CN205313978U - Whole ann of bridge cantilever construction tears protector open - Google Patents

Whole ann of bridge cantilever construction tears protector open Download PDF

Info

Publication number
CN205313978U
CN205313978U CN201520986286.5U CN201520986286U CN205313978U CN 205313978 U CN205313978 U CN 205313978U CN 201520986286 U CN201520986286 U CN 201520986286U CN 205313978 U CN205313978 U CN 205313978U
Authority
CN
China
Prior art keywords
guardrail
reinforcing bar
bar
bridge pier
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520986286.5U
Other languages
Chinese (zh)
Inventor
张享恒
梁鹏飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd
Original Assignee
CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd filed Critical CHONGQING JUNENG CONSTRUCTION GROUP Co Ltd
Priority to CN201520986286.5U priority Critical patent/CN205313978U/en
Application granted granted Critical
Publication of CN205313978U publication Critical patent/CN205313978U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

The utility model discloses a whole ann of bridge cantilever construction tears protector open, including the bridge pier shaft the bilateral symmetry of bridge pier shaft bottom is provided with the guardrail, bar formation that this guardrail was parallel to each other by guardrail horizon bar and duo gen, the reinforcing bar is " L " shape, and the inner of this reinforcing bar crosspiece forms the screw rod through shelling rib straight thread rolled thread processing, during the screw rod stretches into the pre -buried sleeve in bridge pier shaft bottom, both threaded connection, each reinforcing bar of homonymy erect the section through linking together from last many guardrail horizon bars that down set up, erecting of guardrail horizon bar and reinforcing bar section is welded mutually to the perpendicular section of fence horizon bar perpendicular to reinforcing bar. The utility model relates to a rationally, simple structure, it is easy to implement, and it is convenient, with low costs to install, can effectively improve the stability of atress and the security of construction operation, all is suitable for in the construction of different types of rridges cantilever.

Description

Bridge cantilever construction entirety peace tears safety guard open
Technical field
The utility model belongs to technical field of bridge engineering, specifically, tears safety guard open in particular to bridge cantilever construction entirety peace.
Background technology
For many years, continuous rigid frame bridge cantilever casting construction is widely used in highway, municipal administration bridge field and develops. At present, the construction of encorbelmenting of common bridge mainly relies on bracket, bears frame or built-up type support system, stress condition owing to encorbelmenting has the features such as cantilever span is big, Load concentration, Construction treatment are complicated, therefore, ensure that the stable safety and quality control that whole bridge is encorbelmented construction of support system has most important relation, and each has something to recommend him at eminence unsettled place construction safety security problem, but all base oneself upon place without firm. Existing unsettled high-rise working mainly adopts following two kinds of forms of construction work:
1, hanging basket or hang cage construction: lift must be adopted, operator must special messenger's special plane, install and assembling content many, have cost high maintenance require high, turnover is difficult, have enough to meet the need the deficiencies such as slow;
2, rack construction: utilize steel pipe, rod member or synthetic materials to carry out the support system assembled, the rod member at support node place is eccentric connection, transmits load and internal force by skid resistance, thus reduces its supporting capacity; The impact of the connection quality of quality fastener of fastener node own and workman's operation is remarkable, and the more high security risk in hanging operation position is more big.
Practical novel content
Technical problem to be solved in the utility model is to provide the bridge cantilever construction entirety peace that a kind of structure is simple, security is good to tear safety guard open.
The technical solution of the utility model is as follows: a kind of bridge cantilever construction entirety peace tears safety guard open, comprise bridge pier body, it is characterized in that: the zygomorphy bottom described bridge pier body is provided with guardrail, the reinforcing bar that this guardrail is parallel to each other by the horizontal bar of guardrail and Duo Gen is formed, described reinforcing bar is " L " shape, the inner of this reinforcing bar crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, described screw rod stretches in the sleeve buried in advance bottom bridge pier body, both are threaded, linked together by the horizontal bar of many guardrails arranged from top to bottom with the perpendicular section of each reinforcing bar in side, the horizontal bar of guardrail welds mutually with the perpendicular section of reinforcing bar, and the horizontal bar in hurdle is perpendicular to the perpendicular section of reinforcing bar.
Adopting above technical scheme, be embedded in advance by joint sleeve in pier body when bridge pier body is built, sleeve bear one end outwardly, is tamped with sponge.After pier body concrete form removal, take out the sponge burying in sleeve in advance; Adopting hanging basket lifting operation, by the reinforcing bar of machine-shaping together with burying sleeve connection in advance, just define operation platform load-bearing skeleton, then welding is protected and is blocked horizontal bar, lays plank, and plank two ends adopt galvanized steel wire hoop around fixing. It thus is seen that the utility model not only structure is simple, easy for installation, quick, cost is low, and can effectively improve the security of the stability by power and constructing operation.
As preferably, being equipped with plank on described guardrail, this plank is supported jointly by the horizontal section of each reinforcing bar of guardrail, and adopts galvanized steel wire hoop around fixing between plank and reinforcing bar.
Useful effect: the utility model is reasonable in design, structure is simple, implements easily, and it is convenient to install, and cost is low, can effectively improve the security of the stability by power and constructing operation, all applicable in different types of rridges cantilever construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlargement figure of Fig. 1.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
As shown in Figure 1 and Figure 2, the zygomorphy bottom bridge pier body 1 is provided with guardrail 2, and the reinforcing bar 21 that this guardrail 2 is parallel to each other by the horizontal bar 22 of guardrail and Duo Gen is formed. In the present embodiment, the number of reinforcing bar 21 is preferably four, and each reinforcing bar 21 is bent into " L " shape, and the inner of this reinforcing bar 21 crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, and screw rod stretches in the sleeve 3 buried in advance bottom bridge pier body 1, and both are threaded. Being linked together by the horizontal bar 22 of many guardrails arranged from top to bottom with the perpendicular section of each reinforcing bar in side 21, the horizontal bar of guardrail 22 welds mutually with the perpendicular section of reinforcing bar 21, and the horizontal bar in hurdle 22 is perpendicular to the perpendicular section of reinforcing bar 21. Being equipped with plank 4 on guardrail 2, this plank 4 is supported jointly by the horizontal section of each reinforcing bar 21 of guardrail 2, and adopts galvanized steel wire hoop around fixing between plank 4 and reinforcing bar 21.
Construction process of the present utility model is as follows:
Being embedded in pier body in advance by joint sleeve 3 when bridge pier body 1 is built, sleeve 3 bear one end outwardly, is tamped with sponge. After pier body concrete form removal, take out the sponge burying in sleeve 3 in advance; Adopting hanging basket lifting operation, by the reinforcing bar 21 of machine-shaping with burying sleeve 3 in advance and link together, just define operation platform load-bearing skeleton, then welding is protected and is blocked horizontal bar 33, finally lays plank 4, and plank 4 two ends adopt galvanized steel wire hoop around fixing.
The specification of the horizontal bar 22 of above-mentioned reinforcing bar 21, guardrail, sleeve 3 and plank 4 is determined according to actual needs, does not repeat at this.

Claims (2)

1. a bridge cantilever construction entirety peace tears safety guard open, comprise bridge pier body (1), it is characterized in that: the zygomorphy in described bridge pier body (1) bottom is provided with guardrail (2), this guardrail (2) is made up of the horizontal bar of guardrail (22) and the many reinforcing bars being parallel to each other (21), described reinforcing bar (21) is " L " shape, the inner of this reinforcing bar (21) crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, described screw rod stretches in the sleeve (3) that bridge pier body (1) bottom is buried in advance, both are threaded, linked together by the horizontal bar of the many guardrails (22) arranged from top to bottom with the perpendicular section of each reinforcing bar in side (21), the horizontal bar of guardrail (22) welds mutually with the perpendicular section of reinforcing bar (21), and the horizontal bar in hurdle (22) is perpendicular to the perpendicular section of reinforcing bar (21).
2. bridge cantilever construction according to claim 1 entirety peace tears safety guard open, it is characterized in that: on described guardrail (2), be equipped with plank (4), this plank (4) is supported jointly by the horizontal section of guardrail (2) each reinforcing bar (21), and adopts galvanized steel wire hoop around fixing between plank (4) and reinforcing bar (21).
CN201520986286.5U 2015-12-02 2015-12-02 Whole ann of bridge cantilever construction tears protector open Expired - Fee Related CN205313978U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520986286.5U CN205313978U (en) 2015-12-02 2015-12-02 Whole ann of bridge cantilever construction tears protector open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520986286.5U CN205313978U (en) 2015-12-02 2015-12-02 Whole ann of bridge cantilever construction tears protector open

Publications (1)

Publication Number Publication Date
CN205313978U true CN205313978U (en) 2016-06-15

Family

ID=56314501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520986286.5U Expired - Fee Related CN205313978U (en) 2015-12-02 2015-12-02 Whole ann of bridge cantilever construction tears protector open

Country Status (1)

Country Link
CN (1) CN205313978U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326814A (en) * 2017-08-30 2017-11-07 云南工程建设总承包公司 A kind of bridge bottom construction safety protection column

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107326814A (en) * 2017-08-30 2017-11-07 云南工程建设总承包公司 A kind of bridge bottom construction safety protection column

Similar Documents

Publication Publication Date Title
CN204023411U (en) Novel assembled bracket bracket construction equipment
CN104372967B (en) A kind of cooling stack inclined strut structure and construction method thereof
CN104389419A (en) Cantilevered formwork platform installation structure and construction method
CN107524284A (en) A kind of regularization pylon protection system and installation method
JP2016084690A (en) Base type foundation unit
CN207314147U (en) A kind of bridge construction employment row safety climbing ladder
CN104047233A (en) Method for construction of continuous beam linear segment without floor stand
CN202073089U (en) Movable hanging steel bar for steel reinforcement cage of pile foundation
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN205313978U (en) Whole ann of bridge cantilever construction tears protector open
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN104233961A (en) Triangular supporting bracket of suspended cast bridge block 0
CN207267961U (en) A kind of bridge pier shaft pours operating platform
CN206052554U (en) A kind of Construction Supporting System for square twin columns great cantilever bent cap
CN102733599A (en) Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam
CN209816665U (en) Bent cap bracket suitable for round end shape pier stud
CN204386135U (en) Portable Hanging Basket
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN204023417U (en) For building the bearing pin bracket of high pier 0# block concrete
CN207878284U (en) Bailey beam cable saddle hoisting bracket
CN203668857U (en) Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN204531571U (en) The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof
CN211113196U (en) Multifunctional folding assembly type operating platform
CN204940916U (en) A kind of Super High Core Walls Structure emergency escape passage

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160615

Termination date: 20201202