CN205400004U - Construction scaffold - Google Patents

Construction scaffold Download PDF

Info

Publication number
CN205400004U
CN205400004U CN201620176918.6U CN201620176918U CN205400004U CN 205400004 U CN205400004 U CN 205400004U CN 201620176918 U CN201620176918 U CN 201620176918U CN 205400004 U CN205400004 U CN 205400004U
Authority
CN
China
Prior art keywords
plate body
scaffold
locating piece
building
adjusting bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620176918.6U
Other languages
Chinese (zh)
Inventor
李伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Jixiang Plate Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620176918.6U priority Critical patent/CN205400004U/en
Application granted granted Critical
Publication of CN205400004U publication Critical patent/CN205400004U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model provides a construction scaffold belongs to building tool technical field. It has solved the current poor problem of scaffold security performance. This construction scaffold includes support body and loading board that the pipe fitting formed through the lock joint, the loading board package rubbing board body no. 1 and plate body no. 2, plate body no. 1 is articulated with the plate body two -phase, the equal interval in both sides of plate body no. 1 and two bottoms of plate body is provided with a plurality of locating piece, the constant head tank has in the locating piece, the bottom that the constant head tank is close to plate body no. 1 and plate body no. 2 is the arc, two inside walls of opening parallel, an adjustment tank that is rectangular shape that runs through has on the both sides wall of locating piece respectively, wear to be equipped with adjusting bolt in the adjustment tank, the last cover of adjusting bolt has adjusting nut. This construction scaffold has good the having a few of security performance.

Description

A kind of scaffold for building
Technical field
This utility model belongs to building implement technical field, relates to a kind of scaffold for building.
Background technology
Development along with city, more and more residential buildings, the commercial house, market are under construction, also there are increasing residential building, the commercial house, market at finishing, in renovation, due to ceiling, wall on higher along position, therefore, operator generally requires and enables oneself to get at fitting position by instrument such as scaffold etc..
Existing scaffold, for instance Chinese patent literature data discloses scaffold [application number: 201410601008.3;Application publication number: CN104372935A], it is connected and composed through fastener by pipe fitting, also includes loading plate, and this loading plate is rectangle tabular, and its two long side is equipped with arc hook, and this hook intrados is identical with the cambered surface of pipe fitting.
The scaffold of this kind of structure, is hung over by arc and makes loading plate be fixed on pipe fitting on pipe fitting, there is extension loosely, the problem that loading plate comes off, poor safety performance.
Summary of the invention
The purpose of this utility model is for the above-mentioned problems in the prior art, it is provided that a kind of scaffold for building, solves the technical problem that the security performance being how to improve existing scaffold.
The purpose of this utility model can be realized by following technical proposal: a kind of scaffold for building, including the pipe fitting support body through snapping and loading plate, it is characterized in that, described loading plate includes plate body one and plate body two, described plate body one and plate body two are hinged, both sides bottom described plate body one and plate body two are all arranged at intervals with several locating pieces, described locating piece has locating slot, described locating slot is curved near the bottom of plate body one and plate body two, two medial walls of peristome are parallel, the two side of described locating piece is respectively provided with an elongated regulating tank run through, described regulating tank is equipped with adjusting bolt, described adjusting bolt is cased with adjusting nut.
Plate body one and plate body two are hinged, and namely plate body one and plate body two can fold around pin joint;During installation, locating slot is directed at the pipe fitting of support body, pipe fitting is embedded in locating slot, then adjusting bolt is moved up and down, make adjusting bolt be resisted against on body, make adjusting bolt and locating piece be fixedly connected with again through screwing adjusting nut, so that plate body one and plate body two are fixedly connected with support body, plate body one and plate body two do not come off, and security performance is good.
In above-mentioned one scaffold for building, described plate body one, plate body two are all in lattice-shaped.Plate body one, plate body two all alleviate the weight of plate body one and plate body two in lattice-shaped, make plate body one and plate body two easy for installation, support body will not cause excessive extruding, and support body will not collapse, and security performance is good.
In above-mentioned one scaffold for building, described plate body one, plate body two and locating piece are made by metal material.
In above-mentioned one scaffold for building, described locating piece is connected in plate body one and the bottom of plate body two by welding.The connected firmness of welding is high.
Compared with prior art, the scaffold for building that this utility model provides has the advantage that
1, the loading plate of this scaffold for building is fixedly connected with by locating piece, adjusting bolt and adjusting nut and support body, makes loading plate not come off, and firmness is high, and this scaffold security performance is good.
2, the plate body one of this scaffold for building and plate body two are in lattice-shaped, effectively alleviate weight, make plate body one and plate body two reduce the extruding to support body, and the pressure that support body bears is little, is hardly damaged, and security performance is good.
3, the plate body one of this scaffold for building and plate body two can fold, and the space occupied is little.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of this scaffold for building.
Fig. 2 is the side view of this scaffold loading plate for building.
Fig. 3 is the front view of this scaffold loading plate for building.
In figure, 1, support body;2, loading plate;21, plate body one;22, plate body two;3, locating piece;4, locating slot;5, regulating tank;6, adjusting bolt;7, adjusting nut.
Detailed description of the invention
The following is specific embodiment of the utility model and in conjunction with accompanying drawing, the technical solution of the utility model is further described, but this utility model is not limited to these embodiments.
Such as Fig. 1, Fig. 2, shown in Fig. 3, this scaffold for building includes pipe fitting through the support body 1 of snapping and loading plate 2, loading plate 2 includes plate body 1 and plate body 2 22, plate body 1 and plate body 2 22 are hinged, both sides bottom plate body 1 and plate body 2 22 are all arranged at intervals with several locating pieces 3, in the present embodiment, the quantity of locating piece 3 is two, in actual production, the quantity of locating piece 3 can be three or four, plate body 1, plate body 2 22 and locating piece 3 are made by metal material, locating piece 3 is connected in plate body 1 and the bottom of plate body 2 22 by welding, plate body 1, plate body 2 22 is all in lattice-shaped.
Locating piece 3 has locating slot 4, locating slot 4 is curved near the bottom of plate body 1 and plate body 2 22, two medial walls of peristome are parallel, the two side of locating piece 3 is respectively provided with an elongated regulating tank 5 run through, regulating tank 5 is equipped with adjusting bolt 6, adjusting bolt 6 is cased with adjusting nut 7.
The pipe fitting of support body 1 is embedded in locating slot 4, is locked by adjusting bolt 6 and adjusting nut 7, be that plate body 1 and plate body 2 22 and support body 1 are fixedly connected with.
Specific embodiment described herein is only to this utility model spirit explanation for example.Described specific embodiment can be made various amendment or supplements or adopt similar mode to substitute by this utility model person of ordinary skill in the field, but without departing from spirit of the present utility model or surmount the scope that appended claims is defined.
Although more employing the terms such as support body 1, loading plate 2, plate body 1, plate body 2 22, locating piece 3, locating slot 4, regulating tank 5, adjusting bolt 6, adjusting nut 7 herein, but it is not precluded from using the probability of other term.These terms are used to be only used to describe and explain essence of the present utility model more easily;It is all contrary with this utility model spirit for being construed as any additional restriction.

Claims (4)

  1. null1. a scaffold for building,Including the pipe fitting support body (1) through snapping and loading plate (2),It is characterized in that,Described loading plate (2) includes plate body one (21) and plate body two (22),Described plate body one (21) and plate body two (22) are hinged,The both sides of described plate body one (21) and plate body two (22) bottom are all arranged at intervals with several locating pieces (3),Described locating piece (3) has locating slot (4),Described locating slot (4) is curved near the bottom of plate body one (21) and plate body two (22),Two medial walls of peristome are parallel,The two side of described locating piece (3) is respectively provided with an elongated regulating tank (5) run through,Described regulating tank (5) is equipped with adjusting bolt (6),Described adjusting bolt (6) is cased with adjusting nut (7).
  2. 2. one according to claim 1 scaffold for building, it is characterised in that described plate body one (21), plate body two (22) are all in lattice-shaped.
  3. 3. one according to claim 1 and 2 scaffold for building, it is characterised in that described plate body one (21), plate body two (22) and locating piece (3) are made by metal material.
  4. 4. one according to claim 1 and 2 scaffold for building, it is characterised in that described locating piece (3) is connected in plate body one (21) and the bottom of plate body two (22) by welding.
CN201620176918.6U 2016-03-08 2016-03-08 Construction scaffold Expired - Fee Related CN205400004U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620176918.6U CN205400004U (en) 2016-03-08 2016-03-08 Construction scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620176918.6U CN205400004U (en) 2016-03-08 2016-03-08 Construction scaffold

Publications (1)

Publication Number Publication Date
CN205400004U true CN205400004U (en) 2016-07-27

Family

ID=56442374

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620176918.6U Expired - Fee Related CN205400004U (en) 2016-03-08 2016-03-08 Construction scaffold

Country Status (1)

Country Link
CN (1) CN205400004U (en)

Similar Documents

Publication Publication Date Title
CN205400026U (en) Construction scaffolding's loading board
CN206585872U (en) A kind of isolator seat of installation easy to disassemble
CN205400004U (en) Construction scaffold
CN205088920U (en) Grey trowel for building novel
CN205476415U (en) Loading board for building
CN209293211U (en) Waterproof sealing device for expansion joint
CN204665022U (en) A kind of composite and multi-purpose lighting
CN205840099U (en) Metal batten Os Draconis ceiling structure
CN205399780U (en) Ceiling keel structure
CN207727814U (en) Modified open type aluminium plate curtain wall system
CN201581499U (en) Conveniently assembled and disassembled warehouse
CN102733499B (en) Heat-insulation support
CN204006342U (en) A kind of mounting structure of radiant panel
CN207296139U (en) The mounting structure of ceiling
CN209245476U (en) A kind of Circular tube fixer being provided with guide rail
CN208685924U (en) A kind of clean wallboard of food factory's dust proof workshop being easily installed
CN207597817U (en) Combined ornamental transition structure
CN203943595U (en) Shower house corner seat
CN204514414U (en) A kind of Special water meter case at home
CN206888435U (en) A kind of New stone material hanging board fastener
CN205777269U (en) A kind of mounting structure of dry hanging decoration board material
CN208792598U (en) A kind of rectangular second level girder construction
CN209302087U (en) A kind of fire hydrant casting easy to use
CN205804898U (en) A kind of outside corner of wall apparatus of plastering of band handle
CN207700461U (en) A kind of adjustable structure of energy saving based plate

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170802

Address after: 325600, No. three, No. 228, Yueqing Economic Development Zone, Zhejiang, Wenzhou

Patentee after: Wenzhou Jixiang plate Co Ltd

Address before: Jiaojiang District of Taizhou City, Zhejiang Province, the 318000 Street Bridge Village No. 13 tall

Patentee before: Li Weijie

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160727

Termination date: 20180308