CN205289484U - Ball neck meets arm forging stamping die - Google Patents

Ball neck meets arm forging stamping die Download PDF

Info

Publication number
CN205289484U
CN205289484U CN201620056362.7U CN201620056362U CN205289484U CN 205289484 U CN205289484 U CN 205289484U CN 201620056362 U CN201620056362 U CN 201620056362U CN 205289484 U CN205289484 U CN 205289484U
Authority
CN
China
Prior art keywords
hole
die holder
module
ball neck
arm forging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620056362.7U
Other languages
Chinese (zh)
Inventor
秦学森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YIDU TONGXIN PRECISION FORGINGCO Ltd
Original Assignee
YIDU TONGXIN PRECISION FORGINGCO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YIDU TONGXIN PRECISION FORGINGCO Ltd filed Critical YIDU TONGXIN PRECISION FORGINGCO Ltd
Priority to CN201620056362.7U priority Critical patent/CN205289484U/en
Application granted granted Critical
Publication of CN205289484U publication Critical patent/CN205289484U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forging (AREA)

Abstract

Ball neck meets arm forging stamping die, including the upper die base, the die holder, the arrangement is module and last die crushion board on in the upper die base, lower module and the lower mould backing plate of arrangement in the die holder, the guide pillar of fixed mounting on the die holder, install the guide pin bushing that is used for positioning guide pillar in the upper die base, it is used for adjusting the adjusting bolt who goes up module and time module position to install a plurality of on upper die base and die holder, first through -hole has been seted up on the die holder, the second through -hole has been offered under in the module, the third through -hole has been seted up on the lower mould backing plate, and first through -hole, second through -hole and third through -hole are coaxial, a cushion has been settled respectively at both ends at the lower extreme of die holder, the perspective plane of first through -hole is located two clearances between the cushion, include still that can be followed the drift that first through -hole and second through -hole pass through, the thickness that highly is less than the cushion of drift.

Description

Ball neck connects arm forging press tool
Technical field
The utility model relates to a kind of press tool, and feature relates to ball neck and connects arm forging press tool.
Background technology
Need when ball neck connects arm forging punch die in the prior art first to connect at ball neck with punching die on 160 tons of enclosed pressing machinees arm forging is gone out middle hole, then from 160 tons of pressing machinees, ball neck is connect arm forging to take off, then it is transported to and ball neck is connect arm forging with hot Correction Die by 630 tons of pressing machinees corrects. This kind of technique corrects due to first punching again, and middle hole wall is thin, and non-contacted supports and loses circle after calibration, has become ellipse, can not meet requirement; If first correcting punching again, owing to operation is excessively long, the decrease in temperature of middle hole wall and gross weight, in the middle of after punching, hole hole wall deformation is big, need to again correct; And consuming two equipment, two operative employees, single piece production time length, production efficiency is low and cost height.
Summary of the invention
The technical problems to be solved in the utility model is to provide a kind of ball neck and connects arm forging press tool, ball neck is connect arm forging correction and punching can be completed on same pressing machine, and after punching, middle hole hole wall is not out of shape, the single piece production time is short, production efficiency height and cost low.
In order to solve the problem, the technical solution of the utility model is: ball neck connects arm forging press tool, comprise die holder, lower die holder, it is placed in die holder upper module and upper die plate, the lower module being placed in lower die holder and counterdie backing plate, the guide pillar being fixedly mounted on lower die holder, the guide pin bushing for positioning guide column being arranged in die holder, what be arranged on die holder and lower die holder is multiple for regulating upper module and the adjusting bolt of lower module position, lower die holder has been offered the first through hole, lower module has been offered the 2nd through hole, third through-hole offered by counterdie backing plate, and the first through hole, 2nd through hole and third through-hole are coaxial, one piece of cushion block it is mounted with respectively at the two ends of the lower end of lower die holder, in the gap of the projection plane of the first through hole between two pieces of cushion blocks, also comprise a drift that can pass through from the first through hole and the 2nd through hole, the height of drift is less than the thickness of cushion block.
The beneficial effects of the utility model are: this mould first corrects, then punching, again ball neck is connect arm forging and correct while punching, originally three stations are focused on a station suppressed for twice, and hole is not out of shape, workpiece physical dimension is ensured, thus effectively ensure that the quality of workpiece;Operation corrects punching station after concentrating and just can complete for 20 seconds, and the temperature of workpiece can meet correction punching, therefore it is constant to produce beat; Decreasing one, 160 tons of closed single point pressing machinees, an operative employee, decrease frock, mould a set of, production cost obtains reduction.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described further:
Fig. 1 of the present utility model partly cuts open schematic diagram,
Fig. 2 be mentioned by the utility model to ball neck connect the perspective view of arm forging,
Fig. 3 is the vertical view of the utility model lower module,
Fig. 4 is the diagrammatic cross-section at A-A place in Fig. 3,
Fig. 5 is the vertical view of the utility model upper module,
Fig. 6 is the diagrammatic cross-section at B-B place in Fig. 5,
The diagrammatic cross-section of Fig. 7 the utility model when using upper module and lower module punching press.
Fig. 8 be in above-mentioned background technology mentioned to prior art in utilize enclosed pressing machine that ball neck connects arm forging to carry out punching press or partial cutaway schematic when mould corrects.
Embodiment
The technical progress understood the utility model to more allow those skilled in the art and prior art done, before being elaborated by the utility model, first to connecing the punching course of arm forging about ball neck in prior art and step elaborates.
If Fig. 2 is the perspective view that ball neck connects arm forging, the C place shown in figure connects hole in the middle of arm forging for ball neck, and ball neck connects arm forging before undressed, and it is plane that the ball neck of the position in middle hole connects arm forge piece blank reheating.
If Fig. 3 is to shown in 8, in the prior art, lower module 4 is not there is hole, need when ball neck connects arm forging punch die first to connect at ball neck with punching die on 160 tons of enclosed pressing machinees arm forging is gone out middle hole, then from 160 tons of pressing machinees, ball neck is connect arm forging to take off, then it is transported to and ball neck is connect arm forging with hot Correction Die by 630 tons of pressing machinees corrects. This kind of technique corrects due to first punching again, and middle hole wall is thin, and non-contacted supports and loses circle after calibration, has become ellipse, can not meet requirement; If first correcting punching again, owing to operation is excessively long, the decrease in temperature of middle hole wall and gross weight, in the middle of after punching, hole hole wall deformation is big, need to again correct; And consuming two equipment, two operative employees, the single piece production time is long, and production efficiency is low, cost height, and 160 tons of above-mentioned pressing machinees are identical with the profile of 630 tons of pressing machinees, and shape is as shown in Figure 8.
Below the utility model is described in further detail:
If Fig. 1 is to shown in 6, ball neck connects arm forging press tool, comprise die holder 1, lower die holder 2, it is placed in die holder 1 upper module 3 and upper die plate 10, the lower module 4 being placed in lower die holder 2 and counterdie backing plate 5, the guide pillar 7 being fixedly mounted on lower die holder 2, the guide pin bushing 8 for positioning guide column 7 being arranged in die holder 1, what be arranged on die holder 1 and lower die holder 2 is multiple for regulating upper module 3 and the adjusting bolt 11 of lower module 4 position, lower die holder 2 has been offered the first through hole 41, lower module 4 has been offered the 2nd through hole 51, counterdie backing plate 5 has been offered third through-hole 21, and the first through hole 41, 2nd through hole 51 and third through-hole 21 are coaxial, one piece of cushion block 6 it is mounted with respectively at the two ends of the lower end of lower die holder 2, in the gap of the projection plane of the first through hole 41 between two pieces of cushion blocks 6, also comprise a drift 9 that can pass through from the first through hole 41 and the 2nd through hole 51, the height of drift 9 is less than the thickness of cushion block 6.
Operating process of the present utility model:
The first step, ball neck is connect arm forging it is placed in lower module 4 model cavity to hit once correct;
2nd step, middle hole site drift 9 is placed on ball neck connecing arm forging are hit once, simultaneously having corrected of punching, and drift 9 drops on the worktable 12 between two cushion blocks 6 by the first through hole 41, the 2nd through hole 51 and threeway successively simultaneously;
3rd step, taking-up ball neck connect arm forging finished product, take out drift 9 and hole gross weight in the gap between two pieces of cushion blocks 6, hole gross weight and ball neck are connect arm forging finished product and puts into respective Turnover Box, and drift 9 is purchased.
The utility model adopts first to correct, then punching, again ball neck is connect arm forging and correct while punching, originally three stations are focused on a station suppressed for twice, and hole is not out of shape substantially, workpiece physical dimension is ensured, thus effectively ensure that the quality of workpiece; Operation corrects punching station after concentrating and just can complete for 20 seconds, and the temperature of workpiece can meet correction punching, therefore it is constant to produce beat; Decreasing one, 160 tons of closed single point pressing machinees, an operative employee, decrease frock, mould a set of, production cost obtains reduction.

Claims (1)

1. ball neck connects arm forging press tool, comprise die holder (1), lower die holder (2), it is placed in die holder (1) interior upper module (3) and upper die plate (10), the lower module (4) being placed in lower die holder (2) and counterdie backing plate (5), the guide pillar (7) being fixedly mounted on lower die holder (2), the guide pin bushing for positioning guide column (7) (8) being arranged in die holder (1), what be arranged on die holder (1) and lower die holder (2) is multiple for regulating the adjusting bolt (11) of upper module (3) and lower module (4) position, it is characterized in that: on lower die holder (2), offered the first through hole (41), lower module (4) has been offered the 2nd through hole (51), counterdie backing plate (5) has been offered third through-hole (21), and the first through hole (41), 2nd through hole (51) and third through-hole (21) are mutually coaxial, one piece of cushion block (6) it is mounted with respectively at the two ends of the lower end of lower die holder (2), the gap that the projection plane of the first through hole (41) is positioned between two pieces of cushion blocks (6), also comprise a drift (9) that can pass through from the first through hole (41) and the 2nd through hole (51), the height of drift (9) is less than the thickness of cushion block (6).
CN201620056362.7U 2016-01-20 2016-01-20 Ball neck meets arm forging stamping die Expired - Fee Related CN205289484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620056362.7U CN205289484U (en) 2016-01-20 2016-01-20 Ball neck meets arm forging stamping die

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620056362.7U CN205289484U (en) 2016-01-20 2016-01-20 Ball neck meets arm forging stamping die

Publications (1)

Publication Number Publication Date
CN205289484U true CN205289484U (en) 2016-06-08

Family

ID=56429931

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620056362.7U Expired - Fee Related CN205289484U (en) 2016-01-20 2016-01-20 Ball neck meets arm forging stamping die

Country Status (1)

Country Link
CN (1) CN205289484U (en)

Similar Documents

Publication Publication Date Title
CN202479347U (en) Simple stamping die with adjustable template
CN204208982U (en) A kind of multiple operation flange shaping mould
CN105121050A (en) Method for producing highly dimensionally stable half shells and device for producing a half shell
CN104070114A (en) Multi-process flanging forming die
CN105363922A (en) Tertiary forming tool for automatically producing omega-shaped elastic strips
CN106862388A (en) Connection reinforcement plate multi-station progressive die
CN104259319A (en) Expanding and punching compound tool
CN104438591A (en) Automatic stamping forming technology for K-shaped accessory plates and chain plates of chain and for combination of K-shaped accessory plates and chain plates of chain
CN104084491A (en) Bag pulling forming and flanging forming compound die
CN204564921U (en) A kind of diel of five metals baffle plate
CN205289484U (en) Ball neck meets arm forging stamping die
CN108080472A (en) A kind of self-balancing hardware stamping device
CN204912477U (en) Stamping die is connected to shell fragment
CN204396649U (en) A kind of diel of panel beating brace
CN204396677U (en) A kind of processing mold of guide-track groove
CN204148364U (en) Enlarging punching composite die
CN106984708A (en) Ball neck connects arm forging diel
CN107812821A (en) A kind of automobile case pressing equipment
CN104475575A (en) Press shaping die of rear end cross beam connecting plate
CN204974962U (en) Cup presss from both sides stamping die
CN204396670U (en) A kind of processing mold of connection bracket of automotive seat
CN204603182U (en) A kind of annular forging piece centering uplifting device
CN208800653U (en) A kind of bending die
CN207929833U (en) A kind of automobile case stamping equipment
CN206588215U (en) A kind of knee lower carriage stamping system

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160608

Termination date: 20200120

CF01 Termination of patent right due to non-payment of annual fee