CN205442564U - Rail transport passageway connects package to put - Google Patents

Rail transport passageway connects package to put Download PDF

Info

Publication number
CN205442564U
CN205442564U CN201521124207.6U CN201521124207U CN205442564U CN 205442564 U CN205442564 U CN 205442564U CN 201521124207 U CN201521124207 U CN 201521124207U CN 205442564 U CN205442564 U CN 205442564U
Authority
CN
China
Prior art keywords
oil circuit
hydraulic cylinder
rail transport
valve
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521124207.6U
Other languages
Chinese (zh)
Inventor
赵耀祖
戢亮
彭挥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHINALCO-SWA PLATES & STRIPS Co.,Ltd.
Original Assignee
Chinalco Swa Cold Rolling Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chinalco Swa Cold Rolling Co ltd filed Critical Chinalco Swa Cold Rolling Co ltd
Priority to CN201521124207.6U priority Critical patent/CN205442564U/en
Application granted granted Critical
Publication of CN205442564U publication Critical patent/CN205442564U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Winding, Rewinding, Material Storage Devices (AREA)

Abstract

The utility model discloses a rail transport passageway connects package to put, two lifts including correspond setting up respectively in pallet traffic line both sides meet a roll mechanism, go up and down to connect a roll mechanism to include the bracket, fixed mounting is equipped with the hydraulic cylinder that the axis is located vertical direction on the bracket, connect on hydraulic cylinder's the piston rod to be equipped with to hold in the palm and roll up the frame, hold in the palm to roll up to put up to go up to correspond to be equipped with two supporting shoes, two supporting shoes one side in opposite directions sets up into the inclined plane and two form between the supporting shoe and be used for the telescopic V type of spacing support coiled material to support the groove, bracket and support are rolled up to be equipped with between the frame and are used for hold in the palm the guiding mechanism who rolls up the frame and go up and down to lead. The utility model discloses a rail transport passageway connects package to put produces in the time of can effectively avoiding the coiled material to place on the tray and strikes, and then prevents that the coiled material surface from producing to damage and press the wound, improves product yield.

Description

Rail transport passage connects winding apparatus
Technical field
This utility model relates to a kind of web transport auxiliary device, concrete connects winding apparatus for a kind of for rail transport passage.
Background technology
Traditional mode coiled material being transported at other on fortune volume pallet is to use overhead traveling crane handling, manual operation overhead traveling crane first by coiled material handling to aerial, then pass through overhead traveling crane by positive for coiled material handling to pallet overhead, then coiled material be slowly put on pallet.Such mode is when the metal coiled material that handling material is softer, the bad control of operator, and it is limited to the version of pallet and the operation characteristic of overhead traveling crane, overhead traveling crane easily rocks during handling, manual operation cannot be accurately controlled and unreel position and lowering velocity, placement process easily produces with pallet and collides with, or lowering velocity is too fast, produces impact with pallet.So no matter overhead traveling crane operator how elaborate manipulation, all cannot be avoided coiled material when being put on pallet by coiled material and produce, with pallet, impact of colliding with, damage in web exterior surface generation and press wound, product quality is had an impact.
Summary of the invention
In view of this, the purpose of this utility model is to provide a kind of rail transport passage to connect winding apparatus, it is possible to is prevented effectively from when coiled material is placed on pallet and produces impact, and then prevents web exterior surface from producing to damage and press wound, improves finished product rate.
For reaching above-mentioned purpose, this utility model following technical scheme of offer:
A kind of rail transport passage connects winding apparatus, including two the lifting Jie Juan mechanisms being correspondingly arranged at palletized transport line both sides respectively;Described lifting Jie Juan mechanism includes bracket, on described bracket, fixed installation is provided with axis and is positioned at the lifting hydraulic cylinder of vertical direction, torr volume frame it is connected with on the piston rod of described lifting hydraulic cylinder, being correspondingly provided with two pieces bracers on described torr volume frame, two pieces bracer one sides in opposite directions are set to inclined-plane and form the V-type support slot for limited support coil sleeve between described in two pieces bracers;The guiding mechanism guided for described torr volume frame lifting it is provided with between described bracket and torr volume frame.
Further, described guiding mechanism is set to two and is symmetricly set on described lifting hydraulic cylinder both sides.
Further, described guiding mechanism includes the guide pillar seat being fixedly installed on described bracket, and being slidably matched with it in described guide pillar seat is provided with the guide pillar that axis is parallel with described lifting hydraulic cylinder axis.
Further, it is provided with copper sheathing between described guide pillar seat and described guide pillar.
Further, the piston rod of described lifting hydraulic cylinder is connected with described torr volume frame by connector, described connector includes connecting plate, it is correspondingly provided with two on the bottom surface of described connecting plate and connects seat, the piston rod of described lifting hydraulic cylinder is connected by bearing pin and two described connection seats, and described connecting plate is fixed with described torr volume frame and is connected.
Further, described torr volume frame is provided with the postive stop baffle for spacing coil sleeve, described postive stop baffle is arranged on outside described V-type support slot, and described postive stop baffle is provided for the inclined-plane that coil sleeve guides towards the top of the side, side of described V-type support slot.
Further, the hydraulic circuit for controlling two described lifting hydraulic cylinder actions is also included.
Further, described hydraulic circuit includes oil-feed oil circuit and oil return circuit, it is connected with connection oil circuit I on the rodless cavity of one of them described lifting hydraulic cylinder and rod chamber respectively and connects oil circuit II, the rodless cavity of another described lifting hydraulic cylinder and rod chamber be connected with connection oil circuit III respectively and connect oil circuit IV;It is respectively equipped with between explosion-proof valve and hydraulic control one-way valve, and described connection oil circuit I and connection oil circuit III and oil return circuit on described connection oil circuit I and connection oil circuit III and is connected by overflow valve;It is provided with bidirectional throttling valve and three-position four-way electromagnetic directional valve between described connection oil circuit I and connection oil circuit II, it is provided with the proportional direction valve of band incorporated amplifier between described connection oil circuit III and connection oil circuit IV, and is provided with superposing type electric-control stop valve between the proportional direction valve of described band incorporated amplifier and oil-feed oil circuit and oil return circuit;The oil circuit control of described hydraulic control one-way valve is connected with described oil-feed oil circuit and oil return circuit by two-position four way change valve.
The beneficial effects of the utility model are:
Rail transport passage of the present utility model connects winding apparatus, by being respectively provided with two lifting Jie Juan mechanisms in the both sides of palletized transport line, during use, coil sleeve two ends can be individually positioned in V-type support slot inner support location, then when pallet arrives filling position, hydraulic jack is utilized to be lowered on pallet by coiled material lentamente, coiled material is transported by recycling pallet, so, impact is produced when coiled material can be avoided to be placed on pallet, and then prevent from web exterior surface from producing damaging and press wound, improve finished product rate.
Concrete, the motor process that employing this utility model rail transport passage connects winding apparatus is as follows:
1, before hanging volume, operator operates lifting Jie Juan mechanism and falls lowest order, then utilizes overhead traveling crane to be placed on by coiled material on the torr volume frame of lifting Jie Juan mechanism, and is supported and spacing coil sleeve by V-type support slot;
2, after operator operates lifting Jie Juan mechanism rises to highest order, then conveying tray is driven at the filling position being positioned at immediately below coiled material;
3, after conveying tray puts in place, manipulator operates lifting Jie Juan mechanism and slowly declines, and coiled material gently falls on fortune volume pallet the most at last.
4, coiled material is transported by fortune volume pallet.
Accompanying drawing explanation
In order to make the purpose of this utility model, technical scheme and beneficial effect clearer, this utility model provides drawings described below to illustrate:
Fig. 1 is the structural representation that this utility model rail transport passage connects winding apparatus embodiment, concrete for the lifting Jie Juan mechanism structural representation when its lowest position;
Fig. 2 is the structural representation of lifting Jie Juan mechanism;
Fig. 3 is the oil circuit figure of hydraulic circuit.
Detailed description of the invention
The utility model is described in further detail with specific embodiment below in conjunction with the accompanying drawings, so that those skilled in the art can be better understood from this utility model and can be practiced, but illustrated embodiment is not as to restriction of the present utility model.
As it is shown in figure 1, connect the structural representation of winding apparatus embodiment for this utility model rail transport passage.The rail transport passage of the present embodiment connects winding apparatus, including two the lifting Jie Juan mechanisms being correspondingly arranged at palletized transport line 1 both sides respectively.The lifting Jie Juan mechanism of the present embodiment includes bracket 2, on bracket 2, fixed installation is provided with axis and is positioned at the lifting hydraulic cylinder 3 of vertical direction, torr volume frame 4 it is connected with on the piston rod of lifting hydraulic cylinder 3, being correspondingly provided with two pieces bracers 5 on torr volume frame 4, two pieces bracer 5 one sides in opposite directions are set to inclined-plane and form the V-type support slot 7 for limited support coil sleeve 6 between two pieces bracers 5.The guiding mechanism for asking volume frame 4 lifting to guide it is provided with between bracket 2 and torr volume frame 4.The bracket 2 of the present embodiment is fixedly mounted in the concrete foundation being positioned at palletized transport line 1 both sides.
Further, the guiding mechanism of the present embodiment is set to two and is symmetricly set on lifting hydraulic cylinder 3 both sides.The guiding mechanism of the present embodiment includes the guide pillar seat 8 being fixedly installed on bracket 2, it is slidably matched with it in guide pillar seat 8 and is provided with the guide pillar 9 that axis is parallel with lifting hydraulic cylinder 3 axis, and between guide pillar seat 8 and guide pillar 9, it is provided with the copper sheathing 10 being sleeved on guide pillar 9, by the guide effect of guiding mechanism, torr volume frame 4 can be made according to the vertical steady elevating movement in direction.
Further, the piston rod of lifting hydraulic cylinder 3 is connected with torr volume frame 4 by connector 11, and connector 11 includes connecting plate, the bottom surface of connecting plate is correspondingly provided with two and connects seat, the piston rod of lifting hydraulic cylinder 3 is connected seat by bearing pin 12 and is connected with two, and connecting plate is fixed with torr volume frame 4 and is connected.The torr volume frame 4 of the present embodiment is provided with the postive stop baffle 13 for spacing coil sleeve 6, postive stop baffle 13 is arranged on the side of V-type support slot 7 palletized transport line 1 dorsad, and postive stop baffle 13 is provided for the inclined-plane that coil sleeve 6 guides towards the top of the side, side of V-type support slot 7, by arranging postive stop baffle 13, axial location when coiled material is placed on torr volume frame 4 can be limited, i.e. coil sleeve 6 is between two postive stop baffles 13, facilitates it to align with pallet filling position.
Further, the rail transport passage of the present embodiment connect winding apparatus also include for control two lifting hydraulic cylinder actions hydraulic circuit.The hydraulic circuit of the present embodiment includes oil-feed oil circuit 14 and oil return circuit 15, it is connected with connection oil circuit I 16 on the rodless cavity of one of them lifting hydraulic cylinder 3 and rod chamber respectively and connects oil circuit II 17, the rodless cavity of another lifting hydraulic cylinder 3 and rod chamber be connected with connection oil circuit III 18 respectively and connect oil circuit IV 19.Connect to be respectively equipped with between explosion-proof valve 20 and hydraulic control one-way valve 21, and connection oil circuit I 16 and connection oil circuit III 18 and oil return circuit 15 on oil circuit I 16 and connection oil circuit III 18 and be connected by overflow valve 22.Connect and be provided with bidirectional throttling valve 23 and three-position four-way electromagnetic directional valve 24 between oil circuit I 16 and connection oil circuit II 17, connect oil circuit III 18 and connect the proportional direction valve 25 being provided with band incorporated amplifier between oil circuit IV 19, and being provided with superposing type electric-control stop valve 26 between the proportional direction valve 25 of band incorporated amplifier and oil-feed oil circuit 14 and oil return circuit 15.The oil circuit control of the hydraulic control one-way valve 21 of the present embodiment is connected with oil-feed oil circuit 14 and oil return circuit 15 by two-position four way change valve 27.Use this hydraulic circuit, it is possible to effectively control lifting hydraulic cylinder 3 and slowly decline, to realize coiled material gently falls to the technical purpose on fortune volume pallet, it is possible to be prevented effectively between coiled material and pallet generation impact.
The rail transport passage of the present embodiment connects winding apparatus, by being respectively provided with two lifting Jie Juan mechanisms in the both sides of palletized transport line, during use, coil sleeve two ends can be individually positioned in V-type support slot inner support location, then when pallet arrives filling position, hydraulic jack is utilized to be lowered on pallet by coiled material lentamente, coiled material is transported by recycling pallet, so, produces impact when coiled material can be avoided to be placed on pallet, and then prevent from web exterior surface from producing damaging and press wound, improve finished product rate.
Concrete, the motor process that employing this utility model rail transport passage connects winding apparatus is as follows:
1, before hanging volume, operator operates lifting Jie Juan mechanism and falls lowest order, then utilizes overhead traveling crane to be placed on by coiled material on the torr volume frame of lifting Jie Juan mechanism, and is supported and spacing coil sleeve by V-type support slot;
2, after operator operates lifting Jie Juan mechanism rises to highest order, then conveying tray is driven at the filling position being positioned at immediately below coiled material;
3, after conveying tray puts in place, manipulator operates lifting Jie Juan mechanism and slowly declines, and coiled material gently falls on fortune volume pallet the most at last.
4, coiled material is transported by fortune volume pallet.
Embodiment described above is only the preferred embodiment lifted by absolutely proving this utility model, and protection domain of the present utility model is not limited to this.The equivalent that those skilled in the art are made on the basis of this utility model substitutes or conversion, all within protection domain of the present utility model.Protection domain of the present utility model is as the criterion with claims.

Claims (8)

1. a rail transport passage connects winding apparatus, it is characterised in that: include two the lifting Jie Juan mechanisms being correspondingly arranged at palletized transport line both sides respectively;Described lifting Jie Juan mechanism includes bracket, on described bracket, fixed installation is provided with axis and is positioned at the lifting hydraulic cylinder of vertical direction, torr volume frame it is connected with on the piston rod of described lifting hydraulic cylinder, being correspondingly provided with two pieces bracers on described torr volume frame, two pieces bracer one sides in opposite directions are set to inclined-plane and form the V-type support slot for limited support coil sleeve between described in two pieces bracers;The guiding mechanism guided for described torr volume frame lifting it is provided with between described bracket and torr volume frame.
Rail transport passage the most according to claim 1 connects winding apparatus, it is characterised in that: described guiding mechanism is set to two and is symmetricly set on described lifting hydraulic cylinder both sides.
Rail transport passage the most according to claim 2 connects winding apparatus, it is characterized in that: described guiding mechanism includes the guide pillar seat being fixedly installed on described bracket, being slidably matched with it in described guide pillar seat is provided with the guide pillar that axis is parallel with described lifting hydraulic cylinder axis.
Rail transport passage the most according to claim 3 connects winding apparatus, it is characterised in that: it is provided with copper sheathing between described guide pillar seat and described guide pillar.
Rail transport passage the most according to claim 1 connects winding apparatus, it is characterized in that: the piston rod of described lifting hydraulic cylinder is connected with described torr volume frame by connector, described connector includes connecting plate, it is correspondingly provided with two on the bottom surface of described connecting plate and connects seat, the piston rod of described lifting hydraulic cylinder is connected by bearing pin and two described connection seats, and described connecting plate is fixed with described torr volume frame and is connected.
Rail transport passage the most according to claim 1 connects winding apparatus, it is characterized in that: described torr volume frame is provided with the postive stop baffle for spacing coil sleeve, described postive stop baffle is arranged on outside described V-type support slot, and described postive stop baffle is provided for the inclined-plane that coil sleeve guides towards the top of the side, side of described V-type support slot.
7. connect winding apparatus according to the rail transport passage described in any one of claim 1-6, it is characterised in that: also include the hydraulic circuit for controlling two described lifting hydraulic cylinder actions.
Rail transport passage the most according to claim 7 connects winding apparatus, it is characterized in that: described hydraulic circuit includes oil-feed oil circuit and oil return circuit, it is connected with connection oil circuit I on the rodless cavity of one of them described lifting hydraulic cylinder and rod chamber respectively and connects oil circuit II, the rodless cavity of another described lifting hydraulic cylinder and rod chamber be connected with connection oil circuit III respectively and connect oil circuit IV;It is respectively equipped with between explosion-proof valve and hydraulic control one-way valve, and described connection oil circuit I and connection oil circuit III and oil return circuit on described connection oil circuit I and connection oil circuit III and is connected by overflow valve;It is provided with bidirectional throttling valve and three-position four-way electromagnetic directional valve between described connection oil circuit I and connection oil circuit II, it is provided with the proportional direction valve of band incorporated amplifier between described connection oil circuit III and connection oil circuit IV, and is provided with superposing type electric-control stop valve between the proportional direction valve of described band incorporated amplifier and oil-feed oil circuit and oil return circuit;The oil circuit control of described hydraulic control one-way valve is connected with described oil-feed oil circuit and oil return circuit by two-position four way change valve.
CN201521124207.6U 2015-12-31 2015-12-31 Rail transport passageway connects package to put Active CN205442564U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521124207.6U CN205442564U (en) 2015-12-31 2015-12-31 Rail transport passageway connects package to put

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521124207.6U CN205442564U (en) 2015-12-31 2015-12-31 Rail transport passageway connects package to put

Publications (1)

Publication Number Publication Date
CN205442564U true CN205442564U (en) 2016-08-10

Family

ID=56598120

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521124207.6U Active CN205442564U (en) 2015-12-31 2015-12-31 Rail transport passageway connects package to put

Country Status (1)

Country Link
CN (1) CN205442564U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861514A (en) * 2018-08-14 2018-11-23 哈工大机器人(合肥)国际创新研究院 Full-automatic Roll-material conveying AGV robot and its control method
CN110482453A (en) * 2019-09-03 2019-11-22 中冶赛迪工程技术股份有限公司 Tuo Juan mechanism, fortune volume vehicle and fortune volume system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108861514A (en) * 2018-08-14 2018-11-23 哈工大机器人(合肥)国际创新研究院 Full-automatic Roll-material conveying AGV robot and its control method
CN108861514B (en) * 2018-08-14 2023-08-29 合肥哈工图南智控机器人有限公司 Full-automatic coil stock carrying AGV robot and control method thereof
CN110482453A (en) * 2019-09-03 2019-11-22 中冶赛迪工程技术股份有限公司 Tuo Juan mechanism, fortune volume vehicle and fortune volume system
CN110482453B (en) * 2019-09-03 2024-05-07 中冶赛迪工程技术股份有限公司 Coil supporting mechanism, coil transporting vehicle and coil transporting system

Similar Documents

Publication Publication Date Title
CN104129653B (en) Pallet stacking de-stacking device
CN104140037B (en) Wallboard Lift-on/Lift-off System
CN201400508Y (en) Evaluator without machine room
CN205442564U (en) Rail transport passageway connects package to put
WO2015025396A1 (en) Elevator device
CN207671388U (en) Inflation film winder quickly up and down winding apparatus
JP6750754B2 (en) Lifting elevator for construction work
CN102745578A (en) Lift device
KR101224416B1 (en) Vertically Movable Worktable of a Special Purpose Vehicle
CN108058999A (en) A kind of aluminium section material automatic piling system and its control method
CN107499216A (en) A kind of building board carrier
CN107253673A (en) A kind of Architectural Equipment hanging apparatus
CN101692407B (en) Automatic lifting cable arrangement frame
CN107719427A (en) Communication cable construction transfer car(buggy)
CN110436335A (en) A kind of deck unit erection gantry installing mechanism and its application method
CN201565573U (en) Sand box transferring device
CN205531617U (en) Standardized automatic rising transmission unit
CN205294547U (en) Goods lift device goes up and down safely
JP2015168533A (en) Elevator device
CN107651589A (en) The guidance method of double leading block and double multistrand rope
CN207511452U (en) A kind of aluminium section material automatic piling system
CN206665977U (en) A kind of derrick crane
CN106477481A (en) A kind of hanging device
CN207283359U (en) Combined support frame for Large Rotor core pulling
CN205998888U (en) Container crane

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201229

Address after: 401326 Chongqing Jiulongpo District West Industrial Park

Patentee after: CHINALCO-SWA PLATES & STRIPS Co.,Ltd.

Address before: 401326 No.68, aluminum City Avenue, Xipeng Town, Jiulongpo District, Chongqing

Patentee before: CHINALCO-SWA COLD ROLLING Co.,Ltd.

TR01 Transfer of patent right