CN205295256U - Water circulating system of gas producer , forging furnace and boiler - Google Patents
Water circulating system of gas producer , forging furnace and boiler Download PDFInfo
- Publication number
- CN205295256U CN205295256U CN201620066297.6U CN201620066297U CN205295256U CN 205295256 U CN205295256 U CN 205295256U CN 201620066297 U CN201620066297 U CN 201620066297U CN 205295256 U CN205295256 U CN 205295256U
- Authority
- CN
- China
- Prior art keywords
- water
- forging furnace
- gas generator
- boiler
- producer gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)
Abstract
The utility model relates to a water -chilling plant and the boiler heating system field of gas producer, forging furnace specifically are a water circulating system of gas producer, forging furnace and boiler. The water jacket in water jacket among high flush tank and the gas producer, the water jacket in the forging furnace water valve, the forging furnace water frame is connected respectively to this water circulating system's delivery pipe, constitutes gas producer forging furnace water supply system, the water jacket in the forging furnace water valve, water jacket and the high flush tank in the forging furnace water frame are connected respectively to the hot -water line, constitute forging furnace hot water recovery system, high flush tank passes through the tube coupling boiler, set up the water pump on the pipeline, through hot water delivery inlet to the boiler of water pump in with high flush tank, constitute high flush tank drainage system. The utility model has the advantages of simple structure, operation adjustment is convenient, the installation is easy, can fine solution gas stove, the water supply problem of forging furnace, also can solve the heating in winter of factory building, office building etc. Energy -concerving and environment -protective scheduling problem.
Description
Technical field
The utility model relates to producer gas generator, the water-chilling plant of forging furnace and boiler heating system field, is specially the water circulation system of a kind of producer gas generator, forging furnace and boiler.
Background technology
Producer gas generator, forge furnace are the basic equipment of forging industry, it is desired to equipment can safe and reliable operation, Effec-tive Function, energy-conserving and environment-protective. In order to simplified apparatus is safeguarded maintenance, improved service life of equipment, improve apparatus control system most important; Optimizing equipment Controlling System, is possible not only to reduce workman's workload, also reduces production cost, improves labour productivity.
Practical novel content
The purpose of this utility model is to provide the water circulation system of a kind of producer gas generator, forging furnace and boiler, optimize the water circulation system of producer gas generator, forging furnace and boiler, realize producer gas generator, forging furnace and boiler safety reliability service, Effec-tive Function, it is achieved energy-conserving and environment-protective.
The technical solution of the utility model is:
A water circulation system for producer gas generator, forging furnace and boiler, this water circulation system comprises: producer gas generator, forging furnace, boiler, elevated tank, and concrete structure is as follows:
Water-supply pipe connects the water jacket in the water jacket in the water jacket in elevated tank and producer gas generator, forging furnace water valve, forging furnace water frame respectively, forms producer gas generator forging furnace waterworks; Hot water pipe connects the water jacket in the water jacket in forging furnace water valve, forging furnace water frame and elevated tank respectively, forms forging furnace hot water recovery system;
Elevated tank connects boiler by pipeline, and described pipeline arranges water pump, by water pump by the delivery in elevated tank to boiler, forms elevated tank water exhaust system.
The water circulation system of described producer gas generator, forging furnace and boiler, the rising pipe of boiler, through scatterer, is linked back to elevated tank, forms factory building office building heating system;Return water pipe connects scatterer and elevated tank, forms cold water recovery system.
The water circulation system of described producer gas generator, forging furnace and boiler, elevated tank arranges running water pipe, liquid level control switch, tank port, forms water level control system by running water pipe, liquid level control switch, tank port.
The water circulation system of described producer gas generator, forging furnace and boiler, elevated tank bottom is connected with bottom in the water jacket of producer gas generator by water pipe, forms producer gas generator hydrologic cycle cooling system.
The water circulation system of described producer gas generator, forging furnace and boiler, the water jacket of producer gas generator is connected with the drum of producer gas generator, the import of atmospheric steam tank passes through pipeline connection by the drum vapour outlet of vapour pipe III with producer gas generator, the outlet of atmospheric steam tank is connected with elevated tank by vapour pipe I on the one hand, the outlet of atmospheric steam tank is connected with the furnace bottom of producer gas generator by vapour pipe II on the other hand, and vapour pipe II arranges flow valve.
The water circulation system of described producer gas generator, forging furnace and boiler, in producer gas generator, the mixed gas outlet of gas generating chamber is connected with the gas burner of forging furnace by pipeline, described pipeline arranges desulfation dust-extraction device, forms producer gas generator dust-removal system.
Compared with prior art, the utility model tool has the following advantages and useful effect:
1, the utility model is made up of the water at atmospheric pressure recycle system of the water at atmospheric pressure recycle system of elevated tank and producer gas generator, elevated tank and forging furnace, elevated tank and the boiler low-pressure water recycle system, elevated tank water level control system and dust-removal system etc., its structure is simple, operation adjustment convenient, install easily, the water supply problem of gas furnace, forging furnace can be solved very well, it is also possible to solve the problems such as the warming of factory building, office building etc., energy-conserving and environment-protective.
2, system of the present utility model letter knot, safety, space take few.
3, the utility model can optimize workshop pipe-line layout, adopts boiler to purify waste water and processes whole system, it is possible to UTILIZATION OF VESIDUAL HEAT IN fully.
Accompanying drawing explanation
Fig. 1 is the utility model structural representation.
In figure, 1 producer gas generator; 2 water-supply pipes; 3 desulfation dust-extraction devices; 4 forging furnaces; 5 forging furnace water valves; 6 forging furnace water frames; 7 scatterers; 8 hot water pipes; 9 return water pipes; 10 boilers; 11 water pumps; 12 elevated tanks; 13 liquid level control switch; 14 tank ports; 15 running water pipes; 16 vapour pipes I; 17 vapour pipes II; 18 atmospheric steam tanks; 19 vapour pipes III; 20 flow valves; 21 water jackets; 22 drums.
Embodiment
As shown in Figure 1, the water circulation system of the utility model producer gas generator, forging furnace and boiler, mainly comprising: producer gas generator 1, water-supply pipe 2, desulfation dust-extraction device 3, forging furnace 4, forging furnace water valve 5, forging furnace water frame 6, scatterer 7, hot water pipe 8, return water pipe 9, boiler 10, water pump 11, elevated tank 12, liquid level control switch 13, tank port 14, running water pipe 15, vapour pipe I 16, vapour pipe II 17, atmospheric steam tank 18, vapour pipe III 19, flow valve 20 etc., concrete structure is as follows:
Water-supply pipe 2 connects elevated tank 12 and the water jacket in producer gas generator 1, the water jacket in forging furnace water valve 5, the water jacket in forging furnace water frame 6 respectively, forms producer gas generator forging furnace waterworks (forging furnace doorframe cooling system). Hot water pipe 8 connects the water jacket in the water jacket in forging furnace water valve 5, forging furnace water frame 6 and elevated tank 12 respectively, forms forging furnace hot water recovery system.Vapour pipe I 16 connects elevated tank 12 and atmospheric steam tank 18, forms producer gas generator hot steam recovery system. Elevated tank 12 connects boiler 10 by pipeline, and described pipeline arranges water pump 11, by water pump 11 by the delivery in elevated tank 12 to boiler 10, forms elevated tank water exhaust system (boiler feed system). The rising pipe of boiler 10, through scatterer 7, is back to elevated tank 12, forms factory building (office building) heating system. Return water pipe 9 connects scatterer 7 and elevated tank 12, forms cold water recovery system. Elevated tank 12 arranges running water pipe 15, liquid level control switch 13, tank port 14 (ventage), forms water level control system by running water pipe 15, liquid level control switch 13, tank port 14. Form hydrothermal circulation system by producer gas generator forging furnace waterworks, forging furnace hot water recovery system, producer gas generator hot steam recovery system, form water-cooling circulating system by elevated tank water exhaust system (boiler feed system), cold water recovery system.
Elevated tank 12 bottom is connected with bottom in the water jacket 21 of producer gas generator 1 by water pipe 2, forms producer gas generator hydrologic cycle cooling system. The water jacket 21 of producer gas generator 1 is connected with the drum 22 of producer gas generator 1, the import of atmospheric steam tank 18 passes through pipeline connection by drum 22 vapour outlet of vapour pipe III 19 with producer gas generator 1, the outlet of atmospheric steam tank 18 is connected with elevated tank 12 by vapour pipe I 16 on the one hand, the outlet of atmospheric steam tank 18 is connected with the furnace bottom of producer gas generator 1 by vapour pipe II 17 on the other hand, and vapour pipe II 17 arranges flow valve 20. In producer gas generator 1, the mixed gas outlet of gas generating chamber is connected by the gas burner of pipeline with forging furnace 4, described pipeline arranges desulfation dust-extraction device 3, forms producer gas generator dust-removal system.
Red-hot water vapor in atmospheric steam tank 18, through the furnace bottom of producer gas generator 1, enters reaction zone, generates carbon monoxide and hydrogen with the reaction of scorching hot carbon, forms mixed gas generation system. Mixed gas, through desulfation dust-extraction device 3, finally enters forging furnace 4 and burns, heats forged material base.
Claims (6)
1. the water circulation system of a producer gas generator, forging furnace and boiler, it is characterised in that, this water circulation system comprises: producer gas generator, forging furnace, boiler, elevated tank, and concrete structure is as follows:
Water-supply pipe connects the water jacket in the water jacket in the water jacket in elevated tank and producer gas generator, forging furnace water valve, forging furnace water frame respectively, forms producer gas generator forging furnace waterworks; Hot water pipe connects the water jacket in the water jacket in forging furnace water valve, forging furnace water frame and elevated tank respectively, forms forging furnace hot water recovery system;
Elevated tank connects boiler by pipeline, and described pipeline arranges water pump, by water pump by the delivery in elevated tank to boiler, forms elevated tank water exhaust system.
2. according to the water circulation system of producer gas generator according to claim 1, forging furnace and boiler, it is characterised in that, the rising pipe of boiler, through scatterer, is linked back to elevated tank, forms factory building office building heating system; Return water pipe connects scatterer and elevated tank, forms cold water recovery system.
3. according to the water circulation system of producer gas generator according to claim 1, forging furnace and boiler, it is characterized in that, elevated tank arranges running water pipe, liquid level control switch, tank port, forms water level control system by running water pipe, liquid level control switch, tank port.
4. according to the water circulation system of producer gas generator according to claim 1, forging furnace and boiler, it is characterised in that, elevated tank bottom is connected with bottom in the water jacket of producer gas generator by water pipe, forms producer gas generator hydrologic cycle cooling system.
5. according to the water circulation system of producer gas generator according to claim 1, forging furnace and boiler, it is characterized in that, the water jacket of producer gas generator is connected with the drum of producer gas generator, the import of atmospheric steam tank passes through pipeline connection by the drum vapour outlet of vapour pipe III with producer gas generator, the outlet of atmospheric steam tank is connected with elevated tank by vapour pipe I on the one hand, the outlet of atmospheric steam tank is connected with the furnace bottom of producer gas generator by vapour pipe II on the other hand, and vapour pipe II arranges flow valve.
6. according to the water circulation system of producer gas generator according to claim 1, forging furnace and boiler, it is characterized in that, in producer gas generator, the mixed gas outlet of gas generating chamber is connected with the gas burner of forging furnace by pipeline, described pipeline arranges desulfation dust-extraction device, forms producer gas generator dust-removal system.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620066297.6U CN205295256U (en) | 2016-01-22 | 2016-01-22 | Water circulating system of gas producer , forging furnace and boiler |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620066297.6U CN205295256U (en) | 2016-01-22 | 2016-01-22 | Water circulating system of gas producer , forging furnace and boiler |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205295256U true CN205295256U (en) | 2016-06-08 |
Family
ID=56426498
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620066297.6U Active CN205295256U (en) | 2016-01-22 | 2016-01-22 | Water circulating system of gas producer , forging furnace and boiler |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205295256U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106381172A (en) * | 2016-10-21 | 2017-02-08 | 西安建筑科技大学 | Electric-control-heating circulating-water-cooling coal gas generating and collecting device |
CN108775815A (en) * | 2018-06-28 | 2018-11-09 | 江苏富澄冶金氧枪制造有限公司 | A kind of energy-saving tungsten is swaged processing electrothermal furnace |
-
2016
- 2016-01-22 CN CN201620066297.6U patent/CN205295256U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106381172A (en) * | 2016-10-21 | 2017-02-08 | 西安建筑科技大学 | Electric-control-heating circulating-water-cooling coal gas generating and collecting device |
CN108775815A (en) * | 2018-06-28 | 2018-11-09 | 江苏富澄冶金氧枪制造有限公司 | A kind of energy-saving tungsten is swaged processing electrothermal furnace |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205295256U (en) | Water circulating system of gas producer , forging furnace and boiler | |
CN202501759U (en) | Carbon calciner waste heat heating system | |
CN204552846U (en) | A kind of back pressure steam turbines utilization system | |
CN202131271U (en) | Carbon black and oil processing co-production equipment | |
CN105135904A (en) | Steam indirect heating hot water circulation system | |
CN103697451B (en) | A kind of high-temperature atmospheric steam generator | |
CN205690380U (en) | A kind of bamboo and wood goods hot press circulating heat supply system | |
CN205170811U (en) | Pot at bottom of energy -conserving direct combustion formula of making wine gas | |
CN207019287U (en) | A kind of raw oil heater | |
CN201916997U (en) | Constant temperature water supply device | |
CN205261518U (en) | Steaming system | |
CN201322291Y (en) | Steam generator | |
CN206616187U (en) | A kind of waste heat of coke oven crude gas heats rich oil device | |
CN205807814U (en) | Gas fired-boiler flue gas waste heat recovery formula heating plant | |
CN202532439U (en) | Device for heating feed water of steam boiler | |
CN203785470U (en) | Waste heat utilization device for lime kiln | |
CN204553048U (en) | A kind of start up system of generator set | |
CN108204583A (en) | New energy-conserving fuel gas steam boiler heating system | |
CN204478446U (en) | A kind of environment-friendly and energy-efficient electromagnetic heating system | |
CN204630029U (en) | A kind of continuous heat supply homogeneous solution-type reactor being convenient to scale removal | |
CN220366404U (en) | Waste heat steam energy-saving recovery system | |
CN107763601B (en) | Air humidifying and overheating device | |
CN202452855U (en) | Cyclic production device of constant-temperature hot water | |
CN102226044B (en) | Co-production processing method and equipment for carbon black and oil | |
CN112762425B (en) | Multifunctional composite burner power generation device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |