CN205277704U - Burst wind power generation tower section of thick bamboo that double shear concatenation is connected - Google Patents

Burst wind power generation tower section of thick bamboo that double shear concatenation is connected Download PDF

Info

Publication number
CN205277704U
CN205277704U CN201520980408.XU CN201520980408U CN205277704U CN 205277704 U CN205277704 U CN 205277704U CN 201520980408 U CN201520980408 U CN 201520980408U CN 205277704 U CN205277704 U CN 205277704U
Authority
CN
China
Prior art keywords
thick bamboo
section
double shear
tower
tower section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520980408.XU
Other languages
Chinese (zh)
Inventor
陈俊岭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201520980408.XU priority Critical patent/CN205277704U/en
Application granted granted Critical
Publication of CN205277704U publication Critical patent/CN205277704U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/72Wind turbines with rotation axis in wind direction
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/70Wind energy
    • Y02E10/728Onshore wind turbines

Landscapes

  • Wind Motors (AREA)

Abstract

The utility model relates to a burst wind power generation tower section of thick bamboo that double shear concatenation is connected is divided into a plurality of tower section of thick bamboo arc pieces to the great tower section of thick bamboo of diameter, when each tower section of thick bamboo arc piece is connected for whole round platform, puts vertical double shear splice plate at the interior outside equipartition of tower section of thick bamboo arc piece, adopts the bolt in double shear to pass tower section of thick bamboo arc piece and vertical double shear splice plate in proper order, and the fastening bolt in double shear makes that tower section of thick bamboo arc sheet -like cyclization is intact to rigidity, the welding section of thick bamboo section of whole circle. The utility model discloses a burst tower section of thick bamboo is formed by connecting from top to bottom a plurality of welding section of thick bamboo section. Welding the interior outside equipartition of tower section of thick bamboo arc piece of section of thick bamboo section from top to bottom and putting hoop double shear splice plate, the adoption bolt in double shear passes tower section of thick bamboo arc piece and hoop double shear splice plate in proper order, and the fastening bolt in double shear makes the section of concatenation from top to bottom form the continuous tower section of thick bamboo of flexural rigidity. Hoop double shear splice plate hoop divide into a plurality of pieces, makes hoop double shear splice plate and the tower section of thick bamboo arc piece that splices section of thick bamboo section from top to bottom well laminate. Arrange door frame double shear reinforcing plate inside and outside the tower section of thick bamboo arc piece of door opening department, thereby the fastening bolt in double shear makes door frame double shear reinforcing plate and tower section of thick bamboo arc piece play the effect of enhancement.

Description

A kind of two burst wind power tower drum cut splicing and connect
Technical field
The utility model belongs to wind power tower drum technical field of structures, is specifically related to a kind of two burst wind power tower drum cut splicing and connect.
Background technology
Tradition wind power generation stepped common be tower barrel structure, 2 is connected with basis bottom it, top installation aerogenerator 3 and wind wheel 4, the cat ladder of the tower cylinder 1 internal layout upper and lower traffic of confession and the cable etc. of electric energy transmitting, need perforate to arrange door opening 5 bottom tower cylinder 1. Tower cylinder 1 is generally connected to form by multiple welding cylinder section 6, adopts forging lateral flange 7 and flange bolt 8 to connect between each welding cylinder section 6, and the shell ring 9 of each welding cylinder section 6 adopts butt weld 10 to be connected with forging lateral flange 7. Owing to welding cylinder section 6 length is relatively big, each welding cylinder section 6 is made up of multiple shell ring 9, and each shell ring 9 is formed by connecting with longitudinally docking welding 10 by after steel plate 11 volume circle.
Tradition wind power tower drum number of fragments is less, and every section of tower cylinder is heavier, and transport and hoisting difficulty are bigger; When power of fan is relatively big, load is bigger, it is desired to when tower cylinder diameter is bigger, larger-diameter whole circular tower cylinder is bigger by transport by road height and width restriction; For requirements such as satisfied transport, liftings, when high-power blower tower cylinder adopts minor diameter whole circular tower cylinder, structure efficiency is lower, and economy is poor.
Summary of the invention
The purpose of this utility model is to provide a kind of two burst wind power tower drum cut splicing and connect.
The two burst wind power tower drums cut splicing and connect that the utility model proposes, described tower cylinder by some welding cylinder sections 6 from upper and on be welded, each welding cylinder section 6 is welded from top to bottom by some shell rings 9, each shell ring 9 is connected by some tower cylinder arc sheet 12 head and the tail and forms frustum cone structure, each shell ring 9 is provided with to erect cuts splicing plate 13 to two, laterally two splicing plate 14 of cutting cuts bolt 15 with two, the interior outside between tower cylinder arc sheet 12 adjacent on each shell ring 9 is uniform to be equipped with to erect and cuts splicing plate 13 to two, two bolt 15 of cutting is adopted to cut splicing plate 13 with erecting to two through tower cylinder arc sheet 12 successively, fastening two cut bolt 15 to make some tower cylinder arc sheets 12 form hoop rigidity intact, the welding cylinder section 6 of whole round platform.
In the utility model, the uniform ring of putting in the interior outside between tower cylinder arc sheet 12 in neighbouring welding cylinder section 6 cuts splicing plate 14 to two, adopting two bolt 15 of cutting to cut splicing plate 14 through tower cylinder arc sheet 12 with laterally two successively, fastening two bolt 15 of cutting makes welding cylinder section 6 up and down form certain flexural stiffness.
In the utility model, two splicing plate plate 14 ring of cutting of described transverse direction, to being divided into some, makes laterally two splicing plate 14 of cutting fit tightly with the upper and lower tower cylinder arc sheet 12 welded in cylinder section 6.
In the utility model, described tower cylinder is provided with door opening 5, the tower cylinder arc sheet 12 at described door opening 5 place is inside and outside arranges that stiffening plate 16 cut by doorframe pair, adopting two bolt 15 of cutting to cut stiffening plate 16 through tower cylinder arc sheet 12 and doorframe are two successively, fastening two bolt 15 of cutting makes that doorframe is two cuts the effect that stiffening plate 16 and tower cylinder arc sheet 12 play reinforcement.
The utility model advantage is:
1. providing the two burst tower cylinder cut splicing and connect of a kind of wind-force generating, tower cylinder vertical section and longitudinal burst all adopt two cuts connection, and doorframe adopts two cuts reinforcement. To tower cylinder burst, the transport of tower cylinder is unrestricted, can adopt major diameter, more efficient section form.
2. connection is cut in tower cylinder segmentation, longitudinal burst employing pair, and doorframe employing pair is cut reinforcement and can greatly be reduced tower cylinder welding capacity, it is to increase the anti-fatigue performance of structure, reduces welding distortion, it is ensured that the precision of the connection of tower cylinder and installation.
Accompanying drawing explanation
Fig. 1 is traditional wind power generation stepped side-view;
Fig. 2 is conventional tower cylinder welding cylinder section detail drawing;
Fig. 3 is conventional tower cylinder roll of steel plate circle welding detail drawing;
Fig. 4 is conventional tower cylinder forging lateral flange detail drawing;
Fig. 5 is burst tower cylinder side-view;
Fig. 6 is front view bottom burst tower cylinder;
Fig. 7 is that the upper and lower cylinder Duan Shuan of burst tower cylinder cuts splicing detail drawing;
Fig. 8 is that each arc sheet of burst tower cylinder pair cuts splicing detail drawing;
Fig. 9 is that two the cutting of burst tower cylinder strengthens doorframe detail drawing.
Number in the figure: 1 is tower cylinder, based on 2,3 is generator, 4 is wind wheel, and 5 is door opening, and 6 is welding cylinder section, 7 is forging lateral flange, and 8 is flange bolt, and 9 is shell ring, 10 is butt weld, and 11 is steel plate, and 12 is tower cylinder arc sheet, 13 cut splicing plate for erecting to two, 14 cut splicing plate for laterally two, and 15 cut bolt for two, and 16 cut stiffening plate for doorframe is two.
Embodiment
Below by embodiment, the utility model is described by reference to the accompanying drawings further:
Shown in embodiment 1, Fig. 5-Fig. 8, the utility model by tower cylinder arc sheet 12, erect to two cutting splicing plate 13, laterally two cut splicing plate 14, two cut that bolt 15, doorframe are two to be cut stiffening plate 16 and form.
The two burst tower cylinder cut splicing and connect of the wind-force generating that the utility model proposes, some tower cylinder arc sheets 12 can be divided into for the tower cylinder that diameter is bigger, when each tower cylinder arc sheet 12 connects for whole round platform, in tower cylinder arc sheet 12 outside uniform put erect to two cut splicing plate 13, the two bolt 15 of cutting of employing cuts splicing plate 13 with erecting to two through tower cylinder arc sheet 12 successively, cuts bolt 15 and makes tower cylinder arc sheet 12 form the splicing cylinder section 17 of hoop rigidity round platform intact, whole for fastening pair.
The two burst tower cylinder cutting splicing connection of the wind-force generating that the utility model proposes is formed by connecting by some splicing cylinder sections about 17. Connect uniform the putting in outside in the tower cylinder arc sheet 12 splicing cylinder section 16 up and down and laterally two cut splicing plate 14, adopting two bolt 15 of cutting to cut splicing plate 14 through tower cylinder arc sheet 12 with laterally two successively, fastening two bolt 15 of cutting makes splicing cylinder section 17 up and down form the continuous tower cylinder 1 of flexural stiffness.
Two splicing plate 14 ring of cutting of described transverse direction, to being divided into some, makes laterally two tower cylinder arc sheet 12 good fit cutting splicing plate 14 and splice cylinder section 17 up and down.
The wind-force generating that the utility model proposes is two cuts the burst tower cylinder door opening 5 that splicing connects and also adopts and two cut splicing reinforcement, the tower cylinder arc sheet 12 at door opening 5 place is inside and outside arranges that stiffening plate 16 cut by doorframe pair, adopting two bolt 15 of cutting to cut stiffening plate 16 through tower cylinder arc sheet 12 and doorframe are two successively, fastening two bolt 15 of cutting makes the two stiffening plate 16 of cutting of doorframe with tower cylinder arc sheet 12 thus play the effect of reinforcement.

Claims (4)

1. two burst wind power tower drum cut splicing and connect, described tower cylinder by some welding cylinder section (6) from upper and on be welded, each welding cylinder section (6) is welded from top to bottom by some shell rings (9), it is characterized in that each shell ring (9) is connected by some tower cylinder arc sheet (12) head and the tail and form frustum cone structure, each shell ring (9) is provided with to erect cuts splicing plate (13) to two, laterally two cut splicing plate (14) and pair cut bolt (15), interior outside between upper adjacent tower cylinder arc sheet (12) of each shell ring (9) is uniform to be equipped with to erect and cuts splicing plate (13) to two, adopt and two cut bolt (15) successively through tower cylinder arc sheet (12) with erect and splice plate (13) to two cutting, fastening two bolt (15) of cutting makes some towers cylinder arc sheet (12) formation hoop rigidity intact, welding cylinder section (6) of whole round platform.
2. two burst wind power tower drum cut splicing and connect according to claim 1, it is characterized in that uniform the putting in the interior outside between tower cylinder arc sheet (12) in neighbouring welding cylinder section (6) laterally two cuts splicing plate (14), adopt two cut bolt (15) successively through tower cylinder arc sheet (12) and laterally two cutting splice plate (14).
3. two burst wind power tower drum cut splicing and connect according to claim 1, it is characterized in that two splicing plate (14) ring of cutting of described transverse direction is to being divided into some, makes horizontal pair to cut splicing plate (14) and fits tightly with upper and lower tower cylinder arc sheet (12) welded in cylinder section (6).
4. two burst wind power tower drum cut splicing and connect according to claim 1, it is characterized in that described tower cylinder is provided with door opening (5), tower cylinder arc sheet (12) at described door opening (5) place is inside and outside arranges that stiffening plate (16) cut by doorframe pair, adopts two bolt (15) of cutting to cut stiffening plate (16) through tower cylinder arc sheet (12) and doorframe are two successively.
CN201520980408.XU 2015-12-02 2015-12-02 Burst wind power generation tower section of thick bamboo that double shear concatenation is connected Expired - Fee Related CN205277704U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520980408.XU CN205277704U (en) 2015-12-02 2015-12-02 Burst wind power generation tower section of thick bamboo that double shear concatenation is connected

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520980408.XU CN205277704U (en) 2015-12-02 2015-12-02 Burst wind power generation tower section of thick bamboo that double shear concatenation is connected

Publications (1)

Publication Number Publication Date
CN205277704U true CN205277704U (en) 2016-06-01

Family

ID=56062285

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520980408.XU Expired - Fee Related CN205277704U (en) 2015-12-02 2015-12-02 Burst wind power generation tower section of thick bamboo that double shear concatenation is connected

Country Status (1)

Country Link
CN (1) CN205277704U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370504A (en) * 2015-12-02 2016-03-02 同济大学 Slicing wind power generation tower drum in double-shear splicing connection

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105370504A (en) * 2015-12-02 2016-03-02 同济大学 Slicing wind power generation tower drum in double-shear splicing connection

Similar Documents

Publication Publication Date Title
CN205423080U (en) Tower drum of wind generating set and wind generating set
CN206158925U (en) A burst formula wind power generation tower section of thick bamboo
CN102235320B (en) For wall section and the wind turbine tower of wind turbine tower
CN204927384U (en) Battery box
US9726153B2 (en) Wind turbine tower assembly
KR101696019B1 (en) Modular wind tower
CN104641059A (en) Modular tower for a wind power plant
CN105579703A (en) Transition body between tower sections of wind turbine, and tower of wind turbine comprising transition body
CN205260223U (en) Wind generating set's a tower section of thick bamboo
CN105370504A (en) Slicing wind power generation tower drum in double-shear splicing connection
CN106150924A (en) A kind of mixed steel tower and wind power generating set
CN105545609A (en) Tower of wind generating set and construction method of tower
CN108708831A (en) Tower barrel of wind generating set and tower construction method
CN205277704U (en) Burst wind power generation tower section of thick bamboo that double shear concatenation is connected
CN205423079U (en) Tower drum of wind generating set and wind generating set
CN202001212U (en) Tower frame for wind generating set
CN100590281C (en) Sleeve mounted type single post steel pipe tower
CN205445908U (en) Tower drum of wind generating set and wind generating set
CN205243731U (en) Wind power tower cylinder flange
CN205805835U (en) A kind of tower and the attachment structure of doorframe
CN208106660U (en) A kind of clad type lattice tower
CN207098553U (en) A kind of heavy punch piece with deep bead function
CN107355350A (en) Tower barrel of wind generating set, wind generating set and tower barrel construction method
CN214195777U (en) Reinforced structure for door opening of segmented precast concrete tower barrel
CN203827799U (en) Greenhouse frame high in wind survability

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160601

Termination date: 20171202