CN205313978U - Whole ann of bridge cantilever construction tears protector open - Google Patents
Whole ann of bridge cantilever construction tears protector open Download PDFInfo
- Publication number
- CN205313978U CN205313978U CN201520986286.5U CN201520986286U CN205313978U CN 205313978 U CN205313978 U CN 205313978U CN 201520986286 U CN201520986286 U CN 201520986286U CN 205313978 U CN205313978 U CN 205313978U
- Authority
- CN
- China
- Prior art keywords
- guardrail
- reinforcing bar
- bar
- bridge pier
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a whole ann of bridge cantilever construction tears protector open, including the bridge pier shaft the bilateral symmetry of bridge pier shaft bottom is provided with the guardrail, bar formation that this guardrail was parallel to each other by guardrail horizon bar and duo gen, the reinforcing bar is " L " shape, and the inner of this reinforcing bar crosspiece forms the screw rod through shelling rib straight thread rolled thread processing, during the screw rod stretches into the pre -buried sleeve in bridge pier shaft bottom, both threaded connection, each reinforcing bar of homonymy erect the section through linking together from last many guardrail horizon bars that down set up, erecting of guardrail horizon bar and reinforcing bar section is welded mutually to the perpendicular section of fence horizon bar perpendicular to reinforcing bar. The utility model relates to a rationally, simple structure, it is easy to implement, and it is convenient, with low costs to install, can effectively improve the stability of atress and the security of construction operation, all is suitable for in the construction of different types of rridges cantilever.
Description
Technical field
The utility model belongs to technical field of bridge engineering, specifically, tears safety guard open in particular to bridge cantilever construction entirety peace.
Background technology
For many years, continuous rigid frame bridge cantilever casting construction is widely used in highway, municipal administration bridge field and develops. At present, the construction of encorbelmenting of common bridge mainly relies on bracket, bears frame or built-up type support system, stress condition owing to encorbelmenting has the features such as cantilever span is big, Load concentration, Construction treatment are complicated, therefore, ensure that the stable safety and quality control that whole bridge is encorbelmented construction of support system has most important relation, and each has something to recommend him at eminence unsettled place construction safety security problem, but all base oneself upon place without firm. Existing unsettled high-rise working mainly adopts following two kinds of forms of construction work:
1, hanging basket or hang cage construction: lift must be adopted, operator must special messenger's special plane, install and assembling content many, have cost high maintenance require high, turnover is difficult, have enough to meet the need the deficiencies such as slow;
2, rack construction: utilize steel pipe, rod member or synthetic materials to carry out the support system assembled, the rod member at support node place is eccentric connection, transmits load and internal force by skid resistance, thus reduces its supporting capacity; The impact of the connection quality of quality fastener of fastener node own and workman's operation is remarkable, and the more high security risk in hanging operation position is more big.
Practical novel content
Technical problem to be solved in the utility model is to provide the bridge cantilever construction entirety peace that a kind of structure is simple, security is good to tear safety guard open.
The technical solution of the utility model is as follows: a kind of bridge cantilever construction entirety peace tears safety guard open, comprise bridge pier body, it is characterized in that: the zygomorphy bottom described bridge pier body is provided with guardrail, the reinforcing bar that this guardrail is parallel to each other by the horizontal bar of guardrail and Duo Gen is formed, described reinforcing bar is " L " shape, the inner of this reinforcing bar crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, described screw rod stretches in the sleeve buried in advance bottom bridge pier body, both are threaded, linked together by the horizontal bar of many guardrails arranged from top to bottom with the perpendicular section of each reinforcing bar in side, the horizontal bar of guardrail welds mutually with the perpendicular section of reinforcing bar, and the horizontal bar in hurdle is perpendicular to the perpendicular section of reinforcing bar.
Adopting above technical scheme, be embedded in advance by joint sleeve in pier body when bridge pier body is built, sleeve bear one end outwardly, is tamped with sponge.After pier body concrete form removal, take out the sponge burying in sleeve in advance; Adopting hanging basket lifting operation, by the reinforcing bar of machine-shaping together with burying sleeve connection in advance, just define operation platform load-bearing skeleton, then welding is protected and is blocked horizontal bar, lays plank, and plank two ends adopt galvanized steel wire hoop around fixing. It thus is seen that the utility model not only structure is simple, easy for installation, quick, cost is low, and can effectively improve the security of the stability by power and constructing operation.
As preferably, being equipped with plank on described guardrail, this plank is supported jointly by the horizontal section of each reinforcing bar of guardrail, and adopts galvanized steel wire hoop around fixing between plank and reinforcing bar.
Useful effect: the utility model is reasonable in design, structure is simple, implements easily, and it is convenient to install, and cost is low, can effectively improve the security of the stability by power and constructing operation, all applicable in different types of rridges cantilever construction.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the partial enlargement figure of Fig. 1.
Embodiment
Below in conjunction with drawings and Examples, the utility model is described in further detail:
As shown in Figure 1 and Figure 2, the zygomorphy bottom bridge pier body 1 is provided with guardrail 2, and the reinforcing bar 21 that this guardrail 2 is parallel to each other by the horizontal bar 22 of guardrail and Duo Gen is formed. In the present embodiment, the number of reinforcing bar 21 is preferably four, and each reinforcing bar 21 is bent into " L " shape, and the inner of this reinforcing bar 21 crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, and screw rod stretches in the sleeve 3 buried in advance bottom bridge pier body 1, and both are threaded. Being linked together by the horizontal bar 22 of many guardrails arranged from top to bottom with the perpendicular section of each reinforcing bar in side 21, the horizontal bar of guardrail 22 welds mutually with the perpendicular section of reinforcing bar 21, and the horizontal bar in hurdle 22 is perpendicular to the perpendicular section of reinforcing bar 21. Being equipped with plank 4 on guardrail 2, this plank 4 is supported jointly by the horizontal section of each reinforcing bar 21 of guardrail 2, and adopts galvanized steel wire hoop around fixing between plank 4 and reinforcing bar 21.
Construction process of the present utility model is as follows:
Being embedded in pier body in advance by joint sleeve 3 when bridge pier body 1 is built, sleeve 3 bear one end outwardly, is tamped with sponge. After pier body concrete form removal, take out the sponge burying in sleeve 3 in advance; Adopting hanging basket lifting operation, by the reinforcing bar 21 of machine-shaping with burying sleeve 3 in advance and link together, just define operation platform load-bearing skeleton, then welding is protected and is blocked horizontal bar 33, finally lays plank 4, and plank 4 two ends adopt galvanized steel wire hoop around fixing.
The specification of the horizontal bar 22 of above-mentioned reinforcing bar 21, guardrail, sleeve 3 and plank 4 is determined according to actual needs, does not repeat at this.
Claims (2)
1. a bridge cantilever construction entirety peace tears safety guard open, comprise bridge pier body (1), it is characterized in that: the zygomorphy in described bridge pier body (1) bottom is provided with guardrail (2), this guardrail (2) is made up of the horizontal bar of guardrail (22) and the many reinforcing bars being parallel to each other (21), described reinforcing bar (21) is " L " shape, the inner of this reinforcing bar (21) crosspiece is processed to form screw rod by stripping rib straight thread rolled thread, described screw rod stretches in the sleeve (3) that bridge pier body (1) bottom is buried in advance, both are threaded, linked together by the horizontal bar of the many guardrails (22) arranged from top to bottom with the perpendicular section of each reinforcing bar in side (21), the horizontal bar of guardrail (22) welds mutually with the perpendicular section of reinforcing bar (21), and the horizontal bar in hurdle (22) is perpendicular to the perpendicular section of reinforcing bar (21).
2. bridge cantilever construction according to claim 1 entirety peace tears safety guard open, it is characterized in that: on described guardrail (2), be equipped with plank (4), this plank (4) is supported jointly by the horizontal section of guardrail (2) each reinforcing bar (21), and adopts galvanized steel wire hoop around fixing between plank (4) and reinforcing bar (21).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520986286.5U CN205313978U (en) | 2015-12-02 | 2015-12-02 | Whole ann of bridge cantilever construction tears protector open |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520986286.5U CN205313978U (en) | 2015-12-02 | 2015-12-02 | Whole ann of bridge cantilever construction tears protector open |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205313978U true CN205313978U (en) | 2016-06-15 |
Family
ID=56314501
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520986286.5U Expired - Fee Related CN205313978U (en) | 2015-12-02 | 2015-12-02 | Whole ann of bridge cantilever construction tears protector open |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205313978U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
-
2015
- 2015-12-02 CN CN201520986286.5U patent/CN205313978U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107326814A (en) * | 2017-08-30 | 2017-11-07 | 云南工程建设总承包公司 | A kind of bridge bottom construction safety protection column |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204023411U (en) | Novel assembled bracket bracket construction equipment | |
CN104372967B (en) | A kind of cooling stack inclined strut structure and construction method thereof | |
CN104389419A (en) | Cantilevered formwork platform installation structure and construction method | |
CN107524284A (en) | A kind of regularization pylon protection system and installation method | |
JP2016084690A (en) | Base type foundation unit | |
CN207314147U (en) | A kind of bridge construction employment row safety climbing ladder | |
CN104047233A (en) | Method for construction of continuous beam linear segment without floor stand | |
CN202073089U (en) | Movable hanging steel bar for steel reinforcement cage of pile foundation | |
CN103552911B (en) | A kind of movable boom hoisting and the construction installation method of use thereof | |
CN205313978U (en) | Whole ann of bridge cantilever construction tears protector open | |
CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
CN104233961A (en) | Triangular supporting bracket of suspended cast bridge block 0 | |
CN207267961U (en) | A kind of bridge pier shaft pours operating platform | |
CN206052554U (en) | A kind of Construction Supporting System for square twin columns great cantilever bent cap | |
CN102733599A (en) | Fastener type steel pipe scaffold framework support applicable to steel reinforced concrete beam | |
CN209816665U (en) | Bent cap bracket suitable for round end shape pier stud | |
CN204386135U (en) | Portable Hanging Basket | |
CN204023422U (en) | A kind of assembling Coping Construction operating platform | |
CN204023417U (en) | For building the bearing pin bracket of high pier 0# block concrete | |
CN207878284U (en) | Bailey beam cable saddle hoisting bracket | |
CN203668857U (en) | Walkable operating platform frame used for connection and reinforcement of SS-level guardrail templates | |
CN202055509U (en) | Upright rod installation structure of directly-inserted scaffold | |
CN204531571U (en) | The segmented cement electric pole of the pre-buried flange of a kind of cement electric pole and application thereof | |
CN211113196U (en) | Multifunctional folding assembly type operating platform | |
CN204940916U (en) | A kind of Super High Core Walls Structure emergency escape passage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160615 Termination date: 20201202 |