CN205399943U - Building rubbish conveyor - Google Patents

Building rubbish conveyor Download PDF

Info

Publication number
CN205399943U
CN205399943U CN201620133483.7U CN201620133483U CN205399943U CN 205399943 U CN205399943 U CN 205399943U CN 201620133483 U CN201620133483 U CN 201620133483U CN 205399943 U CN205399943 U CN 205399943U
Authority
CN
China
Prior art keywords
conveying pipe
building
supply unit
pipe
conveyer device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620133483.7U
Other languages
Chinese (zh)
Inventor
龚锐生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huihao International
Original Assignee
Huihao International
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huihao International filed Critical Huihao International
Priority to CN201620133483.7U priority Critical patent/CN205399943U/en
Application granted granted Critical
Publication of CN205399943U publication Critical patent/CN205399943U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuse Collection And Transfer (AREA)

Abstract

The utility model discloses a building rubbish conveyor, include by last down in proper order the suit two at least conveying unit and connect conveying unit and fix the coupling mechanism on the building, each conveying unit emptys the conveyer pipe including what dumped rubbish in provide -lodging layer at least, emptys the frustum form that the conveyer pipe is big -end -up to the conveyer pipe is equipped with rubbish pouring opening. Implement the technical scheme of the utility model, in the rubbish pouring opening that conveying unit can be followed to the building rubbish that each floor of building produced poured this rubbish conveyor into, the building bottom had been carried through this building rubbish conveyor to rubbish, has simplified the mode that building rubbish was carried to the floor, as long as change the length that the quantity of empting conveyer pipe and/or the middle conveyer pipe suit degree of depth between or can change whole building rubbish conveyor to use the height and the floor structure of different buildings, have fine adaptability and practicality.

Description

Building waste conveyer device
Technical field
This utility model relates to technical field of building construction, especially relates to a kind of building waste conveyer device.
Background technology
At present, increasing building waste can be produced in tier building is constructed, a large amount of building wastes of its generation need to clear up and be transported to ground in time and then transport to save the construction space of building, and the mode of movement of common buildings construction rubbish has the modes such as elevator conveying.Elevator mode of movement is: first installation elevator, then the building waste of each layer is transported to ground by elevator, but the setup cost of elevator is higher, and this mode of movement needs workman by refuse bag or to frame up, then movement is to elevator, and the manpower of consuming is more.
Utility model content
The technical problems to be solved in the utility model is in that, for drawbacks described above of the prior art, it is provided that one saves manpower and construction cost and convenient building waste conveyer device.
This utility model solves its technical problem and be the technical scheme is that a kind of building waste conveyer device of structure, including at least two supply unit being set with successively from top to bottom and the bindiny mechanism being connected on building by supply unit;Each supply unit at least includes toppling over conveying pipe for what floor was dumped rubbish, topples over the frustum that conveying pipe is big up and small down, and carries pipe to be provided with rubbish pour spout.
Preferably, supply unit also includes being sleeved on toppling over to carry in the middle of at least one conveying below pipe manages, and centre is carried in the supply unit below managing big up and small down frustum and being sleeved on.
Preferably, topple over and conveying pipe and middle conveying pipe are all respectively equipped with conveying pipe jointing part;Bindiny mechanism includes the bar shaped connector vertically arranged, and conveying pipe jointing part is removably connected will topple on bar shaped connector carries pipe and middle conveying pipe to link together.
Preferably, bar shaped connector is continuous print from top to bottom, to connect as a whole by all supply units and to be connected with building;Or, bar shaped connector is segmentation, and every section of bar shaped connector connects each supply unit and building.
Preferably, each top toppling over conveying pipe and each middle conveying pipe is provided with flexible dustproof cover, flexible dustproof cover flexible fastening is toppled on conveying pipe or middle conveying pipe outer wall above it, to close at least part of gaps toppled between conveying pipe or middle conveying pipe of adjacent two suits.
Preferably, the upper inside wall face of middle conveying pipe is provided with soft fixture, carries pipe or middle conveying pipe with toppling over of fixing adjacent two suits.
Preferably, topple over conveying pipe and be provided with two ends and can turn the arc fixture being connected with inside pipe wall, with by conveying pipe in the middle of top or topple over conveying circumference of cannon bone and live to fix.
Preferably, building waste conveyer device also include being located on supply unit, to the depositing dust water pipe of supply unit water outlet.
Preferably, depositing dust water pipe is located in supply unit from top to bottom, and the sidewall of depositing dust water pipe offers apopore to spray water in supply unit;Or, dustfall water circumference of cannon bone is arranged around the mouth of pipe toppling over conveying pipe and/or middle conveying pipe, and the sidewall of depositing dust water pipe offers apopore to spray water in supply unit.
Preferably, this building waste conveyer device also includes the fixed mechanism for supply unit is fixed on building, to be fixed on building by supply unit.
Implement the technical solution of the utility model, at least there is following beneficial effect: in constructure construction procedure, can by this building connect conveyer device install outside the building or in, the building waste then produced at each floor of building can be poured into this waste conveyor from the rubbish pour spout of supply unit, rubbish has been transported to the building bottom by this building waste conveyer device, simplify the mode of floor conveying building waste, it is greatly saved manpower and time, relative to using elevator or loop wheel machine to transport rubbish, reduce construction cost;The simple in construction of this building waste conveyer device, reduce further construction cost, after construction completes, is dismountable whole device simply;As long as and change the quantity toppling over conveying pipe and/or middle conveying pipe or between the suit degree of depth can change the length of whole building waste conveyer device, to use height and the floor structure of difference building, there is well adapting to property and practicality.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is described in further detail, in accompanying drawing:
Schematic diagram is looked on the right side that Fig. 1 is the supply unit in the building waste conveyer device of this utility model one preferred embodiment.
Schematic diagram is looked on the right side that Fig. 2 is the building waste conveyer device of this utility model one preferred embodiment.
Schematic diagram is looked on the right side that Fig. 3 is the supply unit in the building waste conveyer device of another preferred embodiment of this utility model.
The building waste conveyer device that Fig. 4 is this utility model one preferred embodiment is connected to the schematic front view under building state.
Fig. 5 is the schematic perspective view (being provided with dust cover) toppling over conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Fig. 6 is the schematic perspective view (being provided with dust cover) of the middle conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Fig. 7 is the schematic diagram (being provided with dust cover) toppling over conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Fig. 8 is the schematic perspective view (arc fixture is under receiving state) toppling over conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Fig. 9 is the schematic perspective view (arc fixture is in the on-state) toppling over conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Figure 10 is the schematic top plan view (being provided with soft fixture) toppling over conveying pipe in the building waste conveyer device of this utility model one preferred embodiment.
Figure 11 is the schematic top plan view (being provided with soft fixture) toppling over conveying pipe in the building waste conveyer device of another preferred embodiment of this utility model.
Wherein, 1. supply unit, 11. topple over conveying pipe, and 11a. connects pour spout, conveying pipe in the middle of 12., 13. conveying pipe jointing parts, 14. soft fixtures, 15. arc fixtures, 16. dust covers, 17. flanges, 2. bar shaped connector, 3. building.
Detailed description of the invention
In order to technical characteristic of the present utility model, purpose and effect are more clearly understood from, now comparison accompanying drawing describes detailed description of the invention of the present utility model in detail.In the description of building waste conveyer device of the present utility model, it will be appreciated that, "front", "rear", " on ", D score, the term such as "left", "right" be for only for ease of description the technical solution of the utility model, rather than the instruction device of indication or element must have specific orientation, therefore it is not intended that to restriction of the present utility model.
As shown in figs 1-9, the building waste conveyer device in one preferred implementation of this utility model, including at least two supply unit 1 being set with successively from top to bottom and the bindiny mechanism being connected and fixed on building by supply unit 1.Each supply unit 1 at least includes toppling over conveying pipe 11 for what floor was dumped rubbish, topples over the frustum that conveying pipe 11 is big up and small down, and carries pipe to be provided with rubbish pour spout 11a.
This building waste conveyer device entirety is in a tubular form, can set up outside the building or in, and the building bottom can be extended to from arbitrary height of building, it is preferably disposed at outside building, each supply unit 1 can corresponding first floor, then topple over conveying pipe 11 in every floor correspondence at least provided with one, each floor building waste is directly poured into this building waste conveyer device by toppling over the rubbish pour spout 11a of conveying pipe 11 during use, then rubbish has been transported to the building bottom by this building waste conveyer device, it is greatly saved manpower, reduce construction cost.Understandably, this building waste conveyer device both can be vertically arranged, it is possible to is obliquely installed, as long as supply unit 1 can maintain the structure of mutual sheathing and bear the external force that conveying garbage brings.
Specifically, the side tube wall toppling over conveying pipe 11 can tilt to side so that upper orifice extends to side and forms rubbish pour spout 11a, and the tube wall of this inclination is formed topples over ramp.When past rubbish pour spout 11a pours rubbish into, rubbish can slip in building waste conveyer device along toppling over ramp.
Further, supply unit 1 may also include and is sleeved in the supply unit 1 below toppling over the frustum carrying pipe 12, centre to carry pipe 12 big up and small down in the middle of at least one conveying below pipe 11 and being sleeved on.In the middle of this at least one conveying pipe 12 include one be sleeved on topple over below conveying pipe 11 in the middle of conveying pipe 12 or at least two be sleeved on successively from top to bottom topple over below conveying pipe 11 in the middle of conveying pipe 12, the frustum that middle conveying pipe 12 is big up and small down.The conveying pipe 11 of toppling over of big up and small down frustum carries pipe 12 can realize the above-mentioned structure being set with successively from top to bottom with middle, and topple over the degree of depth of suit between conveying pipe 11 and/or middle conveying pipe 12 for adjacent two can freely change, thus the length of each supply unit 1 constituted can freely change, then the length of whole building waste conveyer device also can freely change, to adapt to height and the floor structure of different building;And each supply unit 1 is the upper orifice tubulose more than lower nozzle, thus the suit realized between above-mentioned supply unit 1.In other words, being namely adjacent two and topple between conveying pipe 11 and/or middle conveying pipe 12, the lower nozzle of of top stretches in the upper orifice of of lower section, and the degree of depth stretched into is freely variable, thus the variable-length of supply unit 1;In adjacent two supply units 1, the lower nozzle of the supply unit 1 of top stretches into the upper orifice toppling over conveying member 11 of the supply unit 1 of lower section, and the degree of depth stretched into is freely variable, thus the variable-length of whole building waste conveyer device.Toppling over of frustum carries pipe 11 and middle conveying pipe 12 shape to also help and receive this building waste conveyer device when not in use, maximum between conveying pipe 11 and/or middle conveying pipe 12 it is set with stretching into the degree of depth as long as upper and lower two are toppled over, building waste conveyer device can be made to present shortest length, save parking space.
Additionally, by changing the quantity toppling over conveying pipe 11 or middle conveying pipe 12, it is possible to change the length of this building waste conveyer device.
Further, topple over and conveying pipe 11 and middle conveying pipe 12 are all respectively equipped with conveying pipe jointing part 13;Above-mentioned bindiny mechanism includes the bar shaped connector 2 vertically arranged, conveying pipe jointing part 13 is removably connected will topple on bar shaped connector 2 carries pipe 11 to link together with centre conveying pipe 12, and at least one to be toppled over, conveying pipe 11 and at least one are middle carries pipe 12 connect into a supply unit 1 and at least two supply unit 1 is connected to building.Preferably, conveying pipe jointing part 13 is in annular to be opened/closed, as being similar to the annular with elastic opening and closing mouth climbing up button, and be located at the external wall of upper portion toppling over conveying pipe 11 or middle conveying pipe 12, conveying pipe jointing part 13 after being buckled on bar shaped connector 2 just by elastic closure opening to play the effect of anticreep;Conveying pipe jointing part 13 can be arranged around the outer wall axial symmetry toppling over conveying pipe 11 or middle conveying pipe 12, for instance is symmetrical arranged at the both sides outer wall toppling over conveying pipe 11 or middle conveying pipe 12;Bar shaped connector 2 can be chain or the bonding jumper being provided with a series of perforate along its length, and conveying pipe jointing part 13 is removably connected in the hole of chain or bonding jumper.Bar shaped connector 2 is in the axial symmetry distribution corresponding with conveying pipe jointing part 13, and namely it can be at least symmetrical two, it is possible to is more than two, to strengthen the stability of building waste conveyer device inner connecting structure, not easily distorts because the external factor such as such as blowing.
Further, the form of bar shaped connector 2 can be as follows, as shown in Figure 7, bar shaped connector 2 is continuous print from top to bottom, so that all supply units 1 are connected as a whole, and be connected with described building, namely it is at least one topples over conveying pipe 11 connect into a supply unit 1 with at least one middle conveying pipe 12, all supply units 1 are connected as a whole, and be connected with building at supply unit 1 place of the top, thus connecting on building above whole building waste conveyer device, specifically whole building waste conveyer device is hung on building.
The form of bar shaped connector 2 also can be as follows, as shown in Figure 8, bar shaped connector 2 is segmentation, at least one is toppled over conveying pipe 11 and connects into a supply unit 1 with at least one middle conveying pipe 12 and connect each supply unit 1 and building by every section of bar shaped connector 2, so each supply unit 1 is individually connected with building, and between adjacent two supply units 1, suit is thus forming whole building waste conveyer device.
Preferably, each top toppling over conveying pipe 11 and each middle conveying pipe 12 is provided with flexible dustproof cover 16, flexible dustproof cover 16 flexible fastening is toppled on conveying pipe 11 or middle conveying pipe 12 outer wall above it, to close at least part of gaps toppled between conveying pipe 11 or middle conveying pipe 12 of adjacent two suits.The concrete structure of flexible dustproof cover 16 can be as follows, flexible dustproof cover 16 includes along toppling over the flexiplast layer of at least part of edge setting carrying pipe 11 or middle conveying pipe 12 upper orifice and being located at the ring elastic parts at flexiplast layer edge, so that flexiplast layer wales toppling over of top to mouth of pipe central reduction carries pipe 11 or middle conveying pipe 12.When dumping rubbish, flexible dustproof cover 16 plays and hinders rubbish to fly upward spilling from the gap toppled between conveying pipe 11 and/or middle conveying pipe 12.
Further, the upper inside wall face of middle conveying pipe 12 is provided with soft fixture 14, carries pipe 11 or middle conveying pipe 12 with toppling over of fixing adjacent two suits.The material of soft fixture 14 can be that rubber etc. has elastic material.Soft fixture 14 can ringwise around toppling over conveying pipe 11 and/or middle conveying pipe 12 inwall is arranged, it is also possible in blockly around toppling over conveying pipe 11 and/or middle conveying pipe 12 inwall axial symmetry distribution, and the quantity of axial symmetry distribution is preferably at least 3.Topple in conveying pipe 11 and/or middle conveying pipe 12 at adjacent two, one set of top loads in one of lower section, the outer wall of of top can contact with the soft fixture 14 of the one of lower section, or, the outer wall of of top also can not contact with the soft fixture 14 of the one of lower section, retain certain distance.When colliding the factors such as building waste conveyer device inwall because wind or rubbish and make to topple over generation relative motion between conveying pipe 11 and/or middle conveying pipe 12, soft fixture 14 available buffer topples over the collision between conveying pipe 11 and/or middle conveying pipe 12, strengthens and topples over the stability connected between conveying pipe 11 and/or middle conveying pipe 12;Also can coordinate with above-mentioned dust cover 16 simultaneously and hinder rubbish to fly upward spilling from the gap toppled between conveying pipe 11 or middle conveying pipe 12.
Further, topple over conveying pipe 11 to be provided with two ends and can turn the arc fixture 15 that is connected with inside pipe wall by conveying pipe 12 in the middle of top or topple over and carry pipe 11 to surround fixing, being namely surround fixing by the part stretched in its upper orifice.Arc fixture 15 is curved and can rotate around two ends junction point, it is located in upper orifice, thus arc fixture 15 can include receiving state and open mode, when arc fixture 15 forwards the side, opposite of rubbish pour spout 11a to, for receiving state, arc fixture 15 and inside pipe wall are close to, the mouth of pipe space toppling over conveying pipe 11 will not be formed and intercept, toppling over above now is carried pipe 11 or middle conveying pipe 12 can be set with largely from this upper orifice that topple over conveying pipe 11 and is stretched into wherein, can form and receive the state stacked;When arc fixture 15 forwards the side of rubbish pour spout 11a to, for open mode, the facing interior wall of arc fixture 15 and rubbish pour spout 11a surrounds a ring of encirclement, this ring of encirclement is waled toppling over of top and is carried pipe 11 or the middle outer wall carrying pipe 12, thus hindering toppling over of top to carry pipe 11 or middle conveying pipe 12 to extend further into, and play fixing top and topple over conveying pipe 11 or the effect of middle conveying pipe 12, but rubbish will not be hindered to pour into from rubbish pour spout 11a, wherein, top is toppled over the maximum degree of depth that stretches into of conveying pipe 11 or middle conveying pipe 12 and is determined by the size of this ring of encirclement, change the size of the ring of encirclement to change this and maximum stretch into the degree of depth.
Further, building waste conveyer device also include being located on supply unit 1, to the depositing dust water pipe (not shown) of supply unit 1 water outlet.
Preferably, depositing dust water pipe is located in supply unit 1 from top to bottom, and the sidewall of depositing dust water pipe offers apopore to spray water in supply unit 1, wherein, depositing dust water pipe can be through whole building waste conveyer device, it is also possible to is segmentation, one supply unit 1 of every section of correspondence;Or, dustfall water circumference of cannon bone is arranged around the mouth of pipe toppling over conveying pipe 11 and/or middle conveying pipe 12, and the sidewall of depositing dust water pipe offers apopore to spray water in supply unit 1.What produce when suppressing conveying garbage by the mode of this water spray stirs up a cloud of dust, and reaches the effect of depositing dust.Water spray is preferably the mode of radial sprinkling, to expand water spray sphere of action, improves dust-laying effect.
Preferably, this building waste conveyer device also includes the fixed mechanism for supply unit 1 is fixed on building.Preferably, building does not have the corresponding supply unit 1 of floor, fixed mechanism will be toppled over conveying pipe 11 and will be fixed on building, be sleeved on the middle conveying pipe 12 toppled over below conveying pipe 11 and is connected with toppling over conveying pipe 11 by above-mentioned bar shaped connector 2, thus whole supply unit 1 is connected on floor.Specifically, the form of fixed mechanism can be various, it may include but it is not limited to following form.As shown in Figure 4, fixed mechanism includes being located at the flange 17 toppling over conveying pipe 11 upper orifice, toppling over conveying pipe 11 can rely on flange 17 to hang in the recess of building 3, and can pass through fixture (not shown) further by fixing between flange 17 and building;Additionally, fixed mechanism may also comprise annular fixing member (not shown), this annular fixing member is waled and is toppled over conveying pipe 11 and be fixed on building, is fixed on building thus conveying pipe 11 will be toppled over.Fixed mechanism can coordinate fixing supply unit 1 with above-mentioned bar shaped connector 2, thus improving building to connect stable shape and the firmness of conveyer device.
In sum, in constructure construction procedure, can by this building connect conveyer device install outside the building or in, the building waste then produced at each floor of building can be poured into this waste conveyor from the rubbish pour spout 11a of supply unit 1, rubbish has been transported to the building bottom by this building waste conveyer device, simplifies the mode of floor conveying building waste, is greatly saved manpower and time, relative to using elevator or loop wheel machine to transport rubbish, reduce construction cost;The simple in construction of this building waste conveyer device, reduce further construction cost, after construction completes, is dismountable whole device simply;As long as and change the quantity toppling over conveying pipe 11 and/or middle conveying pipe 12 or between the suit degree of depth can change the length of whole building waste conveyer device, to use height and the floor structure of difference building, there is well adapting to property and practicality.
The foregoing is only preferred embodiment of the present utility model, be not limited to this utility model, for a person skilled in the art, this utility model can have various change, combination and change.All within spirit of the present utility model and principle, any amendment of making, equivalent replacement, improvement etc., should be included within right of the present utility model.

Claims (10)

1. a building waste conveyer device, it is characterised in that include at least two supply unit (1) being set with successively from top to bottom and the bindiny mechanism being connected on building by described supply unit (1);
Each described supply unit (1) at least includes toppling over conveying pipe (11) for what floor was dumped rubbish, described topple over conveying pipe (11) big up and small down frustum, and described conveying pipe is provided with rubbish pour spout (11a).
2. building waste conveyer device according to claim 1, it is characterized in that, described supply unit (1) also include being sleeved on described in topple over conveying pipe (11) lower section at least one in the middle of conveying pipe (12), frustum that in the middle of described, conveying pipe (12) is big up and small down and in being sleeved on the described supply unit (1) of lower section.
3. building waste conveyer device according to claim 2, it is characterised in that described in topple over conveying pipe (11) and described in the middle of conveying pipe (12) on all be respectively equipped with carry pipe jointing part (13);Described bindiny mechanism includes the bar shaped connector (2) vertically arranged, described conveying pipe jointing part (13) be removably connected on described bar shaped connector (2) with by described topple over conveying pipe (11) and described in the middle of conveying manage (12) link together.
4. building waste conveyer device according to claim 3, it is characterised in that described bar shaped connector (2) is continuous print from top to bottom, to connect as a whole by all supply units (1) and to be connected with described building;
Or, described bar shaped connector (2) is segmentation, and every section of described bar shaped connector (2) connects each described supply unit (1) and described building.
5. building waste conveyer device according to claim 2, it is characterized in that, the top toppling over conveying pipe (11) and each described middle conveying pipe (12) described in each is provided with flexible dustproof cover (16), the flexible fastening of described flexible dustproof cover (16) topple over conveying pipe (11) described in above it or be described in the middle of on conveying pipe (12) outer wall, with close topple over conveying pipe (11) or be described described in adjacent two suits in the middle of at least part of gap between conveying pipe (12).
6. building waste conveyer device according to claim 2, it is characterized in that, in the middle of described, conveying pipe (12) upper inside wall face is provided with soft fixture (14), with conveying pipe (12) in the middle of toppling over conveying pipe (11) or be described described in fixing adjacent two suits.
7. building waste conveyer device according to claim 2, it is characterized in that, described topple over conveying pipe (11) and be provided with two ends and can turn the arc fixture (15) being connected with inside pipe wall, with by top described in the middle of conveying pipe (12) or described in topple over conveying and manage (11) and surround fixing.
8. building waste conveyer device according to claim 2, it is characterised in that building waste conveyer device also includes being located at depositing dust water pipe on described supply unit (1), to described supply unit (1) water outlet.
9. building waste conveyer device according to claim 8, it is characterized in that, described depositing dust water pipe is located in described supply unit (1) from top to bottom, and the sidewall of described depositing dust water pipe offers apopore with water spray in described supply unit (1);
Or, described dustfall water circumference of cannon bone is arranged around the described mouth of pipe toppling over conveying pipe (11) and/or described middle conveying pipe (12), and the sidewall of described depositing dust water pipe offers apopore to spray water in described supply unit (1).
10. building waste conveyer device according to claim 1, it is characterised in that also include the fixed mechanism for described supply unit (1) being fixed on described building, to be fixed on described building by described supply unit (1).
CN201620133483.7U 2016-02-22 2016-02-22 Building rubbish conveyor Expired - Fee Related CN205399943U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620133483.7U CN205399943U (en) 2016-02-22 2016-02-22 Building rubbish conveyor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620133483.7U CN205399943U (en) 2016-02-22 2016-02-22 Building rubbish conveyor

Publications (1)

Publication Number Publication Date
CN205399943U true CN205399943U (en) 2016-07-27

Family

ID=56446319

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620133483.7U Expired - Fee Related CN205399943U (en) 2016-02-22 2016-02-22 Building rubbish conveyor

Country Status (1)

Country Link
CN (1) CN205399943U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750500A (en) * 2018-06-07 2018-11-06 中建局集团建设发展有限公司 High-rise building waste vertical transit system and its construction method
CN109518913A (en) * 2018-12-29 2019-03-26 佛山市南海保达建筑机械设备有限公司 A kind of truncated cone-shaped floor garbage shaft
CN112340419A (en) * 2020-10-29 2021-02-09 广船国际有限公司 Garbage conveying device for ship
CN114313684A (en) * 2022-01-18 2022-04-12 中建一局集团华南建设有限公司 High-rise building garbage rapid treatment system and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108750500A (en) * 2018-06-07 2018-11-06 中建局集团建设发展有限公司 High-rise building waste vertical transit system and its construction method
CN109518913A (en) * 2018-12-29 2019-03-26 佛山市南海保达建筑机械设备有限公司 A kind of truncated cone-shaped floor garbage shaft
CN112340419A (en) * 2020-10-29 2021-02-09 广船国际有限公司 Garbage conveying device for ship
CN114313684A (en) * 2022-01-18 2022-04-12 中建一局集团华南建设有限公司 High-rise building garbage rapid treatment system and construction method thereof

Similar Documents

Publication Publication Date Title
CN205399943U (en) Building rubbish conveyor
CA1206896A (en) Container with a catenary-formed contour
CN208105765U (en) A kind of buffer-type construction garbage shaft
CN205525093U (en) Easy open can equipment for packing
CN206901088U (en) A kind of municipal gardens dustbin
CN206636230U (en) Building with waste material conveyance conduit builds frame
CN202186645U (en) Discharge funnel of silo and silo
CN205993337U (en) Lack the crib that material is reported to the police
CN206550125U (en) Provided with the kitchen garbage treater from feed system
CN209599569U (en) A kind of environment-friendly type sandstone conveying device
CN104555195B (en) A kind of plastics work out dust basket
CN207568194U (en) Double layer concrete integral type cloth aggregate bin
CN206927113U (en) Dustbin
CN209291202U (en) A kind of waste classification recovery device
CN205470822U (en) High -speed packagine machine
CN201045099Y (en) Portable poly bag stand
CN208345009U (en) Buffer bin
CN204507870U (en) A kind of plastics establishment car wastebasket
CN108770766A (en) Aquaculture turnover box and turnover box group
JP2011162315A (en) Powder carrying device
CN206265674U (en) A kind of dustbin of convenient environmental protection
CN203200674U (en) Telescopic tumbler traffic cone
CN208462722U (en) Aquaculture turnover box and turnover box group
CN202170108U (en) Material discharging tunnel of silo and silo thereof
CN206502248U (en) Ground embedded type garbage can

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee