CN205262148U - High temperature waste gas waste heat and coating material recovery unit - Google Patents

High temperature waste gas waste heat and coating material recovery unit Download PDF

Info

Publication number
CN205262148U
CN205262148U CN201521019345.8U CN201521019345U CN205262148U CN 205262148 U CN205262148 U CN 205262148U CN 201521019345 U CN201521019345 U CN 201521019345U CN 205262148 U CN205262148 U CN 205262148U
Authority
CN
China
Prior art keywords
coating material
waste gas
output
pipeline
finned cooler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201521019345.8U
Other languages
Chinese (zh)
Inventor
曹余庆
王刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI ADVANCE SYSTEMS Inc
Original Assignee
WUXI ADVANCE SYSTEMS Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI ADVANCE SYSTEMS Inc filed Critical WUXI ADVANCE SYSTEMS Inc
Priority to CN201521019345.8U priority Critical patent/CN205262148U/en
Application granted granted Critical
Publication of CN205262148U publication Critical patent/CN205262148U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P70/00Climate change mitigation technologies in the production process for final industrial or consumer products
    • Y02P70/10Greenhouse gas [GHG] capture, material saving, heat recovery or other energy efficient measures, e.g. motor control, characterised by manufacturing processes, e.g. for rolling metal or metal working

Abstract

The utility model relates to a high temperature waste gas waste heat and coating material recovery unit, including the finned cooler, its input passes through pipe connection high temperature waste gas and enters the mouth, the output of finned cooler divide into two the tunnel, all the way through the pipe connection fan, the output of fan is respectively through tube coupling waste gas recovery drying equipment entry and substrate coating material absorbing device entry, two condensers of pipe connection are crossed to another sweetgum fruit, the output of two condensers connects gradually liquid storage pot and centrifugal pump through the pipeline, the coating material accumulator is connected to the output of centrifugal pump, two condenser rear ends link up has the defroster, the output of defroster passes through the pipeline and is connected with the finned cooler. The utility model discloses compact structure, reasonable, convenient operation is reliable. Can be in high temperature waste gas waste heat recovery the condensation retrieve substrate coating material, can reach salvaging, energy saving and emission reduction's effect, simple structure, less investment.

Description

High-temp waste gas waste heat and coating material retracting device
Technical field
The utility model relates to drying plant technical field, especially a kind of high-temp waste gas waste heat and coating material retracting device being applied on the drying plant that produces high temperature poisonous fume.
Background technology
Drying plant is, by high temperature air, base material is carried out to heating, drying, and its operating temperature sometimes can be up to 200 DEG C, and equipment also needs constantly to supplement fresh air at work, and discharge section high-temp waste gas, and the EGT of discharge is conventionally also more than 100 DEG C. The coating material of some base material contains noxious material, after high-temperature gasification, is blended in waste gas, if these waste gas are directly discharged in atmosphere, and not only contaminated environment but also cause the energy and the waste of coating material.
Way of the prior art has two kinds: the one, waste gas is directly discharged in atmosphere. The 2nd, by exhaust treatment system, poisonous fume is processed into nontoxic being discharged into again in atmosphere. First method is completely infeasible in current stage. Second method has high input, and causes the waste of the energy and coating material.
Utility model content
The applicant, for the shortcoming in above-mentioned existing production technology, provides a kind of high-temp waste gas waste heat rational in infrastructure and coating material retracting device, thereby effectively solves the problem of high pollution, high investment, the energy and coating material waste.
The technical scheme that the utility model adopts is as follows:
A kind of high-temp waste gas waste heat and coating material retracting device, comprise finned cooler, its input connects high-temp waste gas entrance by pipeline, the output of described finned cooler is divided into two-way, lead up to pipeline connecting fan, the output of described blower fan connects waste gas by pipeline respectively and reclaims drying plant entrance and substrate coating material absorption plant entrance; The pipeline of separately leading up to connects two road condensers, the output of described two road condensers connects fluid reservoir and centrifugal pump successively by pipeline, described centrifugal delivery side of pump connects coating material holder, described two condenser rear ends, road are connected demister, and the output of described demister is connected with finned cooler by pipeline.
Further improvement as technique scheme:
The output of described finned cooler is connected in parallel to two blower fans by pipeline;
Described waste gas reclaims on the connecting line between drying plant entrance and substrate coating material absorption plant entrance Pneumatic gate valve is installed;
On described two road condensers, be separately installed with import and the outlet of chilled water.
The beneficial effects of the utility model are as follows:
The utility model compact conformation, reasonable, convenient and reliable operation. Can in high-temp waste gas waste heat recovery, condensation reclaim substrate coating material, can reach twice laid, the effect of energy-saving and emission-reduction, simple in structure, less investment.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Wherein: 1, waste gas reclaims drying plant entrance; 2, substrate coating material absorption plant entrance; 3, Pneumatic gate valve; 4, blower fan; 5, fluid reservoir; 6, centrifugal pump; 7, demister; 8, two road condensers; 9, finned cooler; 10, high-temp waste gas entrance.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described.
As shown in Figure 1, the high-temp waste gas waste heat of the present embodiment and coating material retracting device, comprise finned cooler 9, its input connects high-temp waste gas entrance 10 by pipeline, the output of finned cooler 9 is divided into two-way, lead up to pipeline connecting fan 4, the output of blower fan 4 connects waste gas by pipeline respectively and reclaims drying plant entrance 1 and substrate coating material absorption plant entrance 2; The pipeline of separately leading up to connects two road condensers 8, the output of two road condensers 8 connects fluid reservoir 5 and centrifugal pump 6 successively by pipeline, the output of centrifugal pump 6 connects coating material holder, two road condenser 8 rear ends are connected demister 7, and the output of demister 7 is connected with finned cooler 9 by pipeline.
The output of finned cooler 9 is connected in parallel to two blower fans 4 by pipeline.
Waste gas reclaims on the connecting line between drying plant entrance 1 and substrate coating material absorption plant entrance 2 Pneumatic gate valve 3 is installed.
On two road condensers 8, be separately installed with import and the outlet of chilled water.
As shown in Figure 1, high-temp waste gas (the substrate coating material that contains volatilization of discharging from drying plant, temperature is 105 degrees Celsius) first through a finned cooler 9, (temperature slightly declines, drop to 87.5 degrees Celsius), divide two-way from finned cooler 9 gas out, one tunnel is drawn and is got back to drying plant by blower fan 4, in the time that waste gas floating coat material concentration is too high, Pneumatic gate valve 3 is closed, waste gas enters in substrate coating material absorption plant, in the time that concentration reduces, Pneumatic gate valve 3 is opened, and waste gas comes back to drying plant; The two road condensers 8 of separately leading up to are again lowered the temperature and are made EGT reach the condensing temperature of substrate coating, be condensed into liquid, receive in fluid reservoir 5 by back of pipeline, in the time that the liquid capacity in fluid reservoir 5 reaches certain value, centrifugal pump 6 is worked, coating material is pumped in coating material holder and recycled, and the temperature that simultaneously in Cong Er road condenser 8, waste gas out is now exported through demister 7(is 37 degrees Celsius) again get back in finned cooler 9 and recycle. Finally form the waste heat recovery of high-temp waste gas and recycling of substrate coating material, solved the waste problem of the energy and coating material.
More than describing is to explanation of the present utility model, is not the restriction to utility model, and the utility model limited range, referring to claim, within protection domain of the present utility model, can be done any type of amendment.

Claims (4)

1. a high-temp waste gas waste heat and coating material retracting device, it is characterized in that: comprise finned cooler (9), its input connects high-temp waste gas entrance (10) by pipeline, the output of described finned cooler (9) is divided into two-way, lead up to pipeline connecting fan (4), the output of described blower fan (4) connects waste gas by pipeline respectively and reclaims drying plant entrance (1) and substrate coating material absorption plant entrance (2); The pipeline of separately leading up to connects two road condensers (8), the output of described two road condensers (8) connects fluid reservoir (5) and centrifugal pump (6) successively by pipeline, the output of described centrifugal pump (6) connects coating material holder, described two road condenser (8) rear ends are connected demister (7), and the output of described demister (7) is connected with finned cooler (9) by pipeline.
2. high-temp waste gas waste heat as claimed in claim 1 and coating material retracting device, is characterized in that: the output of described finned cooler (9) is connected in parallel to two blower fans (4) by pipeline.
3. high-temp waste gas waste heat as claimed in claim 1 and coating material retracting device, is characterized in that: described waste gas reclaims on the connecting line between drying plant entrance (1) and substrate coating material absorption plant entrance (2) Pneumatic gate valve (3) is installed.
4. high-temp waste gas waste heat as claimed in claim 1 and coating material retracting device, is characterized in that: on described two road condensers (8), be separately installed with import and the outlet of chilled water.
CN201521019345.8U 2015-12-10 2015-12-10 High temperature waste gas waste heat and coating material recovery unit Withdrawn - After Issue CN205262148U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521019345.8U CN205262148U (en) 2015-12-10 2015-12-10 High temperature waste gas waste heat and coating material recovery unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521019345.8U CN205262148U (en) 2015-12-10 2015-12-10 High temperature waste gas waste heat and coating material recovery unit

Publications (1)

Publication Number Publication Date
CN205262148U true CN205262148U (en) 2016-05-25

Family

ID=56003671

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521019345.8U Withdrawn - After Issue CN205262148U (en) 2015-12-10 2015-12-10 High temperature waste gas waste heat and coating material recovery unit

Country Status (1)

Country Link
CN (1) CN205262148U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105333722A (en) * 2015-12-10 2016-02-17 无锡爱德旺斯科技有限公司 High temperature waste gas heat and coating material recovery device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105333722A (en) * 2015-12-10 2016-02-17 无锡爱德旺斯科技有限公司 High temperature waste gas heat and coating material recovery device
CN105333722B (en) * 2015-12-10 2017-06-16 无锡爱德旺斯科技有限公司 High-temp waste gas waste heat and coating material retracting device

Similar Documents

Publication Publication Date Title
CN103011546B (en) A kind of two-stage sludge mummification and energy-recuperation system and drying process thereof
CN106430901A (en) Moisture discharge and drying system for sludge
CN101408372A (en) Process for drying material by hot pipe and heat pump technology
CN207740028U (en) A kind of mine waste heat recovery reutilization system
CN205980886U (en) Mine return air waste heat recovery utilizes system
CN205262148U (en) High temperature waste gas waste heat and coating material recovery unit
CN203167999U (en) Vacuum pumping device for tobacco vacuum box
CN103604212A (en) Large-temperature-difference wellhead heater and operation mode thereof
CN205026636U (en) Energy -concerving and environment -protective equipment of boiler waste heat recovery
CN203657503U (en) Exhaust gas processing system of kiln
CN105333722B (en) High-temp waste gas waste heat and coating material retracting device
CN202778226U (en) External-heating type zero-air-consumption thermal-regeneration adsorption dryer
CN204159066U (en) Chemical volatility gas discharging retracting device
CN208711380U (en) Device is absorbed and utilized in a kind of venturi VOC
CN203657502U (en) Exhaust gas efficient utilization system of kiln
CN205593217U (en) Air -source heat pump waste heat recovery reuse system
CN203090703U (en) Device for recycling water from coal drying waste moisture
CN205372567U (en) Environment -friendly waste incinerator case of cooling down rapidly
CN205014801U (en) Heat recovery unit of cleaning machine
CN208687988U (en) A kind of air energy heat pump waste heat recycles and reuses device
CN206661868U (en) A kind of printing machinery gas sampling cooling treatment device
CN203303683U (en) Automatic cold oil emptying device
CN103265985A (en) Device for reducing humidity of low-concentration gas and dehumidification method
CN216925276U (en) Exhaust structure for circulating water cooler in large-scale equipment
CN202936195U (en) Waste gas treatment device for chemical industry storage and transportation

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20160525

Effective date of abandoning: 20170616