CN205330145U - Bridging of scaffold - Google Patents

Bridging of scaffold Download PDF

Info

Publication number
CN205330145U
CN205330145U CN201520990255.7U CN201520990255U CN205330145U CN 205330145 U CN205330145 U CN 205330145U CN 201520990255 U CN201520990255 U CN 201520990255U CN 205330145 U CN205330145 U CN 205330145U
Authority
CN
China
Prior art keywords
pipe
tube
fixing
bridging
scaffold
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520990255.7U
Other languages
Chinese (zh)
Inventor
潘燕清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Original Assignee
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd filed Critical WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority to CN201520990255.7U priority Critical patent/CN205330145U/en
Application granted granted Critical
Publication of CN205330145U publication Critical patent/CN205330145U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Prostheses (AREA)

Abstract

The utility model discloses a bridging of scaffold, including the fixed lock of fixed lockhole, double -barrelled fixed lock and tee pipe, fixed inner disc is installed in the outside of fixed lockhole, fixed outer dish is installed in the outside of fixed inner disc, second top tube and second low tube are still installed respectively to the outside of fixed lockhole, first top tube, first low tube is installed respectively to the bottom of second top tube and third top tube, second low tube and third low tube, this bridging of scaffold, moreover, the steam generator is simple in structure, easy installation, through being equipped with three top tubes and three low tubes, it maybe first top tube to divide, second top tube and third top tube, first low tube, second low tube and third low tube, the flat pipe design in three genshui, effectual assurance bridging's rigidity is big, guarantee scaffold non -deformable, the stability of the scaffold is improved, top tube and low tube set up the horizontal plane in the difference respectively, so can not arouse and alternately go wrong.

Description

A kind of bridging of scaffold
Technical field
This utility model relates to Construction Formwork & Scaffold Technology field, is specially the bridging of a kind of scaffold。
Background technology
Bridging is exactly the skewed horizontal load on scaffold, code requirement according to country's scaffold building, when scaffold building height is more than 24m, outside the whole length of side elevation and height should arrange bridging continuously, at present, job site is generally all provided with scaffold at construction wall outrigger, is erected with and plays longitudinal stability to scaffold outside scaffold, strengthen longitudinal rigidity, reduce the bridging of scaffold deformation。
At present, scaffold is generally built by vertical rod and horizon bar, bridging used is usually and forms with hack lever cross-lapping, bridging hack lever connects each through general connection lock with the side of scaffold, bridging is usually single tube or two-tube connection design, such pipe design rigidity weak effect, poor stability, it is impossible to effectively play the effect of support。
Utility model content
The purpose of this utility model is in that to provide the bridging of a kind of scaffold, simple in construction, and easy for installation, stability in the large is high, it is possible to play better support effect, and to solve the problem of proposition in above-mentioned background technology。
For achieving the above object, this utility model provides following technical scheme: the bridging of a kind of scaffold, including fixing lockhole, two-tube fixing lock and the fixing lock of three pipes, the outside of described fixing lockhole is provided with fixing inner disc, the outside of described fixing inner disc is provided with fixing outer disk, the outside of described fixing lockhole is also separately installed with on second and manages and second time pipe, a left side for pipe on described second, right both sides are fixed respectively through the three fixing locks of pipe and are managed on pipe and the 3rd on first, on described first, on pipe and second, the junction of pipe is also equipped with two-tube fixing lock, on described 3rd, on pipe and second, the junction of pipe is provided with two-tube fixing lock, manage on described first, on second, on pipe and the 3rd, the bottom of pipe is separately installed with first time pipe, second time pipe and the 3rd time pipe, a left side for described second time pipe, first time pipe and the 3rd time pipe are fixed respectively through the three fixing locks of pipe in right both sides, the junction of described first time pipe and second time pipe is also equipped with two-tube fixing lock, the junction of described 3rd time pipe and second time pipe is also equipped with two-tube fixing lock。
Preferably, the outside of described fixing outer disk is also equipped with hasp。
Preferably, pipe on described first, pipe on second, pipe on the 3rd, first time pipe, that second time pipe manages equal length with the 3rd time is identical。
Preferably, manage on described first, on pipe and the 3rd, pipe is in same level on second, concordant by fixing inner disc。
Preferably, described first time pipe, second time pipe and the 3rd time pipe are in same level, concordant by fixing outer disk。
Compared with prior art, the beneficial effects of the utility model are: the bridging of this scaffold, simple in construction, easy for installation, by being provided with pipe under three upper pipes and three, be respectively manage on first, pipe on pipe and the 3rd on second, first time pipe, second time pipe and the 3rd time pipe, three horizontal tube designs, the rigidity of effective guarantee bridging is big, it is ensured that scaffold is unlikely to deform, and improves the stability of scaffold, top tube and down tube are separately positioned on different horizontal planes, and intersection so will not be caused to go wrong。
And the bridging of this scaffold is provided with two-tube fixing lock and the fixing lock of three pipes, is separately fixed at different pipeline locations, by being fixed together that bridging stably consolidates, effectively raises the stability of bridging, so that scaffold is more stable firm。
And the bridging of this scaffold, it is provided with fixing inner disc and fixing outer disk, decrease on the one hand and take up room, reduce the connection between bridging and vertical rod, but also the horizontal plane facet of Convenient scissors support, on fixed disk, it is provided with hasp, it is possible to couple together firm to fixed disk and bridging simultaneously, play stable steadiness, be suitable for promoting the use of。
Accompanying drawing explanation
Fig. 1 is this utility model structure front schematic view;
Fig. 2 is this utility model structure perspective diagram。
In figure: 1 fixing lockhole, 2 hasps, 3 two-tube fixing locks, 4 fixing inner discs, 5 second times pipes, 6 the 3rd times pipes, 7 fixing outer disks, 8 first times pipes, the 9 three fixing locks of pipe, pipe on 10 first, pipe on 11 second, pipe on 12 the 3rd。
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments。Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection。
Refer to Fig. 1-2, this utility model provides a kind of technical scheme: the bridging of a kind of scaffold, including fixing lockhole 1, two-tube fixing lock 3 and the fixing lock 9 of three pipes, the outside of fixing lockhole 1 is provided with fixing inner disc 4, the outside of fixing inner disc 4 is provided with fixing outer disk 7, the outside of fixing outer disk 7 is also equipped with hasp 2, and the bridging of this scaffold, it is provided with fixing inner disc 4 and fixing outer disk 7, decrease on the one hand and take up room, reduce the connection between bridging and vertical rod, but also the horizontal plane facet of Convenient scissors support, on fixed disk, it is provided with hasp 2 simultaneously, can couple together firm to fixed disk and bridging, play stably firm effect, it is suitable for promoting the use of。
The outside of fixing lockhole 1 is also separately installed with on second pipe 11 and second time pipe 5, a left side for pipe 11 on second, pipe 12 on pipe 10 and the 3rd is fixed on first respectively through the three fixing locks 9 of pipe in right both sides, on first, on pipe 10 and second, the junction of pipe 11 is also equipped with two-tube fixing lock 3, on 3rd, on pipe 12 and second, the junction of pipe 11 is provided with two-tube fixing lock 3, pipe 10 on first, on second, on pipe 11 and the 3rd, the bottom of pipe 12 is separately installed with first time pipe 8, second time pipe 5 and the 3rd time pipe 6, a left side for second time pipe 5, first time pipe 8 and the 3rd time pipe 9 are fixed respectively through the three fixing locks 9 of pipe in right both sides, the junction of first time pipe 8 and second time pipe 5 is also equipped with two-tube fixing lock 3, the junction of the 3rd time pipe 6 and second time pipe 5 is also equipped with two-tube fixing lock 3, and the bridging of this scaffold is provided with two-tube fixing lock 3 and the fixing lock 9 of three pipes, it is separately fixed at different pipeline locations, by being fixed together that bridging stably consolidates, effectively raise the stability of bridging, so that scaffold is more stable firm。
Pipe 10 on first, pipe 11 on second, pipe 12 on 3rd, first time pipe 8, second time pipe 5 is identical with the 3rd time equal length of pipe 6, pipe 10 on first, on second on pipe 11 and the 3rd pipe 12 in same level, concordant by fixing inner disc 4, first time pipe 8, second time pipe 5 and the 3rd time pipe 6 are in same level, concordant by fixing outer disk 7, the bridging of this scaffold, simple in construction, easy for installation, by being provided with pipe under three upper pipes and three, it is pipe 10 on first respectively, pipe 12 on pipe 11 and the 3rd on second, first time pipe 8, second time pipe 5 and the 3rd time pipe 6, three horizontal tube designs, the rigidity of effective guarantee bridging is big, ensure that scaffold is unlikely to deform, improve the stability of scaffold, top tube and down tube are separately positioned on different horizontal planes, intersection so will not be caused to go wrong。
Operation principle: during use, by two-tube fixing lock 3, is fixed on bridging on scaffold。
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, being appreciated that when without departing from principle of the present utility model and spirit and these embodiments can be carried out multiple change, amendment, replacement and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof。

Claims (5)

1. the bridging of a scaffold, including fixing lockhole (1), two-tube fixing lock (3) and the fixing lock (9) of three pipes, it is characterized in that: the outside of described fixing lockhole (1) is provided with fixing inner disc (4), the outside of described fixing inner disc (4) is provided with fixing outer disk (7), the outside of described fixing lockhole (1) is also separately installed with on second and manages (11) and second time pipe (5), the left side of (11) is managed on described second, right both sides are fixed respectively through the three fixing locks (9) of pipe and are managed pipe (12) on (10) and the 3rd on first, manage the junction of pipe (11) on (10) and second on described first and be also equipped with two-tube fixing lock (3), manage the junction of pipe (11) on (12) and second on described 3rd and two-tube fixing lock (3) is installed, (10) are managed on described first, manage the bottom of pipe (12) on (11) and the 3rd on second and be separately installed with first time pipe (8), second time pipe (5) and the 3rd time pipe (6), a left side for described second time pipe (5), first time pipe (8) and the 3rd time pipe (6) are fixed respectively through the three fixing locks (9) of pipe in right both sides, the junction of described first time pipe (8) and second time pipe (5) is also equipped with two-tube fixing lock (3), the junction of described 3rd time pipe (6) and second time pipe (5) is also equipped with two-tube fixing lock (3)。
2. the bridging of a kind of scaffold according to claim 1, it is characterised in that: the outside of described fixing outer disk (7) is also equipped with hasp (2)。
3. the bridging of a kind of scaffold according to claim 1, it is characterised in that: manage (10) on described first, pipe (11) on second, pipe (12), first time pipe (8), second time pipe (5) and the 3rd time equal length of pipe (6) are identical on the 3rd。
4. the bridging of a kind of scaffold according to claim 1, it is characterised in that: manage (10) on described first, pipe (11) and the 3rd managed (12) on second in same level, concordant by fixing inner disc (4)。
5. the bridging of a kind of scaffold according to claim 1, it is characterised in that: described first time pipe (8), second time pipe (5) and the 3rd time pipe (6) are in same level, concordant by fixing outer disk (7)。
CN201520990255.7U 2015-12-03 2015-12-03 Bridging of scaffold Expired - Fee Related CN205330145U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520990255.7U CN205330145U (en) 2015-12-03 2015-12-03 Bridging of scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520990255.7U CN205330145U (en) 2015-12-03 2015-12-03 Bridging of scaffold

Publications (1)

Publication Number Publication Date
CN205330145U true CN205330145U (en) 2016-06-22

Family

ID=56211860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520990255.7U Expired - Fee Related CN205330145U (en) 2015-12-03 2015-12-03 Bridging of scaffold

Country Status (1)

Country Link
CN (1) CN205330145U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421753A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Diagonal bracing for scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421753A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Diagonal bracing for scaffold

Similar Documents

Publication Publication Date Title
CN201671226U (en) Expanded flanged cross-shaped steel SRC column
CN205224363U (en) Connection structure of floor and girder steel
CN104294828B (en) A kind of foundation pit supporting construction
CN205330145U (en) Bridging of scaffold
CN103469902A (en) Full-rigidity steel pipe concrete column connecting node
CN207032235U (en) Double-barrelled slip casting stock structure
CN205954681U (en) A structure for locating assembly piping lane reinforcing bar
CN204139175U (en) A kind of foundation pit supporting construction
CN206957200U (en) Exempt from wall form bracing system of perforating
CN204212385U (en) Scaffold strengthened by truss
CN207314537U (en) A kind of assembled Outsourcing-type steel chain type combining structure
CN105421753A (en) Diagonal bracing for scaffold
CN203475867U (en) Lattice type supporting system
CN204139177U (en) A kind of supporting component of foundation ditch backplate
CN206916952U (en) A kind of vertical free shearing resistance bearing
CN207462497U (en) Extinguisher fixing device in a kind of construction site room
CN206844646U (en) A kind of high flexible assembly type elevator its support reinforcement mechanism of applicability
CN207314361U (en) A kind of bank protection tile assembly
CN206053080U (en) A kind of floor mounting structure for steel house
CN204983401U (en) Built -in reinforcing regeneration brick aggregate concrete composite columns
CN203891517U (en) Roof cooling tower pond
CN205296822U (en) Multipurpose steel tube column pushes up support
CN203924489U (en) A kind of box type column for building
CN208454332U (en) A kind of variable cross-section tower crane section
CN203716300U (en) Connection structure of light external wall and side column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20171203