CN205263050U - Experimental device for simulation drilling fluid is missed in crack of stratum - Google Patents

Experimental device for simulation drilling fluid is missed in crack of stratum Download PDF

Info

Publication number
CN205263050U
CN205263050U CN201520912813.8U CN201520912813U CN205263050U CN 205263050 U CN205263050 U CN 205263050U CN 201520912813 U CN201520912813 U CN 201520912813U CN 205263050 U CN205263050 U CN 205263050U
Authority
CN
China
Prior art keywords
drilling fluid
holding unit
core holding
nitrogen cylinder
crack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520912813.8U
Other languages
Chinese (zh)
Inventor
何冠韬
贾永禄
聂仁仕
彭立帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Petroleum University
Original Assignee
Southwest Petroleum University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Petroleum University filed Critical Southwest Petroleum University
Priority to CN201520912813.8U priority Critical patent/CN205263050U/en
Application granted granted Critical
Publication of CN205263050U publication Critical patent/CN205263050U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model relates to an experimental device for simulation drilling fluid is missed in crack of stratum mainly comprises confined pressure bottle, nitrogen cylinder, manometer, seal baffle, stock solution room, drilling fluid import, confined pressure table, crack control thin slice, rock core holder, fixation nut, flowmeter, graduated flask. The nitrogen gas of the certain pressure of nitrogen cylinder output promotes seal baffle and removes right to the indoor drilling fluid of extrusion stock solution gets into the rock core holder, and the rock core of confined pressure bottle in to the rock core holder provides the confined pressure of a sizing simultaneously, the drilling fluid under the drive of pressure, rock core crack along the rock core holder in, outflow rock core holder flows into the graduated flask at last. Through adjusting confined pressure bottle and nitrogen cylinder delivery pressure size and crack control thin slice thickness, can simulate the leakage of drilling fluid in different pit shaft pressure, different formation pressure, different fracture width. The utility model discloses an advantage: simple structure, convenient operation can effectively simulate the leakage of drilling fluid in the crack of stratum.

Description

A kind ofly simulate the experimental provision that drilling fluid is missed in formation fracture
Technical field
The utility model relates to conventional drilling liquid drilling technology field, relates more specifically to a kind of experimental provision that drilling fluid is missed in formation fracture of simulating.
Background technology
Generally grow in a lot of oil gas field tomographies of China and crack, and leakage phenomena often occurs in this area thus, brings severe challenge to drillng operation, and how effectively simulation fracture formation leakage is a generality difficult problem. Statistics shows, in oil drilling process, the expense of fractured reservoir leakproof, leak stopping accounts for the more than 90% of various stratum total cost, thereby it is great to solve the leakage question meaning of fractured reservoir. Research discovery, if know size and the character of original place fracture width, the selection meeting of leakage stopping technology and leakage-stop liquid formula is more targeted, can increase substantially leak stopping one-time success rate. Therefore,, if can invent a kind of experimental provision that drilling fluid is missed in formation fracture of simulating, be conducive to study the impact of Fractured confrontation drilling fluid leakage.
Summary of the invention
The utility model object is: a kind of experimental provision that drilling fluid is missed in formation fracture of simulating is provided.
The technical scheme that the utility model adopts is:
The utility model is a kind of simulates the experimental provision that drilling fluid is missed in formation fracture, is mainly made up of nitrogen cylinder A, nitrogen cylinder B, Pressure gauge A, sealing baffle, fluid reservoir, drilling fluid import, Pressure gauge B, Crack Control thin slice, core holding unit, hold-down nut, flowmeter, graduated cylinder. Nitrogen cylinder A is connected with core holding unit, Pressure gauge B is arranged between nitrogen cylinder A and core holding unit, nitrogen cylinder A is connected with fluid reservoir, there is a sealing baffle fluid reservoir inside, fluid reservoir upper end connects drilling fluid import, fluid reservoir is connected with core holding unit left end, core holding unit is the two parts up and down that have inner chamber, Crack Control thin slice is installed in the middle of core holding unit, core holding unit is fixed by hold-down nut, core holding unit right-hand member connects drilling fluid outlet, and drilling fluid exit is provided with flowmeter. Drilling fluid enters fluid reservoir by drilling fluid import, the nitrogen of nitrogen cylinder B output certain pressure promotes sealing baffle and moves, thereby the drilling fluid in extruding fluid reservoir enters core holding unit, nitrogen cylinder A provides a certain size confined pressure to the rock core in core holding unit simultaneously, drilling fluid is under the driving of pressure, along the rock core crack in core holding unit, flow out core holding unit, finally flow into graduated cylinder. Pressure gauge A and Pressure gauge B show respectively the pressure of nitrogen cylinder B and nitrogen cylinder A output, and Crack Control thin slice is used for regulating fracture width, and the mud flow rate of core holding unit is flowed out in flowmeter monitoring. By regulating nitrogen cylinder A and nitrogen cylinder B output pressure size and Crack Control sheet thickness, can simulate the leakage of drilling fluid in different wellbore pressures, Different Strata pressure, different crack.
Advantage of the present utility model: simple in structure, easy to operate, can effectively simulate the leakage of drilling fluid in formation fracture.
Brief description of the drawings
Fig. 1 is a kind of structural representation of simulating the experimental provision that drilling fluid misses in formation fracture of the utility model.
In figure: 1. nitrogen cylinder A, 2. nitrogen cylinder B, 3. Pressure gauge A, 4. sealing baffle, 5. fluid reservoir, 6. drilling fluid import, 7. Pressure gauge B, 8. Crack Control thin slice, 9. core holding unit, 10. hold-down nut, 11. flowmeters, 12. graduated cylinders.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is described further.
As shown in Figure 1, the utility model is a kind of simulates the experimental provision that drilling fluid is missed in formation fracture, is mainly made up of nitrogen cylinder A1, nitrogen cylinder B2, Pressure gauge A3, sealing baffle 4, fluid reservoir 5, drilling fluid import 6, Pressure gauge B7, Crack Control thin slice 8, core holding unit 9, hold-down nut 10, flowmeter 11, graduated cylinder 12. Described nitrogen cylinder A1 is for providing the confined pressure of core holding unit 9 interior rock cores. Nitrogen cylinder B2 provides pressure and promotes sealing baffle 4 for sealing baffle 4, and sealing baffle 4 pushes by drilling fluid import 6 and enters into the drilling fluid in fluid reservoir 5, and drilling fluid enters core holding unit 9. Core holding unit 9 is for clamping post-fracturing rock core, Crack Control thin slice 8 is for regulating the Size of Crack between rock core, hold-down nut 10 seals fixing to core holding unit 9, Pressure gauge B7 and Pressure gauge A3 show respectively the pressure of nitrogen cylinder A1 and nitrogen cylinder B2 output, Crack Control thin slice 8 is for regulating fracture width, and the mud flow rate of core holding unit 9 is flowed out in flowmeter 11 monitorings. Drilling fluid enters fluid reservoir 5 by drilling fluid import 6, under the pressure-acting providing at nitrogen cylinder B2, sealed baffle plate 4 extruding enter core holding unit 9, nitrogen cylinder A1 provides a certain size confined pressure to the rock core in core holding unit 9 simultaneously, drilling fluid is along the rock core crack in core holding unit 9, flow out core holding unit 9, flow into graduated cylinder 12. By regulating nitrogen cylinder A1 and nitrogen cylinder B2 output pressure size and Crack Control thin slice 8 thickness, can simulate the leakage of drilling fluid in different wellbore pressures, Different Strata pressure, different crack.

Claims (3)

1. the utility model is a kind of simulates the experimental provision that drilling fluid is missed in formation fracture, mainly by nitrogen cylinder A (1), nitrogen cylinder B (2), Pressure gauge A (3), sealing baffle (4), fluid reservoir (5), drilling fluid import (6), Pressure gauge B (7), Crack Control thin slice (8), core holding unit (9), hold-down nut (10), flowmeter (11), graduated cylinder (12) composition, it is characterized in that: described nitrogen cylinder A (1) is connected with core holding unit (9), Pressure gauge B (7) is arranged between nitrogen cylinder A (1) and core holding unit (9), nitrogen cylinder B (2) is connected with fluid reservoir (5), there is a sealing baffle (4) fluid reservoir (5) inside, fluid reservoir (5) upper end connects drilling fluid import (6), fluid reservoir (5) is connected with core holding unit (9) left end, core holding unit (9) is made up of the two parts up and down with inner chamber, Crack Control thin slice (8) is installed in the middle of core holding unit (9), core holding unit (9) is fixing by hold-down nut (10), core holding unit (9) right-hand member connects drilling fluid outlet, drilling fluid exit is provided with flowmeter (11), graduated cylinder (12) is positioned at drilling fluid exit.
2. a kind of experimental provision that drilling fluid is missed in formation fracture of simulating according to claim 1, it is characterized in that: there is a sealing baffle (4) fluid reservoir (5) inside, sealing baffle (4) is high pressure resistant quality of rubber materials, and can be inner along fluid reservoir (5) axis relative sliding at fluid reservoir (5).
3. a kind of experimental provision that drilling fluid is missed in formation fracture of simulating according to claim 1, it is characterized in that: Crack Control thin slice (8) is installed in the middle of core holding unit (9), Crack Control thin slice (8) thickness is unfixing, changes corresponding Crack Control thin slice (8) according to simulation fracture width.
CN201520912813.8U 2015-11-17 2015-11-17 Experimental device for simulation drilling fluid is missed in crack of stratum Expired - Fee Related CN205263050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520912813.8U CN205263050U (en) 2015-11-17 2015-11-17 Experimental device for simulation drilling fluid is missed in crack of stratum

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520912813.8U CN205263050U (en) 2015-11-17 2015-11-17 Experimental device for simulation drilling fluid is missed in crack of stratum

Publications (1)

Publication Number Publication Date
CN205263050U true CN205263050U (en) 2016-05-25

Family

ID=56004572

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520912813.8U Expired - Fee Related CN205263050U (en) 2015-11-17 2015-11-17 Experimental device for simulation drilling fluid is missed in crack of stratum

Country Status (1)

Country Link
CN (1) CN205263050U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318398A (en) * 2018-01-08 2018-07-24 中国石油天然气股份有限公司 Heavy crude reservoir high temperature and pressure oil displacement efficiency experimental provision and its experimental method
CN109374859A (en) * 2018-10-19 2019-02-22 成都理工大学 A kind of adjustable crack core holding unit of slit width
CN110146424A (en) * 2019-05-08 2019-08-20 中国石油大学(北京) The simulator and method of stratum cell breath
CN110763826A (en) * 2018-07-25 2020-02-07 中国石油天然气股份有限公司 Drilling fluid detection equipment
CN112213199A (en) * 2020-09-16 2021-01-12 中国石油天然气集团有限公司 Drilling fluid plugging performance evaluation device and simulation method for micro-fracture core by using same

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108318398A (en) * 2018-01-08 2018-07-24 中国石油天然气股份有限公司 Heavy crude reservoir high temperature and pressure oil displacement efficiency experimental provision and its experimental method
CN110763826A (en) * 2018-07-25 2020-02-07 中国石油天然气股份有限公司 Drilling fluid detection equipment
CN109374859A (en) * 2018-10-19 2019-02-22 成都理工大学 A kind of adjustable crack core holding unit of slit width
CN110146424A (en) * 2019-05-08 2019-08-20 中国石油大学(北京) The simulator and method of stratum cell breath
CN112213199A (en) * 2020-09-16 2021-01-12 中国石油天然气集团有限公司 Drilling fluid plugging performance evaluation device and simulation method for micro-fracture core by using same

Similar Documents

Publication Publication Date Title
CN205263050U (en) Experimental device for simulation drilling fluid is missed in crack of stratum
CN102680176B (en) A kind of tubing stress corrosion (cracking) test machine in kind
CN206035473U (en) Fracturing fluid returns row crack analogue means
CN103696745A (en) Multifunctional experimental apparatus for dynamically simulating reservoir horizontal well
CN204086078U (en) A kind of parallel board slit simulation apparatus of fracturing fluid leak
CN202166572U (en) Water pressure testing machine for heavy-caliber fiber reinforced plastic pipe
CN114352248B (en) Two-dimensional physical simulation experiment device for thickened oil thermal recovery and application method thereof
CN204832183U (en) Many rock specimens circulation fracturing fluid moves in step to strain and loses analogue means
CN2866805Y (en) Drilling well leakage plugging simulating experimental instrument
CN207621006U (en) Metering adjusts novel hydraulic oil rig
CN212716576U (en) High-pressure liquid quantitative sand carrying device
CN204511850U (en) Water pump hydraulic detection device
CN201176873Y (en) Oilfield water injection well flow gauge
CN214585242U (en) Novel dynamic leaking stoppage evaluation device
CN204286733U (en) Normal temperature water attack pilot system
CN204163709U (en) A kind of oil well production pressure reduction analogue means
CN209976538U (en) API flow guide chamber suitable for testing flow guide capacity of fractured rock plate
CN103712862A (en) Device for testing expansion performance of magnesium alloy tubular product
CN204694705U (en) A kind of portable hydraulic system air air content proving installation
CN201963300U (en) Simulative multilevel cylinder sand filling tube device of two-dimensional rock core
CN203257369U (en) Built-in shaft blocking device of reservoir physical model
CN202000948U (en) Leakage type pipeline hanging device
CN220602831U (en) Sealing performance detection device for blowout preventer
CN210239654U (en) Oil field water injection development physical simulation experimental apparatus
CN205027620U (en) To grinding testing experiment device under ambient condition

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20161117

CF01 Termination of patent right due to non-payment of annual fee