CN205254055U - Aluminium alloy casting water system - Google Patents

Aluminium alloy casting water system Download PDF

Info

Publication number
CN205254055U
CN205254055U CN201521048054.1U CN201521048054U CN205254055U CN 205254055 U CN205254055 U CN 205254055U CN 201521048054 U CN201521048054 U CN 201521048054U CN 205254055 U CN205254055 U CN 205254055U
Authority
CN
China
Prior art keywords
valve
water
aluminium alloy
cooling line
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521048054.1U
Other languages
Chinese (zh)
Inventor
山流光
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Aluminum Group Co Ltd
Original Assignee
Southwest Aluminum Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Aluminum Group Co Ltd filed Critical Southwest Aluminum Group Co Ltd
Priority to CN201521048054.1U priority Critical patent/CN205254055U/en
Application granted granted Critical
Publication of CN205254055U publication Critical patent/CN205254055U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses an aluminium alloy casting water system, including the first cooling pipeline that is used for feeding through cooling water source and water jacket crystallizer, first cooling tube has set gradually first -class gauge, first governing valve, first ooff valve along water flow direction on the road, first governing valve with between the first ooff valve first cooling tube is connected with on the road and leads to the pipeline of releasing of casting the well, the bleeder pipe is provided with the second switch valve on the road. When the system moved, the flow of cooling water had been adjusted to first governing valve, through opening and close first ooff valve and second switch valve in turn, can realize the pulsed chilled(cooling) water supply (CWS) to the water jacket crystallizer. This water system is convenient for control, and the cost is lower.

Description

A kind of aluminium alloy casting water system
Technical field
The utility model relates to aluminium alloy casting water system technical field, relates in particular to a kind of aluminium alloy castingWater system.
Background technology
In aluminium alloy casting, discharge (intensity of cooling) and control thereof are three large critical processes of casting techniqueParameter. Casting water system mainly by blowdown pipeline branch road, self-cleaning filter, drain branch road (casting knotWhen bundle, crystallizer drains), discharge regulate and realize pulse function pipeline valve member, casting Well Water LevelDetect and sump pump system composition. Wherein, discharge regulate main by executive component electric control valve andDetecting element electromagnetic flowmeter, the closed-loop regulating system of PLC electric-control system composition realizes the accurate of dischargeControl. In prior art, adopt triple valve to realize the function of pulse water flow, its cost is higher, and pulseThe variation of current is larger, is inconvenient to control, and is unfavorable for ingot casting to carry out effectively cooling.
Therefore, how providing a kind of aluminium alloy of being convenient to control to cast water system, is those skilled in the artThe technical issues that need to address at present.
Utility model content
The purpose of this utility model is to provide a kind of aluminium alloy of being convenient to control and casts water system.
A kind of aluminium alloy casting water system, comprises for being communicated with the first cold of cooling water source and water jacket crystallizerBut pipeline, is disposed with first flow meter, first along water (flow) direction on described the first cooling line and regulatesValve, the first switch valve, described the first cooling tube between described the first control valve and described the first switch valveOn road, be connected with and lead to the pipeline of releasing of casting well, described in release on pipeline and be provided with second switch valve.
Preferably, in above-mentioned aluminium alloy casting water system, described first before described first flow meterOn cooling line, be connected with the second cooling line, the other end of described the second cooling line is connected in describedOn described the first cooling line after one switch valve, described the second cooling line is established successively along water (flow) directionBe equipped with the second flowmeter and the second control valve.
Preferably, in above-mentioned aluminium alloy casting water system, described first flow meter and described the second flowMeter is electromagnetic flowmeter, and described the first control valve and described the second control valve are solenoid valve.
Preferably, in above-mentioned aluminium alloy casting water system, described first before described first flow meterOn cooling line, be connected with the blowdown branch road that leads to described casting well, described blowdown branch road is provided with scum cockValve, is provided with on described the first cooling line and is positioned at described first flow meter and described blowdown branch road junctionBetween the first service switch valve.
Preferably, in above-mentioned aluminium alloy casting water system, on described the first cooling line, be provided with and be positioned atPressure maintaining valve between described the first service switch valve and described first flow meter.
Preferably, in above-mentioned aluminium alloy casting water system, on described the first cooling line, be provided with and be positioned atThe second service switch valve between described pressure maintaining valve and described first flow meter.
Preferably, in above-mentioned aluminium alloy casting water system, on described the first cooling line, be provided with and be positioned atWater temperature water-pressure survey unit between described the second service switch valve and described first flow meter.
Preferably, in above-mentioned aluminium alloy casting water system, described the first switch valve and described second switchValve is Pneumatic butterfly valve.
Preferably, in above-mentioned aluminium alloy casting water system, described first after described the first switch valveOn cooling line, be connected with emergent water lines, on described the first cooling line, be provided with and be positioned at described first and openClose the first check valve between valve and described emergent water lines junction, described the first check valve is along described coldBut water source, to described water jacket crystallizer direction one-way conduction, is provided with emergency button in described emergent water linesValve and the second check valve, described the second check valve is unidirectional to the direction of described water jacket crystallizer along emergent water sourceConducting.
Preferably, in above-mentioned aluminium alloy casting water system, described the first cooling line and described emergent waterOn described the first cooling line after pipeline junction, be connected with and drain branch road.
The aluminium alloy casting water system that the utility model provides, comprises for being communicated with cooling water source and water jacket knotThe first cooling line of brilliant device, is disposed with first flow along water (flow) direction on described the first cooling lineMeter, the first control valve, the first switch valve, the institute between described the first control valve and described the first switch valveState on the first cooling line and be connected with and lead to the pipeline of releasing of casting well, described in release on pipeline and be provided with secondSwitch valve. When system operation, the first control valve regulates the flow of cooling water, by alternately opening and closingClose the first switch valve and second switch valve, can realize the pulsed chilled(cooling) water supply (CWS) to water jacket crystallizer.This water system is convenient to control, and cost is lower.
Brief description of the drawings
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, below willAccompanying drawing to required use in embodiment or description of the Prior Art is briefly described, apparently,Accompanying drawing in the following describes is only embodiment more of the present utility model, for ordinary skill peopleMember, is not paying under the prerequisite of creative work, can also obtain the attached of other according to these accompanying drawingsFigure.
Fig. 1 is the layout drawing of the aluminium alloy casting water system in the utility model specific embodiment.
In Fig. 1:
1-the first cooling line, 11-first flow meter, 12-the first control valve, 13-the first switch valve, 14-The first check valve, 15-water temperature water-pressure survey unit, 16-the second service switch valve, 17-pressure maintaining valve, 18-The first service switch valve, 2-release pipeline, 21-second switch valve, 22-Hand-operated butterfly valve, 3-the second cooling tubeRoad, 31-the second flowmeter, 32-the second control valve, 4-blowdown branch road, 41-scum cock valve, 5-drainBranch road, 51-drain switch valve, the emergent water lines of 6-, 61-emergency button valve, 62-the second check valve.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, to the technology in the utility model embodimentScheme is clearly and completely described, and obviously, described embodiment is only one of the utility modelDivide embodiment, instead of whole embodiment. Based on the embodiment in the utility model, this area is commonTechnical staff is not making the every other embodiment obtaining under creative work prerequisite, all belongs to thisThe scope of utility model protection.
Please refer to Fig. 1, Fig. 1 is the cloth of the aluminium alloy casting water system in the utility model specific embodimentPut figure.
In a kind of specific embodiment scheme, the utility model provides a kind of aluminium alloy casting water system,This water system is used to water jacket crystallizer cooling water supply, so that ingot casting cooled and solidified. This system comprises useOn the first cooling line 1, the first cooling line 1 that is communicated with cooling water source and water jacket crystallizer along currentDirection is disposed with first flow meter 11, the first control valve 12, the first switch valve 13, the first adjustingsOn the first cooling line 1 between valve 12 and the first switch valve 13, be connected with and lead to the pipeline of releasing of casting well2, on the pipeline 2 of releasing, be provided with second switch valve 21. Concrete, on the pipeline 2 of releasing, be also provided with handMoving butterfly valve 22. This aluminium alloy casting water system specifically also comprises casting Well Water Level meter and draining pump.
When system operation, the first control valve 12 regulates the flow of cooling water, by alternately opening and closingThe first switch valve 13 and second switch valve 21, while opening the first switch valve 13, second switch valve 21 closesClose, while opening second switch valve 21, the first switch valve 13 cuts out, and can realize the arteries and veins to water jacket crystallizerRush formula chilled(cooling) water supply (CWS).
Preferably, on the first cooling line 1 before first flow meter 11, be connected with the second cooling line 3,The other end of the second cooling line 3 is connected on the first cooling line 1 after the first switch valve 13, theTwo cooling lines 3 are disposed with the second flowmeter 31 and the second control valve 32 along water (flow) direction. Wherein,The flow that the second control valve 32 regulates is less than the flow that the first control valve 12 regulates, i.e. the second cooling line3 so arrange by compared with the cooling water of low discharge, and in the time that the first switch valve 13 cuts out, cooling water is largePart is released casting well from the pipeline 2 of releasing, and can also ensure that a fraction of cooling water is by second simultaneouslyCooling line 3 enters into water jacket crystallizer, so can realize soft pulse refrigerating function, i.e. pulsating waterThe lowest stream value of stream is greater than zero, can avoid burning out like this crystallizer, has effectively improved crystallizerCooling effect.
It should be noted that, above-mentioned first flow meter 11 and the second flowmeter 31 can be selected various structuresForm, such as spinner flowmeter, ultrasonic flowmeter or electromagnetic flowmeter etc., preferably, in this programmeFirst flow meter 11 and the second flowmeter 31 are electromagnetic flowmeter. For the ease of controlling, preferably,The first control valve 12 and the second control valve 32 are all selected solenoid valve, certainly, and those skilled in the artCan also select electric control valve or pneumatic control valve etc.
In order to realize pulse cooling function, need the first switch valve 13 and second switch valve 21 to have fastThe function of opening and turn-offing, therefore, preferably, the first switch valve 13 and second switch valve in this programme21 are Pneumatic butterfly valve, and certainly, those skilled in the art can also select pneumatic ball valve or Pneumatic gate valve etc.Pneumatic rapid cut-off valve.
Because cooling water source is for producing cooling water, after long-play, in pipeline, may retain dirtImpurity such as dirt mud etc., thus the normal survey of the accurate valve member instrument such as solenoid valve and electromagnetic flowmeter affectedAmount and work. In order to get rid of the impurity in pipeline, ensure each element normal operation, preferably, theOn the first cooling line 1 before one flowmeter 11, be connected with and lead to the blowdown branch road 4 of casting well, blowdown is propped upRoad 4 is provided with on scum cock valve 41, the first cooling lines 1 and is provided with and is positioned at first flow meter 11 HesThe first service switch valve 18 between blowdown branch road 4 junctions. So arrange, need to get rid of the assorted of pipelineWhen matter, only the first service switch valve 18 need cut out, open scum cock valve 41 will produce cooling water fromBlowdown branch road 4 by and flow to casting well in, thereby can enter the technological parameter of each follow-up components and partsRow is confirmed.
Preferably, on the first cooling line 1, be also provided with and be positioned at the first service switch valve 18 and first flowPressure maintaining valve 17 between meter 11, pressure maintaining valve 17 can reduce the pressure of cooling water source, thereby ensures firstStable cooling water flow is provided in cooling line 1.
Preferably, on the first cooling line 1, be provided with between pressure maintaining valve 17 and first flow meter 11The second service switch valve 16. In the time that pressure maintaining valve 17 needs repairing, can close the second service switch valve16 and the first service switch valve 18, then by pressure maintaining valve 17 detachable maintainings.
It should be noted that, on the first cooling line 1, be provided with and be positioned at the second service switch valve 16 and firstWater temperature water-pressure survey unit 15 between flowmeter 11, in real time measuring the first cooling line 1Water temperature and hydraulic pressure, thus be convenient to timely control and regulation.
It should be noted that, on the first cooling line 1 after the first switch valve 13, be connected with emergent water pipeOn 6, the first cooling lines 1 of road, be provided be positioned at the first switch valve 13 and emergent water lines 6 junctions itBetween the first check valve 14, the first check valves 14 along cooling water source to water jacket crystallizer direction one-way conduction,In emergent water lines 6, be provided with emergency button valve 61 and the second check valve 62, the second check valves 62 along answeringAnxious water source is to the direction one-way conduction of water jacket crystallizer. Emergent water lines 6 can produced cooling water deficiencyOr first cooling line 1 while going wrong to water jacket crystallizer emergency service cooling water, the first check valve 14For ensureing that emergent water source can not flow to the upstream of the first cooling line 1, the second check valve 62 is for ensureingCooling water in the first cooling line 1 can not flow in emergent water lines 6. Concrete, emergency button valve61 can be Pneumatic butterfly valve.
It should be noted that first cooling after the first cooling line 1 and emergent water lines 6 junctionsOn pipeline 1, be connected with and drain branch road 5. Concrete, drain on branch road 5 and be provided with and drain switch valve 51,This drains switch valve 51 and is specifically as follows pneumatic ball valve.
In the aluminium alloy casting water system that the utility model provides, the adjusting of discharge is mainly by carrying out unitPart solenoid valve and detecting element electromagnetic flowmeter are realized, the closed-loop adjustment of PLC electric-control system compositionSystem realizes the accurate control of discharge, 40~500 cubic meters/hour of adjustable ranges, and precision is less than or equal to 1%,The adjustment process time is less than 12 seconds, and the adjustable cycle period of ratio switch time is 2 seconds to the maximum, without water hammerProblem. Pneumatic butterfly valve is to be combined by Pneumatic piston executing agency and valve component, mixes handwheel,In the time that source of the gas breaks down, can carry out manual operation. Mix magnetic valve and fast-discharge valve, valve is realized fastSpeed is closed or is opened. This scheme is convenient to realize, and cost is low, utilizes the flow of two switch valves to water systemAdjusting has realized combined type innovation, thereby can obtain good effect.
To the above-mentioned explanation of the disclosed embodiments, professional and technical personnel in the field can be realized or useThe utility model. To be aobvious for those skilled in the art to the multiple amendment of these embodimentAnd easily see, General Principle as defined herein can not depart from spirit or scope of the present utility modelSituation under, in other embodiments realize. Therefore, the utility model will can not be restricted to institute hereinThese embodiment that show, but to meet consistent with principle disclosed herein and features of novelty the widestScope.

Claims (10)

1. an aluminium alloy casting water system, is characterized in that, comprises for being communicated with cooling water source and water jacketFirst cooling line (1) of crystallizer, described the first cooling line (1) is upper to be set gradually along water (flow) directionHave first flow meter (11), the first control valve (12), the first switch valve (13), described first regulatesOn described the first cooling line (1) between valve (12) and described the first switch valve (13), be connected with logicalTo the pipeline of releasing (2) of casting well, described in release on pipeline (2) and be provided with second switch valve (21).
2. aluminium alloy casting water system according to claim 1, is characterized in that, described first-classOn amount meter (11) described the first cooling line (1) before, be connected with the second cooling line (3), described inThe other end of the second cooling line (3) is connected in afterwards described first cold of described the first switch valve (13)But pipeline (1) is upper, and described the second cooling line (3) is disposed with the second flowmeter (31) along water (flow) directionWith the second control valve (32).
3. aluminium alloy casting water system according to claim 2, is characterized in that, described first-classAmount meter (11) and described the second flowmeter (31) are electromagnetic flowmeter, described the first control valve (12)Be solenoid valve with described the second control valve (32).
4. aluminium alloy casting water system according to claim 1, is characterized in that, described first-classOn amount meter (11) described the first cooling line (1) before, be connected with the blowdown branch road that leads to described casting well(4), described blowdown branch road (4) is provided with scum cock valve (41), described the first cooling line (1)On be provided with and be positioned at first between described first flow meter (11) and described blowdown branch road (4) junctionService switch valve (18).
5. aluminium alloy according to claim 4 casting water system, is characterized in that, described first coldBut on pipeline (1), be provided with and be positioned at described the first service switch valve (18) and described first flow meter (11)Between pressure maintaining valve (17).
6. aluminium alloy according to claim 5 casting water system, is characterized in that, described first coldBut on pipeline (1), be provided with and be positioned between described pressure maintaining valve (17) and described first flow meter (11)The second service switch valve (16).
7. aluminium alloy according to claim 6 casting water system, is characterized in that, described first coldBut on pipeline (1), be provided with and be positioned at described the second service switch valve (16) and described first flow meter (11)Between water temperature water-pressure survey unit (15).
8. aluminium alloy casting water system according to claim 1, is characterized in that, described first opensClose valve (13) and described second switch valve (21) and be Pneumatic butterfly valve.
9. aluminium alloy casting water system according to claim 1, is characterized in that, described first opensClose on described the first cooling line (1) afterwards of valve (13) and be connected with emergent water lines (6), described theOn one cooling line (1), be provided with and be positioned at described the first switch valve (13) and described emergent water lines (6)The first check valve (14) between junction, described the first check valve (14) is along described cooling water source to instituteState water jacket crystallizer direction one-way conduction, in described emergent water lines (6), be provided with emergency button valve (61)With the second check valve (62), described the second check valve (62) is along emergent water source to described water jacket crystallizerDirection one-way conduction.
10. aluminium alloy according to claim 9 casting water system, is characterized in that, described first coldBut on described the first cooling line (1) after pipeline (1) and described emergent water lines (6) junctionBe connected with and drain branch road (5).
CN201521048054.1U 2015-12-15 2015-12-15 Aluminium alloy casting water system Active CN205254055U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521048054.1U CN205254055U (en) 2015-12-15 2015-12-15 Aluminium alloy casting water system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521048054.1U CN205254055U (en) 2015-12-15 2015-12-15 Aluminium alloy casting water system

Publications (1)

Publication Number Publication Date
CN205254055U true CN205254055U (en) 2016-05-25

Family

ID=55995606

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521048054.1U Active CN205254055U (en) 2015-12-15 2015-12-15 Aluminium alloy casting water system

Country Status (1)

Country Link
CN (1) CN205254055U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105328146A (en) * 2015-12-15 2016-02-17 西南铝业(集团)有限责任公司 Alloy casting cooling water system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105328146A (en) * 2015-12-15 2016-02-17 西南铝业(集团)有限责任公司 Alloy casting cooling water system

Similar Documents

Publication Publication Date Title
CN202109938U (en) Wide range flow measuring device
CN202381795U (en) Intelligent flow throttling control system
ATE166453T1 (en) COMPOSITE FLOW METER AND LEAK DETECTOR SYSTEM WITH VALVE CLOSING DURING ABNORMAL FLOW CONDITIONS
CN205254055U (en) Aluminium alloy casting water system
DE69804432D1 (en) Device for controlling a flow
CN105328146A (en) Alloy casting cooling water system
CN205841917U (en) Wisdom static balancing valve
CN202510791U (en) Intelligent flow balancing valve with LCD (Liquid Crystal Display)
CN207064812U (en) A kind of combustion taps
CN88203650U (en) Balancing valve and its special intelligent instrument
RU135716U1 (en) WELL PRODUCT SAMPLING DEVICE
CN203570277U (en) Oil field well opening liquid flow direction indicating device
CN201595051U (en) Water supply system of gradient planting
CN207704275U (en) A kind of flow control system
CN110501242A (en) A kind of cooling system of piston heat fatigue simulator stand
CN109882623A (en) Accurate flow-limiting valve and Pneumatic three-way valve
CN205429408U (en) A water knockout drum for multiple path laser cooling back installation
CN205472864U (en) Novel thermoelectricity thermodynamic system ammonifying device
CN207197607U (en) A kind of high accuracy measuring system for chilled water high-low flow great fluctuation process
CN209502911U (en) A kind of aluminium alloy casting system
CN205078972U (en) Valve with flexible pipe
CN203404059U (en) Movable emergency pump device
CN203615339U (en) Burner gas flow regulating device
CN211472706U (en) Water supply system pipeline flow control device
CN107727168A (en) A kind of multi-functional flowmeter

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant