CN205369789U - Novel hang marble futilely device - Google Patents

Novel hang marble futilely device Download PDF

Info

Publication number
CN205369789U
CN205369789U CN201620125322.3U CN201620125322U CN205369789U CN 205369789 U CN205369789 U CN 205369789U CN 201620125322 U CN201620125322 U CN 201620125322U CN 205369789 U CN205369789 U CN 205369789U
Authority
CN
China
Prior art keywords
bolt
type part
stone material
glue
angle steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620125322.3U
Other languages
Chinese (zh)
Inventor
张嘉强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620125322.3U priority Critical patent/CN205369789U/en
Application granted granted Critical
Publication of CN205369789U publication Critical patent/CN205369789U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Finishing Walls (AREA)

Abstract

The utility model discloses a novel hang marble futilely device, cut formula crab -bolt, antidetonation blotter after, including zinc -plated angle steel, positioning bolt, E type spare, concrete structure, anticorrosive gasket, S type spare, anchor bolt, linking bolt and cut that formula crab -bolt, stone cladding process are glued, the stone material is caulked and is glued and marble slab after, the zinc -plating angle steel is connected with positioning bolt, and angle steel and positioning bolt all with the concrete structural connection, the zinc -plating angle steel is connected with E type spare, the antidetonation blotter is installed on E type spare right side, just after being provided with, antidetonation blotter right side cuts the formula crab -bolt, after cut formula crab -bolt and stone cladding process and glue and is connected, and the flexible buffer cover is located the right side of stone cladding process glue, flexible buffer cover is caulked to glue with the stone material and is connected, and flexible buffer overlaps and caulks glue through the stone material and be connected with marble slab. This novel hang marble futilely device has improved the security and the durability of building, is favorable to keeping the curtain clean pleasing to the eye, prevents to age, can also play thermal -insulated heat preservation effect.

Description

A kind of novel cladding marble device
Technical field
This utility model relates to a kind of decorating outer wall of building field, is specially a kind of novel cladding marble device.
Background technology
Requirement outer surface of building decorated along with people is more and more higher, promotes cladding marble technology to come into vogue, but owing to the cladding marble technology of present stage is constructed complicated, therefore raw material and construction cost are high;Secondly because be suspended on exterior wall, by self gravitation effect, it is easy to come off, there is certain danger;Finally, due to structure stone material and panel are and are jointly fixed on suspension member, under geological process, stone material and skeleton connect into entirety, are unfavorable for displacement deformation, Gu shock resistance is poor.So having to from many-sided device considering to solve problems such as technology and design.
Summary of the invention
The purpose of this utility model is in that to provide a kind of novel cladding marble device, with the problem solving to propose in above-mentioned background technology.
nullFor achieving the above object,This utility model provides following technical scheme: the utility model discloses a kind of novel cladding marble device,Including Zinc-coated angle steel、Bolt、E type part、Concrete structure、Anticorrosion pad、S type part、Anchor bolt、Linking bolt、Post-cut crab-bolt、Antidetonation cushion pad、Post-cut anchor pole、Stone material dry suspending glue、Stone material gap-filling glue and marble slab,Described Zinc-coated angle steel is connected with bolt,And angle steel and bolt are all connected with concrete structure,Described Zinc-coated angle steel is connected with E type part,On the right side of described E type part, antidetonation cushion pad is installed,And it is provided with post-cut anchor pole on the right side of described antidetonation cushion pad,Described post-cut anchor pole is connected with stone material dry suspending glue,And flexible buffer set is positioned at the right side of stone material dry suspending glue,Described flexible buffer set is connected with stone material gap-filling glue,And flexible buffer set is connected with marble slab by stone material gap-filling glue.
Preferably, described E type part is provided with cup square neck bolt.
Preferably, described E type part and S type part are symmetrical above and below about neutral axis.
Preferably, it is provided with, on the left of described anchor bolt, anchor adhesive of saving the situation.
Preferably, described flexible buffer set right side is provided with back of the body bolt.
Compared with prior art, the beneficial effects of the utility model are: this novel cladding marble device is anti-extrusion, can be effectively prevented from tradition wet combining technique occur sheet material hollowing, cracking, etc. phenomenon, hence it is evident that improve safety and the durability of building;Secondly, it is possible to avoid the phenomenons such as the whiting of tradition wet combining technique appearance, variable color, be conducive to keeping curtain wall cleaning attractive in appearance, it is prevented that aging;Furthermore, cladding material is corrosion-resistant, can reserve the space of 40~50mm between stone material and structure, can play thermal insulation function, has again the advantage of environmental protection and energy saving.
Accompanying drawing explanation
Fig. 1 is this utility model structural representation.
In figure: 1, Zinc-coated angle steel, 2, bolt, 3, E type part, 4, concrete structure, 5, anticorrosion pad, 6, S type part, 7, anchor bolt, 8, linking bolt, 9, post-cut crab-bolt, 10, antidetonation cushion pad, 11, post-cut anchor pole, 12, stone material dry suspending glue, 13, flexible buffer set, 14, stone material gap-filling glue, 15, marble slab.
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments.Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection.
nullRefer to Fig. 1,This utility model provides a kind of technical scheme: the utility model discloses a kind of novel cladding marble device,Including Zinc-coated angle steel 1、Bolt 2、E type part 3、Concrete structure 4、Anticorrosion pad 5、S type part 6、Anchor bolt 7、Linking bolt 8、Post-cut crab-bolt 9、Antidetonation cushion pad 10、Post-cut anchor pole 11、Stone material dry suspending glue 12、Flexible buffer set 13、Stone material gap-filling glue 14 and marble slab 15,Zinc-coated angle steel 1 is connected with bolt 2,And angle steel 1 and bolt 2 are all connected with concrete structure 4,Zinc-coated angle steel 1 is connected with E type part 3,E type part 3 is provided with cup square neck bolt,Upper and lower two connectors can be combined closely,Improve overall performance,And E type part 3 is connected with anticorrosion pad 5,Anchor bolt 7 is installed on the right side of anticorrosion pad 5,It is provided with, on the left of anchor bolt 7, anchor adhesive of saving the situation,Zinc-coated angle steel 1 is more firmly connected with concrete structure,Increase safety,E type part 3 is connected with anchor bolt 7 by anticorrosion pad 5,E type part 3 is connected with S type part 6 by being connected bolt 8,E type part 3 and S type part 6 are symmetrical above and below about neutral axis,On the one hand under the premise not affecting connector performance,Ensure that aesthetic property,It is easy to the convenience of construction and installation on the other hand,And E type part 3 is connected with post-cut crab-bolt 9,On the right side of E type part 3, antidetonation cushion pad 10 is installed,And on the right side of antidetonation cushion pad 10, it is provided with post-cut anchor pole 11,Post-cut anchor pole 11 is connected with stone material dry suspending glue 12,And flexible buffer set 13 is positioned at the right side of stone material dry suspending glue 12,It is provided with back of the body bolt on the right side of flexible buffer set 13,Can ensure that post-cut anchor pole 11 and marble slab 15 are better fixed together,Prevent the cracking of marble slab 15,Flexible buffer set 13 is connected with stone material gap-filling glue 14,And flexible buffer set 13 is connected with marble slab 15 by stone material gap-filling glue 14.
Operation principle: carry out metope unwrapping wire according to construction drawing axis and stone material typesetting figure the actual size in conjunction with job site, the cladding installation typesetting of metope marble is carried out according to on-the-spot actual size by technical staff, snap the line operation completes, separate according to the finished surface snap the line of metope and angle steel 1 is installed, Os Draconis construction welding is full weld construction, weld bead height meets design requirement, welding slag is cleaned out, stone surface is fully dried, it is used on marble and smears dry-hang glue 12, the rustless steel dry hanging article adopting mounting design selected installed by stone material, stone material dry suspending completes, adjust levelness and the perpendicularity of entirety, then stone material gap-filling glue 14 is completely added at slotting position, fixing stone and dry hanging article, after cloud stone glue solidifies, next block stone material can be installed.
Although this utility model being described in detail with reference to previous embodiment; for a person skilled in the art; technical scheme described in foregoing embodiments still can be modified by it; or wherein portion of techniques feature is carried out equivalent replacement; all within spirit of the present utility model and principle; any amendment of being made, equivalent replacement, improvement etc., should be included within protection domain of the present utility model.

Claims (5)

  1. null1. a novel cladding marble device,Including Zinc-coated angle steel (1)、Bolt (2)、E type part (3)、Concrete structure (4)、Anticorrosion pad (5)、S type part (6)、Anchor bolt (7)、Linking bolt (8)、Post-cut crab-bolt (9)、Antidetonation cushion pad (10)、Post-cut anchor pole (11)、Stone material dry suspending glue (12)、Flexible buffer set (13)、Stone material gap-filling glue (14) and marble slab (15),It is characterized in that: described Zinc-coated angle steel (1) is connected with bolt (2),And angle steel (1) and bolt (2) are all connected with concrete structure (4),Described Zinc-coated angle steel (1) is connected with E type part (3),And E type part (3) is connected with anticorrosion pad (5),Described anticorrosion pad (5) right side is provided with anchor bolt (7),And E type part (3) is connected with anchor bolt (7) by anticorrosion pad (5),Described E type part (3) is connected with S type part (6) by being connected bolt (8),And E type part (3) is connected with post-cut crab-bolt (9),Described E type part (3) right side is provided with antidetonation cushion pad (10),And described antidetonation cushion pad (10) right side is provided with post-cut anchor pole (11),Described post-cut anchor pole (11) is connected with stone material dry suspending glue (12),And flexible buffer set (13) is positioned at the right side of stone material dry suspending glue (12),Described flexible buffer set (13) is connected with stone material gap-filling glue (14),And flexible buffer set (13) is connected with marble slab (15) by stone material gap-filling glue (14).
  2. 2. the novel cladding marble device of one according to claim 1, it is characterised in that: described E type part (3) is provided with cup square neck bolt.
  3. 3. the novel cladding marble device of one according to claim 1, it is characterised in that: described E type part (3) and S type part (6) are symmetrical above and below about neutral axis.
  4. 4. the novel cladding marble device of one according to claim 1, it is characterised in that: described anchor bolt (7) left side is provided with anchor adhesive of saving the situation.
  5. 5. the novel cladding marble device of one according to claim 1, it is characterised in that: described flexible buffer set (13) right side is provided with back of the body bolt.
CN201620125322.3U 2016-02-18 2016-02-18 Novel hang marble futilely device Expired - Fee Related CN205369789U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620125322.3U CN205369789U (en) 2016-02-18 2016-02-18 Novel hang marble futilely device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620125322.3U CN205369789U (en) 2016-02-18 2016-02-18 Novel hang marble futilely device

Publications (1)

Publication Number Publication Date
CN205369789U true CN205369789U (en) 2016-07-06

Family

ID=56271673

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620125322.3U Expired - Fee Related CN205369789U (en) 2016-02-18 2016-02-18 Novel hang marble futilely device

Country Status (1)

Country Link
CN (1) CN205369789U (en)

Similar Documents

Publication Publication Date Title
CN107060166B (en) A kind of circular arc diamond shape stone curtain wall
CN205153436U (en) Stone material decorative board suspension group
CN203113681U (en) Combined wall plate for use in indoor decoration and combined wall plate system
CN204385994U (en) The full Concealed glass curtain wall structure of a kind of buckle-type
CN206987154U (en) A kind of aluminium side being easily installed leads to grille ceiling furred ceiling
CN202324295U (en) Drop ceiling closing-in structure
CN203846656U (en) Dry-hanging structure of concave-convex stone curtain wall
CN205444780U (en) General system of hanging futilely of wall of interchangeable surface course material
CN202227545U (en) Steel/aluminum composite curtain wall system
CN205369789U (en) Novel hang marble futilely device
CN105040930A (en) Decorative wall protecting plate
CN204781780U (en) Wall hanging plate structure
CN205557943U (en) Heat preservation curtain articulates system
CN102535698A (en) Heat insulation curtain wall
CN202439766U (en) Multiple sealing access cover
CN201109950Y (en) Combined structure of panel wall
CN202595981U (en) Open aluminum plate curtain wall system
CN203308047U (en) Installing and suspending assembly of finish material
CN205875477U (en) Unit type curtain wall structure
CN204960197U (en) Decorate dado
CN205276648U (en) Suspended ceiling structure
CN202936978U (en) Installation structure of large-space decorative surface
CN210439536U (en) Herringbone overlapping suspended ceiling
CN203361434U (en) Large-scale suspended ceiling structure with thin-wall metal plate
CN202099953U (en) Heat insulating, sound insulating and sound absorbing hanger plate structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160706

Termination date: 20170218