CN205329907U - 3D modularization run -up wall - Google Patents

3D modularization run -up wall Download PDF

Info

Publication number
CN205329907U
CN205329907U CN201520990699.0U CN201520990699U CN205329907U CN 205329907 U CN205329907 U CN 205329907U CN 201520990699 U CN201520990699 U CN 201520990699U CN 205329907 U CN205329907 U CN 205329907U
Authority
CN
China
Prior art keywords
cage body
card
prominent
post
right post
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520990699.0U
Other languages
Chinese (zh)
Inventor
刘进武
向元进
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wendeng Landao Construction Engineering Co Ltd
Original Assignee
Wendeng Landao Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wendeng Landao Construction Engineering Co Ltd filed Critical Wendeng Landao Construction Engineering Co Ltd
Priority to CN201520990699.0U priority Critical patent/CN205329907U/en
Application granted granted Critical
Publication of CN205329907U publication Critical patent/CN205329907U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to a 3D modularization run -up wall, its two baffles that include parallel arrangement, two be provided with support chassis between the baffle, support chassis includes the cage body and passes the reinforcing bar of the cage body, formation is piled up by a plurality of cages body along three -dimensional direction to the cage body, the cage body three -dimensional square cage that 12 posts constitute that serves as reasons is provided with card respectively suddenly on the cage body, two baffle inboards are provided with the kerve, support chassis with the baffle is fixed with the abrupt joint of card through the draw -in groove of thinking the adaptation. The utility model discloses possess simple structure, construction portably, the dead weight is light, and the sound insulation keeps warm effectually, application scope characteristics extensively.

Description

A kind of 3D modularity run-up wall
Technical field
This utility model belongs to building materials field, specifically arranges a kind of 3D modularity run-up wall。
Background technology
At present, China's economic society is faced with the new frame of in-depth reform, actively innovation, Transformation Development。In building constructions field, advancing modernization of the housing industry, Development of Green Building is the important principles and policies that central authorities propose。The main mode of Development of Green Building is to carry out 3D modularity to build a house, and so-called 3D modularity builds a house, and is namely the splicing of building structure module, and its operating process is just as playing with building blocks, and is without humidifying operation。House is resolved into several modules by it, and from load-carrying members, door and window body of wall to interior decoration etc., Uniting also manufactures in factory, assembles by figure at the scene, and job site can't see that any traditional architecture building site building waste is in heaps, the scene of muddy water crossing current。How to accelerate the construction of body of wall and comply with the polygons of body of wall, it is necessary to inventing a kind of novel compound wall structure being not limited to processing place。
Utility model content
The purpose of this utility model is in that to overcome the defect of prior art, it is provided that a kind of simple in construction, easy construction 3D modularity run-up wall。
To achieve these goals, the technical scheme that this utility model is taked is as follows:
A kind of 3D modularity run-up wall, it includes two baffle plates be arrangeding in parallel, is provided with support frame between two described baffle plates;
Described support frame includes cage body and the reinforcing bar through described cage body, described cage body is piled up along three-dimensional by multiple cage body and is formed, the left and right of described cage body is to for two cage body, before and after to for m cage body, upward and downward is x cage body, described m and x is all higher than being equal to 2, and described cage body is the square cage of the solid being made up of 12 posts, and described 12 posts include front left post, front right post, rear left post, rear right post, upper left post, upper front pillar, upper right post, upper rear pillar, bottom left post, lower front pillar, bottom right post and bottom left post, it is prominent that the corner that described front right post and described upper right post are formed is provided with outward extending first card, it is prominent that the corner that described upper rear pillar and described rear right post are formed is provided with outward extending second card, it is prominent that the corner that described front right post and described bottom right post are formed is provided with outward extending 3rd card, it is prominent that the corner that described rear right post and described bottom right post are formed is provided with outward extending 4th card, and described first card is prominent, second card is prominent, 3rd card is prominent blocks prominent vertical described front right post with the 4th, rear right post, the plane at upper right post and bottom right post place;
Described reinforcing bar includes upward and downward reinforcing bar and front and back to reinforcing bar, and upward and downward x described cage body runs through fixing by sequentially passing through the upward and downward reinforcing bar of each cage body, and front and back run through fixing by sequentially passing through the front and back of each cage body to reinforcing bar to m described cage body;
Be provided with inside described baffle plate prominent with described first card, the second card is prominent, the 3rd card is prominent and the prominent draw-in groove matched of the 4th card, described cage body is provided with that described first card is prominent, the second card is prominent, the 3rd card is prominent and the 4th card is prominent one facing to described baffle plate, and connects and fixes with described baffle plate。
Further improving as this utility model, many described upward and downward reinforcing bar end colligations, many described left and right are to reinforcing bar end colligation, and many described front and back are to reinforcing bar end colligation。
Further improving as this utility model, described 12 posts are square column。
Further improving as this utility model, described 12 column lengths are short and thick thin all identical。
Compared with prior art, having the beneficial effect that acquired by this utility model:
3D modularity run-up wall provided by the utility model, by using cage body and reinforcing bar to substitute tradition cage bone, simplifies the step of reinforcing bar erection, reduces the difficulty of reinforcing bar erection。Need only to reinforcing bar traverse cage body, cage body is formed there through the cage body mated with body of wall, then the two sides of cage body are provided with that the first card is prominent, the second card is prominent, the 3rd card is prominent and the 4th card is prominent, two side shields are provided with prominent with the first card, the second card is prominent, the 3rd card is prominent and the prominent draw-in groove matched of the 4th card, arranges barb, it is possible to snap in draw-in groove on card is prominent, baffle plate and support frame is made to be combined into one, on-the-spot directly plug-in mounting molding, reduces the difficulty of construction, simplifies the step of construction。Owing to being hollow-core construction between two baffle plates, sound-insulating is effective。This utility model possesses simple in construction, easy construction, feature applied widely。
Accompanying drawing explanation
Accompanying drawing 1 is structural representation of the present utility model;
Accompanying drawing 2 is this utility model sectional view;
Accompanying drawing 3 is cage body structural representation of the present utility model;
Accompanying drawing 4 piles up schematic diagram for this utility model cage body;
In the accompanying drawings:
Front pillar under 1 cage body, 1-1 front left post, 1-2 front right post, 1-3 rear left post, 1-4 rear right post, the upper left post of 1-5, the upper front pillar of 1-6, the upper right post of 1-7, the upper rear pillar of 1-8,1-9 bottom left post, 1-10,1-11 bottom right post, 1-12 bottom left post, 1-31 first block prominent, 1-32 second block prominent, 1-33 the 3rd card is prominent, 1-34 the 4th card is prominent, 2 reinforcing bars, 2-1 upward and downward reinforcing bar, about 2-2 before and after reinforcing bar, 2-3 to reinforcing bar, 100 baffle plates, 101 draw-in grooves。
Detailed description of the invention
Below in conjunction with accompanying drawing 1-4, this utility model is carried out further details of narration。
As shown in accompanying drawing 1,2,3 and 4, a kind of 3D modularity run-up wall, it includes two baffle plates 100 be arrangeding in parallel, is provided with support frame between two described baffle plates 100;
Described support frame includes cage body and the reinforcing bar 2 through described cage body, described cage body is piled up along three-dimensional by multiple cage body 1 and is formed, and the left and right of described cage body is to for two cage body, and front and back are to for 15 cage body, upward and downward is nine cage body, and described m and x is all higher than being equal to 2;
Described cage body 1 is the square cage of the solid being made up of 12 posts, described 12 posts include front left post 1-1, front right post 1-2, rear left post 1-3, rear right post 1-4, upper left post 1-5, upper front pillar 1-6, upper right post 1-7, upper rear pillar 1-8, bottom left post 1-9, lower front pillar 1-10, bottom right post 1-11 and bottom left post 1-12, the corner that described front right post 1-2 and described upper right post 1-7 is formed is provided with the outward extending first prominent 1-31 of card, the corner that described upper rear pillar 1-8 and described rear right post 1-3 is formed is provided with the outward extending second prominent 1-32 of card, the corner that described front right post 2 and described bottom right post 1-11 are formed is provided with the outward extending 3rd prominent 1-33 of card, the corner that described rear right post 1-3 and described bottom right post 1-11 is formed is provided with the outward extending 4th prominent 1-34 of card, the described first prominent 1-31 of card, the second prominent 1-32 of card, 3rd card prominent 1-33 and the four prominent vertical described front right post 1-2 of 1-34 of card, rear right post 1-3, the plane at upper right post 1-7 and bottom right post 1-11 place。
Described reinforcing bar 2 includes upward and downward reinforcing bar 2-1 and front and back to reinforcing bar 2-3, the described cage body 1 of upward and downward nine runs through fixing by sequentially passing through the upward and downward reinforcing bar 2-1 of each cage body, the end of upward and downward reinforcing bar 2-1 can directly colligation in cage body 1, it is also possible to two upward and downward mutual colligations of reinforcing bar 2-1。Before and after to reinforcing bar 2-3 run through fixing by sequentially passing through before and after each cage body to 15 each and every one described cage body 1, the end of backward reinforcing bar 2-3 can directly colligation in cage body 1, it is also possible to two front and back are to the mutual colligation of reinforcing bar 2-3。
The draw-in groove 101 matched with the described first prominent 1-31 of card, the second prominent 1-32 of card, the 3rd card prominent 1-33 and the 4th prominent 1-34 of card it is provided with inside described baffle plate 100, described cage body 1 be provided with the described first prominent 1-31 of card, the second prominent 1-32 of card, the 3rd card prominent 1-33 and the four prominent 1-34 of card one facing to described baffle plate 100, and connect and fix with described baffle plate 100。
The square cage of solid that cage body 1 of the present utility model is made up of the short and thick thin all identical square column of 12 root lengths。
Two described baffle plates 100 of the present utility model are fixedly installed upper cover plate。The end face of body of wall can be formed, make body of wall more attractive in appearance。
Construction method of the present utility model is as follows:
First, involve a need to according to body of wall, select the cage body of suitable size and the number of cage body, carrying out piling up of three-dimensional, form cage body, the left and right of cage body is to for two cage body, before and after to for m cage body, upward and downward is x cage body, left and right to two back-to-back settings of cage body, make to arrange the prominent 1-31 of the first card, the second prominent 1-32 of card, the 3rd card prominent 1-33 and the four prominent 1-34 of card one facing to described baffle plate 100。Upward and downward x described cage body 1 runs through fixing by sequentially passing through the upward and downward reinforcing bar 2-1 of each cage body, front and back run through fixing by sequentially passing through the front and back of each cage body to reinforcing bar 2-3 to m described cage body 1, three staggered reinforcing bars in direction and cage body form support frame, install baffle plate additional in support frame both sides, in make the first card dash forward draw-in groove that 1-31, the second prominent 1-32 of card, the 3rd card prominent 1-33 and the four prominent 1-34 of card snap on baffle plate, complete the fixing of baffle plate and support frame。
The 3D modularity run-up wall that this utility model provides, it is possible to factory process, it is also possible to site operation, Assembling, is not limited to the restriction of setting up of reinforcing bar, and baffle plate and support frame are directly fixed, it is to avoid the use of Screw arbor with nut at both-ends。
The above embodiment is only preferred embodiment of the present utility model, and is not the exhaustive of the feasible enforcement of this utility model。For persons skilled in the art, any apparent change under the premise without departing substantially from this utility model principle and spirit, it is done, all should be contemplated as falling with within claims of the present utility model。

Claims (5)

1. a 3D modularity run-up wall, it is characterised in that it includes two baffle plates (100) be arrangeding in parallel, is provided with support frame between two described baffle plates (100);
Described support frame includes cage body and the reinforcing bar (2) through described cage body, described cage body is piled up along three-dimensional by multiple cage body (1) and is formed, the left and right of described cage body is to for two cage body, before and after to for m cage body, upward and downward is x cage body, and described m and x is all higher than being equal to 2;
Described cage body (1) is the square cage of solid being made up of 12 posts, and described 12 posts include front left post (1-1), front right post (1-2), rear left post (1-3), rear right post (1-4), upper left post (1-5), upper front pillar (1-6), upper right post (1-7), upper rear pillar (1-8), bottom left post (1-9), lower front pillar (1-10), bottom right post (1-11) and bottom left post (1-12), the corner that described front right post (1-2) and described upper right post (1-7) are formed is provided with outward extending first card prominent (1-31), the corner that described upper rear pillar (1-8) and described rear right post (1-3) are formed is provided with outward extending second card prominent (1-32), the corner that described front right post (2) and described bottom right post (1-11) are formed is provided with outward extending 3rd card prominent (1-33), the corner that described rear right post (1-3) and described bottom right post (1-11) are formed is provided with outward extending 4th card prominent (1-34), described first card prominent (1-31), second card prominent (1-32), 3rd card prominent (1-33) and prominent (1-34) the vertical described front right post (1-2) of the 4th card, rear right post (1-3), the plane at upper right post (1-7) and bottom right post (1-11) place;
Described reinforcing bar (2) includes upward and downward reinforcing bar (2-1) and front and back to reinforcing bar (2-3), upward and downward x described cage body (1) runs through fixing by sequentially passing through the upward and downward reinforcing bar (2-1) of each cage body upper limit hole (1-24), and front and back run through fixing by sequentially passing through the front and back of each cage body front limit hole (1-22) to reinforcing bar (2-3) to m described cage body (1);
Described baffle plate (100) inner side is provided with the draw-in groove (101) matched with described first card prominent (1-31), the second card prominent (1-32), the 3rd card prominent (1-33) and the 4th card prominent (1-34), described cage body (1) be provided with described first card prominent (1-31), the second card prominent (1-32), the 3rd card prominent (1-33) and the 4th card dash forward (1-34) one facing to described baffle plate (100), and connect and fix with described baffle plate (100)。
2. a kind of 3D modularity run-up wall according to claim 1, it is characterised in that be fixedly installed upper cover plate on two described baffle plates (100)。
3. a kind of 3D modularity run-up wall according to claim 1, it is characterised in that many described upward and downward reinforcing bars (2-1) end colligation, many described front and back are to reinforcing bar (2-3) end colligation。
4. a kind of 3D modularity run-up wall according to any one of claim 1-3, it is characterised in that described 12 posts are square column。
5. a kind of 3D modularity run-up wall according to any one of claim 1-3, it is characterised in that described 12 column lengths are short and thick thin all identical。
CN201520990699.0U 2015-12-03 2015-12-03 3D modularization run -up wall Expired - Fee Related CN205329907U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520990699.0U CN205329907U (en) 2015-12-03 2015-12-03 3D modularization run -up wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520990699.0U CN205329907U (en) 2015-12-03 2015-12-03 3D modularization run -up wall

Publications (1)

Publication Number Publication Date
CN205329907U true CN205329907U (en) 2016-06-22

Family

ID=56211843

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520990699.0U Expired - Fee Related CN205329907U (en) 2015-12-03 2015-12-03 3D modularization run -up wall

Country Status (1)

Country Link
CN (1) CN205329907U (en)

Similar Documents

Publication Publication Date Title
CN103469933B (en) Double-layer plate built-in support complex heat-preservation shear wall and preparation method thereof
CN205935315U (en) Light steel composite wall panel module
CN110331777A (en) A kind of bamboo matter green prefabricated buildings and its method of construction
CN205329907U (en) 3D modularization run -up wall
CN205242714U (en) 3D modularization is built room and is used interior partition wall
KR20140008144A (en) Panel for prefabricated house, assembly structure using the same, and prefabricated house including the same
CN203559504U (en) Built-in supporting composite insulation shear wall with double layers of steel pipes
CN206128303U (en) Modularization integrated configuration building system
CN205329895U (en) 3D modular walling body waterproof construction
CN105350684A (en) Novel 3D modularized assembling wall structure
CN208792820U (en) Characteristic small town house
CN105544773A (en) 3D modularization run-up wall
CN208396013U (en) A kind of modularization composite structure connecting node
CN205242697U (en) Support element
CN205329962U (en) Skeleton cage
CN205242851U (en) Wallboard supporting component for room is built to 3D modularization
CN105756198A (en) Beam and center post connecting piece for prefabricated building
CN105544772A (en) Wallboard fixing member
CN105544771A (en) 3D modularization dry method run-up waterproof wall
CN207934183U (en) A kind of chip steel construction integrated house
CN203546904U (en) Box structure building system
CN206205728U (en) Hollow module novel environment friendly radioresistance door
CN207144168U (en) Novel box type modular combination house architectural structure
CN205421624U (en) Fast -assembling light wall
CN218814305U (en) Multi-combined steel structure house frame

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160622

Termination date: 20181203

CF01 Termination of patent right due to non-payment of annual fee