CN205464234U - A pendulum groove that is used for package splashproof steel accident in middle of continuous casting - Google Patents

A pendulum groove that is used for package splashproof steel accident in middle of continuous casting Download PDF

Info

Publication number
CN205464234U
CN205464234U CN201620241661.8U CN201620241661U CN205464234U CN 205464234 U CN205464234 U CN 205464234U CN 201620241661 U CN201620241661 U CN 201620241661U CN 205464234 U CN205464234 U CN 205464234U
Authority
CN
China
Prior art keywords
pendulum groove
boss
groove body
pendulum
continuous casting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620241661.8U
Other languages
Chinese (zh)
Inventor
乔明
苗金鹏
候云鹏
梁景玥
郭达
刘文凭
李振
王尖锐
王玉春
魏义胜
刘志民
张昭平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Iron and Steel Group Co Ltd SISG
Original Assignee
Shandong Iron and Steel Group Co Ltd SISG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Iron and Steel Group Co Ltd SISG filed Critical Shandong Iron and Steel Group Co Ltd SISG
Priority to CN201620241661.8U priority Critical patent/CN205464234U/en
Application granted granted Critical
Publication of CN205464234U publication Critical patent/CN205464234U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Casting Support Devices, Ladles, And Melt Control Thereby (AREA)

Abstract

The utility model provides a pendulum groove that is used for package splashproof steel accident in middle of continuous casting, it includes: set up in the pendulum groove body of centre package mouth of a river below for the packet flow is inferior in the middle of the continuous casting opens when watering starting and crash handling, and package beam molten steel does not get into in the continuous casting crystallizer in the middle of the drainage, pendulum groove body in the form of slot, the cell wall one end of pendulum groove body is opened there is beam steel water flow outlet, be formed with first boss on the tank bottom of pendulum groove body, wherein, when use in the pendulum groove, first boss is just right the middle package mouth of a river. The utility model discloses an above -mentioned technical scheme has alleviateed middle packet of beam molten steel ballistic pendulum groove greatly and has spattered the steel condition, has avoided spattering the steel and has glued middle package accident. The installation is simple, in the aspect of the use, maneuverability is strong.

Description

Pendulum groove for continuous casting production splashproof steel accident
Technical field
This utility model belongs to metallurgical production continuous casting technology field, particularly relates to a kind of for continuous casting production The pendulum groove of splashproof steel accident.
Background technology
At present, conticaster uses sizing slide block tundish to support the use pendulum groove, and the Main Function of pendulum groove is out When watering starting and accident, drain tundish beam molten steel does not enter in crystallizer, it is ensured that normal production operation, Reduce the generation of production accident, but frequently occur pendulum groove and spatter steel and seriously glue tundish production accident, pendulum groove this Body becomes the risk factor that an impact produces.
Up to now, not yet there is the open report of the device of continuous casting production splashproof steel accident pendulum groove.Metallurgical Produce the application that continuous casting technology field does not has the device of continuous casting production splashproof steel accident pendulum groove yet.
Utility model content
In order to solve problems of the prior art, this utility model provides a kind of in the middle of continuous casting The pendulum groove of bag splashproof steel accident, its pendulum groove includes: be arranged at the pendulum groove body below continuous casting intermediate inlet, Time open when watering starting and accident treatment for continuous casting production stream, the drain tundish beam molten steel not company of entrance In casting crystallizer;Described pendulum groove body is in the form of slot, and the cell wall of the one end being positioned at described pendulum groove body has Beam steel flow exports, and the bottom land of described pendulum groove body is formed the first boss, wherein, described pendulum groove During application, described first boss is just to described middle water containing opening.
In pendulum groove as above, it is preferable that built by laying refractory slab on described bottom land resistance to form bottom land Fire bed, the end face of described refractory slab upwards swell formed along described pendulum groove body length direction extend institute State the first boss.
In pendulum groove as above, it is preferable that described refractory slab includes along described tundish beam molten steel Impact zone refractory slab that drain direction sets gradually and downstream refractory slab;Formed on described impact zone refractory slab Having described first boss, described downstream refractory slab is connected with described impact zone refractory slab to form described bottom land Flame retardant coating.
In pendulum groove as above, it is preferable that built by laying refractory brick on the medial surface of described cell wall with shape Becoming cell wall flame retardant coating, the top of described refractory brick bends in the groove that described pendulum groove body is formed.
In pendulum groove as above, it is preferable that the angle that the top of described refractory brick is formed with described bottom land For acute angle.
In pendulum groove as above, it is preferable that be positioned at described refractory slab upper surface middle part and be formed along described The second boss that the length direction of pendulum groove body extends, described first boss is positioned at the top of described second boss On face;Described refractory brick is embedded between side and the medial surface of described cell wall of described second boss.
In pendulum groove as above, it is preferable that fill out between side and the described refractory brick of described second boss Fill and be sealed with refractory material.
In pendulum groove as above, it is preferable that the vertical section of described first boss is semicircle.
In pendulum groove as above, it is preferable that one end of described pendulum groove body is rotatably provided in continuous casting Between on bag crossbeam, the other end of described pendulum groove body is provided with action bars.
In pendulum groove as above, it is preferable that the section of described second boss is rectangle.
In sum, what this utility model brought has the beneficial effect that:
Significantly reduce tundish beam molten steel ballistic pendulum groove and spatter steel situation, it is to avoid spattering steel glues tundish thing Therefore.Simple, use is installed, workable.
Accompanying drawing explanation
A kind of pendulum groove for continuous casting production splashproof steel accident that Fig. 1 provides for this utility model embodiment Pendulum groove body construction schematic diagram;
A kind of dome brick that Fig. 2 provides for this utility model embodiment, impact zone refractory slab, downstream refractory slab, Impact zone refractory brick and the assembled schematic diagram of downstream refractory brick;
The structural representation of a kind of impact zone refractory slab that Fig. 3 provides for this utility model embodiment;
Fig. 4 is by scheming for the structure of a kind of impact zone refractory brick that this utility model embodiment provides;
A kind of pendulum groove for continuous casting production splashproof steel accident that Fig. 5 provides for this utility model embodiment Operating diagram;
A kind of beam impact schematic diagram that Fig. 6 provides for this utility model embodiment;
Wherein, in figure, symbol description is as follows:
1 pendulum groove body, 11 cell walls, 12 bottom lands, 121 first boss, 10 beam steel flow outlet, 2 Continuous casting production, 21 continuous casting intermediate inlets, 3 tundish beam molten steel, 4 continuous cast molds, 5 molten steel Collecting tank, 6 action bars, 7 continuous casting production crossbeams, 71 collars, 72 axles, 81 impact zone refractory slabs, 811 first boss, 812 second boss, 82 downstream refractory slabs, 91 dome bricks, 92 impact zone refractory brick, 93 downstream refractory brick.
Detailed description of the invention
With detailed description of the invention, this utility model is described in further details below in conjunction with the accompanying drawings.
As shown in figs. 1 to 6, this utility model embodiment provides a kind of for continuous casting production splashproof steel thing Therefore pendulum groove, comprising: pendulum groove body 1.Pendulum groove body 1 is in the form of slot, such as rectangular channel.It is positioned at pendulum Beam steel flow outlet 10 is had on the cell wall 11 of one end of groove body 1.Continuous casting production stream is opened and is watered When starting and accident treatment, pendulum groove body 1 is arranged at below continuous casting intermediate inlet 21, in drain Between outside bag beam molten steel 3 to continuous cast mold 4, be such as drained to be positioned at the molten steel that continuous cast mold 4 is other Collecting tank 5, so that in it does not enter continuous cast mold 4 and reclaim tundish beam molten steel 3.During making, Pendulum groove body 1 can be welded by plurality of steel plates, and such as thickness is the steel plate of 4~6mm, in order to grasp Making normal work that is convenient and that do not affect continuous cast mold 4, pendulum groove body 1 is rotatably provided in continuous casting Between below water-coating port 21, the cell wall 11 of the other end of pendulum groove body 1 is provided with action bars 6, operation Bar 6 can provide convenient for mobile or rotation pendulum groove body 1.It is positioned at the groove of one end of pendulum groove body 1 The lower end at the end 12 connects the collar 71, is provided with axle 72, the collar 71 on continuous casting production crossbeam 7 It is rotatably provided on axle 72, thus realizes putting groove body 1 and be rotatably provided in continuous casting production crossbeam 7 On.For the flowing of beneficially tundish beam molten steel 3, between the other end and the horizontal plane of pendulum groove body 1 Distance 10 be positioned at higher than the distance between one end and the horizontal plane of pendulum groove body 1, the outlet of beam steel flow This end, i.e. pendulum groove body 1 is inclined to set, and the angular range of inclination can be 10~20 °, example Such as 10 °, 15 °, 20 °.Generally continuous casting tundish bottom has multiple continuous casting intermediate inlet, permissible Putting groove each continuous casting intermediate inlet arranged beneath one, now continuous casting intermediate inlet is properly termed as even The packet stream time mouth of a river in the middle of casting.
Upper surface at the bottom land 12 of pendulum groove body 1 is formed with the first boss 811, and during drain, first is convex Platform 811 is positioned at immediately below middle water containing opening 21 so that tundish beam molten steel 3 first to impact first convex Platform 811, under the peptizaiton of the first boss 811, the impact alleviating tundish beam molten steel 3 is strong Degree, thus decrease tundish beam molten steel 3 ballistic pendulum groove body 1 spatter steel, it is to avoid spattering steel is bonded at On continuous casting production 2, improve the safety that pendulum groove uses, reduce continuous casting production accident incidence rate. In order to improve peptizaiton, the vertical section of the first boss 811 is preferably arc, such as semicircle.
Owing to bottom land 12 is relatively big, in order to improve bottom land 12 with the contact area of tundish beam molten steel 3 Service life and reduce the external radiations heat energy of tundish beam molten steel 3, at the bottom land 12 of pendulum groove body 1 Upper surface be equipped with bottom land flame retardant coating, it is built by laying by refractory slab and is formed.In the middle part of the end face of refractory slab upwards Protuberance forms the first boss 811 of the length direction extension along pendulum groove body 1, the i.e. first boss 811 Formed on the upper end of formation is connected on pendulum groove body bottom land 12 between being.In other examples, first is convex The formation of platform 811 can be directly in the upper end formation of the bottom land 12 putting groove body 1, such as pendulum groove body 1 is welded by plurality of steel plates, by welding semi-cylindrical rod iron in the steel plate upper end forming bottom land 12, Thus form the first boss 811.
Refractory slab is split-type structural, and so so that manufacture, install and safeguard convenient, it includes phase Being spliced to form impact zone refractory slab 81 and the downstream refractory slab 82 of bottom land flame retardant coating mutually, both are along tundish The drain direction of beam molten steel 3 sets gradually, i.e. impact zone refractory slab 81 is positioned at tundish beam molten steel 3 The upstream in drain direction, downstream refractory slab 82 is positioned at the downstream in the drain direction of tundish beam molten steel 3. Impact zone refractory slab 81 is just to middle water containing opening 21, and end is formed with the first boss 811 thereon.Middle The drain direction of bag beam molten steel 3 is the tundish beam molten steel 3 flow direction in pendulum groove body 1. Refractory slab can also be integral type structure, is an imposite, is built by laying on bottom land 12 by this imposite.For Improving the high-temperature erosion-resistant erosiveness of the first boss 811, the material of impact zone refractory slab 81 is magnesia Refractory material, the material of downstream refractory slab 82 can be silica refractory, the most cost-effective.
In order to improve the service life of cell wall 11, the medial surface of cell wall 11 is equipped with cell wall flame retardant coating, It is built by laying by refractory brick and is formed.The top (i.e. the top of refractory brick in Fig. 6) of refractory brick is to pendulum groove body Bending in 1 groove formed, thus the tundish beam molten steel 3 built up of protection spill pendulum groove body 1 and It is bonded on continuous casting production 2, the angle (angle that i.e. top of refractory brick is formed with bottom land 12) of bending Preferably acute angle, more preferably 60 °~70 °, such as, 60 °, 65 °, 70 °.In reality, can To be whole top bending in the groove that pendulum groove body 1 is formed of refractory brick, it is also possible to be refractory brick Operative tip bends in the groove that pendulum groove body 1 is formed, and this operative tip is positioned at the first boss 811 Both sides, this is not defined by the present embodiment.The material of refractory brick can be silica refractory, effectively Cost-effective.
In order to reduce the tundish beam molten steel 3 directly contacted with bottom land 12, in refractory slab upper surface middle part (i.e. in Fig. 6 from left to right direction on) is formed with the second boss 812, and it is along the length of pendulum groove body 1 Direction extends, and the first boss 811 is positioned on the end face of the second boss 812, and refractory brick is positioned on refractory slab And be embedded between side and the medial surface of cell wall 11 of the second boss 812, now refractory slab and cell wall 11 connect, and in order to improve the sealing between refractory brick and refractory slab, both seam crossings are filled with fire-resistant Material.So that the manufacture of refractory brick, install and safeguard convenient, refractory brick is Split type structure, its bag Include and be mutually spliced to form the dome brick 91 of bottom land flame retardant coating, impact zone refractory brick 92 and downstream refractory brick 93, Three sets gradually along beam MOLTEN STEEL FLOW direction;Dome brick 91 be placed in bottom land 12, cell wall 11 and fire-resistant In the groove that plate is formed, impact zone refractory brick 92 is placed on refractory slab and is connected in cell wall 11 and refractory slab In the groove formed, downstream refractory slab 93 is placed on refractory slab and is connected in cell wall 11 and refractory slab is formed Groove in.The top (top on the long limit of impact zone refractory brick in such as Fig. 4) of impact zone refractory brick 92 Bend in the groove that pendulum groove body 1 is formed.The section of the second boss 812 is preferably rectangle.
Below the manufacture method putting groove for continuous casting production splashproof steel accident is illustrated, the method Including: pendulum groove body 1 in be sequentially placed into dome brick 91, impact zone refractory slab 81, downstream refractory slab 82, Impact zone refractory brick 92 and downstream refractory brick 93, wherein, dome brick 91, impact zone refractory brick 92 and downstream Refractory brick 93 is built by laying on the medial surface of the cell wall 11 of pendulum groove body 1 to form cell wall flame retardant coating, and edge The drain direction of tundish beam molten steel 3 sets gradually, impact zone refractory slab 81 and downstream refractory slab 82 Build by laying in the upper end of the bottom land 12 putting groove body 1 to form bottom land flame retardant coating, and along tundish beam molten steel The drain direction of 3 sets gradually, and impact zone refractory slab 81 is formed the first boss 811, the first boss 811 along tundish beam molten steel 3 drain direction extend.Dome brick 91, impact zone refractory slab 81, downstream The material of refractory slab 82, impact zone refractory brick 92 and downstream refractory brick 93 is refractory material.During making, The width of impact zone refractory slab 81 and downstream refractory slab 82 can be 260~300mm, thickness can be 40~50mm, length can be 450~500mm, and dome brick 91, impact zone fire-resistant turn 92 and downstream are resistance to The height of firebrick 93 can be 170~200mm, thickness can be 40~50mm mm, length is permissible Be 450~500mm, the vertical section of the first boss 811 be preferably semicircle, its diameter can be 80~ 100mm.Can fill between cell wall flame retardant coating and bottom land flame retardant coating and be sealed with refractory material.
Pendulum groove body 1 can be formed by Plate Welding, and its length can be according to the size of continuous casting production 2 Determining, width can determine according to pendulum frid.During application, pendulum groove body 1 is rotatably provided in continuous casting Between wrap below 2, specifically can be found in the rotary setting about pendulum groove body 1 in above-described embodiment.
Continuous casting tundish is opened when watering starting and accident, is rotated to tundish and the first boss by pendulum groove 811 just to middle water containing opening, and then makes tundish beam molten steel 3 beam impact impact zone refractory slab 81 On the first boss 811, after the first boss 811 disperse function, pendulum groove body 1 in flowing, by Beam molten steel 3 flow export flows in molten steel collecting tank.
In sum, what this utility model brought has the beneficial effect that:
Significantly reduce tundish beam molten steel ballistic pendulum groove and spatter steel situation, it is to avoid spattering steel glues tundish thing Therefore.Simple, use is installed, workable.
As known by the technical knowledge, this utility model can be by other essence without departing from its spirit or necessity The embodiment of feature realizes.Therefore, embodiment disclosed above, for each side, all only It is to illustrate, is not only.All in the range of this utility model or new being equal to this practicality Change in the range of type is all included in the utility model.

Claims (10)

1. the pendulum groove for continuous casting production splashproof steel accident, it is characterised in that described pendulum groove includes:
Being arranged at the pendulum groove body below continuous casting intermediate inlet, time open for continuous casting production stream when watering starting and accident treatment, drain tundish beam molten steel does not enter in continuous cast mold;
Described pendulum groove body is in the form of slot, and the cell wall of the one end being positioned at described pendulum groove body has the outlet of beam steel flow, and the bottom land of described pendulum groove body is formed the first boss, and wherein, during the application of described pendulum groove, described first boss is just to described middle water containing opening.
Pendulum groove the most according to claim 1, it is characterised in that built by laying refractory slab on described bottom land to form bottom land flame retardant coating, the end face of described refractory slab upwards swells and forms described first boss that the length direction along described pendulum groove body extends.
Pendulum groove the most according to claim 2, it is characterised in that described refractory slab includes impact zone refractory slab and the downstream refractory slab set gradually along the drain direction of described tundish beam molten steel;
Being formed with described first boss on described impact zone refractory slab, described downstream refractory slab is connected with described impact zone refractory slab to form described bottom land flame retardant coating.
Pendulum groove the most according to claim 2, it is characterised in that having built by laying refractory brick on the medial surface of described cell wall to form cell wall flame retardant coating, the top of described refractory brick bends in the groove that described pendulum groove body is formed.
Pendulum groove the most according to claim 4, it is characterised in that the angle that the top of described refractory brick is formed with described bottom land is acute angle.
Pendulum groove the most according to claim 4, it is characterised in that described refractory slab upper surface middle part is formed with the second boss of the length direction extension along described pendulum groove body, and described first boss is positioned on the end face of described second boss;
Described refractory brick is embedded between side and the medial surface of described cell wall of described second boss.
Pendulum groove the most according to claim 6, it is characterised in that fill between side and the described refractory brick of described second boss and be sealed with refractory material.
Pendulum groove the most according to claim 1, it is characterised in that the vertical section of described first boss is semicircle.
Pendulum groove the most according to claim 1, it is characterised in that one end of described pendulum groove body is rotatably provided on continuous casting production crossbeam, the other end of described pendulum groove body is provided with action bars.
Pendulum groove the most according to claim 6, it is characterised in that the section of described second boss is rectangle.
CN201620241661.8U 2016-03-25 2016-03-25 A pendulum groove that is used for package splashproof steel accident in middle of continuous casting Expired - Fee Related CN205464234U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620241661.8U CN205464234U (en) 2016-03-25 2016-03-25 A pendulum groove that is used for package splashproof steel accident in middle of continuous casting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620241661.8U CN205464234U (en) 2016-03-25 2016-03-25 A pendulum groove that is used for package splashproof steel accident in middle of continuous casting

Publications (1)

Publication Number Publication Date
CN205464234U true CN205464234U (en) 2016-08-17

Family

ID=56647869

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620241661.8U Expired - Fee Related CN205464234U (en) 2016-03-25 2016-03-25 A pendulum groove that is used for package splashproof steel accident in middle of continuous casting

Country Status (1)

Country Link
CN (1) CN205464234U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105665667A (en) * 2016-03-25 2016-06-15 山东钢铁股份有限公司 Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove
CN112059197A (en) * 2020-09-22 2020-12-11 江苏威拉里新材料科技有限公司 Vacuum gas atomization melting crucible device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105665667A (en) * 2016-03-25 2016-06-15 山东钢铁股份有限公司 Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove
CN112059197A (en) * 2020-09-22 2020-12-11 江苏威拉里新材料科技有限公司 Vacuum gas atomization melting crucible device

Similar Documents

Publication Publication Date Title
CN206622605U (en) A kind of three machines three stream slab CC tundish
CN101791682B (en) Manufacturing device for rectangular ingot blank of ultra-large extra-thick plate
CN201603865U (en) T type tundish adopting flow control device in form of 'two retaining walls and two retaining dams'
CN205464234U (en) A pendulum groove that is used for package splashproof steel accident in middle of continuous casting
CN201261063Y (en) Pouring apparatus for cast-rolling of twin-roll thin strip
CN101994392A (en) Large-volume concrete fast pouring and temperature control method
CN103990787A (en) Device and method for removing molten steel slag inclusion in continuous casting tundish
CN103990772B (en) A kind of metallurgical plant removing double flow tray billet continuous casting machine tundish inclusion
CN106583675B (en) A kind of molten steel continuous casting steel conticaster
CN101091982A (en) Method and device for carrying out protected casting for shaped blank continuous casting by using single immersed nozzle
CN101780530A (en) Method and device for preparing double-sided composite plate blanks
CN204770627U (en) Packing is put in middle of single current passageway formula induction heating bend pipe type passageway
CN102310193A (en) Steel ladle sliding mechanism
CN105665667A (en) Steel splashing accident prevention pendulum groove for continuous casting tundish and manufacturing method of pendulum groove
CN104722746B (en) A kind of slab CC tundish working lining and preparation method thereof
CN203508972U (en) Sealing part for vertical type continuous casting machine
CN206065393U (en) A kind of ferro-aluminum tundish
CN201823925U (en) Precast block for ladle bottom impact area of steel ladle
CN201572911U (en) Submersed nozzle of super wide slab continuous casting mold
CN201644709U (en) Manufacturing device for rectangular ingot blank of ultra-large extra-thick plate
CN206373353U (en) A kind of steel ladle sliding mechanism attachment structure
CN203956070U (en) A kind of for removing the device of molten steel field trash in continuous casting tundish
CN103231048B (en) High pulling rate FTSC crystallizer for continuous casting of thin slabs four cellular type submersed nozzles
CN204035501U (en) A kind of continuous casting production guiding device
CN103862010B (en) A kind of continuous casting production guiding device and preparation method thereof

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20190325

CF01 Termination of patent right due to non-payment of annual fee