Background technology
Existing curtain wall panel when mounted, generally adopts following two mode to install:
1, first slotted-angle shelving is welded on the appointment position of Os Draconis, then adopts the tapping screw of M5.5 curtain wall panel to be fixed on slotted-angle shelving. Adopt said structure that curtain wall panel is installed and have the disadvantage that (1), tapping screw easily loosen, there is potential safety hazard; (2) offset if there is position when, curtain wall panel is installed, when needing to adjust position, then need to disassemble tapping screw, again curtain wall panel is put, again through automatic screw, curtain wall panel is fixed on slotted-angle shelving, whole procedure regulation is difficult, and the tapping screw disassembled leaves installing hole in curtain wall panel, affects the attractive in appearance of curtain wall panel; (3) head of screw can expose in the tapping screw place, in curtain wall panel, affects the attractive in appearance of curtain wall panel.
2, reserved steel bar or ironware in curtain wall panel, is then directly welded on curtain wall panel on main joist. Adopt said structure that curtain wall panel is installed to have the disadvantage that (1), installation site cannot be adjusted; (2), anticorrosion can be produced impact; (3), when curtain wall panel and agent structure installation site are less, lower end cannot be installed.
Utility model content
The purpose of this utility model is in that to provide a kind of GRC curtain wallboard fastener formula to install node, its simple in construction, and dismounting efficiency is high, and safety is high, the curtain wall panel surface aesthetic after installation.
For reaching above-mentioned purpose, this utility model by the following technical solutions:
There is provided a kind of GRC curtain wallboard fastener formula that this curtain wall panel of node is installed and be fixed on main joist by this installation node, described installation node includes built-in fitting, first buckle, second buckle, first angle bar and the second angle bar, described built-in fitting is embedded in described curtain wall panel, the one end on its surface protruding from described curtain wall panel is provided with screw thread, described first snap thread is screwed in described built-in fitting and arranges threaded one end, one end of described second buckle and described first buckle clamping, the other end is connected by stop screw, described second buckle is connected with described first angle bar by the first fastening bolt away from the side of described first buckle, described second angle bar is welded on the setting position of described main joist, described first angle bar fastens bolt by second and removably connects with described second angle bar.
The beneficial effects of the utility model: the GRC curtain wallboard fastener formula that this utility model provides installs node by being embedded in curtain wall panel by the built-in fitting installing node, perforate can be reduced in curtain wall panel and play screw, the installation safety coefficient of curtain wall panel can be increased, effectively prevent curtain wall panel from coming off, curtain wall panel without perforate and head of screw, adds the surface aesthetics of curtain wall panel away from the one side of main joist; By by one end clamping of the first buckle and the second buckle, the other end is connected by stop screw, it is possible to increase dismounting speed, simultaneously it is also ensured that the stability connected. Contrast prior art, it is simple that GRC curtain wallboard fastener formula of the present utility model installs node structure, and dismounting efficiency is high, and safety is high, the curtain wall surface aesthetic after installation.
Accompanying drawing explanation
Fig. 1 is the installment state schematic diagram of the GRC curtain wallboard fastener formula installation node of this utility model embodiment.
Fig. 2 is the top view of Fig. 1.
In Fig. 1��2:
1, curtain wall panel; 2, main joist; 3, built-in fitting; 31, baffle plate; 32, fixing bar; 4, the first buckle; 41, the first clamp; 42, the first connecting plate; 43, the first limiting plate; 44, the 3rd connecting plate; 45, the 3rd limiting plate; 5, the second buckle; 51, the second clamp; 52, the second connecting plate; 53, the second limiting plate; 54, the 4th connecting plate; 55, the 4th limiting plate; 56, the 5th connecting plate; 57, stopper protrusion; 58, holding tank; 59, connecting hole; 6, the first angle bar; 7, the second angle bar; 8, stop screw; 9, the first fastening bolt; 10, the second fastening bolt; 11, the first clamp nut; 12, the first backing plate; 13, the second backing plate; 14, the 3rd backing plate; 15, the second clamp nut; 16, fixing screw.
Detailed description of the invention
The technical solution of the utility model is further illustrated below in conjunction with accompanying drawing and by detailed description of the invention. In description of the present utility model, it will be appreciated that, orientation or the position relationship of the instruction such as term " vertically ", " level ", " top ", " lower section ", " interior ", " outward " are based on orientation shown in the drawings or position relationship, it is for only for ease of the description present invention and simplifies description, rather than instruction or hint indication device or element must have specific orientation, with specific azimuth configuration and operation, be therefore not considered as limiting the invention.
As shown in Figure 1, this utility model embodiment provides a kind of GRC curtain wallboard fastener formula to install node, this curtain wall panel 1 is installed node by this and is fixed on main joist 2, node is installed and includes built-in fitting 3, first buckle 4, second buckle 5, first angle bar 6 and the second angle bar 7, built-in fitting 3 is embedded in curtain wall panel 1, the one end on its surface protruding from curtain wall panel 1 is provided with screw thread, first buckle 4 screw thread is screwed in built-in fitting 3 and arranges threaded one end, one end of second buckle 5 and the first buckle 4 clamping, the other end is connected by stop screw 8, second buckle 5 is connected with the first angle bar 6 by the first fastening bolt 9 away from the side of the first buckle 4, second angle bar 7 is welded on the setting position of main joist 2, first angle bar 6 is removably connected by the second fastening bolt 10 and the second angle bar 7.
Built-in fitting 3 includes the baffle plate 31 being fixed in curtain wall panel 1 and the fixing bar 32 being vertically set on baffle plate 31 side, and fixing bar 32 extends to outside curtain wall panel 1 away from one end of baffle plate 31 and is provided with screw thread.
First buckle 4 includes the first clamp 41, vertically, first clamp 41 includes superposed first end and is positioned at the second end of bottom, second end of the first clamp 41 is directed away from that the side of curtain wall panel 1 is horizontal-extending the first connecting plate 42, first connecting plate 42 is vertically extended with the first limiting plate 43 away from one end of the first clamp 41, second buckle 5 includes the second clamp 51, vertically, second clamp 51 includes superposed first end and is positioned at the second end of bottom, second clamp 51 is parallel with the first clamp 41, second end of the second clamp 51 has the second connecting plate 52 towards horizontal-extending near the side of the first clamp 41, second connecting plate 52 extended the first limiting plate 43 and was extended with the second limiting plate 53 in the end of the second connecting plate 52 towards the first connecting plate 42, first limiting plate 43 is between the second limiting plate 53 and the second clamp 51.
First buckle 4 also includes being directed away from the 3rd connecting plate 44 that the side of curtain wall panel 1 is horizontal-extending by the first end of the first clamp 41, 3rd connecting plate 44 is vertically extended with the 3rd limiting plate 45 away from one end of the first clamp 41 towards the side of the first connecting plate 42, second buckle 5 also includes the 4th connecting plate 54 that the first end by the second clamp 51 is horizontal-extending towards the side of close first clamp 41, 4th connecting plate 54 is extended with the 4th limiting plate 55 away from one end of the second clamp 51 towards the 3rd connecting plate 44, 4th limiting plate 55 is between the 3rd limiting plate 45 and the first clamp 41, the 5th connecting plate 56 is had away from one end of the 4th connecting plate 54 is horizontally extending at the 4th limiting plate 55, 5th connecting plate 56 is parallel with the 3rd connecting plate 44, 5th connecting plate 56 and the 3rd connecting plate 44 are arranged to both carry out spacing stop screw 8 and the fixing screw 16 for both are fixed, stop screw 8 and fixing screw 16 interval are arranged.
Second connecting plate 52 is arranged at intervals with stopper protrusion 57 with the second limiting plate 53, first limiting plate 43 is between the second limiting plate 53 and stopper protrusion 57, in second clamp 51, holding tank 58 is set, second clamp 51 offers the connecting hole 59 connected with holding tank 58 near the side of the first angle bar 6, first fastening bolt 9 includes screw rod and is positioned at the nut of screw rod one end, nut is arranged in holding tank 58, it is sized larger than the diameter of connecting hole 59, one end of screw rod is fixing with nut to be connected, the other end sequentially passes through connecting hole 59, first angle bar 6 is connected with the first clamp nut 11, first backing plate 12 is set between first clamp 41 and curtain wall panel 1, first backing plate 12 is offered the through hole passed through for built-in fitting 3, between second clamp 51 and the first angle bar 6, the second backing plate 13 is set, second backing plate 13 is offered the through hole passed through for the first fastening bolt 9.
First angle bar 6 arranges the 3rd backing plate 14, second angle bar the 7, first angle bar 6 and the 3rd backing plate 14 are all offered the through hole passed through for the second fastening bolt 10, second fastening bolt 10 sequentially passes through the through hole on the through hole on the second angle bar 7, the first angle bar 6 and the through hole on the 3rd backing plate 14 and the second clamp nut 15 screw thread spins, and the 3rd backing plate 14 welds with the first angle bar 6.
As this utility model preferred embodiment, for fixing the first angle bar 6 and the second angle bar 7 further, first angle bar 6 is fixed and is passed through the second clamp nut 15 locked by two second fastening bolts 10 and the second angle bar 7, corresponding equal interval on second angle bar the 7, first angle bar 6 and the 3rd backing plate 14 is offered two confessions second and is fastened the through hole that bolt 10 passes through, and two second fasten bolt 10 and sequentially pass through the through hole on the through hole on the second angle bar 7, the first angle bar 6 and the through hole on the 3rd backing plate 14 and the second clamp nut 15 screw thread spins.
Concrete installation steps are as follows:
Step S100, built-in fitting 3 is embedded in curtain wall panel 1, and makes its threaded portion protrude from the side of curtain wall panel 1, then weld the second angle bar 7 at the correspondence position of main joist 2;
Step S200, the first backing plate 12 and the first buckle 4 are fixed on the threaded portion of built-in fitting 3;
Step S300, the first angle bar 6 and the 3rd backing plate 14 are passed sequentially through the second fastening bolt 10 it is fixed on the second angle bar 7, and by the 3rd backing plate 14 and the first angle bar 6 spot welding;
Step S400, the second backing plate 13 and the second buckle 5 are passed sequentially through the first fastening bolt 9 it is fixed on the first angle bar 6;
Step S500, curtain wall panel 1 is moved to main joist 2 correspondence position, make the lower end of the second buckle 5 and the lower end snapping of the first buckle 4, then the upper end of the second buckle 5 and the upper end snapping of the first buckle 4 are made, adopt trip bolt 16 to fix the upper end of two buckles after spacing by stop screw 8, complete to install.
In description of the present utility model, it is to be understood that term " first ", " second ", " the 3rd ", " the 4th ", " the 5th ", it is used only for being distinguish between on describing, not special implication.
It is to be understood that; above-mentioned detailed description of the invention is only preferred embodiment of the present utility model and institute's application technology principle; in technical scope disclosed in the utility model; change that any those familiar with the art is readily apparent that or replacement, all should be encompassed in protection domain of the present utility model.