CN205445089U - Anti -wind reinforcement type electric power iron tower - Google Patents
Anti -wind reinforcement type electric power iron tower Download PDFInfo
- Publication number
- CN205445089U CN205445089U CN201620269407.9U CN201620269407U CN205445089U CN 205445089 U CN205445089 U CN 205445089U CN 201620269407 U CN201620269407 U CN 201620269407U CN 205445089 U CN205445089 U CN 205445089U
- Authority
- CN
- China
- Prior art keywords
- reinforced concrete
- angle
- reinforcement
- column
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides an anti -wind reinforcement type electric power iron tower, includes iron tower basis, iron tower body of the tower, its characterized in that: the iron tower basis is including the thick building rubbish tamp layer of 500mm, be provided with 4 reinforced concrete column that the structure is the same on the thick building rubbish tamp layer of 500mm, reinforced concrete column's height is 2000mm, 4 individual reinforced concrete column is provided with the hierarchic structure reinforced concrete layer that 1200mm is high all around, 4 connect through reinforced concrete additional strengthening between the individual reinforced concrete column, 4 individual reinforced concrete column's top is provided with the microlith concrete layer that 300mm is thick, every reinforced concrete column upper portion is equipped with 4 buried bolt in advance, reinforced concrete column includes the stand longitudinal reinforcement, stand transverse reinforcement. The utility model has the characteristics of the biggest lifting surface area in the same volume, it is strong to have a bearing capacity, and wind -resistance capability is good, stable in structure, the life of iron tower has been improved.
Description
Technical field
This utility model relates to steel tower technical field, is specially a kind of wind resistance reinforcement type electric power tower.
Background technology
Electric power tower is mainly used in setting up high voltage transmission line, owing to electric power tower height is higher, has typhoon or ground the area of sedimentation easily occur at some, and wind resistance and steadiness to electric power tower require the highest.And existing electric power tower is not in order to expand floor space, being generally only increases many cross-arms at column foot and consolidates with oblique pull bracing piece, but this mode not only increases the weight of electric power tower tower body, and can be the biggest with the moment suffered by flange connections at column foot, and once column foot occurs loosening or rupturing causing whole tower body to fall down, abnormally dangerous, therefore the wind resistance of enhancing electric power tower is extremely important, after tower body weight increases, ground is required the highest simultaneously, need firm and stocky basis.Traditional iron tower foundation not only volume is big, needs the steel material expended many, and its bearing capacity is the most not fully up to expectations, elapses the stability meeting step-down on basis over time, there is potential safety hazard.
Summary of the invention
This utility model is for the problems referred to above, a kind of wind resistance reinforcement type electric power tower is provided, foundation bottom makes massive plate shape, prevent basis sinking, basis is overall to be linked by armored concrete reinforcement structure between column in hierarchic structure, and pre-embedded bolt is arranged in reinforced concrete upright column, for rigid tower pipe so that this basis has the maximum weighted area in same volume;Oblique pull bracing piece is added in steel tower, on the premise of not expanding floor space, effectively reinforced bottom steel tower, greatly reduce steel tower pipe, angle steel and the power suffered by flange connections when wind-engaging, by oblique pull bracing piece to pipe, the support of angle steel, make its stress effectively be disperseed, enhance the wind resistance of steel tower.Having bearing capacity strong, wind resistance is good, constitutionally stable feature, improves the service life of steel tower.
nullThe technical solution of the utility model is: a kind of wind resistance reinforcement type electric power tower,Including iron tower foundation、Steel tower tower body,It is characterized in that: described iron tower foundation includes that 500mm thickness building waste tamps layer,It is provided with 4 identical reinforced concrete upright columns of structure on described 500mm thickness building waste compacting layer,The height of reinforced concrete upright column is 2000mm,4 reinforced concrete upright column surroundings are provided with hierarchic structure reinforced concrete floor high for 1200mm,Connected by armored concrete reinforcement structure between 4 reinforced concrete upright columns,The top of 4 reinforced concrete upright columns is provided with the pea gravel concreten layer that 300mm is thick,Pea gravel concreten layer is arranged over base plate,Each reinforced concrete upright column top is provided with 4 pre-embedded bolts,Base plate is connected by pre-embedded bolt and reinforced concrete upright column are fixing,Reinforced concrete upright column includes column longitudinal reinforcement、Column transverse steel,Column longitudinal reinforcement is connected by column tied silk with column transverse steel,Armored concrete reinforcement structure includes reinforcement structure horizontal reinforcement、Reinforcement structure is directly to reinforcing bar,Reinforcement structure horizontal reinforcement is directly connected by reinforcement structure tied silk to reinforcing bar with reinforcement structure,Described steel tower tower body,Including angle steel、Pipe,Angle steel and pipe junction are provided with attachment means,This attachment means includes Bolted angle connection head and pipe union joint,Bolted angle connection head is welded by angle cleat flange and angle cleat,It is simultaneously connected with angle steel flange and angle cleat is all welded with a connecting plate and a stiffened panel,And it is welded with No. two stiffened panels between angle cleat and a connecting plate,A number connecting plate is connected with oblique pull bracing piece,Angle cleat is connected with angle steel bolt by angle steel Baogang,Pipe union joint is by matching angle steel flange、Connecting circular tube flange is socketed to form by connecting circular tube,Pairing angle steel flange、Connecting circular tube flange opposite side is all welded with No. two connecting plates and No. three stiffened panels,Pipe union joint is bolted with angle cleat flange and pairing tube flange,The bottom of pipe is welded with base plate,Gusset and pipe、Base plate welds simultaneously.
The beneficial effects of the utility model are: this utility model provides a kind of wind resistance reinforcement type electric power tower, massive plate shape is made bottom iron tower foundation, prevent basis sinking, basis is overall in hierarchic structure, linked by armored concrete reinforcement structure between column, pre-embedded bolt is arranged in reinforced concrete upright column, for rigid tower pipe so that basis has the maximum weighted area in same volume;Oblique pull bracing piece is added in steel tower, on the premise of not expanding floor space, effectively reinforced bottom steel tower, greatly reduce steel tower pipe, angle steel and the power suffered by flange connections when wind-engaging, by oblique pull bracing piece to pipe, the support of angle steel, make its stress effectively be disperseed, enhance the wind resistance of steel tower.Having bearing capacity strong, wind resistance is good, constitutionally stable feature, improves the service life of steel tower.
Accompanying drawing explanation
Fig. 1 is steel tower tower body and the structural representation of local iron tower foundation in this utility model.
Fig. 2 is the planar structure schematic diagram of iron tower foundation in this utility model.
Fig. 3 is sectional view at A-A in Fig. 2.
Fig. 4 is sectional view at B-B in Fig. 2.
Fig. 5 is sectional view at C-C in Fig. 3.
Fig. 6 is sectional view at D-D in Fig. 3.
Fig. 7 is sectional view at E-E in Fig. 3.
Fig. 8 is sectional view at F-F in Fig. 4.
Fig. 9 is sectional view at G-G in Fig. 1.
Figure 10 is sectional view at H-H in Fig. 1.
Figure 11 is sectional view at K-K in Fig. 1.
Figure 12 is enlarged diagram at M in Fig. 1.
Figure 13 is enlarged diagram at N in Fig. 9.
nullFig. 1、Fig. 2、Fig. 3、Fig. 4、Fig. 5、Fig. 6、Fig. 7、Fig. 8、Fig. 9、Figure 10、Figure 11、Figure 12、In Figure 13,1.500mm thickness building waste compacting layer,2. hierarchic structure reinforced concrete floor,3. reinforced concrete upright column,4. pea gravel concreten layer,5. armored concrete reinforcement structure,6. pre-embedded bolt,7. column longitudinal reinforcement,8. column transverse steel,9. column tied silk,10. reinforcement structure horizontal reinforcement,11. reinforcement structures are directly to reinforcing bar,12. reinforcement structure tied silks,13. base plates,No. 14. connecting plates,15. gussets,16. reinforcing bars,17. No. two connecting plates,18. angle steel,19. angle steel Baogangs,20. oblique pull bracing pieces,21. pipes,22. pull bars,23. angle cleats,24. connecting circular tubes,25. angle cleat flanges,26. pairing angle steel flanges,27. connecting circular tube flanges,28. pairing tube flanges,No. 29. stiffened panels,30. No. two stiffened panels,31. No. three stiffened panels.
Detailed description of the invention
Below in conjunction with the accompanying drawings this utility model is further described.
nullSuch as Fig. 1、Fig. 2、Fig. 3、Fig. 4、Fig. 5、Fig. 6、Fig. 7、Fig. 8、Fig. 9、Figure 10、Figure 11、Figure 12、Shown in Figure 13,This utility model is a kind of wind resistance reinforcement type electric power tower,Including iron tower foundation、Steel tower tower body,It is characterized in that: described iron tower foundation includes that 500mm thickness building waste tamps layer 1,It is provided with 4 identical reinforced concrete upright columns of structure 3 on described 500mm thickness building waste compacting layer 1,The height of reinforced concrete upright column 3 is 2000mm,4 reinforced concrete upright column 3 surroundings are provided with hierarchic structure reinforced concrete floor 2 high for 1200mm,Connected by armored concrete reinforcement structure 5 between 4 reinforced concrete upright columns 3,The top of 4 reinforced concrete upright columns 3 is provided with the pea gravel concreten layer 4 that 300mm is thick,Pea gravel concreten layer 4 is arranged over base plate 13,Each reinforced concrete upright column 3 top is provided with 4 pre-embedded bolts 6,Base plate 13 is connected by pre-embedded bolt 6 is fixing with reinforced concrete upright column 3,Reinforced concrete upright column 3 includes column longitudinal reinforcement 7、Column transverse steel 8,Column longitudinal reinforcement 7 is connected by column tied silk 9 with column transverse steel 8,Armored concrete reinforcement structure 5 includes reinforcement structure horizontal reinforcement 10、Reinforcement structure is directly to reinforcing bar 11,Reinforcement structure horizontal reinforcement 10 is directly connected by reinforcement structure tied silk 12 to reinforcing bar 11 with reinforcement structure,Described steel tower tower body,Including angle steel 18、Pipe 21,Angle steel 18 and pipe 21 junction are provided with attachment means,This attachment means includes Bolted angle connection head and pipe union joint,Bolted angle connection head is welded by angle cleat flange 25 and angle cleat 23,It is simultaneously connected with angle steel flange 25 and angle cleat 23 is all welded with a connecting plate 14 and a stiffened panel 29,And it is welded with No. two stiffened panels 30 between angle cleat 23 and a connecting plate 14,A number connecting plate 14 is connected with oblique pull bracing piece 20,Angle cleat 23 is connected with angle steel 18 bolt by angle steel Baogang 19,Pipe union joint is by matching angle steel flange 26、Connecting circular tube flange 27 is socketed to form by connecting circular tube 24,Pairing angle steel flange 26、Connecting circular tube flange 27 opposite side is all welded with No. two connecting plates 17 and No. three stiffened panels 31,Pipe union joint is bolted with angle cleat flange 25 and pairing tube flange 28,The bottom of pipe 21 is welded with base plate 13,Gusset 15 and pipe 21、Base plate 13 welds simultaneously.
Operation principle of the present utility model:
Foundation bottom makes massive plate shape reinforcing bar 16 xoncrete structure, prevent basis sinking, basis is overall in hierarchic structure, linked by armored concrete reinforcement structure 5 between reinforced concrete upright column 3, pre-embedded bolt 6 is arranged in reinforced concrete upright column 3, for fixing pipe 21, base plate 13 it is provided with between pipe 21 and pea gravel concreten layer 4, and with gusset 15, pipe 21 is reinforced, this basis is made to have the maximum weighted area in same volume, there is bearing capacity strong, constitutionally stable feature, improves service life;
Steel tower tower body adds a stiffened panel 30, No. three stiffened panels 31 of 29, No. two stiffened panels and plays reinforcement effect, 14, No. two connecting plates 17 of a same connecting plate also function to reinforcement effect, and in steel tower, add oblique pull bracing piece 20, on the premise of not expanding floor space, effectively reinforced bottom steel tower, greatly reduce steel tower pipe 21, angle steel 18 and the power suffered by flange connections when wind-engaging, by oblique pull bracing piece 20 to pipe 21, the support of angle steel 18, make its stress effectively be disperseed, enhance the wind resistance of steel tower.
As can be seen here, this utility model provides a kind of wind resistance reinforcement type electric power tower, foundation bottom makes massive plate shape, prevent basis sinking, basis is overall to be linked by armored concrete reinforcement structure between column in hierarchic structure, and pre-embedded bolt is arranged in reinforced concrete upright column, for rigid tower pipe so that this basis has the maximum weighted area in same volume;Oblique pull bracing piece is added in steel tower, on the premise of not expanding floor space, effectively reinforced bottom steel tower, greatly reduce steel tower pipe, angle steel and the power suffered by flange connections when wind-engaging, by oblique pull bracing piece to pipe, the support of angle steel, make its stress effectively be disperseed, enhance the wind resistance of steel tower.Having bearing capacity strong, wind resistance is good, constitutionally stable feature, improves the service life of steel tower.
Claims (1)
- null1. a wind resistance reinforcement type electric power tower,Including iron tower foundation、Steel tower tower body,It is characterized in that: described iron tower foundation includes that 500mm thickness building waste tamps layer,It is provided with 4 identical reinforced concrete upright columns of structure on described 500mm thickness building waste compacting layer,The height of reinforced concrete upright column is 2000mm,4 reinforced concrete upright column surroundings are provided with hierarchic structure reinforced concrete floor high for 1200mm,Connected by armored concrete reinforcement structure between 4 reinforced concrete upright columns,The top of 4 reinforced concrete upright columns is provided with the pea gravel concreten layer that 300mm is thick,Pea gravel concreten layer is arranged over base plate,Each reinforced concrete upright column top is provided with 4 pre-embedded bolts,Base plate is connected by pre-embedded bolt and reinforced concrete upright column are fixing,Reinforced concrete upright column includes column longitudinal reinforcement、Column transverse steel,Column longitudinal reinforcement is connected by column tied silk with column transverse steel,Armored concrete reinforcement structure includes reinforcement structure horizontal reinforcement、Reinforcement structure is directly to reinforcing bar,Reinforcement structure horizontal reinforcement is directly connected by reinforcement structure tied silk to reinforcing bar with reinforcement structure,Described steel tower tower body,Including angle steel、Pipe,Angle steel and pipe junction are provided with attachment means,This attachment means includes Bolted angle connection head and pipe union joint,Bolted angle connection head is welded by angle cleat flange and angle cleat,It is simultaneously connected with angle steel flange and angle cleat is all welded with a connecting plate and a stiffened panel,And it is welded with No. two stiffened panels between angle cleat and a connecting plate,A number connecting plate is connected with oblique pull bracing piece,Angle cleat is connected with angle steel bolt by angle steel Baogang,Pipe union joint is by matching angle steel flange、Connecting circular tube flange is socketed to form by connecting circular tube,Pairing angle steel flange、Connecting circular tube flange opposite side is all welded with No. two connecting plates and No. three stiffened panels,Pipe union joint is bolted with angle cleat flange and pairing tube flange,The bottom of pipe is welded with base plate,Gusset and pipe、Base plate welds simultaneously.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620269407.9U CN205445089U (en) | 2016-03-24 | 2016-03-24 | Anti -wind reinforcement type electric power iron tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620269407.9U CN205445089U (en) | 2016-03-24 | 2016-03-24 | Anti -wind reinforcement type electric power iron tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205445089U true CN205445089U (en) | 2016-08-10 |
Family
ID=56609335
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620269407.9U Active CN205445089U (en) | 2016-03-24 | 2016-03-24 | Anti -wind reinforcement type electric power iron tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205445089U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112392062A (en) * | 2019-08-19 | 2021-02-23 | 成都华网电力工程咨询有限公司 | Electric power iron tower base reinforced structure |
-
2016
- 2016-03-24 CN CN201620269407.9U patent/CN205445089U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112392062A (en) * | 2019-08-19 | 2021-02-23 | 成都华网电力工程咨询有限公司 | Electric power iron tower base reinforced structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101812842B (en) | Tensionless filling pile structure | |
CN101851970B (en) | Horizontal seamed energy dissipation prestressed shear wall structure | |
CN101818478A (en) | Connection structure for concrete-filled circular steel tubular pier column and concrete cover beam | |
CN108412128A (en) | A kind of connection structure of steel core concrete column | |
CN202466845U (en) | Middle-layer node connecting structure for steel tube concrete column and steel reinforced concrete beam | |
CN107905385A (en) | The assembled arthitecutral structure and method of construction that steel construction is combined with concrete structure | |
CN205445089U (en) | Anti -wind reinforcement type electric power iron tower | |
CN103074889A (en) | Flexible pile cap for composite foundation | |
CN205445090U (en) | High strength wind resistance electric power iron tower | |
CN202730749U (en) | Prefabricated reinforced concrete H-shaped support pile | |
CN206693403U (en) | A kind of steel core concrete column and connected mode | |
CN206617282U (en) | Half truss formula pylon | |
CN205445087U (en) | Wind resistance electric power iron tower | |
CN108086135A (en) | A kind of assembled steel tube constrains reinfored concrete line frame bridge pier | |
CN208830464U (en) | A kind of girder steel and concrete small column rigid joint | |
CN209195137U (en) | A kind of concrete-filled double skin steel tube mixing splicing node | |
CN203821248U (en) | Steel pipe arch main arch assembling supporting system | |
CN202767286U (en) | Connection joint of precast concrete shear wall and main steel structure | |
CN205530327U (en) | Basis of electric power iron tower | |
CN206737115U (en) | A kind of steel core concrete column and steel beam connecting joint | |
CN206457838U (en) | A kind of assembling type base for power transmission tower | |
CN109441198A (en) | A kind of high tensile steel tube concurrent | |
CN101514556A (en) | Prefabricated tower crane foundation and a dedicated hydraulic installation piling machine thereof | |
CN103981810A (en) | Steel tube arch main arch splicing and supporting system | |
CN108661080A (en) | The manufacturing method in assembled underground one corridor |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |