CN205330138U - Protection device for construction scaffolding is with installing fast - Google Patents

Protection device for construction scaffolding is with installing fast Download PDF

Info

Publication number
CN205330138U
CN205330138U CN201520990147.XU CN201520990147U CN205330138U CN 205330138 U CN205330138 U CN 205330138U CN 201520990147 U CN201520990147 U CN 201520990147U CN 205330138 U CN205330138 U CN 205330138U
Authority
CN
China
Prior art keywords
framework
preventer
increasing
flange
admittedly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520990147.XU
Other languages
Chinese (zh)
Inventor
潘燕清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Original Assignee
WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd filed Critical WUXI CHENYUAN CONSTRUCTION EQUIPMENT Co Ltd
Priority to CN201520990147.XU priority Critical patent/CN205330138U/en
Application granted granted Critical
Publication of CN205330138U publication Critical patent/CN205330138U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a protection device for construction scaffolding is with installing fast, the fruit pick -up device includes a frame body, all be provided with in the middle of framework inboard and increase muscle horizontal admittedly and three and increase solid perpendicular muscle, the back that increases muscle horizontal admittedly, fence and increase solid perpendicular muscle all is provided with the protection steel mesh that corresponds with framework inner chamber profile phase, the back top of framework transversely is provided with the flange, the bottom of flange is provided with the clamp plate, the utility model discloses simple to operate, the security is high, and the clamp plate and the fastening bolt of adoption can be with direct the installing on the steel pipe of scaffold of protector to carrying out firm installation on next step through fastening bolt, carrying out further fixed mounting with it at last, make protector's installation convenient and fast more, the effect of the improvement protector protection that the protection steel mesh of adoption can be very big has improved steadiness and security that protector used.

Description

A kind of preventer of building scaffold energy Fast Installation
Technical field
This utility model relates to building scaffold preventer technical field, is specially the preventer of a kind of building scaffold energy Fast Installation。
Background technology
Protection steel mesh serves as the facility of preventer for various building scaffolds, and building scaffold is used for construction site, it is possible to is effectively prevented the person, the fall injury of object, it is possible to effectively reduce noise contamination by dust, reaches the purpose of civilized construction。
But preventer nowadays on the market is when carrying out being arranged on scaffold, owing to can not be rapidly performed by connecting, and connect firm not, owing to the steadiness of preventer own is low, the safety in utilization making preventer is low, and the net matter adding protection network is soft yielding, can through protection network when weight drops, the limited efficiency of protection, it is difficult to adapt to the development in market。
Utility model content
The purpose of this utility model is in that to provide the preventer of a kind of building scaffold energy Fast Installation, with the problem solving to propose in above-mentioned background technology。
For achieving the above object, this utility model provides following technical scheme:
A kind of preventer of building scaffold energy Fast Installation, including framework, described framework is configured to vertical frame-saw mutually by montant and cross bar, the solid horizontal bar of increasing and three admittedly perpendicular muscle of increasing it are provided with in the middle of the inner side of described framework, the solid horizontal bar of described increasing is mutually perpendicular to the admittedly perpendicular muscle of increasing and superposes setting, the right angle that the solid horizontal bar of described increasing and the admittedly perpendicular muscle of increasing and framework are formed is connected to a hurdle of symmetric design, and the solid horizontal bar of described increasing, a hurdle are provided with the protection steel mesh corresponding with framework inner chamber profile with the back side of the admittedly perpendicular muscle of increasing;
The top, the back side of described framework is horizontally arranged with flange, and the bottom of described flange is provided with pressing plate, and the crown center of described pressing plate is provided with the vertical arrangement fastening bolt through flange inner chamber。
Preferably, the arranged on left and right sides of described framework is provided with " u "-shaped shadoof, and the surface of described shadoof is frosting。
Preferably, the bottom arranged on left and right sides of described framework is provided with connecting plate, and the front of described connecting plate is provided through hole, location。
Preferably, being provided with connecting bolt in hole, described location, hole, described location is circular design。
Preferably, the cross bar top arranged bottom the bottom of described flange and framework is installed on the jube of vertical rod, the right side of described vertical rod and the left side of framework horizontally set longitudinal arrangement each other each other。
Compared with prior art, the beneficial effects of the utility model are:
(1), this utility model is easy for installation, safety is high, preventer can be directly installed on the steel pipe of scaffold by the pressing plate and the fastening bolt that adopt, and next step firm installation is carried out by fastening bolt, finally fixedly mount further, the installation enhanced convenience making preventer is quick, the connecting plate taked and hole, location also have the utilization of connecting bolt to make preventer further to reinforce, the protection steel mesh adopted can greatly improve the effect of preventer protection, bigger weight is effectively avoided to threaten the safety of personnel through protection network, improve steadiness and safety that preventer uses。
(2) what, this utility model adopted increases solid horizontal bar and increases admittedly perpendicular muscle and a hurdle while improving preventer entirety steadiness, it also is able to drastically increase the aesthetic property that preventer is overall, the vertical rod that adopts and jube be equipped with the steadiness and safety that improve further preventer, the installation of preventer is easy in the use of shadoof。
Accompanying drawing explanation
Fig. 1 is this utility model structure schematic diagram;
Fig. 2 is this utility model side structure schematic diagram。
In figure: 1 framework, 2 montants, 3 cross bars, 4 increase solid horizontal bars, 5 increase admittedly perpendicular muscle, 6 hurdles, 7 protection steel meshes, 8 shadoofs, 9 flanges, 10 pressing plates, 11 fastening bolts, 12 location hole, 13 connecting plates, 14 vertical rods, 15 jubes, 16 connecting bolts。
Detailed description of the invention
Below in conjunction with the accompanying drawing in this utility model embodiment, the technical scheme in this utility model embodiment is clearly and completely described, it is clear that described embodiment is only a part of embodiment of this utility model, rather than whole embodiments。Based on the embodiment in this utility model, the every other embodiment that those of ordinary skill in the art obtain under not making creative work premise, broadly fall into the scope of this utility model protection。
Referring to Fig. 1-2, this utility model provides a kind of technical scheme:
A kind of preventer of building scaffold energy Fast Installation, including framework 1, framework 1 is configured to vertical frame-saw mutually by montant 2 and cross bar 3, the solid horizontal bar 4 of increasing and three admittedly perpendicular muscle 5 of increasing it are provided with in the middle of the inner side of framework 1, the solid horizontal bar 4 of increasing is mutually perpendicular to the admittedly perpendicular muscle 5 of increasing and superposes setting, the right angle increasing solid horizontal bar 4 and increase admittedly perpendicular muscle 5 and framework 1 is formed is connected to a hurdle 6 of symmetric design, what adopt increases solid horizontal bar 4 and increases admittedly perpendicular muscle 5 and a hurdle 6 while improving preventer entirety steadiness, it also is able to drastically increase the aesthetic property that preventer is overall, increase solid horizontal bar 4, the back side propping up hurdle 6 and increase admittedly perpendicular muscle 5 is provided with the protection steel mesh 7 corresponding with framework 1 inner chamber profile, the protection steel mesh 7 adopted can greatly improve the effect of preventer protection, bigger weight is effectively avoided to threaten the safety of personnel through protection network, improve steadiness and safety that preventer uses, a left side for framework 1, right both sides are provided with " u "-shaped shadoof 8, the surface of shadoof 8 is frosting, the installation of preventer is easy in the use of shadoof 8, improve the comfortableness that preventer is installed。
The top, the back side of framework 1 is horizontally arranged with flange 9, the bottom of flange 9 is provided with pressing plate 10, the crown center of pressing plate 10 is provided with the vertical arrangement fastening bolt 11 through flange 9 inner chamber, preventer can be directly installed on the steel pipe of scaffold by the pressing plate 10 and the fastening bolt 11 that adopt, and next step firm installation is carried out by fastening bolt 11, finally fixedly mount further, the installation enhanced convenience making preventer is quick, cross bar 3 top arranged bottom the bottom of flange 9 and framework 1 is installed on vertical rod 14 each other, the jube 15 of the left side horizontally set longitudinal arrangement each other of the right side of vertical rod 14 and framework 1, the vertical rod 14 that adopts and jube 15 be equipped with the steadiness and safety that improve further preventer, the bottom of framework 1 is left, right both sides are provided with connecting plate 13, the front of connecting plate 13 is provided through hole 12, location, location is provided with connecting bolt 16 in hole 12, hole 12, location is circular design, the connecting plate 13 taked and hole, location 12 also have the utilization of connecting bolt 16 to make preventer further to reinforce。
Operation principle: utilize shadoof 8 to mention preventer and the pressing plate 10 bottom flange 9 is placed on the steel pipe of scaffold, then utilize fastening bolt 11 to rotate pressing plate 10 preventer is made next step to fix, improve the steadiness installed, then recycling connecting bolt 16 coordinates hole 12, location that preventer work is fixing further, protection is in the article fallen can be blocked in by steel mesh 7, it is prevented that high-altitude weight drops the threat to personal security。
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, being appreciated that when without departing from principle of the present utility model and spirit and these embodiments can be carried out multiple change, amendment, replacement and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof。

Claims (5)

1. the building scaffold preventer of energy Fast Installation, including framework (1), it is characterized in that: described framework (1) is configured to vertical frame-saw mutually by montant (2) and cross bar (3), the solid horizontal bar (4) of increasing and three admittedly perpendicular muscle (5) of increasing it are provided with in the middle of the inner side of described framework (1), the solid horizontal bar (4) of described increasing is mutually perpendicular to the admittedly perpendicular muscle (5) of increasing and superposes setting, the right angle that the solid horizontal bar (4) of described increasing and the admittedly perpendicular muscle (5) of increasing and framework (1) are formed is connected to a hurdle (6) of symmetric design, the solid horizontal bar (4) of described increasing, the back side propping up hurdle (6) and increase admittedly perpendicular muscle (5) is provided with the protection steel mesh (7) corresponding with framework (1) inner chamber profile;
The top, the back side of described framework (1) is horizontally arranged with flange (9), and the bottom of described flange (9) is provided with pressing plate (10), and the crown center of described pressing plate (10) is provided with the vertical arrangement fastening bolt (11) through flange (9) inner chamber。
2. the preventer of a kind of building scaffold according to claim 1 energy Fast Installation, it is characterised in that: the arranged on left and right sides of described framework (1) is provided with " u "-shaped shadoof (8), and the surface of described shadoof (8) is frosting。
3. the preventer of a kind of building scaffold according to claim 1 energy Fast Installation, it is characterized in that: the bottom arranged on left and right sides of described framework (1) is provided with connecting plate (13), the front of described connecting plate (13) is provided through hole, location (12)。
4. the preventer of a kind of building scaffold according to claim 3 energy Fast Installation, it is characterised in that: being provided with connecting bolt (16) in hole, described location (12), hole, described location (12) is circular design。
5. the preventer of a kind of building scaffold according to claim 1 energy Fast Installation, it is characterized in that: cross bar (3) top that the bottom of described flange (9) and framework (1) bottom are arranged is installed on the jube (15) of the left side horizontally set longitudinal arrangement each other of vertical rod (14), the right side of described vertical rod (14) and framework (1) each other。
CN201520990147.XU 2015-12-03 2015-12-03 Protection device for construction scaffolding is with installing fast Expired - Fee Related CN205330138U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520990147.XU CN205330138U (en) 2015-12-03 2015-12-03 Protection device for construction scaffolding is with installing fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520990147.XU CN205330138U (en) 2015-12-03 2015-12-03 Protection device for construction scaffolding is with installing fast

Publications (1)

Publication Number Publication Date
CN205330138U true CN205330138U (en) 2016-06-22

Family

ID=56211592

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520990147.XU Expired - Fee Related CN205330138U (en) 2015-12-03 2015-12-03 Protection device for construction scaffolding is with installing fast

Country Status (1)

Country Link
CN (1) CN205330138U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421744A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Quick installation type protecting device for building scaffold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421744A (en) * 2015-12-03 2016-03-23 无锡市晨源建筑器材有限公司 Quick installation type protecting device for building scaffold

Similar Documents

Publication Publication Date Title
CN211775968U (en) A face limit protector for floor template construction
CN205330138U (en) Protection device for construction scaffolding is with installing fast
CN201953005U (en) Detachable protective railing
CN204627010U (en) A kind of outer guard net being applicable to climbing frame
CN105421744A (en) Quick installation type protecting device for building scaffold
CN204590556U (en) With the steel pipe lifting scaffold of steel sash net safeguard structure
CN205330126U (en) High scaffold of security for building
CN105464353A (en) High-safety scaffold for building
CN210947685U (en) Fixing device of metal protection net on external scaffolding
CN210927509U (en) Photovoltaic support anchor clamps
CN207149366U (en) Transformer and JP cabinet mounting structures
CN205276847U (en) Safety device is assisted to scaffold
CN202689682U (en) Safe protective screening
CN208168407U (en) A kind of construction anti-falling bracket
CN202731261U (en) Movable scaffold with adjustable height
CN205875688U (en) Scaffold frame disc system
CN206110643U (en) Scaffold frame perpendicular fixed knot construct
CN201687263U (en) Safety warning shielding device
CN206198634U (en) A kind of sand hill frame
CN204199728U (en) Highrise building regularization horizontal protective device
CN203129617U (en) Quick-disassembling protective fence
CN215406508U (en) Height-adjustable frame-containing steel plate net and frame supporting beam combined structure
CN211143706U (en) Protective net clip
CN201447906U (en) Safe guardrail
CN210780631U (en) Solar photovoltaic fence for oil well

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20171203