CN205399110U - Novel highway deck bridge - Google Patents
Novel highway deck bridge Download PDFInfo
- Publication number
- CN205399110U CN205399110U CN201620130290.6U CN201620130290U CN205399110U CN 205399110 U CN205399110 U CN 205399110U CN 201620130290 U CN201620130290 U CN 201620130290U CN 205399110 U CN205399110 U CN 205399110U
- Authority
- CN
- China
- Prior art keywords
- overbridge
- bridge
- highway
- access bridge
- lou
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 claims abstract description 33
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 30
- 239000010959 steel Substances 0.000 claims abstract description 30
- 239000000463 material Substances 0.000 claims description 12
- 230000002787 reinforcement Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 abstract description 2
- 239000011435 rock Substances 0.000 description 5
- 230000035939 shock Effects 0.000 description 5
- 238000005253 cladding Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 4
- 239000004575 stone Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a novel highway deck bridge, deck bridge erect on highway, and it includes: cross -line bridge body, the connection of spaning on highway are in the deck bridge access bridge at cross -line bridge body both ends, cross -line bridge body's lower extreme is the arch, cross -line bridge body's both sides are equipped with two que lou respectively, four que lou set up respectively highway cross -line bridge body and the contained angle department that the deck bridge access bridge formed, one side of que lou all is equipped with deck bridge access bridge wall, deck bridge access bridge wall is followed deck bridge access bridge direction is extended, the construction of deck bridge access bridge wall is in the both sides of deck bridge access bridge, the cross -line bridge body include: as inner support structure's steel construction main part with the outside concrete structure of steel construction main part, the concrete structure is passed through dry hanging process and is set up the steel construction main part is outside. The utility model discloses a deck bridge shortens the time of site operation, has improved the efficiency of construction.
Description
Technical field
This utility model relates to highway structure field, is specifically related to a kind of Box Beam Bridge, especially a kind of can the Box Beam Bridge of rapid construction.
Background technology
Box Beam Bridge is a kind of common highway road and bridge type, being typically in bottom overbridge is highway, can also be open to traffic above overbridge, when building Box Beam Bridge, traditional way is to be closed by the highway being open to traffic, then portion sets up overbridge on a highway, traditional construction technology is the base component first building both sides with basic material, then overbridge is set up again, is constructed in the outside of overbridge again, this efficiency of construction is relatively low, it is necessary to highway is closed for a long time, has a strong impact on the convenience of traffic.
Summary of the invention
The purpose of this utility model is in that the problem above overcoming prior art to exist, a kind of express highway overbridge is provided, overbridge of the present utility model is internal adopts steel construction, the outside mode adopting stone cladding, rock material is processed in processing factory, shortens the time of site operation, improve efficiency of construction, and the steadiness of steel construction is good, there is good shock resistance so that overbridge is more suitable for shaking area more.
For realizing above-mentioned technical purpose, reaching above-mentioned technique effect, this utility model is achieved through the following technical solutions:
nullA kind of express highway overbridge,Overbridge sets up on a highway,Comprising: across the overbridge body on highway、It is connected to the overbridge access bridge at described overbridge body two ends,The lower end of described overbridge body is arch,Described overbridge body be respectively provided on two sides with Liang Geque building,Four described Que Lou are separately positioned on highway、The angle that described overbridge body and described overbridge access bridge are formed,The side of described Que Lou is equipped with overbridge access bridge wall,Described overbridge access bridge wall extends along described overbridge access bridge direction,Described overbridge access bridge wall is built in the both sides of described overbridge access bridge,Described overbridge body includes: as the concrete structure of the steel construction main body of inner supporting structure and described steel construction body exterior,Described concrete structure is arranged on described steel construction body exterior by dry-hanging.
In a preferred embodiment of the present utility model, farther include, described Que Lou is made up of support section and contoured section, and below ground is submerged as ground in the bottom of described support section, described support section at the cross-sectional area of below ground more than its cross-sectional area more than ground;Described contoured section is the external structure of described Que Lou.
In a preferred embodiment of the present utility model, farther including, the side of described support section is equipped with gutter, and the chase in described gutter is lower than the horizontal plane on ground.
In a preferred embodiment of the present utility model, farther including, the middle part of described support section is provided with cobble drainage layer, and described cobble drainage layer is used for drainage.
In a preferred embodiment of the present utility model, farther including, the skeleton of described support section is framework of steel reinforcement, and the outside of described framework of steel reinforcement is concrete material.
The beneficial effects of the utility model are:
Overbridge of the present utility model specifically includes that across the overbridge body on highway, it is connected to the overbridge access bridge at described overbridge body two ends, the lower end of described overbridge is arch, described overbridge body be respectively provided on two sides with Liang Geque building, four described Que Lou are separately positioned on highway, the angle that described overbridge body and described overbridge access bridge are formed, the side of described Que Lou is equipped with overbridge access bridge wall, described overbridge access bridge wall extends along described overbridge access bridge direction, described overbridge access bridge wall is built in the both sides of described overbridge access bridge, described overbridge body includes: as the concrete structure of the steel construction main body of inner supporting structure and described steel construction body exterior, described concrete structure is arranged on described steel construction body exterior by dry-hanging.
The internal steel construction that adopts of overbridge of the present utility model, the outside mode adopting stone cladding, rock material is processed in processing factory, shorten the time of site operation, improve efficiency of construction, and the steadiness of steel construction is good, there is good shock resistance so that overbridge is more suitable for shaking area more.
Described above is only the general introduction of technical solutions of the utility model, in order to better understand technological means of the present utility model, and can be practiced according to the content of description, below with preferred embodiment of the present utility model and coordinate accompanying drawing describe in detail as after.Detailed description of the invention of the present utility model is shown in detail in by following example and accompanying drawing thereof.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme in this utility model embodiment technology, the accompanying drawing used required in the description of embodiment technology will be briefly described below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the premise not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the top view of overbridge of the present utility model;
Fig. 2 is the schematic diagram of this utility model overbridge structure;
Fig. 3 is the structural representation of this utility model support section;
Wherein, 1-expressway, 10-overbridge body, 20-overbridge access bridge, 30-Que Lou, 40-overbridge access bridge wall, 301-support section, 302-contoured section, 303-gutter, 304-cobble drainage layer, 305-framework of steel reinforcement, 306-concrete material.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
With reference to shown in Fig. 1-3, a kind of Box Beam Bridge disclosed in the present embodiment, this overbridge sets up on a highway, comprising: across the overbridge body 10 on highway 1, the overbridge access bridge 20 being connected to above-mentioned overbridge body 10 two ends, the lower end of above-mentioned overbridge body 10 is arch.
It is respectively provided on two sides with Liang Geque building 30 at above-mentioned overbridge body 10, four above-mentioned fault buildings 30 are separately positioned on the angle that highway 1, above-mentioned overbridge body 10 and above-mentioned overbridge access bridge 20 are formed, the side in above-mentioned fault building 30 is equipped with overbridge access bridge wall 40, above-mentioned overbridge access bridge wall 40 extends along above-mentioned overbridge access bridge 20 direction, above-mentioned overbridge access bridge wall 40 is built in the both sides of above-mentioned overbridge access bridge 20, and above-mentioned overbridge access bridge 20 is had safeguard function by above-mentioned overbridge access bridge wall 40.
Above-mentioned overbridge body 10 includes: as the concrete structure of the steel construction main body of inner supporting structure and above-mentioned steel construction body exterior, above-mentioned concrete structure is arranged on above-mentioned steel construction body exterior by dry-hanging.The internal steel construction that adopts of overbridge, the outside mode adopting stone cladding, rock material is processed in processing factory, shorten the time of site operation, improve efficiency of construction, and the steadiness of steel construction is good, there is good shock resistance so that overbridge is more suitable for shaking area more.
In order to improve efficiency of construction and shock resistance, in the present embodiment, above-mentioned fault building 30 is also adopted by dry-hanging, and above-mentioned fault building 30 is made up of support section 301 and contoured section 302, above-mentioned support section 301 is the skeleton in this fault building 30, and above-mentioned contoured section 302 designs along with the shape-designing in fault building 30.
Below ground is submerged as ground in the bottom of above-mentioned support section 301, above-mentioned support section 301 at the cross-sectional area of below ground more than its cross-sectional area more than ground;Above-mentioned contoured section 302 is the external structure of above-mentioned Que Lou.
In order to ensure the smoothness of draining, being equipped with gutter 303 in the side of above-mentioned support section 301, the chase in above-mentioned gutter 303 is lower than the horizontal plane on ground.Meanwhile, being provided with cobble drainage layer 304 at the middle part of above-mentioned support section 301, above-mentioned cobble drainage layer 304 is for drainage.
In the present embodiment, the skeleton of above-mentioned support section 301 is framework of steel reinforcement 305, and the outside of above-mentioned framework of steel reinforcement 305 is concrete material 306.Above-mentioned concrete material can also is that other rock material, determines according to specific design.
The internal steel construction that adopts of overbridge, the outside mode adopting stone (concrete material) cladding, rock material is processed in processing factory, shorten the time of site operation, improve efficiency of construction, and the steadiness of steel construction is good, there is good shock resistance so that overbridge is more suitable for shaking area more.
Described above to the disclosed embodiments, makes professional and technical personnel in the field be capable of or uses this utility model.The multiple amendment of these embodiments be will be apparent from for those skilled in the art, and generic principles defined herein when without departing from spirit or scope of the present utility model, can realize in other embodiments.Therefore, this utility model is not intended to be limited to the embodiments shown herein, and is to fit to the widest scope consistent with principles disclosed herein and features of novelty.
Claims (5)
- null1. an express highway overbridge,Overbridge sets up on a highway,Comprising: across the overbridge body on highway、It is connected to the overbridge access bridge at described overbridge body two ends,The lower end of described overbridge body is arch,It is characterized in that,Described overbridge body be respectively provided on two sides with Liang Geque building,Four described Que Lou are separately positioned on highway、The angle that described overbridge body and described overbridge access bridge are formed,The side of described Que Lou is equipped with overbridge access bridge wall,Described overbridge access bridge wall extends along described overbridge access bridge direction,Described overbridge access bridge wall is built in the both sides of described overbridge access bridge,Described overbridge body includes: as the concrete structure of the steel construction main body of inner supporting structure and described steel construction body exterior,Described concrete structure is arranged on described steel construction body exterior by dry-hanging.
- 2. a kind of express highway overbridge according to claim 1, it is characterized in that, described Que Lou is made up of support section and contoured section, below ground is submerged as ground in the bottom of described support section, described support section at the cross-sectional area of below ground more than its cross-sectional area more than ground;Described contoured section is the external structure of described Que Lou.
- 3. a kind of express highway overbridge according to claim 2, it is characterised in that the side of described support section is equipped with gutter, and the chase in described gutter is lower than the horizontal plane on ground.
- 4. a kind of express highway overbridge according to claim 2, it is characterised in that the middle part of described support section is provided with cobble drainage layer, and described cobble drainage layer is used for drainage.
- 5. a kind of express highway overbridge according to claim 2-4 any one, it is characterised in that the skeleton of described support section is framework of steel reinforcement, and the outside of described framework of steel reinforcement is concrete material.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620130290.6U CN205399110U (en) | 2016-02-22 | 2016-02-22 | Novel highway deck bridge |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620130290.6U CN205399110U (en) | 2016-02-22 | 2016-02-22 | Novel highway deck bridge |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205399110U true CN205399110U (en) | 2016-07-27 |
Family
ID=56449026
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620130290.6U Expired - Fee Related CN205399110U (en) | 2016-02-22 | 2016-02-22 | Novel highway deck bridge |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205399110U (en) |
-
2016
- 2016-02-22 CN CN201620130290.6U patent/CN205399110U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205224363U (en) | Connection structure of floor and girder steel | |
CN205399110U (en) | Novel highway deck bridge | |
CN104060780A (en) | Large-cantilever steel structure wall face canopy and construction method thereof | |
CN206110494U (en) | Reinforced concrete joist structure | |
CN208396061U (en) | Structure draws seam plate | |
CN105971117A (en) | Pseudo-classic architecture steel-frame structure with box type cross-section girders | |
CN103397719B (en) | Post, wall disjunctor cavity shear wall | |
CN205444490U (en) | Back tiling formula steel -pipe column dislocation docking mechanism | |
CN205804724U (en) | A kind of embedded glass curtain wall structure system | |
CN204212304U (en) | A kind of fan-shaped imitative shell roofing | |
CN208415538U (en) | A kind of trapping structure for building expansion joint waterproof | |
CN203924476U (en) | The complete shock-proof wall plate of the prefabricated tenon joint type of integrated building | |
CN206916952U (en) | A kind of vertical free shearing resistance bearing | |
CN206655105U (en) | A kind of beam-arch structure and beam-arch composition bridge | |
CN204626964U (en) | Concreting leak-proof device | |
CN205530847U (en) | Whole outer wall that waters is connected in assembled auto -lock | |
CN207092376U (en) | Prefabricated composite wallboard | |
CN204645094U (en) | Waterproof structure for deformation seams | |
CN207469746U (en) | A kind of post template cross-pulling system | |
CN204059956U (en) | Steel wood composite keel | |
CN204081490U (en) | Mould built by a kind of sunk type flooring | |
CN208396060U (en) | Structure draws seam plate water fender | |
CN207376914U (en) | A kind of assembly concrete mesh-beam floor system | |
CN204781522U (en) | Hollow superstructure | |
CN207878758U (en) | A kind of building system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160727 |
|
CF01 | Termination of patent right due to non-payment of annual fee |