CN205333329U - High -speed flexible slide rail test device - Google Patents

High -speed flexible slide rail test device Download PDF

Info

Publication number
CN205333329U
CN205333329U CN201620043956.4U CN201620043956U CN205333329U CN 205333329 U CN205333329 U CN 205333329U CN 201620043956 U CN201620043956 U CN 201620043956U CN 205333329 U CN205333329 U CN 205333329U
Authority
CN
China
Prior art keywords
flexible
coaster
pulley
rail
station
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201620043956.4U
Other languages
Chinese (zh)
Inventor
钟辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Holloman Aero Equipment Engineering Co Ltd
Original Assignee
Hubei Holloman Aero Equipment Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Holloman Aero Equipment Engineering Co Ltd filed Critical Hubei Holloman Aero Equipment Engineering Co Ltd
Priority to CN201620043956.4U priority Critical patent/CN205333329U/en
Application granted granted Critical
Publication of CN205333329U publication Critical patent/CN205333329U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a high -speed flexible slide rail test device. Belong to simulation experiment technical field. The various flying speeds of the high -speed flight body of experimental test and research simulation and the problem of gesture are solved to it. Its leading features is: including flexible rail set, flexible slide rail fixed support means, flexible slide rail safety speed reduction intercepting device, pulley device and various experimental background cable suspension device, flexible rail set includes flexible track, track stretch -draw anchor, the circuitous pulley of track and intelligent control constant force compensation arrangement, flexible slide rail fixed support means is by valley station steel construction and upper station steel structure composing, flexible slide rail safety speed reduction intercepting device constitutes pulley device by decelerator and safe intercepting device and retrieves mechanism group by coaster and coaster are automatic. The utility model discloses the utensil with higher speed fast, the orbit that can realize different amounts of deflection, keep the invariant to subtract the characteristics of acceleration, the various flying speeds and the gesture of the mainly used simulation high -speed flight body are convenient for test the test and study it.

Description

High-speed flexible sled test device
Technical field
This utility model belongs to modelling technique field, and being specifically related to a kind of carrier for certain high-speed cruising provides running orbit and run attitude, it is simple to certain device on carrier carries out the assay device of various test, test and research。
Background technology
Development along with international situation, national defence ability and the dog fight ability of China must strengthen, various new-type weapon and equipment, the particularly life-saving equipment of air defence weaponry and dog fight, substantial amounts of experimental test research must be carried out, just can ensure that the advanced effectiveness of the advance of air defence weaponry and accuracy and life-saving equipment。
One, air defence weaponry can carry out on high-speed flexible sled test device substantial amounts of pass through lead, guide, target acquisition simulation test, reduce pre-stage test cost;
Two, aviation lifesaving's equipment can simulate the escape ejection test carrying out under substantial amounts of various flight envelope on high-speed flexible sled test device。
In order to meet above-mentioned air defence weaponry and aviation lifesaving equips the demand of development test, my company project technical staff's binding tests purpose, on the basis of former simple and easy flexible rail, invent a kind of novel high-speed flexible sled test device。
Summary of the invention
The purpose of this utility model is to provide the high-speed flexible sled test device of a kind of satisfied different flight speeds, different flight path, for meeting passing through of air defence weaponry and lead, guiding, target acquisition simulation test, and the ejection test of aviation ejection escape seat。
This utility model is achieved through the following technical solutions: a kind of high-speed flexible sled test device, it is characterised in that: include flexible rail device, flexible slide rail fixed support device, flexible slide rail slow down safely blocking apparatus, tackle arrangement and test background erecting by overhang;Wherein,
Flexible rail device includes flexible rail, track stretching and anchoring device, the roundabout pulley of track and Based Intelligent Control constant force compensation device;Wherein, flexible rail adopts steel wire rope;Track stretching and anchoring device includes arranged side by side two couple anchoring slide rail, two anchoring slide blocks, two groups of assembly pulleys and track stretch-draw anchor hoist engines, and two anchoring slide blocks are separately positioned on two pairs of anchoring slide rails, and two anchoring slide blocks are corresponding with two groups of assembly pulleys respectively to be connected;Based Intelligent Control constant force compensation device includes power section, elevator body portion, automatically controlled part, casing, hand release and connecting platform part;Power section is made up of frequency conversion motor and the reductor that matches with it, is fixedly mounted on the side of casing;Elevator body portion is made up of drive link, elevator and upper and lower lead limit switch, is fixedly mounted on box house;Connecting platform part is made up of platform, the first pressure transducer, and the first pressure transducer is arranged on the platform junction being connected with external system, and platform is connected with the elevating lever of elevator;The roundabout pulley of track is arranged on bottom the steel construction of lower station;
Flexible slide rail fixed support device is made up of lower station steel construction and upper station steel construction;The upper end of upper station steel construction and bottom be respectively equipped with two put station top holder assembly pulley, two put station bottom leading block group, two put station bottom leading block group outer end respectively with two pairs anchor extreme is connected;The top of lower station steel construction be provided with under two sets stand top holder assembly pulley;Based Intelligent Control constant force compensation device is arranged on the bottom of lower station steel construction;
Flexible slide rail deceleration blocking apparatus safely is stopped deceleration device by umbrella and Security distillation device forms, and is arranged between lower station steel construction and upper station steel construction;Wherein, umbrella deceleration device of stopping is made up of gantry umbrella tower, two umbrella rings and two packs, and two umbrella rings are connected with two packs respectively;Security distillation device is made up of xoncrete structure, top rail, buffering dolly, the gentle sand surfing bag of buffering junked tire, enclosure wall is worn at the top three of xoncrete structure, top rail and buffering dolly are positioned at xoncrete structure top, and the gentle sand surfing bag of buffering junked tire is positioned at the three of xoncrete structure top and wears enclosure wall;
Tackle arrangement is reclaimed dolly by coaster, coaster, coaster reclaims hoist engine and coaster reclaims holder pulley and forms;Wherein, coaster both sides are respectively provided with two piston shoes;Coaster reclaims dolly both sides and is respectively provided with two steel wire loop snap closes, coaster reclaims dolly and is arranged on flexible rail through steel wire loop snap close, reclaiming holder pulley by the steel wire rope on hoist engine through coaster to be connected with coaster recovery hoist engine, coaster reclaims hoist engine and is arranged on the top of lower station steel construction;
Test background erecting by overhang is freely lifted hoist engine, pulley, lifting hoist engine, test background and relevant device basis is formed by 1# background tower, 2# background tower, pulley;1# background tower, 2# background tower lay respectively at the both sides of lower station steel construction, are provided with test background between 1# background tower and 2# background tower;
Flexible rail one end is drawn by track stretching and anchoring device side, through bottom, upper station leading block group, top, upper station holder assembly pulley, cross over Security distillation device, pass through umbrella and stop deceleration device and 2# background tower, to top, lower station holder assembly pulley, further around row and the roundabout pulley of track, hold in the palm assembly pulley through opposite side top, pass through 2# background tower and umbrella is stopped deceleration device, cross over Security distillation device, hold in the palm assembly pulley to opposite side top, introduce stretching and anchoring device opposite side then through leading block group bottom opposite side;Umbrella ring set is contained on flexible rail;Coaster is arranged on flexible rail by piston shoes;Coaster reclaims dolly and is arranged on flexible rail through steel wire loop snap close。
Hand release described in technical solution of the present utility model is made up of handwheel, electromagnetic clutch and gear, is fixedly mounted on the opposite side of casing。
Top, upper station described in technical solution of the present utility model asks leading block group bottom assembly pulley and upper station to include pulley seat and five same model pulleys respectively, and five pulleys become sector to install。
Elevator body portion described in technical solution of the present utility model includes two elevator or is respectively equipped with the first pressure transducer and the second pressure transducer for having the elevator of double; two elevating lever, the elevator of these two elevator or double; two elevating lever with platform place。
Flexible rail described in technical solution of the present utility model is double-deck bright finish locked coil wire rope。
Bottom, upper station leading block group described in technical solution of the present utility model is curved。
Tackle arrangement is connected by rocket-powered promotion (traction) device, realize the various speed of service, test products is placed on tackle arrangement, so as to the aerial flexible rail along erection in advance runs, meet the test demand under different attitude, when reaching the speed needed for various test, it is carried out experimental test, by umbrella deceleration device of stopping, tackle arrangement is carried out retarding braking afterwards, run to willful intercept place at it and carry out Security distillation by flexibility slide rail Security distillation device。
This utility model has following characteristics:
(1) lengthen gauge, adopt rocket-powered, accelerate fast。Can meeting friction speed requirement, maximum speed is up to 0-500m/s;
(2) automatically control tension force by PLC, it may be achieved the track of different amounts of deflection, meet the test demand of different conditions;
(3) automatically compensate (displacement) by constant force tension device, the security incident that flexible rail device causes because of variation of ambient temperature can be eliminated;
(4) adopt umbrella to stop deceleration device, it is possible to keep constant and subtract acceleration, will not produce to slow down overload, failure test part and flexible rail device and retarding braking effective。
This utility model is mainly used in various flight speeds and the attitude of simulation high-speed flying orbit (equipment), it is simple to it is carried out experimental test and research。
Accompanying drawing explanation
Fig. 1 is this utility model structure overall schematic。
Fig. 2 is this utility model structural rail stretching and anchoring device front-view schematic diagram。
Fig. 3 is this utility model structural rail stretching and anchoring device schematic top plan view。
Fig. 4 is that this utility model structure intelligent controls constant force compensation device front-view schematic diagram。
Fig. 5 is that this utility model structure intelligent controls constant force compensation device left view schematic diagram。
Fig. 6 is that this utility model structure intelligent control constant force compensation device axis of no-feathering measures intention。
Fig. 7 is station steel construction left view schematic diagram on this utility model structural flexibility slide rail fixed support device。
Fig. 8 is station steel construction front-view schematic diagram on this utility model structural flexibility slide rail fixed support device。
Fig. 9 is station steel construction front-view schematic diagram under this utility model structural flexibility slide rail fixed support device。
Figure 10 is station steel construction left view schematic diagram under this utility model structural flexibility slide rail fixed support device。
Figure 11 is that this utility model structure umbrella is stopped deceleration device front-view schematic diagram。
Figure 12 is that this utility model structure umbrella is stopped deceleration device left view schematic diagram。
Figure 13 is this utility model structural safety blocking apparatus left view schematic diagram。
Figure 14 is this utility model structural safety blocking apparatus schematic top plan view。
Figure 15 is this utility model structure coaster schematic top plan view。
Figure 16 is this utility model structural test background erecting by overhang 1# background tower front-view schematic diagram。
Figure 17 is this utility model structural test background erecting by overhang 1# background tower schematic top plan view。
Figure 18 is this utility model structural test background erecting by overhang 2# background tower front-view schematic diagram。
Figure 19 is this utility model structural test background erecting by overhang 2# background tower schematic top plan view。
In figure: 1, flexible rail;2, track stretching and anchoring device;3, the roundabout pulley of track;4, Based Intelligent Control constant force compensation device;5, lower station steel construction, 6, upper station steel construction;7, top, upper station holder assembly pulley;8, bottom, upper station leading block group;9, top, lower station holder assembly pulley;10, umbrella is stopped deceleration device;11, Security distillation device;12, coaster;13-1, coaster reclaim dolly;13-2, coaster reclaim hoist engine;13-3 coaster reclaims holder pulley;14,1# background tower;15,2# background tower;2-1, anchoring slide rail;2-2, anchoring slide block;2-3, assembly pulley (running block and fixed pulley group);2-4, track stretch-draw anchor hoist engine;4-1, power section;4-2, elevator body portion;4-3, automatically controlled part;4-4, casing;4-5, hand release;4-6, connecting platform part;10-1, gantry umbrella tower, 10-2, umbrella ring, 10-3, pack;11-1, xoncrete structure, 11-2, top rail, 11-3, buffering dolly, 11-4, buffering junked tire, 11-5, buffering sandbag;12-1, piston shoes。
Detailed description of the invention
Below in conjunction with accompanying drawing and instantiation, further illustrate the technical solution of the utility model。
This utility model high-speed flexible sled test device includes flexible rail device, flexible slide rail fixed support device, flexible slide rail slow down safely blocking apparatus, tackle arrangement and various test background erecting by overhang。
Flexible rail device, such as shown in Fig. 1, Fig. 9, is made up of flexible rail 1, track stretching and anchoring device 2, the roundabout pulley 3 of track, Based Intelligent Control constant force compensation device 4 etc.。Flexible rail 1 adopts double-deck bright finish locked coil wire rope。
Track stretching and anchoring device 2 as shown in Figure 2 and Figure 3, including two couples of anchoring slide rail 2-1 arranged side by side, two anchorings slide block 2-2, two groups of assembly pulley 2-3 and track stretch-draw anchor hoist engine 2-4。Two anchoring slide block 2-2 are separately positioned on two couples of anchoring slide rail 2-1, and two anchoring slide block 2-2 are corresponding with two groups of assembly pulley 2-3 respectively to be connected。
Based Intelligent Control constant force compensation device 4 is as shown in Fig. 4, Fig. 5, Fig. 6, including power section 4-1, elevator body portion 4-2, automatically controlled part 4-3, casing 4-4, hand release 4-5 and connecting platform part 4-6。Wherein, power section 4-1 is made up of frequency conversion motor and the reductor that matches with it, is fixedly mounted on the side of casing 4-4。Elevator body portion 4-2 is fixedly mounted on inside casing 4-4, is made up of drive link, elevator and upper and lower lead limit switch, and drive link is connected between elevator and reductor。Elevator is the elevator with double; two elevating lever, it is possible to adopt the elevator with single elevating lever。Connecting platform part 4-6 is positioned at outside casing 4-4, it is made up of platform, the first pressure transducer and the second pressure transducer, first pressure transducer, the second pressure transducer are arranged on the platform junction being connected with external system, platform is connected the second pressure transducer as redundancy backup with the elevating lever of elevator, and connecting platform part 4-6 mainly connects external system and is connected with of the present utility model。Hand release 4-5 is made up of handwheel, electromagnetic clutch and gear, is arranged on the opposite side of casing 4-4, and electromagnetic clutch is connected with the reductor of power section 4-1, and gear is connected with drive link or elevator。Hand release 4-5 mainly under rugged environment, the huge increasing of system pulling force, and the situation that power-off, reserve battery are failed, by discharging manually, system tension can be made to be released, thus protecting system。Automatically controlled part 4-3 is fixedly mounted on casing 4-4, built-in PLC, display screen and reserve battery etc., PLC output control terminal is connected with frequency conversion motor, and the first pressure transducer, the second pressure transducer, upper and lower lead limit switch input corresponding to PLC respectively connects。Automatically controlled part 4-3 is control hinge of the present utility model, after calculating of mainly being compared by the signal that first, second pressure transducer provides, device is controlled。This utility model, by existing mechanical & electrical technology, scientifically, reasonably combines, and applies the PLC control technology of advanced person, it is achieved that automatically control。This utility model is mainly used in the constant compensation of the stretching force Based Intelligent Control constant force compensation device by name of various petrochemical industry, heat distribution pipeline, power circuit, flexible rail, passenger traffic freight ropeway etc.。Steel wire rope is applied constant force by this device and guarantees that steel wire rope is in tensioning state by Based Intelligent Control constant force compensation device 4。
Flexible slide rail fixed support device as shown in Figure 1, Figure 7 shows, is made up of lower station steel construction 5 and upper station steel construction 6, and upper station steel construction 6 is containing cat ladder and platform, wind resistance hawser。The upper end of upper station steel construction 6 and bottom be respectively equipped with two put station top holder assembly pulley 7, two put station bottom leading block group 8, two put station bottom leading block group 8 curved, outer end is connected with two pairs of anchoring slide rail 2-1 ends respectively。The top of lower station steel construction 5 be provided with under two sets stand top holder assembly pulley 9。Based Intelligent Control constant force compensation device 4 is arranged on the bottom of lower station steel construction 5。Top, upper station holder assembly pulley 7 and bottom, upper station leading block group 8 include pulley seat and five same model pulleys respectively, five pulleys become sector to install, aerial roundabout erection flexible rail 1 ask bottom, the upper station leading block group 8 that assembly pulley 7 detours bottom the steel construction of supreme station to be connected with upper station steel construction outside track stretching and anchoring device 2 by top, upper station, employing meets the long radius Combined pulley technology of bright wire rope bending radius。
Flexible slide rail deceleration blocking apparatus safely is such as shown in Fig. 1, Figure 11-14, umbrella stop deceleration device 10 and Security distillation device 11 forms, be arranged between lower station steel construction 5 and upper station steel construction 6。Wherein, umbrella deceleration device 10 of stopping is made up of gantry umbrella tower 10-1, two umbrella ring 10-2 and two pack 10-3, and two umbrella ring 10-2 are connected with two pack 10-3 respectively, and umbrella ring 10-2 is sleeved on flexible rail 1。Security distillation device 11 is made up of xoncrete structure 11-1, top rail 11-2, buffering dolly 11-3, the gentle sand surfing bag 11-5 of buffering junked tire 11-4, enclosure wall is worn at the top three of xoncrete structure 11-1, dolly 11-3 is equipped with cystosepiment for buffering, top rail 11-2 and buffering dolly 11-3 is positioned at xoncrete structure 11-1 top, and the gentle sand surfing bag 11-5 of buffering junked tire 11-4 is positioned at the three of xoncrete structure 11-1 top and wears enclosure wall。Deceleration device 10 stopped by umbrella and Security distillation device 11 is disposed between station steel construction 6 and lower station steel construction 5, and Security distillation device 11 is adjacent with upper station steel construction 6。Two umbrella ring 10-2 and two pack 10-3 set up separately in the both sides of flexible rail 1。
Tackle arrangement, such as shown in Figure 15, Figure 10, is reclaimed dolly 13-1, coaster recovery hoist engine 13-2 by coaster 12, coaster and coaster recovery holder pulley 13-3 forms。Wherein, coaster 12 both sides are respectively provided with two piston shoes 12-1, and coaster 12 is arranged on flexible rail 1 by piston shoes 12-1。12 points of coaster is self-powered and does not set power two kinds。Coaster reclaims dolly 13-1 both sides and is respectively provided with two steel wire loop snap closes, coaster reclaims dolly 13-1 and is arranged on flexible rail 1 through steel wire loop snap close, reclaiming holder pulley 13-3 by the steel wire rope on hoist engine through coaster to be connected with coaster recovery hoist engine 13-2, coaster reclaims hoist engine 13-2 and is arranged on the top of lower station steel construction 5。Coaster 12 runs to umbrella and stops deceleration device 10 place, the piston shoes of coaster 12 clash into the umbrella ring 10-2 being sleeved on flexible rail 1, slow down opening with the umbrella ring 10-2 pack 10-3 being connected, run to buffering dolly (equipped with the cystosepiment) 11-3 that willful intercept place is arranged on xoncrete structure (enclosure wall is worn at top three) 11-1 top rail 11-2 by shock and run and carry out Security distillation to the gentle sand surfing bag 11-5 of buffering junked tire 11-4 of the top rail other end。
Test background erecting by overhang, such as shown in Fig. 1, Figure 16-18, is freely lifted hoist engine 16, pulley 17, lifting hoist engine 18, test background 19 and relevant device basis is formed by 1# background tower 14,2# background tower 15, pulley。1# background tower 14,2# background tower 15 lay respectively at the both sides of lower station steel construction 5, are provided with test background 19 between 1# background tower 14 and 2# background tower 15。
Test background erecting by overhang embodiment: test background 19 is connected with the steel wire rope of lifting hoist engine 18;Be separately turned on test background erecting by overhang 1# background tower 14, the pulley of 2# background tower 15 is freely lifted hoist engine 16, pulley 17 is elevated to the height of required test, winch brake device locks;Be separately turned on test background erecting by overhang 1# background tower, test background 19 is carried out stretch-draw, and by folding and unfolding Adjustment Tests background 19 skyborne position and the attitude of hoist engine, is then locked by winch brake device by the lifting hoist engine 18 of 2# background tower。
Flexible rail 1 one end is drawn by track stretching and anchoring device 2 side, bottom, station leading block group 8, Shang Zhan top, side holder assembly pulley 7 on side, cross over Security distillation device 11, pass through umbrella to stop deceleration device 10 and 2# background tower 15, assembly pulley 9 is held in the palm to Xia Zhan top, side, further around row and the roundabout pulley 3 of track, assembly pulley 9 is held in the palm through opposite side top, pass through 2# background tower 15 and umbrella is stopped deceleration device 10, cross over Security distillation device 11, hold in the palm assembly pulley 7 to opposite side top, introduce stretching and anchoring device 2 opposite side then through leading block group 8 bottom opposite side。Track stretch-draw anchor hoist engine 2-4 carries out stretch-draw, adjustment and anchoring by assembly pulley 2-3 two the anchoring slide blocks being pointed to its anchoring slide rail。
When connecting the connecting platform part 4-6 needing to control the tension system of constant force and being subject to the pulling force exceeding constant force setting value, the real-time strain of system is shown on the display screen of switch board by the first or second pressure transducer accurately that be arranged on junction, the real-time strain of system is shown on the display screen of switch board accurately by the first or second pressure transducer, and the first or second pressure transducer is input a signal into automatically controlled part 4-3, PLC and the parameter set in advance are compared calculating, thus controlling power section 4-1 to drive elevator body portion 4-2, its elevating lever is made to increase, until pulling force reaches constant force setting value and promotes automatically controlled part 4-3 ring off signal and elevating lever to stop rising;When connecting the connecting platform part 4-6 needing to control the object of the constant force pulling force being subject to lower than constant force setting value, the real-time strain of system is shown on the display screen of switch board by the first or second pressure transducer accurately that be arranged on junction, and the first or second pressure transducer is input a signal into automatically controlled part 4-3, PLC and the parameter set in advance are compared calculating, thus controlling power section 4-1 to drive elevator body portion 4-2, its elevating lever is made to decline, until pulling force reaches constant force setting value and promotes automatically controlled part 4-3 ring off signal and elevating lever to stop declining。
In conjunction with accompanying drawing, detailed description of the invention of the present utility model having been carried out exemplary description above, it is clear that this utility model is not limited to this, the various remodeling carried out within the scope of this utility model are all without departing from protection domain of the present utility model。

Claims (6)

1. a high-speed flexible sled test device, it is characterised in that: include flexible rail device, flexible slide rail fixed support device, flexible slide rail slow down safely blocking apparatus, tackle arrangement and test background erecting by overhang;Wherein, flexible rail device includes flexible rail (1), track stretching and anchoring device (2), the roundabout pulley of track (3) and Based Intelligent Control constant force compensation device (4);Wherein, flexible rail (1) adopts steel wire rope;Track stretching and anchoring device (2) includes arranged side by side two couple anchoring slide rail (2-1), two anchorings slide block (2-2), two groups of assembly pulleys (2-3) and track stretch-draw anchor hoist engine (2-4), two anchorings slide block (2-2) are separately positioned on two pairs of anchoring slide rails (2-1), two anchoring slide block (2-2) connections corresponding to two groups of assembly pulleys (2-3) respectively;Based Intelligent Control constant force compensation device (4) includes power section (4-1), elevator body portion (4-2), automatically controlled part (4-3), casing (4-4), hand release (4-5) and connecting platform part (4-6);Power section (4-1) is made up of frequency conversion motor and the reductor that matches with it, is fixedly mounted on the side of casing (4-4);Elevator body portion (4-2) is made up of drive link, elevator and upper and lower lead limit switch, is fixedly mounted on casing (4-4) internal;Connecting platform part (4-6) is made up of platform, the first pressure transducer, and the first pressure transducer is arranged on the platform junction being connected with external system, and platform is connected with the elevating lever of elevator;The roundabout pulley of track (3) is arranged on bottom, lower station steel construction (5);
Flexible slide rail fixed support device is made up of lower station steel construction (5) and upper station steel construction (6);The upper end at upper station steel construction (6) and bottom be respectively equipped with two put station top holder assembly pulley (7), two put station bottom leading block group (8), two put station bottom leading block group (8) outer end is connected with two pairs of anchoring slide rail (2-1) ends respectively;The top at lower station steel construction (5) be provided with under two sets stand top holder assembly pulley (9);Based Intelligent Control constant force compensation device (4) is arranged on the bottom at lower station steel construction (5);
Flexible slide rail deceleration blocking apparatus safely is stopped deceleration device (10) by umbrella and Security distillation device (11) forms, and is arranged between lower station steel construction (5) and upper station steel construction (6);Wherein, umbrella deceleration device (10) of stopping is made up of gantry umbrella tower (10-1), two umbrella rings (10-2) and two packs (10-3), and two umbrella rings (10-2) are connected with two packs (10-3) respectively;Security distillation device (11) is made up of xoncrete structure (11-1), top rail (11-2), buffering dolly (11-3), the gentle sand surfing bag (11-5) of buffering junked tire (11-4), enclosure wall is worn at the top three of xoncrete structure (11-1), top rail (11-2) and buffering dolly (11-3) are positioned at xoncrete structure (11-1) top, and the gentle sand surfing bag (11-5) of buffering junked tire (11-4) is positioned at the three of xoncrete structure (11-1) top and wears enclosure wall;
Tackle arrangement is reclaimed dolly (13-1) by coaster (12), coaster, coaster reclaims hoist engine (13-2) and coaster reclaims holder pulley (13-3) and forms;Wherein, coaster (12) both sides are respectively provided with two piston shoes (12-1);Coaster reclaims dolly (13-1) both sides and is respectively provided with two steel wire loop snap closes, coaster reclaims dolly (13-1) and is arranged on flexible rail (1) through steel wire loop snap close, reclaiming holder pulley (13-3) by the steel wire rope on hoist engine through coaster to be connected with coaster recovery hoist engine (13-2), coaster reclaims hoist engine (13-2) and is arranged on the top at lower station steel construction (5);
Test background erecting by overhang is freely lifted hoist engine (16), pulley (17), lifting hoist engine (18), test background (19) and relevant device basis is formed by 1# background tower (14), 2# background tower (15), pulley;1# background tower (14), 2# background tower (15) lay respectively at the both sides at lower station steel construction (5), are provided with test background (19) between 1# background tower (14) and 2# background tower (15);
Flexible rail (1) one end is drawn by track stretching and anchoring device (2) side, through upper bottom leading block group, station (8), top, upper station holder assembly pulley (7), cross over Security distillation device (11), pass through umbrella to stop deceleration device (10) and 2# background tower (15), to top, lower station holder assembly pulley (9), further around row and the roundabout pulley of track (3), assembly pulley (9) is held in the palm through opposite side top, pass through 2# background tower (15) and umbrella is stopped deceleration device (10), cross over Security distillation device (11), assembly pulley (7) is held in the palm to opposite side top, stretching and anchoring device (2) opposite side is introduced then through leading block group (8) bottom opposite side;Umbrella ring (10-2) is sleeved on flexible rail (1);Coaster (12) is arranged on flexible rail (1) by piston shoes (12-1);Coaster reclaims dolly (13-1) and is arranged on flexible rail (1) through steel wire loop snap close。
2. a kind of high-speed flexible sled test device according to claim 1, it is characterised in that: described hand release (4-5) is made up of handwheel, electromagnetic clutch and gear, is fixedly mounted on the opposite side of casing (4-4)。
3. a kind of high-speed flexible sled test device according to claim 1 and 2, it is characterized in that: described top, upper station holder assembly pulley (7) and upper bottom leading block group, station (8) include pulley seat and five same model pulleys respectively, five pulleys become sector to install。
4. a kind of high-speed flexible sled test device according to claim 1 and 2, it is characterized in that: described elevator body portion (4-2) includes two elevator or is respectively equipped with the first pressure transducer and the second pressure transducer for having the elevator of double; two elevating lever, the elevator of these two elevator or double; two elevating lever with platform place。
5. a kind of high-speed flexible sled test device according to claim 1 and 2, it is characterised in that: described flexible rail (1) is double-deck bright finish locked coil wire rope。
6. a kind of high-speed flexible sled test device according to claim 1 and 2, it is characterised in that: described upper bottom leading block group, station (8) is curved。
CN201620043956.4U 2016-01-16 2016-01-16 High -speed flexible slide rail test device Withdrawn - After Issue CN205333329U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620043956.4U CN205333329U (en) 2016-01-16 2016-01-16 High -speed flexible slide rail test device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620043956.4U CN205333329U (en) 2016-01-16 2016-01-16 High -speed flexible slide rail test device

Publications (1)

Publication Number Publication Date
CN205333329U true CN205333329U (en) 2016-06-22

Family

ID=56196590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620043956.4U Withdrawn - After Issue CN205333329U (en) 2016-01-16 2016-01-16 High -speed flexible slide rail test device

Country Status (1)

Country Link
CN (1) CN205333329U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105699104A (en) * 2016-01-16 2016-06-22 湖北霍洛曼航空设备工程有限公司 High-speed flexible slide rail test device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105699104A (en) * 2016-01-16 2016-06-22 湖北霍洛曼航空设备工程有限公司 High-speed flexible slide rail test device
CN105699104B (en) * 2016-01-16 2018-07-24 湖北霍洛曼航空设备工程有限公司 High-speed flexible sled test device

Similar Documents

Publication Publication Date Title
CA2275338C (en) Aerial cableway leading to an aerostatic airborne body
CN202783765U (en) Low-altitude manned mooring helium balloon
CN105692351B (en) A kind of mooring line draw off gear
CN209833984U (en) Arresting mechanism for sliding and landing of unmanned aerial vehicle
CN105620493B (en) A kind of novel rapid-installation freight ropeway
CN109580166A (en) Works over entry experimental rig
CN205333329U (en) High -speed flexible slide rail test device
CN205418143U (en) Sensing remote control 's rod -type arresting net device that takes off and land
CN203666996U (en) Ground arresting cable device of unmanned aerial vehicle
CN110589027B (en) Aircraft ground test suspension device
CN202464107U (en) Shipboard aircraft arresting cable of aircraft carrier
CN209351619U (en) A kind of unmanned plane draw off gear based on sliding rail
CN2787247Y (en) Escaping device for high building danger
CN105699104A (en) High-speed flexible slide rail test device
CN107892227A (en) A kind of emergency staircase of anti-high-speed falling
CN209276056U (en) A kind of novel air rescue winch
CN201264850Y (en) Cage type elevator
CN209298754U (en) A kind of traction of helicopter unwrapping wire, counterweight attachment device
CN203283983U (en) Safety reel-type hanging cage
CN101630049A (en) Aerial optical cable line construction machine
CN210973774U (en) High-altitude emergency rescue vehicle
CN102975192B (en) Robot for automatically loading and unloading aviation marker balls
CN208995018U (en) A kind of construction material lifting device
CN208596173U (en) A kind of wind sensor tower with function of auto-lift
CN102642753B (en) Pneumatic elevator

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20160622

Effective date of abandoning: 20180724