CN205280057U - Highway subgrade settlement observation device - Google Patents

Highway subgrade settlement observation device Download PDF

Info

Publication number
CN205280057U
CN205280057U CN201620047569.8U CN201620047569U CN205280057U CN 205280057 U CN205280057 U CN 205280057U CN 201620047569 U CN201620047569 U CN 201620047569U CN 205280057 U CN205280057 U CN 205280057U
Authority
CN
China
Prior art keywords
ground
settlement
observation
mark
horizontal displacement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620047569.8U
Other languages
Chinese (zh)
Inventor
曹云修
李青山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620047569.8U priority Critical patent/CN205280057U/en
Application granted granted Critical
Publication of CN205280057U publication Critical patent/CN205280057U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Abstract

The utility model belongs to the technical field of road construction's technique and specifically relates to a highway subgrade settlement observation device. Its mainly by ground, weak soil, sedimentation pipe, cubic metre of earth pressure cell, deviational survey mark, layering subside mark, observation of ground settlement component, horizontal displacement observation component, the instrument ware is subsided on the earth's surface and horizontal displacement instrument ware is formed, the sedimentation pipe parallel is buried underground in the weak soil of ground top, and sedimentation pipe's top is provided with a cubic metre of earth pressure cell, and deviational survey mark and layering are subsided the mark and is inserted perpendicularly and establish in the ground, and the observation of ground settlement component observes the component all set up on ground base surface with horizontal displacement, and ware, the external horizontal displacement instrument ware of horizontal displacement observation component are shown to the external earth's surface of observation of ground settlement component sedimentometer. Can subside the accurate circumstances of subsiding of knowing the highway subgrade of instrument ware and horizontal displacement instrument ware through the earth's surface, make repairing promptly and accurately, shorten working time, improve labor efficiency.

Description

A kind of highway subgrade settlement observer
Technical field
The utility model relates to the technical field of Road construction, especially a kind of highway subgrade settlement observer.
Background technology
Along with the development of society, road construction is also perfect constantly. Highway is in long-time use procedure; usually there will be sedimentation and obtain phenomenon; the reason of this kind of situation generation is mostly because roadbed is unstable; it is exactly regular be subjected to rolling of large-scale loaded vehicle in addition; road surface is made to there will be uneven phenomenon; like this when automobile is through these road surfaces time, usually there will be the generation that displacement causes vehicle accident, seriously compromise the driving safety problem of people. Building scientific research personnel takes observation device to carry out the settlement measurement of highway subgrade every year, but the application condition often measured is big, operate cumbersome, it is all that experience artificially is to carry out the reparation of later stage highway, such operator scheme wastes time and energy, and can not well carry out the reparation of highway, guarantee the normal use of highway completely.
Practical novel content
The technical problems to be solved in the utility model is: in order to the prior art Problems existing solved in above-mentioned background technology, a kind of highway subgrade settlement observer is provided, reparation simple to operation, to measure precisely, facilitate follow-up highway subgrade, saves working time, it is to increase production efficiency.
The utility model solves the technical scheme that its technical problem adopts: a kind of highway subgrade settlement observer, primarily of ground, weak soil, sedimentation pipe, earthwork pressure box, surveys tiltedly mark, delaminating deposition mark, ground settlement observation element, horizontal shift observation element, ground settlement console and horizontal shift console and forms; Described sedimentation pipe is parallel to be embedded in the weak soil above ground, the top of described sedimentation pipe is provided with a cubic metre of earth pressure box, described survey is tiltedly marked and vertical with delaminating deposition mark is plugged in ground, described ground settlement observation element and horizontal shift observation element are all arranged on foundation surface, described ground settlement observation element external earth's surface sedimentometer table device, the described horizontal shift observation external horizontal shift console of element.
Further specifically, in technique scheme, described survey is tiltedly put on and is also evenly arranged multiple ventage piezometer. Such design can the personnel of being convenient for measuring be observed, and conveniently the data measured effectively is verified.
Further specifically, in technique scheme, described delaminating deposition is put on and is also evenly arranged multiple ventage piezometer. Such design can the personnel of being convenient for measuring be observed, and conveniently the data measured effectively is verified.
Further specifically, in technique scheme, the lower end of described ground settlement observation element is also connected with survey mass by wireline. Such design is the data in order to effectively measure ground settlement.
The beneficial effects of the utility model are: this highway subgrade settlement observer, sedimentation situation simple to operation, highway subgrade can be known accurately by ground settlement console and horizontal shift console, make repair process promptly and accurately, shorten working time, it is to increase efficiency.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the utility model is illustrated further.
Fig. 1 is structural representation of the present utility model.
Label in accompanying drawing is: 1, ground, 2, weak soil, 3, sedimentation pipe, 4, earthwork pressure box, 5, survey and tiltedly mark, 6, delaminating deposition mark, 7, ground settlement observation element, 8, horizontal shift observation element, 9, ground settlement console, 10, horizontal shift console, 11, ventage piezometer, 12, wireline, 13, survey mass.
Embodiment
By reference to the accompanying drawings the utility model is described in further detail now. These accompanying drawings are the schematic diagram of simplification, only with illustration, basic structure of the present utility model are described, therefore it only shows the formation relevant with the utility model.
As shown in Figure 1 be a kind of highway subgrade settlement observer, primarily of ground 1, weak soil 2, sedimentation pipe 3, earthwork pressure box 4, survey tiltedly mark 5, delaminating deposition mark 6, ground settlement observation element 7, horizontal shift observation element 8, ground settlement console 9 and horizontal shift console 10 and form; Sedimentation pipe 3 is parallel to be embedded in the weak soil 2 above ground 1, the top of sedimentation pipe 3 is provided with a cubic metre of earth pressure box 4, the oblique mark 5 of survey is vertical with delaminating deposition mark 6 to be plugged in ground 1, ground settlement observation element 7 and horizontal shift observation element 8 are all arranged on ground 1 on the surface, ground settlement observation element 7 external earth's surface sedimentometer table device 9, the horizontal shift observation external horizontal shift console 10 of element 8.
Wherein survey tiltedly to mark on 5 and multiple ventage piezometer 11 is also evenly set. Delaminating deposition mark 6 also evenly arranges multiple ventage piezometer 11. The lower end of ground settlement observation element 7 is also connected with survey mass 13 by wireline 12.
The concrete operating process of this highway subgrade settlement observer is as follows:
After weak soil 2 or original ground have processed, the measuring point of INTEGRATED SIGHT section can be carried out laying on the one hand, namely comprise delaminating deposition mark 6, survey tiltedly mark 5, earthwork pressure box 4, ground settlement observation element 7, horizontal shift observation element 8 and ventage piezometer 11; On the other hand, it is possible to lay soft base table settlement plate and timber; Carry out filling out weak soil 2 at ground upper surface again, in time filling out certain altitude, generally at more than 10m, lay sedimentation pipe 3 according to plan wherein; Finally, after being filled in by roadbed soil, carry out regular observation and record settling data, in order to the reparation of follow-up highway subgrade.
Taking above-mentioned according to desirable embodiment of the present utility model as enlightenment, by above-mentioned description, relevant staff in the scope not deviateing this practical new technique thought, can carry out various change and amendment completely. The content that the novel technical scope of this practicality is not limited on specification sheets, it is necessary to determine its technical scope according to right.

Claims (4)

1. a highway subgrade settlement observer, it is characterised in that: primarily of ground (1), weak soil (2), sedimentation pipe (3), earthwork pressure box (4), survey tiltedly mark (5), delaminating deposition mark (6), ground settlement observation element (7), horizontal shift observation element (8), ground settlement console (9) and horizontal shift console (10) composition, in the parallel weak soil (2) being embedded in ground (1) top of described sedimentation pipe (3), the top of described sedimentation pipe (3) is provided with a cubic metre of earth pressure box (4), described survey tiltedly marks that (5) are vertical with delaminating deposition mark (6) to be plugged in ground (1), described ground settlement observation element (7) and horizontal shift observation element (8) are all arranged on ground (1) on the surface, described ground settlement observation element (7) external earth's surface sedimentometer table device (9), described horizontal shift observation element (8) external horizontal shift console (10).
2. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that: described survey is tiltedly marked and is also evenly arranged multiple ventage piezometer (11) on (5).
3. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that: described delaminating deposition mark (6) also evenly arranges multiple ventage piezometer (11).
4. a kind of highway subgrade settlement observer according to claim 1, it is characterised in that: the lower end of described ground settlement observation element (7) is also connected with survey mass (13) by wireline (12).
CN201620047569.8U 2016-01-13 2016-01-13 Highway subgrade settlement observation device Expired - Fee Related CN205280057U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620047569.8U CN205280057U (en) 2016-01-13 2016-01-13 Highway subgrade settlement observation device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620047569.8U CN205280057U (en) 2016-01-13 2016-01-13 Highway subgrade settlement observation device

Publications (1)

Publication Number Publication Date
CN205280057U true CN205280057U (en) 2016-06-01

Family

ID=56064624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620047569.8U Expired - Fee Related CN205280057U (en) 2016-01-13 2016-01-13 Highway subgrade settlement observation device

Country Status (1)

Country Link
CN (1) CN205280057U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204799A (en) * 2018-03-08 2018-06-26 湖南科技大学 Mining influence lower room basic slope settles stretcher strain measuring device and method
CN108981657A (en) * 2018-07-09 2018-12-11 中国二十冶集团有限公司 The monitoring and analysis method of peat soil soft soil roadbed settlement

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108204799A (en) * 2018-03-08 2018-06-26 湖南科技大学 Mining influence lower room basic slope settles stretcher strain measuring device and method
CN108204799B (en) * 2018-03-08 2023-05-23 湖南科技大学 Device and method for measuring inclination, settlement, stretching and deformation of house foundation under mining influence
CN108981657A (en) * 2018-07-09 2018-12-11 中国二十冶集团有限公司 The monitoring and analysis method of peat soil soft soil roadbed settlement

Similar Documents

Publication Publication Date Title
CN111058855B (en) Deformation control method and evaluation system for shield underpassing structure
CN202494442U (en) Stratum layering and settlement measuring device
CN202433536U (en) Physical model testing system for tunnel-penetrated ground crack zone
CN107130592B (en) construction method for long spiral drill and impact drill double-machine composite hole-forming cast-in-place pile
CN102830217B (en) The critical experimental study device that subsides of the variable multiscale coupling of fracture opening
CN103290836B (en) Vacuum decompression compacting and consolidating construction method for soft foundation treatment
CN106949877A (en) The monitoring method of ground settlement above a kind of various dimensions shield tunnel
CN103471647B (en) A kind of shield tunnel remote automation monitoring method
CN103575198A (en) Ground deformation air bag simulation method
CN106761776A (en) Existing pipeline construction method is worn under super shallow-buried tunnel shield
CN108169456A (en) A kind of collapsible loess estimates big pressure evaluation method
CN205280057U (en) Highway subgrade settlement observation device
CN103953023A (en) Vacuum combined surcharge preloading method settlement volume measurement method
CN106096796A (en) A kind of soft soil base sedimentation course prediction method mapped based on coordinate complex indexes
CN107314748A (en) A kind of long range roadbed continuous modification monitoring device and monitoring method
Valievich Measurement Of Sediments Of Industrial And Civil Buildings And Structures By High-Precision And Accurate Levelling Of Short Rays
CN203587095U (en) Device for monitoring sedimentation of tunnel by using distributed optical fibers
CN209279955U (en) The long-range subsiding observation station of integration
CN204439065U (en) A kind of subgrade settlement monitoring system
CN207007155U (en) A kind of subgrade settlement automatic monitoring system
CN103344214B (en) 1.6-degree parabolic extralarge pier measuring and pier body linear control method
CN105178367A (en) Three-dimensional visualization method of final foundation settlement amount
CN102102358A (en) Method for measuring deep sedimentation deformation of foundation by using wireless conduction water pressure meter
Dai et al. Analysis of Roadbed Deformation Monitoring of Cangzhou Section of Beijing to Shanghai Express Railway
Jia et al. In situ monitoring of the long-term settlement of high-fill subgrade

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20170113

CF01 Termination of patent right due to non-payment of annual fee