CN205426884U - 一种可模拟多角度基岩的覆盖层边坡稳定性试验模型 - Google Patents

一种可模拟多角度基岩的覆盖层边坡稳定性试验模型 Download PDF

Info

Publication number
CN205426884U
CN205426884U CN201521006985.5U CN201521006985U CN205426884U CN 205426884 U CN205426884 U CN 205426884U CN 201521006985 U CN201521006985 U CN 201521006985U CN 205426884 U CN205426884 U CN 205426884U
Authority
CN
China
Prior art keywords
basement rock
plate
angle
sleeve
covering layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521006985.5U
Other languages
English (en)
Inventor
史振宁
曾铃
付宏渊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Changsha University of Science and Technology
Original Assignee
Changsha University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Changsha University of Science and Technology filed Critical Changsha University of Science and Technology
Application granted granted Critical
Publication of CN205426884U publication Critical patent/CN205426884U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本实用新型公开了一种可模拟多角度基岩的覆盖层边坡稳定性试验模型。模型共分为两部分,第一部分为模拟基岩试验装置,该装置共分为四个主要部分:上挡土板、上基岩板、下基岩板、下挡土板以及连接四个主要部分的转轴,上挡土板与上基岩板、上基岩板与下基岩板、下基岩板与下挡土板之间均由转轴连接;第二部分为支撑装置,在钢槽两端设置有打孔的有机玻璃板,第一部分中连接挡土板与基岩板的三个转轴插入两侧有机玻璃的孔内,用于支撑挡土板与基岩板。以上两部分结合紧密,共同工作。

Description

一种可模拟多角度基岩的覆盖层边坡稳定性试验模型
技术领域
本实用新型涉及一种可以模拟不同基岩角度、不同基岩摩擦系数的覆盖层边坡室内试验模型,特别是涉及一种用于公路两侧覆盖层边坡领域进行边坡渗流特征分析,变形分析以及稳定性分析的试验装置。
背景技术
覆盖层边坡是指在基岩之上覆盖多层土质的一种土岩混合边坡,在不同地质条件下基岩角度、基岩性质、覆盖层分层特性、覆盖层厚度等均有所不同。
目前,边坡失稳、垮塌等地质灾害已经成为公路、铁路和房建等领域不可忽视的问题,由边坡滑动尤其是覆盖层边坡上覆土体的滑动引起的各种事故时有发生。尤其是高速公路沿线覆盖层边坡,其在降雨与地下水变化过程中的渗流状态、变形与稳定性相比于完全土质边坡、完全岩质边坡有很大不同。不同的基岩角度对稳定性有很大的影响,对于土-岩界面来讲,不同的摩擦系数与渗透系数也会对边坡渗流特性造成一定影响,不同的土层厚度,土层分层状态都是对边坡稳定性产生影响的关键因素。所以本实验装置以及试验方法对今后的覆盖层边坡渗流特征及稳定性方面的研究具有重大意义。
现有的传统的对边坡进行室内模型试验的试验方法主要是均一土坡模型以及单一角度边坡模型。均一土坡模型即是将边坡土完全填入模型箱内,然后制成边坡,单一角度边坡模型是指试验模型只能够采用一种角度,而且不能折弯成其他角度,这样就对试验手段带来了局限性。
现有边坡室内试验模型的缺点是,首先,以上两种方式均只能模拟单一角度的边坡,而在工程实际中基岩角度会有各种变化,基岩并非一条直线,而是在不同位置存在一定的角度。其次,这两种试验方式无法模拟土层与岩层相交的界面,而实际上土-岩界面作用对边坡稳定性会产生极大影响。因此,设计一种允许调整不同基岩角度的,并且可以更换基岩材料的新型室内模型试验装置来替代传统的试验是十分必要的。
发明内容
本实用新型要解决的第一个技术问题是设计一种能够真实地模拟覆盖层边坡基岩角度以及土-岩接触面的,并且便于使用、便于观察的覆盖层边坡室内试验模型。
为了解决上述技术问题,本实用新型提供的覆盖层边坡室内试验模型,在钢槽左右两侧固定有有机玻璃板,所述的有机玻璃板上的特定位置设有钻孔,上挡土板与上基岩板之间采用转轴连接,所述的上基岩板与下基岩板之间采用所述的转轴连接,所述的下基岩板与下挡土板之间采用所述的转轴连接,所述的转轴插入所述有机玻璃板上的特定孔位。所述下挡土板的下部由支撑柱所支撑。
所述的有机玻璃板由有机玻璃制成,其厚度为0.04m,其上部打孔方式为,距板底部1.2m、右侧2m的板中心位置钻有半径为0.04m的圆孔,其余圆孔的圆心位于以中心孔为圆心,1.5m为半径的圆弧上,左上设置4个、右下设置4个,各圆孔之间的角度为15°,各圆孔半径为0.04m。
所述的支撑柱为能控制、调节高度的支撑柱。
采用上述技术方案的覆盖层边坡室内试验模型,首先将模拟基岩材料与覆盖层土体准备好。将上挡土板、上下基岩板、下挡土板按照一定顺序与角度和钢槽、有机玻璃板组装成整体,调节支撑柱的高度。将基岩材料填在基岩板之上,将土层填筑在基岩材料以及挡土板之上,布设监控装置。然后按照设计方案对边坡进行降雨,得到结果后将土层以及基岩材料去掉,将转轴抽出,调整基岩板角度进行不同基岩角度的试验,或者更换基岩材料与土层材料,进行不同方案的试验。有机玻璃上的不同角度的孔位可调整为16种角度组合的基岩状态,从而达到真实模拟基岩状态的效果。该装置结构设计合理,容易安装,使用简便,同时可以较为真实地模拟覆盖层边坡在不同基岩角度条件下的渗流、变形及稳定性。
本实用新型提供的覆盖层边坡室内试验模型的试验方法,实验步骤如下:
步骤一、检查实验装置是否完整可用,准备试验所需的基岩材料,准备试验所需覆盖层土;
步骤二、将试验用基岩材料按照一定方案填充在上基岩板(4)与下基岩板(5)的凹槽内;
步骤三、按照一定的角度将上挡土板(3)、上基岩板(4)、下基岩板(5)、下挡土板(6)安装在钢槽(1)与有机玻璃板(2)上,将支撑柱(8)调整好高度,支撑住下挡土板。
步骤四、将准备好的试验用覆盖层土按照一定的方案放置于基岩板与挡土板之上;
步骤五、采用人工降雨装置,按照一定方案对覆盖层边坡模型进行降雨。
步骤六、采用孔压测试仪、张力计等仪器按照一定方案测试土层中的渗流状态,采用位移计等仪器测定土层的变形状态,观察边坡的破坏状态。
步骤七、将试验完成的土样撤下,将基岩板上的模拟基岩材料去除,调整基岩板的角度或者基岩性质,重复步骤二到步骤六。
采用上述技术方案的覆盖层边坡室内试验模型及试验方法,本实用新型的创新之处在于:覆盖层边坡室内试验模型的侧面有机玻璃板上进行了打孔设计,这样可以通过调节转轴的位置来模拟不同的基岩角度,在基岩板上设置了凹槽,可以更换所用模拟基岩材料,这样可以更真实地模拟基岩与土层的磨擦作用。
本实用新型是一种用于分析覆盖层-基岩边坡渗流特征、变性特征与稳定性的装置及其试验方法,通过改变转轴在两侧有机玻璃的插入位置来改变基岩角度,通过改变基岩板上模拟基岩的摩擦系数来改变土层与岩层之间的作用状态,从而得到在基岩角度变化以及基岩性质变化影响下的边坡渗流状态、变形状态及稳定性。以便于对覆盖层边坡在极端气候条件下产生滑坡的机理的研究。
综上所述,本实用新型是一种能较为真实地模拟不同基岩角度、不同基岩摩擦系数的覆盖层边坡室内试验装置及其试验方法。
附图说明
图1是本实用新型钢槽的结构示意图。
图2是本实用新型有机玻璃板示意图。
图3是本实用新型上、下挡土板示意图。
图4是本实用新型上、下基岩板示意图。
图5是本实用新型链接转轴示意图。
图6是本实用新型支撑柱示意图。
图7是本实用新型整体图。
具体实施方式
下面结合附图,详细说明一种模拟地下水周期循环状态下的土层沉降测试仪的具体实施方式。
如图1、图2、图3、图4、图5和图6所示,在钢槽(1)左右两侧固定有有机玻璃板(2),所述的有机玻璃板(2)上的特定位置设有钻孔,上挡土板(3)与上基岩板(4)之间采用转轴(7)连接,所述的上基岩板(4)与下基岩板(5)之间采用所述的转轴(7)连接,所述的下基岩板(5)与下挡土板(6)之间采用所述的转轴(7)连接,所述的转轴(7)插入所述有机玻璃板(2)上的特定孔位。所述下挡土板(6)的下部由支撑柱(8)所支撑。
具体的,钢槽(1)由钢材制成,其主视形状为“L”形,尺寸为整体高2.41m,钢板厚0.01m,宽为4.11m,侧向长度为4.11m。所述的有机玻璃板(2)由有机玻璃制成,其厚度为0.04m,其上部打孔方式为,距板底部1.2m、右侧2m的有机玻璃板的中心位置钻有半径为0.04m的圆孔,其余圆孔的圆心位于以中心孔为圆心,1.5m为半径的圆弧上,左上设置4个、右下设置4个,各圆孔之间的角度为15°,各圆孔半径为0.04m。所述的上挡土板(3)与下挡土板(6)由钢材制成,其尺寸为长4m,宽1.5m,厚0.005m上挡土板(3)一侧设有连接用的套筒,套筒内径为0.035m,套筒内径为0.04m,套筒长度为0.4m,套筒间距为0.7m。所述的上基岩板(4)和下基岩板(5)由钢材制成,侧视图呈“凹”形,板厚0.005m,凹进部分尺寸为长4m,宽1.2m,高0.1m,凹槽内可以填充水泥、岩石等模拟基岩的材料。基岩板两侧设有连接用的套筒,套筒内径为0.035m,套筒外径为0.04m,套筒长度为0.4m,套筒间距为0.7m。所述的转轴(7)采用钢材制成,其长度为4.4m,内径为0.025m,外径为0.03m。在转轴与有机玻璃孔相接触的地方可以设置有垫片,以防止材料磨损。所述的支撑柱(8)为能控制、调节高度的支撑柱(8)。
如图6所示,土层沉降测试仪的试验方法,实验步骤如下:
步骤一、检查实验装置是否完整可用,准备试验所需的基岩材料,准备试验所需覆盖层土;
步骤二、将试验用基岩材料按照一定方案填充在上基岩板(4)与下基岩板(5)的凹槽内;
步骤三、按照一定的角度将上挡土板(3)、上基岩板(4)、下基岩板(5)、下挡土板(6)安装在钢槽(1)与有机玻璃板(2)上,将支撑柱(8)调整好高度,支撑住下挡土板。
步骤四、将准备好的试验用覆盖层土按照一定的方案放置于基岩板与挡土板之上;
步骤五、采用人工降雨装置,按照一定方案对覆盖层边坡模型进行降雨。
步骤六、采用孔压测试仪、张力计等仪器按照一定方案测试土层中的渗流状态,采用位移计等仪器测定土层的变形状态,观察边坡的破坏状态。
步骤七、将试验完成的土样撤下,将基岩板上的模拟基岩材料去除,调整基岩板的角度或者基岩性质,重复步骤二到步骤六。

Claims (8)

1.一种可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:在钢槽(1)左右两侧固定有有机玻璃板(2),所述的有机玻璃板(2)上的特定位置设有钻孔,上挡土板(3)与上基岩板(4)之间采用转轴(7)连接,所述的上基岩板(4)与下基岩板(5)之间采用所述的转轴(7)连接,所述的下基岩板(5)与下挡土板(6)之间采用所述的转轴(7)连接,所述的转轴(7)插入所述有机玻璃板(2)上的特定孔位,所述下挡土板(6)的下部由支撑柱(8)所支撑。
2.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的有机玻璃板(2)与所述的钢槽(1)紧密连接,保持装置的整体稳定性。
3.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的钢槽(1)由钢材制成,其主视形状为“L”形,尺寸为整体高2.41m,钢板厚0.01m,宽为4.11m,侧向长度为4.11m。
4.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的有机玻璃板(2)由有机玻璃制成,其厚度为0.04m,其上部打孔方式为,距板底部1.2m、右侧2m的板中心位置钻有半径为0.04m的圆孔,其余圆孔的圆心位于以中心孔为圆心,1.5m为半径的圆弧上,左上设置4个、右下设置4个,各圆孔之间的角度为15°,各圆孔半径为0.04m。
5.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的上挡土板(3)与下挡土板(6)由钢材制成,其尺寸为长4m,宽1.5m,厚0.005m,上挡土板(3)一侧设有连接用的套筒,套筒内径为0.035m,套筒内径为0.04m,套筒长度为0.4m,套筒间距为0.7m。
6.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的上基岩板(4)和下基岩板(5)由钢材制成,侧视图呈“凹”形,板厚0.005m,凹进部分尺寸为长4m,宽1.2m,高0.1m,凹槽内填充由水泥、砂和岩石制作的模拟基岩,上基岩板与下基岩板两侧设有连接用的套筒,套筒内径为0.035m,套筒外径为0.04m,套筒长度为0.4m,套筒间距为0.7m。
7.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的转轴(7)采用钢材制成,其长度为4.4m,内径为0.025m,外径为0.03m,在转轴与有机玻璃孔相接触的地方设置有垫片,以防止材料磨损。
8.根据权利要求1所述的可模拟多角度基岩的覆盖层边坡稳定性试验模型,其特征是:所述的支撑柱(8)为能控制、调节高度的支撑柱(8)。
CN201521006985.5U 2015-04-29 2015-12-08 一种可模拟多角度基岩的覆盖层边坡稳定性试验模型 Expired - Fee Related CN205426884U (zh)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CN201520268742 2015-04-29
CN2015202687422 2015-04-29

Publications (1)

Publication Number Publication Date
CN205426884U true CN205426884U (zh) 2016-08-03

Family

ID=56516422

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521006985.5U Expired - Fee Related CN205426884U (zh) 2015-04-29 2015-12-08 一种可模拟多角度基岩的覆盖层边坡稳定性试验模型

Country Status (1)

Country Link
CN (1) CN205426884U (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106840882A (zh) * 2017-03-21 2017-06-13 中国科学院武汉岩土力学研究所 一种边坡走向夹角可调的组合式试验装置
CN106949875A (zh) * 2017-05-23 2017-07-14 中国电建集团成都勘测设计研究院有限公司 适用于边坡变形破坏的物理模拟试验装置
CN106978824A (zh) * 2017-03-09 2017-07-25 大连理工大学 一种模拟海底复杂边坡的土体制备装置及其制备方法
CN107037195A (zh) * 2016-10-31 2017-08-11 中国地质大学(武汉) 水位波动对下卧冰层岩堆边坡稳定性影响试验装置及方法
CN107179271A (zh) * 2017-06-29 2017-09-19 沈阳建筑大学 多功能土坡抗渗稳定性测试箱及其测试方法
CN110887953A (zh) * 2019-11-25 2020-03-17 清华大学 土工离心机模型中连续可调近弧形不均匀沉降机械装置
CN110987600A (zh) * 2019-11-25 2020-04-10 清华大学 土工离心模型中连续可调梯形或锥形不均匀沉降控制设备
CN113324817A (zh) * 2021-07-02 2021-08-31 中国科学院武汉岩土力学研究所 一种制作复杂反倾边坡模型的方法及试验装置
CN114414455A (zh) * 2022-01-17 2022-04-29 福州大学 模拟花岗岩二元结构边坡的渗流试验装置及试验方法

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107037195B (zh) * 2016-10-31 2019-04-30 中国地质大学(武汉) 水位波动对下卧冰层岩堆边坡稳定性影响试验装置及方法
CN107037195A (zh) * 2016-10-31 2017-08-11 中国地质大学(武汉) 水位波动对下卧冰层岩堆边坡稳定性影响试验装置及方法
CN106978824A (zh) * 2017-03-09 2017-07-25 大连理工大学 一种模拟海底复杂边坡的土体制备装置及其制备方法
CN106978824B (zh) * 2017-03-09 2019-01-01 大连理工大学 一种模拟海底复杂边坡的土体制备装置及其制备方法
CN106840882B (zh) * 2017-03-21 2023-08-04 中国科学院武汉岩土力学研究所 一种边坡走向夹角可调的组合式试验装置
CN106840882A (zh) * 2017-03-21 2017-06-13 中国科学院武汉岩土力学研究所 一种边坡走向夹角可调的组合式试验装置
CN106949875A (zh) * 2017-05-23 2017-07-14 中国电建集团成都勘测设计研究院有限公司 适用于边坡变形破坏的物理模拟试验装置
CN107179271B (zh) * 2017-06-29 2023-05-09 沈阳建筑大学 多功能土坡抗渗稳定性测试箱及其测试方法
CN107179271A (zh) * 2017-06-29 2017-09-19 沈阳建筑大学 多功能土坡抗渗稳定性测试箱及其测试方法
CN110987600A (zh) * 2019-11-25 2020-04-10 清华大学 土工离心模型中连续可调梯形或锥形不均匀沉降控制设备
CN110887953A (zh) * 2019-11-25 2020-03-17 清华大学 土工离心机模型中连续可调近弧形不均匀沉降机械装置
CN113324817B (zh) * 2021-07-02 2023-04-28 中国科学院武汉岩土力学研究所 一种制作复杂反倾边坡模型的方法及试验装置
CN113324817A (zh) * 2021-07-02 2021-08-31 中国科学院武汉岩土力学研究所 一种制作复杂反倾边坡模型的方法及试验装置
CN114414455A (zh) * 2022-01-17 2022-04-29 福州大学 模拟花岗岩二元结构边坡的渗流试验装置及试验方法
CN114414455B (zh) * 2022-01-17 2023-08-22 福州大学 模拟花岗岩二元结构边坡的渗流试验装置及试验方法

Similar Documents

Publication Publication Date Title
CN205426884U (zh) 一种可模拟多角度基岩的覆盖层边坡稳定性试验模型
CN106198339A (zh) 一种考虑降雨入渗的覆盖层边坡渗流特征及稳定性试验模型
CN103117020B (zh) 盾构隧道动态掘进诱发地层损失及地表沉陷试验装置
Liu et al. Influence of natural fractures on propagation of hydraulic fractures in tight reservoirs during hydraulic fracturing
CN106223928B (zh) 一种多分支井实验模型的填砂方法
CN203238678U (zh) 一种超长桩有效桩长模拟试验箱
Dias et al. Data analysis of pile tunnel interaction
Carter et al. The geometry of slip surfaces beneath landslides: predictions from surface measurements
CN103866736B (zh) 一种矿震对煤矿地下水库影响的物理模拟试验系统及方法
Yang et al. A true triaxial geomechanical model test apparatus for studying the precursory information of water inrush from impermeable rock mass failure
Yang et al. Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock
CN103791884A (zh) 一种煤矿开采覆岩及地表移动变形一体化规律的研究方法
CN105780772A (zh) 一种通过研究膨胀性粘结材料在锚杆灌浆中的特性进行锚杆灌浆参数优化设计的方法
Xue et al. Deformation rule and mechanical characteristic analysis of subsea tunnel crossing weathered trough
Liu et al. Numerical modeling of gas flow in coal using a modified dual-porosity model: a multi-mechanistic approach and finite difference method
CN205538580U (zh) 裂隙介质系统渗透张量室内测定装置
Ieronymaki et al. Interpretation of free-field ground movements caused by mechanized tunnel construction
Ieronymaki et al. Comparative study of the effects of three tunneling methods on ground movements in stiff clay
Zhang et al. Study on slope stability due to the influence of excavation of the high-speed rail tunnel
Xu et al. Experimental study on uniaxial compression behavior of fissured loess before and after vibration
Wang et al. Stability and airtightness of a deep anhydrite cavern group used as an underground storage space: A case study
Rastegarnia et al. Assessment of relationship between grouted values and calculated values in the Bazoft dam site
CN103176220A (zh) 一种隧道水压力模型试验方法
CN105952445A (zh) 一种基于数理模型的高地应力条件下的钻孔试验方法
Wan et al. Lessons learnt from installation of field instrumentation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160803

Termination date: 20161208

CF01 Termination of patent right due to non-payment of annual fee