CN205257080U - Pitch uninstallation, storage, transport integration are equipped - Google Patents

Pitch uninstallation, storage, transport integration are equipped Download PDF

Info

Publication number
CN205257080U
CN205257080U CN201520997971.8U CN201520997971U CN205257080U CN 205257080 U CN205257080 U CN 205257080U CN 201520997971 U CN201520997971 U CN 201520997971U CN 205257080 U CN205257080 U CN 205257080U
Authority
CN
China
Prior art keywords
pitch
pump
storage
valve
pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520997971.8U
Other languages
Chinese (zh)
Inventor
王军
周云芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINAN HUAYANG CARBON CO Ltd
Original Assignee
JINAN HUAYANG CARBON CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINAN HUAYANG CARBON CO Ltd filed Critical JINAN HUAYANG CARBON CO Ltd
Priority to CN201520997971.8U priority Critical patent/CN205257080U/en
Application granted granted Critical
Publication of CN205257080U publication Critical patent/CN205257080U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a pitch uninstallation, storage, transport integration are equipped, includes: pipeline I, pitch storage tank and pump I and pump II are imported to coupling hose, the pitch that links to each other with coupling hose. Pump I is opened with valve II to shut -off valve I, and pitch gets into pitch outlet line II from pitch input pipeline I, stores in finally flowing into the pitch storage tank. When pitch uses, open valve II whiles, II work of pump, the pitch in the pitch storage tank is discharged from the II well I well pitches of realizing of pitch outlet line that flow into of pitch input pipeline. Pump I and pump II can the simultaneous workings, can make and unload, store and carry and go on simultaneously, have improved efficiency. Can reduce the storage capacity, reduce the transfer degree of difficulty, have the investment and economize. Processing environmental protection, the high primary treatment of device availability measure big characteristics.

Description

Pitch unloading, storage, transportation integration equipment
Technical field
The utility model relates to a kind of pitch unloading, storage, transportation integration equipment.
Background technology
During charcoal element is produced or other fixing production operation places need to be used pitch. Adopt solid asphalt, add and melt inconvenience, carry summer due to the high easily caking of temperature, add more trouble, and link is many, flue gas is difficult for processing. Use liquid to carry current equipment efficiency not high, utilization rate of equipment and installations is low.
Summary of the invention
The utility model, in order to overcome the deficiency of above technology, provides a kind of efficiency is high, environmental pollution is little pitch unloading, storage, transportation integration equipment.
The utility model overcomes the technical scheme that its technical problem adopts:
A kind of pitch unloading, store, transportation integration equipment, comprise: connecting hose, the pitch intake pipeline I being connected with connecting hose, asphalt storage and pump I and pump II, the bottom of described asphalt storage is connected with intake pipeline I by pitch intake pipeline II, described asphalt storage lower end is connected with pitch export pipeline II, pump I one end is connected in intake pipeline I, its other end is connected in pitch export pipeline II, pump II one end is connected in intake pipeline I by valve I, its other end is connected to pitch export pipeline I and is connected in pitch export pipeline II by valve II.
In order to make pitch keep temperature required, in above-mentioned asphalt storage, be provided with heater.
In order to prevent flue gas leakage, above-mentioned asphalt storage upper end is connected with flue gas collecting pipe.
In order further to raise the efficiency, above-mentioned asphalt storage has two.
Also comprise the stand-by pump being arranged between pump I and pump II, described stand-by pump one end is connected in intake pipeline I through valve III, and its other end is connected in pitch export pipeline II through valve IV.
The beneficial effects of the utility model are: shut off valve I and valve II are also opened pump I, and pitch enters pitch export pipeline II from pitch intake pipeline I, finally flows in asphalt storage and stores. In the time that pitch uses, the simultaneously pump II work of open valve II, the pitch in asphalt storage flows into from pitch intake pipeline II to be realized pitch in pitch export pipeline I and discharges. Pump I and pump II can be worked simultaneously, can make to unload, store and carry simultaneously to carry out, and have improved efficiency. Can reduce storage capacity, reduce transfer difficulty, there is reduced investment. Process environmental protection, the large feature of the high coagulation amount of device efficiency.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
In figure, 1. connecting hose 2. pitch intake pipeline I 3. pitch intake pipeline II 4. pitch export pipeline I 5. pitch export pipeline II 6. asphalt storage 7. heater 8. flue gas collecting pipe 9. pump I 10. pump II 11. stand-by pump 12. valve I 13. valve II 14. valve III 15. valve IV.
Detailed description of the invention
Below in conjunction with accompanying drawing 1, the utility model is described further.
A kind of pitch unloading, store, transportation integration equipment, comprise: connecting hose 1, the pitch intake pipeline I 2 being connected with connecting hose 1, asphalt storage 6 and pump I 9 and pump II 10, the bottom of asphalt storage 6 is connected with intake pipeline I 2 by pitch intake pipeline II 3, asphalt storage 6 lower ends are connected with pitch export pipeline II 5, pump I 9 one end are connected in intake pipeline I 2, its other end is connected in pitch export pipeline II 5, pump II 10 one end are connected in intake pipeline I 2 by valve I 12, its other end is connected to pitch export pipeline I 4 and is connected in pitch export pipeline II 5 by valve II 13. the filling vehicle that is loaded with liquid asphalt is unloaded while a little unloading at pitch, by connecting hose 1 and filling vehicle is convenient is connected, raises the efficiency. shut off valve I 12 and valve II 13 are also opened pump I 9, and pitch enters pitch export pipeline II 5 from pitch intake pipeline I 2, finally flow in asphalt storage 6 and store. in the time that pitch uses, open valve II 13 simultaneously pump II 10 is worked, and the pitch in asphalt storage 6 flows into from pitch intake pipeline II 3 to be realized pitch in pitch export pipeline I 4 and discharge. pump I 9 can be worked with pump II 10 simultaneously, can make to unload, store and carry simultaneously to carry out, and has improved efficiency. can reduce storage capacity, reduce transfer difficulty, there is reduced investment. process environmental protection, the large feature of the high coagulation amount of device efficiency.
Further, be provided with heater 7 in asphalt storage 6, heater 7 can keep the temperature of the pitch in asphalt storage 6. Asphalt storage 6 upper ends are connected with flue gas collecting pipe 8 simultaneously. Flue gas collecting pipe 8 is discharged the flue gas in asphalt storage 6 effectively to prevent the pollution of the environment.
Further, asphalt storage 6 can have two, a wherein standing temperature adjustment for pitch, and another normal use, has improved efficiency.
Can also comprise the stand-by pump 11 being arranged between pump I 9 and pump II 10, stand-by pump 11 one end are connected in intake pipeline I 2 through valve III 14, and its other end is connected in pitch export pipeline II 5 through valve IV 15. Can be stand-by pump 11 instead of pump I 9 or pump II 10 by the switching of valve III 14 and valve IV 15, further improve reliability.

Claims (5)

1. a pitch unloading, store, transportation integration equipment, it is characterized in that, comprise: connecting hose (1), the pitch intake pipeline I (2) being connected with connecting hose (1), asphalt storage (6) and pump I (9) and pump II (10), the bottom of described asphalt storage (6) is connected with intake pipeline I (2) by pitch intake pipeline II (3), described asphalt storage (6) lower end is connected with pitch export pipeline II (5), pump I (9) one end is connected in intake pipeline I (2), its other end is connected in pitch export pipeline II (5), pump II (10) one end is connected in intake pipeline I (2) by valve I (12), its other end is connected to pitch export pipeline I (4) and is connected in pitch export pipeline II (5) by valve II (13).
2. pitch unloading according to claim 1, storage, transportation integration equipment, is characterized in that: in described asphalt storage (6), be provided with heater (7).
3. pitch unloading according to claim 1, storage, transportation integration equipment, is characterized in that: described asphalt storage (6) upper end is connected with flue gas collecting pipe (8).
4. pitch unloading according to claim 1, storage, transportation integration equipment, is characterized in that: described asphalt storage (6) has two.
5. according to the pitch unloading described in any one in claim 1 to 4, storage, transportation integration equipment, it is characterized in that: also comprise the stand-by pump (11) being arranged between pump I (9) and pump II (10), described stand-by pump (11) one end is connected in intake pipeline I (2) through valve III (14), and its other end is connected in pitch export pipeline II (5) through valve IV (15).
CN201520997971.8U 2015-12-07 2015-12-07 Pitch uninstallation, storage, transport integration are equipped Expired - Fee Related CN205257080U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520997971.8U CN205257080U (en) 2015-12-07 2015-12-07 Pitch uninstallation, storage, transport integration are equipped

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520997971.8U CN205257080U (en) 2015-12-07 2015-12-07 Pitch uninstallation, storage, transport integration are equipped

Publications (1)

Publication Number Publication Date
CN205257080U true CN205257080U (en) 2016-05-25

Family

ID=55998623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520997971.8U Expired - Fee Related CN205257080U (en) 2015-12-07 2015-12-07 Pitch uninstallation, storage, transport integration are equipped

Country Status (1)

Country Link
CN (1) CN205257080U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114620668A (en) * 2022-03-31 2022-06-14 山东京博物流股份有限公司 Anti-blocking device and method for asphalt unloading pump pool

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114620668A (en) * 2022-03-31 2022-06-14 山东京博物流股份有限公司 Anti-blocking device and method for asphalt unloading pump pool
CN114620668B (en) * 2022-03-31 2024-03-22 山东京博物流股份有限公司 Asphalt unloading pump pool anti-blocking device and method

Similar Documents

Publication Publication Date Title
CN204197705U (en) A kind of aluminum paste feedway
CN206701038U (en) A kind of heat pump steam-supplying system applied to sulfur recovery facility
CN205257080U (en) Pitch uninstallation, storage, transport integration are equipped
CN202338775U (en) Online blow-down apparatus for high-pressure natural gas pipeline
CN103255806B (en) Central circulating water supply system of workshops
CN205278760U (en) Filling system of LNG accepting station
CN210216561U (en) Secondary pressurizing water supply device of circulating water system
CN206563443U (en) A kind of heating in vacuum pipe is inverted the solar heater used
CN209587663U (en) A kind of hose exchange system suitable for large-scale oil depot
CN102383469A (en) Water supply method and unit and device of same
CN205345841U (en) Pitch storage device and pump drainage device thereof
CN206943814U (en) A kind of liquid additive adding set
CN104613317A (en) System for preventing liquid in pipeline from expanding
CN204873781U (en) Production efficiency's ton bucket can be improved and material device is taken out
CN104864765A (en) Vacuum water-feeding system of cooling tower
CN203629092U (en) Water saving and freeze proofing device for solar water heater
CN202449628U (en) Device for preventing water from flowing back into storage bin in activated coke hydraulic conveying process
CN207385430U (en) A kind of production equipment with waste gas recovering device
CN208865602U (en) Realize that main pump and stand-by pump are quickly converted the device of operation in lime white transportation system
CN214119701U (en) Recycling device for boiler exhaust hot water
CN207110280U (en) A kind of antifreeze downpipe
CN204824784U (en) Civilian hydrocarbon blending system
CN218360059U (en) Liquid spraying equipment
CN203068857U (en) Siphon-type water inlet/outlet pipe emptying solar energy system
CN209263750U (en) A kind of multiple-grooved parallel connection accumulation of energy tank systems that can synchronize accumulation of energy

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160525

Termination date: 20211207

CF01 Termination of patent right due to non-payment of annual fee