CN205333712U - Measurement wiring box and testing plug -in - Google Patents

Measurement wiring box and testing plug -in Download PDF

Info

Publication number
CN205333712U
CN205333712U CN201620119293.XU CN201620119293U CN205333712U CN 205333712 U CN205333712 U CN 205333712U CN 201620119293 U CN201620119293 U CN 201620119293U CN 205333712 U CN205333712 U CN 205333712U
Authority
CN
China
Prior art keywords
current
socket
ramp
testing
goes out
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620119293.XU
Other languages
Chinese (zh)
Inventor
陈知丰
王义永
张晨晨
王浩
翁凌
杜鹏
杨珀
张纯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Super High Voltage Branch Of State Grid Anhui Electric Power Co ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Corp of China SGCC
Maintenace Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Maintenace Co of State Grid Anhui Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201620119293.XU priority Critical patent/CN205333712U/en
Application granted granted Critical
Publication of CN205333712U publication Critical patent/CN205333712U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Measuring Leads Or Probes (AREA)

Abstract

The utility model discloses the measurement wiring box, including the box body, be equipped with three -phase wiring module and un wiring module on the box body, whenever, the drawing die piece that meets all includes voltage test jack, and current test advances the socket, current test goes out socket and electric current on -off device, and un wiring module includes un test jack. The utility model provides a with above -mentioned measurement wiring box matched with testing plug -in, which comprises a substrate, a side of base plate is equipped with three -phase test module and un test module, and every looks test module includes all that voltage test inserting pin, current test advance the contact pin, current test goes out contact pin and conductive contact piece thimble, and un test module includes un test inserting pin. Through the utility model discloses measurement wiring box and testing plug -in can insert kilowatt -hour meter tester fast and test, and kilowatt -hour meter tester also can be broken off after accomplishing fast to the test, the work of returning to normal, and whole operation process is very simple moreover, need not relapse the disconnect wire, and is very convenient, and the security is high moreover.

Description

Metering junction box and probe card
Technical field
This utility model relates to a kind of metering junction box and the probe card matched with this metering junction box。
Background technology
At present, kilowatt-hour meter is all accessed by metering junction box, it is necessary to when kilowatt-hour meter is detected, and accesses electric meter tester also by metering junction box, by Ua, Ub, Uc, Un electric meter tester in parallel respectively, Ia, Ib, Ic electric current is sealed in electric meter tester。
Wire, when accessing electric meter tester, is clipped in the voltage of metering junction box in flakes or on screw, and changes original current loop trend by sliding in flakes so that the series connection of electric meter tester current loop enters in original current loop by existing metering junction box;Voltage link first to be taken off from metering junction box, then will to return to original state in flakes, then the electric current wiring of electric meter tester be untied from metering junction box after terminating by test。
From the above, it can be seen that existing metering junction box is when accessing and disconnect electric meter tester, operate very loaded down with trivial details, and when using, there is the risk producing current loop open circuit, voltage circuit short circuit。
Utility model content
Technical problem to be solved in the utility model be to provide one can quickly make-and-break voltage, change current loop, use safe metering junction box。
In order to solve above-mentioned technical problem, this utility model adopts the following technical scheme that metering junction box, and including box body, box body is provided with three-phase Wiring module and Un Wiring module;
Every phase connection module all includes voltage transformer ramp, current transformer enters ramp, current transformer goes out ramp, watt-hour meter voltage ramp, current watt-hour meter enters ramp, current watt-hour meter goes out ramp, two voltages access socket, two electric currents exit socket, current switching device, voltage tester socket, testing current enters socket and testing current goes out socket, and Un Wiring module includes Un mutual inductor interstar connection terminal, Un kilowatt-hour meter ramp and Un testing jack;
Voltage transformer ramp and one of them voltage access between socket, another voltage accesses between socket and voltage tester socket, between voltage tester socket and watt-hour meter voltage ramp, current transformer enters ramp and one of them electric current exits between socket, one of them electric current exits socket and current watt-hour meter enters between ramp, current watt-hour meter goes out between ramp and current switching device, current switching device and another electric current exit between socket, another electric current exits socket and current transformer goes out between ramp, testing current enters socket and current watt-hour meter goes out between ramp, testing current goes out socket and current transformer goes out between ramp, electrically connect each through wire between Un mutual inductor interstar connection terminal and Un testing jack and between Un testing jack with Un kilowatt-hour meter ramp。
Further, described current switching device includes insulation shell, the one side of insulation shell is provided with two non-touching conducting blocks, two conducting blocks go out ramp respectively through described wire with current watt-hour meter and another electric current exits socket and electrically connects, it is connected to conductive contact film also by elastic component in insulation shell, conductive contact film abuts against with two conducting blocks under the elastic force effect of elastic component, the one side of insulation shell is provided with opening between two conducting blocks, and the position of opening is corresponding with conductive contact film。
Further, described box body has a plane, and described three-phase Wiring module and Un Wiring module are all located in this plane of box body, and the opening of current switching device exposes this plane of box body。
Probe card, match with above-mentioned metering junction box, including substrate, the one side of described substrate is provided with three-phase test module and Un tests module, every module of test mutually all includes voltage tester contact pin, testing current enters contact pin, testing current goes out contact pin and conductive contact film thimble, Un tests module and includes Un test contact pin, when probe card coordinates with metering junction box, every voltage tester contact pin testing module mutually, testing current enters contact pin and goes out the voltage tester socket of the contact pin corresponding phase connection module of corresponding insertion with testing current, testing current enters socket and testing current goes out in socket, conductive contact film thimble stretches into from the opening of current switching device and conductive contact film is lifted off two conducting blocks, Un tests contact pin and inserts in Un testing jack。
Further, the testing current that is shorter in length than of described conductive contact film thimble enters contact pin and testing current goes out contact pin。
Compared to prior art, the beneficial effects of the utility model are:
1. this utility model metering junction box is when accessing kilowatt-hour meter and using, short circuit wire between socket is accessed at two voltages, so that voltage enters kilowatt-hour meter, when needs pull down kilowatt-hour meter carry out keeping in repair or changing time, short circuit wire between socket is exited at two electric currents, produce short circuit, the short circuit wire that such electric current exits between socket from two electric currents flows through, and without kilowatt-hour meter, again the short circuit wire that two voltages access between socket is extracted, off voltage connects, and when therefore this utility model uses, processing safety is high。
2. by this utility model metering junction box and probe card, electric meter tester can be accessed rapidly to test, after having tested, can also quickly disconnect electric meter tester, recover normal operation, and whole test operating procedure is very simple, need not repeatedly disconnect wire, current trend is changed in flakes also without additionally by sliding, very convenient, and also safe and reliable。
Accompanying drawing explanation
Fig. 1 is the structural representation of this utility model metering junction box。
Fig. 2 is the structural representation of the current switching device in this utility model metering junction box。
Fig. 3 is the view that this utility model conductive contact film thimble backs down conductive contact film。
Fig. 4 is the structural representation of this utility model probe card。
Being labeled as of each parts in accompanying drawing: 1 box body, 21 voltage transformer ramps, 22 current transformers enter ramp, 23 current transformers go out ramp, 24 watt-hour meter voltage ramps, 25 current watt-hour meters enter ramp, 26 current watt-hour meters go out ramp, 27 two voltages access socket, 28 electric currents exit socket, 29 current switching devices, 291 insulation shells, 292 conducting blocks, 293 elastic components, 294 conductive contact films, 295 openings, 210 voltage tester sockets, 211 testing currents enter socket, 212 testing currents go out socket, 31Un mutual inductor interstar connection terminal, 32Un kilowatt-hour meter ramp, 33Un testing jack, 4 substrates, 51 voltage tester contact pins, 52 testing currents enter contact pin, 53 testing currents go out contact pin, 54 conductive contact film thimbles, 61 test contact pins。
Detailed description of the invention
Below in conjunction with accompanying drawing, this utility model is further described:
Referring to Fig. 1 and Fig. 2。
This utility model metering junction box, including box body 1, box body 1 adopts insulant to make, and box body 1 is provided with three-phase Wiring module and Un Wiring module;
Every phase connection module all includes voltage transformer ramp 21, current transformer enters ramp 22, current transformer goes out ramp 23, watt-hour meter voltage ramp 24, current watt-hour meter enters ramp 25, current watt-hour meter goes out 26, two voltages of ramp and accesses socket 27, two electric currents exit socket 28, current switching device 29, voltage tester socket 210, testing current enters socket 211 and testing current goes out socket 212, Un Wiring module and includes Un mutual inductor interstar connection terminal 31, Un kilowatt-hour meter ramp 32 and Un testing jack 33;
Voltage transformer ramp 21 and one of them voltage access between socket 27, another voltage accesses between socket 27 and voltage tester socket 210, between voltage tester socket 210 and watt-hour meter voltage ramp 24, current transformer enters ramp 22 and one of them electric current exits between socket 28, one of them electric current exits socket 28 and current watt-hour meter enters between ramp 25, current watt-hour meter goes out between ramp 26 and current switching device 29, current switching device 29 and another electric current exit between socket 28, another electric current exits socket 28 and current transformer goes out between ramp 23, testing current enters socket 211 and current watt-hour meter goes out between ramp 26, testing current goes out socket 212 and current transformer goes out between ramp 23, electrically connect each through wire (in Fig. 1 dotted portion) between Un mutual inductor interstar connection terminal 31 and Un testing jack 33 and between Un testing jack 33 with Un kilowatt-hour meter ramp 32。
In the present embodiment, described current switching device 29 includes insulation shell 291, the one side of insulation shell 291 is provided with two non-touching conducting blocks 292, two conducting blocks 292 go out ramp 26 respectively through described wire with current watt-hour meter and another electric current exits socket 28 and electrically connects, it is connected to conductive contact film 294 also by elastic component 293 in insulation shell 291, conductive contact film 294 abuts against with two conducting blocks 292 under the elastic force effect of elastic component 293, the one side of insulation shell 291 is provided with opening 295 between two conducting blocks 292, the position of opening 295 is corresponding with conductive contact film 294。
When being embodied as, insulation shell 291 can be made into cuboid, and two conducting blocks 292 are arranged on the both sides, top length direction of insulation shell 291, conductive contact film 294 is rectangle, elastic component 293 selects spring, and is provided with two, is connected to the length direction both sides of conductive contact film 294。
In the present embodiment, described box body 1 is in cuboid, and described three-phase Wiring module and Un Wiring module are arranged in a length and width face of box body along the length direction of box body, and the opening 295 of current switching device 29 exposes this length and width face of box body 1。
When accessing kilowatt-hour meter by this utility model, first pass through the voltage transformer ramp 21 of three-phase Wiring module, current transformer enters ramp 22, current transformer goes out ramp 23 and Un mutual inductor interstar connection terminal 31 accesses threephase potential transformer summation current transformer, then by the three-phase voltage of kilowatt-hour meter, electric current enters, electric current goes out and the Un voltage corresponding watt-hour meter voltage ramp 24 being connected on three-phase Wiring module respectively, current watt-hour meter enters ramp 25, current watt-hour meter goes out on ramp 26 and Un kilowatt-hour meter ramp 32, last at two voltages access 27 short circuit wires of socket, so that voltage enters kilowatt-hour meter, namely cut-in operation is completed。
When needs pull down kilowatt-hour meter carry out keeping in repair or changing time, 28 short circuit wires of socket are exited at two electric currents, produce short circuit, the short circuit wire that such electric current exits between socket 28 from two electric currents flows through, and without kilowatt-hour meter, being extracted by the short circuit wire that two voltages access between socket 27, off voltage connects again, so that it is guaranteed that processing safety。
Referring to Fig. 4, in order to the convenient electric meter tester that accesses is tested, this utility model also provides for the probe card that a kind of above-mentioned metering junction box matches, including substrate 4, substrate 4 adopts insulant to make, the one side of described substrate 4 is provided with three-phase test module and Un tests module, every module of test mutually all includes voltage tester contact pin 51, testing current enters contact pin 52, testing current goes out contact pin 53 and conductive contact film thimble 54, Un tests module and includes Un test contact pin 61, when probe card coordinates with metering junction box, every voltage tester contact pin 51 testing module mutually, testing current enters contact pin 52 and testing current goes out the corresponding voltage tester socket 210 inserting corresponding phase connection module of contact pin 53, testing current enters socket 211 and testing current goes out in socket 212, conductive contact film thimble 54 stretches into from the opening 295 of current switching device 29 and conductive contact film 294 is lifted off two conducting blocks 292, Un tests contact pin 61 and inserts in Un testing jack 33。
During test, first by the three-phase voltage test lead of electric meter tester, testing current inlet side, testing current goes out end and Un test lead and is connected on the voltage tester contact pin 51 of three-phase test module respectively through wire correspondence, testing current enters contact pin 52, testing current goes out contact pin 53 and Un tests contact pin 61, then probe card is directed at metering junction box, slowly engage, make often to test mutually the voltage tester contact pin 51 of module, testing current enters contact pin 52 and testing current goes out the corresponding voltage tester socket 210 inserting corresponding phase connection module of contact pin 53, testing current enters socket 211 and testing current goes out in socket 212, Un tests contact pin 61 and inserts in Un testing jack 33, conductive contact film thimble 54 stretches into from the opening 295 of current switching device 29, finally it is engaging in place, as shown in Figure 3, conductive contact film 294 is lifted off two conducting blocks 292 by conductive contact film thimble 54, thus disconnecting the electric current of kilowatt-hour meter, now electric current flows to electric meter tester, such that it is able to test electric current, and voltage tester contact pin 51 can be directly accessed voltage and test, Un test contact pin 61 can be directly accessed Un voltage and test。
Probe card is directly extracted after terminating by test from metering junction box, and conductive contact film 294 again abuts against with two conducting blocks 292 under the elastic force effect of elastic component 293, so that electric current reenters kilowatt-hour meter。
Can be seen that from technique scheme, by metering junction box of the present utility model and probe card, electric meter tester can be accessed rapidly to test, after having tested, it is also possible to quickly disconnect electric meter tester, recover normal operation, and whole test operating procedure is very simple, need not repeatedly disconnect wire, it is not required that change current trend in flakes additionally by sliding, very convenient。
When being embodied as, the testing current that is shorter in length than of conductive contact film thimble 54 enters contact pin 52 and testing current goes out contact pin 53。So, when probe card inserts metering junction box, testing current enters contact pin 52 and testing current goes out contact pin 53 and first inserts testing current and enter socket 211 and testing current goes out in socket 212, test current channel is made first to be incorporated into electric meter tester, it is deep into metering junction box then as probe card, conductive contact film 294 is lifted off two conducting blocks 292 by conductive contact film thimble 54, disconnects current watt-hour meter, and so operation is more safely, effectively。
It it is more than a kind of embodiment of the present utility model。It should be pointed out that, for the person of ordinary skill of the art, under the premise without departing from this utility model principle, it is also possible to make some deformation and improvement, broadly fall into protection domain of the present utility model。

Claims (5)

1. metering junction box, including box body (1), it is characterised in that: box body (1) is provided with three-phase Wiring module and Un Wiring module;
Every phase connection module all includes voltage transformer ramp (21), current transformer enters ramp (22), current transformer goes out ramp (23), watt-hour meter voltage ramp (24), current watt-hour meter enters ramp (25), current watt-hour meter goes out ramp (26), two voltages access socket (27), two electric currents exit socket (28), current switching device (29), voltage tester socket (210), testing current enters socket (211) and testing current goes out socket (212), Un Wiring module includes Un mutual inductor interstar connection terminal (31), Un kilowatt-hour meter ramp (32) and Un testing jack (33);
Voltage transformer ramp (21) and one of them voltage access between socket (27), another voltage accesses between socket (27) and voltage tester socket (210), between voltage tester socket (210) and watt-hour meter voltage ramp (24), current transformer enters ramp (22) and one of them electric current exits between socket (28), one of them electric current exits socket (28) and current watt-hour meter enters between ramp (25), current watt-hour meter goes out between ramp (26) and current switching device (29), current switching device (29) and another electric current exit between socket (28), another electric current exits socket (28) and current transformer goes out between ramp (23), testing current enters socket (211) and current watt-hour meter goes out between ramp (26), testing current goes out socket (212) and current transformer goes out between ramp (23), electrically connect each through wire between Un mutual inductor interstar connection terminal (31) with Un testing jack (33) and between Un testing jack (33) with Un kilowatt-hour meter ramp (32)。
2. metering junction box as claimed in claim 1, it is characterized in that: described current switching device (29) includes insulation shell (291), the one side of insulation shell (291) is provided with two non-touching conducting blocks (292), two conducting blocks (292) go out ramp (26) respectively through described wire with current watt-hour meter and another electric current exits socket (28) and electrically connects, it is connected to conductive contact film (294) also by elastic component (293) in insulation shell (291), conductive contact film (294) abuts against with two conducting blocks (292) under the elastic force effect of elastic component (293), the one side of insulation shell (291) is positioned between two conducting blocks (292) and is provided with opening (295), the position of opening (295) is corresponding with conductive contact film (294)。
3. metering junction box as claimed in claim 2, it is characterized in that: described box body (1) has a plane, described three-phase Wiring module and Un Wiring module are all located in this plane of box body (1), and the opening (295) of current switching device (29) exposes this plane of box body (1)。
4. probe card, match with the metering junction box described in claim 3, it is characterized in that: include substrate (4), the one side of described substrate (4) is provided with three-phase test module and Un tests module, every module of test mutually all includes voltage tester contact pin (51), testing current enters contact pin (52), testing current goes out contact pin (53) and conductive contact film thimble (54), Un tests module and includes Un test contact pin (61), when probe card coordinates with metering junction box, every voltage tester contact pin (51) testing module mutually, testing current enters contact pin (52) and testing current goes out the corresponding voltage tester socket (210) inserting corresponding phase connection module of contact pin (53), testing current enters socket (211) and testing current goes out in socket (212), conductive contact film thimble (54) stretches into from the opening (295) of current switching device (29) and conductive contact film (294) is lifted off two conducting blocks (292), Un tests contact pin (61) and inserts in Un testing jack (33)。
5. probe card as claimed in claim 4, it is characterised in that: the testing current that is shorter in length than of described conductive contact film thimble (54) enters contact pin (52) and testing current goes out contact pin (53)。
CN201620119293.XU 2016-02-05 2016-02-05 Measurement wiring box and testing plug -in Active CN205333712U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620119293.XU CN205333712U (en) 2016-02-05 2016-02-05 Measurement wiring box and testing plug -in

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620119293.XU CN205333712U (en) 2016-02-05 2016-02-05 Measurement wiring box and testing plug -in

Publications (1)

Publication Number Publication Date
CN205333712U true CN205333712U (en) 2016-06-22

Family

ID=56316883

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620119293.XU Active CN205333712U (en) 2016-02-05 2016-02-05 Measurement wiring box and testing plug -in

Country Status (1)

Country Link
CN (1) CN205333712U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813947A (en) * 2019-02-22 2019-05-28 国网山东省电力公司日照供电公司 A kind of novel short circuit piece direct orbit formula terminal box

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109813947A (en) * 2019-02-22 2019-05-28 国网山东省电力公司日照供电公司 A kind of novel short circuit piece direct orbit formula terminal box

Similar Documents

Publication Publication Date Title
CN107024634B (en) One kind using power-on detection device for harness test
CN203491485U (en) Secondary circuit wiring terminal strip short-circuiting plug for power plant or transformer station
CN109085402A (en) The multifunctional combined terminal box of electrical energy measurement
CN203443993U (en) Electric energy metering wiring apparatus
CN205333847U (en) Measurement wiring testing component
CN205333712U (en) Measurement wiring box and testing plug -in
CN208383986U (en) High-voltage switch gear coil resistance test device
CN209086301U (en) The multifunctional combined terminal box of electrical energy measurement
CN110196347B (en) Electric energy metering combined wiring terminal strip
CN209028125U (en) A kind of electric energy metering combined wiring box of the anti-error behaviour of band
CN209417143U (en) A kind of pulse power test macro
CN205333125U (en) Measurement test machine people
CN205643595U (en) Circuit break -make detection device
CN208805545U (en) A kind of loop resistance test device
CN109085396A (en) With the multifunctional combined terminal box of electrical energy measurement for changing table tooling
CN209248002U (en) A kind of LED light strip ageing tester
CN209432983U (en) Power source aging test device
CN202486209U (en) Technological equipment for testing energy consumption of mobile communication terminal
CN207623372U (en) A kind of portable transformer test harness device
CN207636718U (en) A kind of circuit-breaker testing repairing auxiliary device
CN208093914U (en) A kind of connector for realizing CT secondary side automatic short circuit functions
CN202126480U (en) Testing table for alternative current voltage withstand test of alternate current ceramic capacitor
CN108549044B (en) Insulation line selection tester for direct current system of transformer substation
CN205786755U (en) A kind of plug-in type docking apparatus
CN204376541U (en) A kind of Comprehensive Automatic System for Substation remote signalling snowslide testing apparatus

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061

Patentee after: STATE GRID ANHUI POWER SUPPLY COMPANY OVERHAUL BRANCH

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: No.415 Wuhu Road, Baohe District, Hefei City, Anhui Province 230061

Patentee before: Maintenance Company Of State Grid Anhui Electric Power Company

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061

Patentee after: Super high voltage branch of State Grid Anhui Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: No. 397, Tongcheng South Road, Baohe District, Hefei City, Anhui Province 230061

Patentee before: STATE GRID ANHUI POWER SUPPLY COMPANY OVERHAUL BRANCH

Patentee before: STATE GRID CORPORATION OF CHINA