside bag beam molten steel 3 to continuous cast mold 4, be such as drained to be positioned at the molten steel that continuous cast mold 4 is other
Collecting tank 5, so that in it does not enter continuous cast mold 4 and reclaim tundish beam molten steel 3.During making,
Pendulum groove body 1 can be welded by plurality of steel plates, and such as thickness is the steel plate of 4~6mm, in order to grasp
Making normal work that is convenient and that do not affect continuous cast mold 4, pendulum groove body 1 is rotatably provided in continuous casting
Between below water-coating port 21, the cell wall 11 of the other end of pendulum groove body 1 is provided with action bars 6, operation
Bar 6 can provide convenient for mobile or rotation pendulum groove body 1.It is positioned at the groove of one end of pendulum groove body 1
The lower end at the end 12 connects the collar 71, is provided with axle 72, the collar 71 on continuous casting production crossbeam 7
It is rotatably provided on axle 72, thus realizes putting groove body 1 and be rotatably provided in continuous casting production crossbeam 7
On.For the flowing of beneficially tundish beam molten steel 3, between the other end and the horizontal plane of pendulum groove body 1
Distance 10 be positioned at higher than the distance between one end and the horizontal plane of pendulum groove body 1, the outlet of beam steel flow
This end, i.e. pendulum groove body 1 is inclined to set, and the angular range of inclination can be 10~20 °, example
Such as 10 °, 15 °, 20 °.Generally continuous casting tundish bottom has multiple continuous casting intermediate inlet, permissible
Putting groove each continuous casting intermediate inlet arranged beneath one, now continuous casting intermediate inlet is properly termed as even
The packet stream time mouth of a river in the middle of casting.
Upper surface at the bottom land 12 of pendulum groove body 1 is formed with the first boss 811, and during drain, first is convex
Platform 811 is positioned at immediately below middle water containing opening 21 so that tundish beam molten steel 3 first to impact first convex
Platform 811, under the peptizaiton of the first boss 811, the impact alleviating tundish beam molten steel 3 is strong
Degree, thus decrease tundish beam molten steel 3 ballistic pendulum groove body 1 spatter steel, it is to avoid spattering steel is bonded at
On continuous casting production 2, improve the safety that pendulum groove uses, reduce continuous casting production accident incidence rate.
In order to improve peptizaiton, the vertical section of the first boss 811 is preferably arc, such as semicircle.
Owing to bottom land 12 is relatively big, in order to improve bottom land 12 with the contact area of tundish beam molten steel 3
Service life and reduce the external radiations heat energy of tundish beam molten steel 3, at the bottom land 12 of pendulum groove body 1
Upper surface be equipped with bottom land flame retardant coating, it is built by laying by refractory slab and is formed.In the middle part of the end face of refractory slab upwards
Protuberance forms the first boss 811 of the length direction extension along pendulum groove body 1, the i.e. first boss 811
Formed on the upper end of formation is connected on pendulum groove body bottom land 12 between being.In other examples, first is convex
The formation of platform 811 can be directly in the upper end formation of the bottom land 12 putting groove body 1, such as pendulum groove body
1 is welded by plurality of steel plates, by welding semi-cylindrical rod iron in the steel plate upper end forming bottom land 12,
Thus form the first boss 811.
Refractory slab is split-type structural, and so so that manufacture, install and safeguard convenient, it includes phase
Being spliced to form impact zone refractory slab 81 and the downstream refractory slab 82 of bottom land flame retardant coating mutually, both are along tundish
The drain direction of beam molten steel 3 sets gradually, i.e. impact zone refractory slab 81 is positioned at tundish beam molten steel 3
The upstream in drain direction, downstream refractory slab 82 is positioned at the downstream in the drain direction of tundish beam molten steel 3.
Impact zone refractory slab 81 is just to middle water containing opening 21, and end is formed with the first boss 811 thereon.Middle
The drain direction of bag beam molten steel 3 is the tundish beam molten steel 3 flow direction in pendulum groove body 1.
Refractory slab can also be integral type structure, is an imposite, is built by laying on bottom land 12 by this imposite.For
Improving the high-temperature erosion-resistant erosiveness of the first boss 811, the material of impact zone refractory slab 81 is magnesia
Refractory material, the material of downstream refractory slab 82 can be silica refractory, the most cost-effective.
In order to improve the service life of cell wall 11, the medial surface of cell wall 11 is equipped with cell wall flame retardant coating,
It is built by laying by refractory brick and is formed.The top (i.e. the top of refractory brick in Fig. 6) of refractory brick is to pendulum groove body
Bending in 1 groove formed, thus the tundish beam molten steel 3 built up of protection spill pendulum groove body 1 and
It is bonded on continuous casting production 2, the angle (angle that i.e. top of refractory brick is formed with bottom land 12) of bending
Preferably acute angle, more preferably 60 °~70 °, such as, 60 °, 65 °, 70 °.In reality, can
To be whole top bending in the groove that pendulum groove body 1 is formed of refractory brick, it is also possible to be refractory brick
Operative tip bends in the groove that pendulum groove body 1 is formed, and this operative tip is positioned at the first boss 811
Both sides, this is not defined by the present embodiment.The material of refractory brick can be silica refractory, effectively
Cost-effective.
In order to reduce the tundish beam molten steel 3 directly contacted with bottom land 12, in refractory slab upper surface middle part
(i.e. in Fig. 6 from left to right direction on) is formed with the second boss 812, and it is along the length of pendulum groove body 1
Direction extends, and the first boss 811 is positioned on the end face of the second boss 812, and refractory brick is positioned on refractory slab
And be embedded between side and the medial surface of cell wall 11 of the second boss 812, now refractory slab and cell wall
11 connect, and in order to improve the sealing between refractory brick and refractory slab, both seam crossings are filled with fire-resistant
Material.So that the manufacture of refractory brick, install and safeguard convenient, refractory brick is Split type structure, its bag
Include and be mutually spliced to form the dome brick 91 of bottom land flame retardant coating, impact zone refractory brick 92 and downstream refractory brick 93,
Three sets gradually along beam MOLTEN STEEL FLOW direction;Dome brick 91 be placed in bottom land 12, cell wall 11 and fire-resistant
In the groove that plate is formed, impact zone refractory brick 92 is placed on refractory slab and is connected in cell wall 11 and refractory slab
In the groove formed, downstream refractory slab 93 is placed on refractory slab and is connected in cell wall 11 and refractory slab is formed
Groove in.The top (top on the long limit of impact zone refractory brick in such as Fig. 4) of impact zone refractory brick 92
Bend in the groove that pendulum groove body 1 is formed.The section of the second boss 812 is preferably rectangle.
Below the manufacture method putting groove for continuous casting production splashproof steel accident is illustrated, the method
Including: pendulum groove body 1 in be sequentially placed into dome brick 91, impact zone refractory slab 81, downstream refractory slab 82,
Impact zone refractory brick 92 and downstream refractory brick 93, wherein, dome brick 91, impact zone refractory brick 92 and downstream
Refractory brick 93 is built by laying on the medial surface of the cell wall 11 of pendulum groove body 1 to form cell wall flame retardant coating, and edge
The drain direction of tundish beam molten steel 3 sets gradually, impact zone refractory slab 81 and downstream refractory slab 82
Build by laying in the upper end of the bottom land 12 putting groove body 1 to form bottom land flame retardant coating, and along tundish beam molten steel
The drain direction of 3 sets gradually, and impact zone refractory slab 81 is formed the first boss 811, the first boss
811 along tundish beam molten steel 3 drain direction extend.Dome brick 91, impact zone refractory slab 81, downstream
The material of refractory slab 82, impact zone refractory brick 92 and downstream refractory brick 93 is refractory material.During making,
The width of impact zone refractory slab 81 and downstream refractory slab 82 can be 260~300mm, thickness can be
40~50mm, length can be 450~500mm, and dome brick 91, impact zone fire-resistant turn 92 and downstream are resistance to
The height of firebrick 93 can be 170~200mm, thickness can be 40~50mm mm, length is permissible
Be 450~500mm, the vertical section of the first boss 811 be preferably semicircle, its diameter can be 80~
100mm.Can fill between cell wall flame retardant coating and bottom land flame retardant coating and be sealed with refractory material.
Pendulum groove body 1 can be formed by Plate Welding, and its length can be according to the size of continuous casting production 2
Determining, width can determine according to pendulum frid.During application, pendulum groove body 1 is rotatably provided in continuous casting
Between wrap below 2, specifically can be found in the rotary setting about pendulum groove body 1 in above-described embodiment.
Continuous casting tundish is opened when watering starting and accident, is rotated to tundish and the first boss by pendulum groove
811 just to middle water containing opening, and then makes tundish beam molten steel 3 beam impact impact zone refractory slab 81
On the first boss 811, after the first boss 811 disperse function, pendulum groove body 1 in flowing, by
Beam molten steel 3 flow export flows in molten steel collecting tank.
In sum, what this utility model brought has the beneficial effect that:
Significantly reduce tundish beam molten steel ballistic pendulum groove and spatter steel situation, it is to avoid spattering steel glues tundish thing
Therefore.Simple, use is installed, workable.
As known by the technical knowledge, this utility model can be by other essence without departing from its spirit or necessity
The embodiment of feature realizes.Therefore, embodiment disclosed above, for each side, all only
It is to illustrate, is not only.All in the range of this utility model or new being equal to this practicality
Change in the range of type is all included in the utility model.
Claims (10)
1. the pendulum groove for continuous casting production splashproof steel accident, it is characterised in that described pendulum groove includes:
Being arranged at the pendulum groove body below continuous casting intermediate inlet, time open for continuous casting production stream when watering starting and accident treatment, drain tundish beam molten steel does not enter in continuous cast mold;
Described pendulum groove body is in the form of slot, and the cell wall of the one end being positioned at described pendulum groove body has the outlet of beam steel flow, and the bottom land of described pendulum groove body is formed the first boss, and wherein, during the application of described pendulum groove, described first boss is just to described middle water containing opening.
Pendulum groove the most according to claim 1, it is characterised in that built by laying refractory slab on described bottom land to form bottom land flame retardant coating, the end face of described refractory slab upwards swells and forms described first boss that the length direction along described pendulum groove body extends.
Pendulum groove the most according to claim 2, it is characterised in that described refractory slab includes impact zone refractory slab and the downstream refractory slab set gradually along the drain direction of described tundish beam molten steel;
Being formed with described first boss on described impact zone refractory slab, described downstream refractory slab is connected with described impact zone refractory slab to form described bottom land flame retardant coating.
Pendulum groove the most according to claim 2, it is characterised in that having built by laying refractory brick on the medial surface of described cell wall to form cell wall flame retardant coating, the top of described refractory brick bends in the groove that described pendulum groove body is formed.
Pendulum groove the most according to claim 4, it is characterised in that the angle that the top of described refractory brick is formed with described bottom land is acute angle.
Pendulum groove the most according to claim 4, it is characterised in that described refractory slab upper surface middle part is formed with the second boss of the length direction extension along described pendulum groove body, and described first boss is positioned on the end face of described second boss;
Described refractory brick is embedded between side and the medial surface of described cell wall of described second boss.
Pendulum groove the most according to claim 6, it is characterised in that fill between side and the described refractory brick of described second boss and be sealed with refractory material.
Pendulum groove the most according to claim 1, it is characterised in that the vertical section of described first boss is semicircle.
Pendulum groove the most according to claim 1, it is characterised in that one end of described pendulum groove body is rotatably provided on continuous casting production crossbeam, the other end of described pendulum groove body is provided with action bars.
Pendulum groove the most according to claim 6, it is characterised in that the section of described second boss is rectangle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620241661.8U CN205464234U (en) | 2016-03-25 | 2016-03-25 | A pendulum groove that is used for package splashproof steel accident in middle of continuous casting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620241661.8U CN205464234U (en) | 2016-03-25 | 2016-03-25 | A pendulum groove that is used for package splashproof steel accident in middle of continuous casting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205464234U true CN205464234U (en) | 2016-08-17 |
Family
ID=56647869
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620241661.8U Expired - Fee Related CN205464234U (en) | 2016-03-25 | 2016-03-25 | A pendulum groove that is used for package splashproof steel accident in middle of continuous casting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205464234U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105665667A (en) * | 2016-03-25 | 2016-06-15 | 山东钢铁股份有限公司 | Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove |
CN112059197A (en) * | 2020-09-22 | 2020-12-11 | 江苏威拉里新材料科技有限公司 | Vacuum gas atomization melting crucible device |
-
2016
- 2016-03-25 CN CN201620241661.8U patent/CN205464234U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105665667A (en) * | 2016-03-25 | 2016-06-15 | 山东钢铁股份有限公司 | Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove |
CN112059197A (en) * | 2020-09-22 | 2020-12-11 | 江苏威拉里新材料科技有限公司 | Vacuum gas atomization melting crucible device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206622605U (en) | A kind of three machines three stream slab CC tundish | |
CN101791682B (en) | Manufacturing device for rectangular ingot blank of ultra-large extra-thick plate | |
CN201603865U (en) | T type tundish adopting flow control device in form of 'two retaining walls and two retaining dams' | |
CN205464234U (en) | A pendulum groove that is used for package splashproof steel accident in middle of continuous casting | |
CN201261063Y (en) | Pouring apparatus for cast-rolling of twin-roll thin strip | |
CN101994392A (en) | Large-volume concrete fast pouring and temperature control method | |
CN103990787A (en) | Device and method for removing molten steel slag inclusion in continuous casting tundish | |
CN103990772B (en) | A kind of metallurgical plant removing double flow tray billet continuous casting machine tundish inclusion | |
CN106583675B (en) | A kind of molten steel continuous casting steel conticaster | |
CN101091982A (en) | Method and device for carrying out protected casting for shaped blank continuous casting by using single immersed nozzle | |
CN101780530A (en) | Method and device for preparing double-sided composite plate blanks | |
CN204770627U (en) | Packing is put in middle of single current passageway formula induction heating bend pipe type passageway | |
CN102310193A (en) | Steel ladle sliding mechanism | |
CN105665667A (en) | Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove | |
CN104722746B (en) | A kind of slab CC tundish working lining and preparation method thereof | |
CN203508972U (en) | Sealing part for vertical type continuous casting machine | |
CN206065393U (en) | A kind of ferro-aluminum tundish | |
CN201823925U (en) | Precast block for ladle bottom impact area of steel ladle | |
CN201572911U (en) | Submersed nozzle of super wide slab continuous casting mold | |
CN201644709U (en) | Manufacturing device for rectangular ingot blank of ultra-large extra-thick plate | |
CN206373353U (en) | A kind of steel ladle sliding mechanism attachment structure | |
CN203956070U (en) | A kind of for removing the device of molten steel field trash in continuous casting tundish | |
CN103231048B (en) | High pulling rate FTSC crystallizer for continuous casting of thin slabs four cellular type submersed nozzles | |
CN204035501U (en) | A kind of continuous casting production guiding device | |
CN103862010B (en) | A kind of continuous casting production guiding device and preparation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160817 Termination date: 20190325 |
|
CF01 | Termination of patent right due to non-payment of annual fee |