CN205248643U - Preceding wiring front maintenance's direct current divides electric cabinet - Google Patents
Preceding wiring front maintenance's direct current divides electric cabinet Download PDFInfo
- Publication number
- CN205248643U CN205248643U CN201521079037.4U CN201521079037U CN205248643U CN 205248643 U CN205248643 U CN 205248643U CN 201521079037 U CN201521079037 U CN 201521079037U CN 205248643 U CN205248643 U CN 205248643U
- Authority
- CN
- China
- Prior art keywords
- air switch
- direct current
- cabinet
- dodge gate
- copper bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Patch Boards (AREA)
Abstract
Description
技术领域 technical field
本实用新型属于电力设备领域,具体涉及一种前接线前维护的直流分电柜。 The utility model belongs to the field of electric equipment, in particular to a direct current distribution cabinet for maintenance before wiring.
背景技术 Background technique
随着国家电网标准配送式智能变电站的建设推广,预制舱逐步替代了继电器室或控制室。预制舱包含舱体及内部的二次设备屏柜,在工厂内完成生产、组装、接线、调试等工作,以预制舱为单位进行现场安装,实现了“标准化设计、工厂化加工、装配式建设”,缩短了现场施工周期,提高了现场工作效率。 With the construction and promotion of the national grid standard distribution smart substation, the prefabricated cabin has gradually replaced the relay room or control room. The prefabricated cabin includes the cabin body and the secondary equipment screen cabinet inside. The production, assembly, wiring, commissioning and other work are completed in the factory, and the on-site installation is carried out with the prefabricated cabin as a unit, realizing the "standardized design, factory processing, and assembled construction. ", which shortened the on-site construction period and improved the on-site work efficiency.
由于预制舱运输制造条件的限制,预制舱体尺寸有一定限制。为了增加预制舱的二次屏柜安装位置,提升预制舱空间利用率,舱内屏柜采用双列布置方案,舱内屏柜需要紧贴舱壁安装,屏柜的后方、侧面都无法开门,需要在正面实现接线、维护、运行、管理,导致正面显示操作及安装调试间存在较大的矛盾。此外,预制舱内的直流分电柜需要兼顾内部安装元件复杂,正面显示操作元件多,柜内含有带电铜排,施工安全等多项要求,安全性要求较高,因此,为了满足现场安装、调试、运行、维护等多方面需求,必须对直流分电柜的结构、布局进行重新设计。 Due to the limitation of the transportation and manufacturing conditions of the prefabricated cabin, the size of the prefabricated cabin has certain restrictions. In order to increase the installation position of the secondary screen cabinet in the prefabricated cabin and improve the space utilization rate of the prefabricated cabin, the screen cabinet in the cabin adopts a double-row layout scheme. The screen cabinet in the cabin needs to be installed close to the bulkhead, and the rear and sides of the screen cabinet cannot be opened. Wiring, maintenance, operation, and management need to be realized on the front, resulting in a large contradiction between the front display operation and installation and commissioning. In addition, the DC distribution cabinet in the prefabricated cabin needs to take into account the complexity of the internal installation components, the front display has many operating components, the cabinet contains live copper bars, construction safety and other requirements, and the safety requirements are high. Therefore, in order to meet on-site installation, The structure and layout of the DC distribution cabinet must be redesigned to meet various needs such as commissioning, operation, and maintenance.
实用新型内容 Utility model content
为了解决现有技术中存在的不足,本实用新型提供了一种前接线前维护的直流分电柜,其具有运行管理、安装维护分区域布置的特点,解决了现有技术中直流分电柜正面显示操作及安装调试的矛盾,提高了现场施工的安全性及运行管理的便利性。 In order to solve the deficiencies in the prior art, the utility model provides a DC distribution cabinet with front wiring and maintenance, which has the characteristics of operation management, installation and maintenance divided into areas, and solves the problems of the DC distribution cabinet in the prior art. The contradiction between operation and installation and debugging is displayed on the front, which improves the safety of on-site construction and the convenience of operation management.
为解决上述问题,本实用新型具体采用以下技术方案: In order to solve the above problems, the utility model specifically adopts the following technical solutions:
一种前接线前维护的直流分电柜,其特征在于,包括机柜框架,所述机柜框架从外到内依次设有玻璃前门、活动门,所述玻璃前门通过第一旋转铰链连接于机柜框架的一侧,所述活动门通过第二旋转铰链连接于机柜框架的另一侧,所述玻璃前门打开后预留出活动门打开空间,所述活动门包括上活动门、下活动门。 A DC distribution cabinet for maintenance before wiring, characterized in that it includes a cabinet frame, the cabinet frame is provided with a glass front door and a movable door in turn from the outside to the inside, and the glass front door is connected to the cabinet frame through a first rotary hinge One side of the movable door, the movable door is connected to the other side of the cabinet frame through the second rotary hinge, and the opening space of the movable door is reserved after the glass front door is opened, and the movable door includes an upper movable door and a lower movable door.
前述的一种前接线前维护的直流分电柜,其特征在于,所述机柜框架内设有进线总空气开关、支路分支馈出空气开关、绝缘监视CT、通用安装条组件以及直流进线铜排,所述进线总空气开关通过空开接头接入直流进线铜排,所述进线总空气开关安装在第一U型轨上,所述第一U型轨固定在空开支架固定板上,所述进线总空气开关的下部设有若干个并列设置的支路分支馈出空气开关,所述进线总空气开关的下端出线部通过互联铜排接入各支路分支馈出空气开关,所述支路分支馈出空气开关的下部设有绝缘监视CT,所述绝缘监视CT安装在CT安装板上,所述进线总空气开关、支路分支馈出空气开关、绝缘监视CT设于与上活动门相对应的机柜框架内,所述通用安装条组件、横向端子排、接地铜排设于与下活动门相对应的机柜框架内,所述通用安装条组件下方设有用于安装固定横向端子排的第二U型轨,所述机柜框架的底部设有接地铜排。 The aforementioned DC power distribution cabinet for maintenance before wiring is characterized in that the main air switch for incoming lines, the air switch for branch feed-out, insulation monitoring CT, general installation strip assembly and DC incoming air switch are arranged in the cabinet frame. The main air switch of the incoming line is connected to the copper bar of the DC incoming line through the air breaker joint. The main air switch of the incoming line is installed on the first U-shaped rail, and the first U-shaped rail is fixed on the air switch On the bracket fixing plate, the lower part of the incoming main air switch is provided with several side-by-side branch branch feed-out air switches, and the lower end of the incoming main air switch is connected to each branch branch through an interconnected copper bar. Feed-out air switch, the lower part of the feed-out air switch of the branch branch is provided with an insulation monitoring CT, and the insulation monitoring CT is installed on the CT mounting plate, the main air switch of the incoming line, the feed-out air switch of the branch branch, The insulation monitoring CT is set in the cabinet frame corresponding to the upper movable door, and the universal installation bar assembly, horizontal terminal block, and grounding copper bar are arranged in the cabinet frame corresponding to the lower movable door. There is a second U-shaped rail for installing and fixing the horizontal terminal row, and the bottom of the cabinet frame is provided with a grounding copper bar.
前述的一种前接线前维护的直流分电柜,其特征在于,所述直流进线铜排固定在铜排固定条上,所述直流进线铜排与铜排固定条之间设有绝缘子。 The aforementioned DC power distribution cabinet with maintenance before wiring, is characterized in that the copper bar of the DC incoming line is fixed on the copper bar fixing bar, and an insulator is arranged between the copper bar of the DC incoming line and the copper bar fixing bar .
前述的一种前接线前维护的直流分电柜,其特征在于,机柜框架内设有沿着机柜框架的高度方向设置的安装立柱,两个安装立柱为一组,对称设置在机柜框架的两侧,所述安装立柱包括前安装立柱、后安装立柱,所述铜排固定条固定在后安装立柱上,空开支架固定板、CT安装板、通用安装条组件、第二U型轨以及接地铜排固定在前安装立柱上。 The aforementioned DC distribution cabinet for maintenance before wiring is characterized in that the cabinet frame is provided with installation columns along the height direction of the cabinet frame, and the two installation columns form a group and are symmetrically arranged on two sides of the cabinet frame. On the side, the installation column includes a front installation column and a rear installation column, the copper bar fixing strip is fixed on the rear installation column, an open bracket fixing plate, a CT mounting plate, a general mounting bar assembly, a second U-shaped rail and a grounding The copper bars are fixed on the front mounting columns.
前述的一种前接线前维护的直流分电柜,其特征在于,所述机柜框架内设有垂直线槽,所述垂直线槽设置在机柜框架上异于第二旋转铰链的一侧。 The aforementioned DC power distribution cabinet with maintenance before wiring is characterized in that a vertical wire groove is provided in the cabinet frame, and the vertical wire groove is arranged on the side of the cabinet frame different from the second rotary hinge.
前述的一种前接线前维护的直流分电柜,其特征在于,所述玻璃前门的下方设有散热孔,所述玻璃前门采用外挂形式,通过门锁与机柜框架连接固定。 The aforementioned DC distribution cabinet for maintenance before wiring is characterized in that heat dissipation holes are provided under the glass front door, and the glass front door adopts an external hanging form, which is connected and fixed to the cabinet frame through a door lock.
前述的一种前接线前维护的直流分电柜,其特征在于,所述上活动门上安装有指示灯、仪表,并预留有进线总空气开关开孔、支路分支馈出空气开关开孔,所述进线总空气开关开孔、支路分支馈出空气开关开孔分别与机柜框架内的进线总空气开关、支路分支馈出空气开关对应。 The aforementioned DC distribution cabinet for maintenance before wiring is characterized in that indicator lights and instruments are installed on the upper movable door, and openings for the main air switch for incoming lines and air switches for branch feedouts are reserved. Openings, the openings of the incoming line main air switch and the branch branch feed-out air switch respectively correspond to the incoming line main air switch and the branch branch feed-out air switch in the cabinet frame.
前述的一种前接线前维护的直流分电柜,其特征在于,所述活动门通过锁扣与机柜框架连接固定。 The aforementioned DC power distribution cabinet with maintenance before wiring is characterized in that the movable door is connected and fixed to the cabinet frame through a lock.
前述的一种前接线前维护的直流分电柜,其特征在于,所述机柜框架的顶部对应于玻璃前门处设有门楣,所述机柜框架异于门楣的一侧顶部设有墙体支架。 The aforementioned DC distribution cabinet with maintenance before wiring is characterized in that a lintel is provided on the top of the cabinet frame corresponding to the glass front door, and a wall bracket is provided on the top of the side of the cabinet frame that is different from the lintel.
本实用新型的有益效果:本实用新型提供的一种前接线前维护的直流分电柜,对应于上活动门、下活动门将机柜框架划分为运行管理及安装调试两个容置区域。空气开关、直流进线铜排、绝缘监测CT等不需要现场安装的器件固定安装在机柜框架内上部区域,端子排等需要现场安装接线的器件安装在机柜框架内下部区域,上活动门上安装指示灯、仪表等运行中需监测的器件,并预留空气开关开孔,关门后可露出容置区内安装的空气开关,可在正面进行空气开关操作、监视运行状态;下活动门开启后可方便的安装接线,关闭后可遮挡后部接线区域。本柜体结构可以实现直流分电柜的前接线前维护,可直接紧贴预制舱壁安装,提高预制舱空间利用,屏柜区域功能的划分,优化了屏柜布局,有效的满足了现场运行管理及安装维护的需要。 Beneficial effects of the utility model: The utility model provides a DC distribution cabinet for maintenance before wiring, which divides the cabinet frame into two accommodating areas for operation management and installation and debugging corresponding to the upper movable door and the lower movable door. Components that do not require on-site installation, such as air switches, DC incoming copper bars, and insulation monitoring CTs, are fixed and installed in the upper area of the cabinet frame. Terminal blocks and other components that require on-site installation and wiring are installed in the lower area of the cabinet frame. Indicator lamps, instruments and other devices that need to be monitored during operation, and an air switch opening is reserved. After closing the door, the air switch installed in the accommodation area can be exposed, and the air switch operation can be performed on the front to monitor the running status; after the lower movable door is opened The wiring can be installed conveniently, and the rear wiring area can be blocked after being closed. The structure of this cabinet can realize the maintenance before the front wiring of the DC distribution cabinet, and can be installed directly close to the prefabricated bulkhead to improve the space utilization of the prefabricated cabin. Management and installation and maintenance needs.
附图说明 Description of drawings
图1是本实用新型去除玻璃前门后的正视图; Fig. 1 is the front view of the utility model after removing the glass front door;
图2是本实用新型正视图; Fig. 2 is a front view of the utility model;
图3是本实用新型去除玻璃前门和活动门后的正视图; Fig. 3 is the front view of the utility model after removing the glass front door and the dodge door;
图4是本实用新型左侧视图; Fig. 4 is a left side view of the utility model;
图5是本实用新型的俯视图。 Fig. 5 is a top view of the utility model.
附图标记含义如下: The reference signs have the following meanings:
1:机柜框架;2:玻璃前门;3:第一旋转铰链;4:第二旋转铰链;5:上活动门;6:下活动门;7:进线总空气开关;8:支路分支馈出空气开关;9:绝缘监视CT;10:通用安装条组件;11:直流进线铜排;12:空开接头;13:第一U型轨;14:空开支架固定板;15:互联铜排;16:CT安装板;17:第二U型轨;18:接地铜排;19:铜排固定条;20:绝缘子;21:前安装立柱;22:后安装立柱;23:垂直线槽;24:散热孔;25:门锁;26:指示灯;27:仪表;28:进线总空气开关开孔;29:支路分支馈出空气开关开孔;30:锁扣;31:门楣;32墙体支架。 1: cabinet frame; 2: glass front door; 3: first rotary hinge; 4: second rotary hinge; 5: upper movable door; 6: lower movable door; 7: main air switch for incoming line; 8: branch branch feeder Outlet air switch; 9: Insulation monitoring CT; 10: Universal installation strip assembly; 11: DC incoming copper bar; 12: Air break connector; 13: First U-shaped rail; 14: Air open bracket fixing plate; Copper bar; 16: CT mounting plate; 17: second U-shaped rail; 18: grounding copper bar; 19: copper bar fixing strip; 20: insulator; 21: front mounting column; 22: rear mounting column; 23: vertical line Slot; 24: cooling hole; 25: door lock; 26: indicator light; 27: instrument; 28: main air switch opening for incoming line; 29: branch feed-out air switch opening; 30: lock; 31: lintel; 32 wall brackets.
具体实施方式 detailed description
下面结合附图和具体实施例对本实用新型作进一步描述。 Below in conjunction with accompanying drawing and specific embodiment the utility model is described further.
如图1至图5所示,一种前接线前维护的直流分电柜,包括机柜框架1,所述机柜框架1从外到内依次设有玻璃前门2、活动门,即玻璃前门设置在机柜框架的最外侧,而活动门设置在玻璃前门内侧,所述玻璃前门2通过第一旋转铰链3连接于机柜框架1的一侧,可实现180°旋转,所述活动门通过第二旋转铰链4连接于机柜框架1的另一侧,因此,玻璃前门2与活动门是相对打开的,对应的第一旋转铰链3、第二旋转铰链4安装在机柜框架1的两侧,所述玻璃前门2打开后预留出活动门打开空间,不影响内侧活动门的打开,其中玻璃前门2正面采用透明玻璃,便于观察设备运行情况,且玻璃前门2的下方预留有散热孔24,便于设备散热,所述玻璃前门2采用外挂形式,通过门锁25与机柜框架1连接固定,所述活动门包括上活动门5、下活动门6,上活动门5与相对应的机柜框架1部分构成上部容置区域,下活动门6与相对应的机柜框架1部分构成下部容置区域,上部容置区域布置现场无需安装接线的固定器件,下部容置区域布置现场需安装接线而无需显示观察的器件、端子排,活动门通过锁扣30与机柜框架1连接固定,确保正常运行或是运输过程中与机柜框架锁紧,当需要安装调试时,松开锁扣30,转开对应活动门。上活动门5、下活动门6可以分别独立开合、上锁,上活动门5上安装有指示灯26、仪表27等接线少、质量轻的小型设备,可随上活动门5一同转动,关门后可在正面显示设备运行状态,并预留有进线总空气开关开孔28、支路分支馈出空气开关开孔29,该进线总空气开关开孔28、支路分支馈出空气开关开孔29分别与机柜框架1内的进线总空气开关7、支路分支馈出空气开关8对应,关门后可露出容置区内安装的空气开关,可在上活动门正面进行空气开关的操作。下活动门6开启后,可进行安装接线操作,关上门后可以有效遮挡后部端子、器件。 As shown in Figures 1 to 5, a DC distribution cabinet for maintenance before wiring includes a cabinet frame 1, and the cabinet frame 1 is provided with a glass front door 2 and a movable door sequentially from the outside to the inside, that is, the glass front door is set on The outermost side of the cabinet frame, and the movable door is arranged on the inner side of the glass front door. The glass front door 2 is connected to one side of the cabinet frame 1 through the first rotary hinge 3, which can be rotated by 180°. The movable door is connected through the second rotary hinge. 4 is connected to the other side of the cabinet frame 1. Therefore, the glass front door 2 and the movable door are relatively opened, and the corresponding first rotary hinge 3 and the second rotary hinge 4 are installed on both sides of the cabinet frame 1. The glass front door 2 After opening, the opening space of the movable door is reserved, which does not affect the opening of the inner movable door. The front of the glass front door 2 is made of transparent glass, which is convenient for observing the operation of the equipment, and the bottom of the glass front door 2 is reserved with cooling holes 24, which is convenient for equipment to dissipate heat , the glass front door 2 adopts an external hanging form, and is connected and fixed with the cabinet frame 1 through a door lock 25. The movable door includes an upper movable door 5 and a lower movable door 6, and the upper movable door 5 and the corresponding cabinet frame 1 part constitute the upper part The accommodation area, the lower movable door 6 and the corresponding part of the cabinet frame 1 constitute the lower accommodation area, the upper accommodation area is arranged on site without the need to install fixed devices for wiring, and the lower accommodation area is arranged on site to install wiring without display and observation devices , the terminal block, and the movable door are connected and fixed with the cabinet frame 1 through the lock catch 30 to ensure that they are locked with the cabinet frame during normal operation or during transportation. When installation and debugging are required, loosen the lock catch 30 and turn the corresponding movable door. Upper dodge door 5, lower dodge door 6 can independently open and close, lock respectively, and on the dodge door 5, there are few small-sized equipment such as pilot lamp 26, instrument 27 etc. wiring, light weight, can rotate together with upper dodge door 5, After the door is closed, the running status of the equipment can be displayed on the front, and the opening 28 for the main air switch of the incoming line and the opening 29 for the air switch feeding out of the branch branch are reserved. The switch openings 29 are respectively corresponding to the main air switch 7 of the incoming line and the air switch 8 of the branch branch feed-out in the cabinet frame 1. After closing the door, the air switch installed in the accommodation area can be exposed, and the air switch can be performed on the front of the upper movable door. operation. After the lower dodge door 6 is opened, the installation wiring operation can be carried out, and the rear terminal and devices can be effectively blocked after the door is closed.
进一步的,所述机柜框架1内设有进线总空气开关7、支路分支馈出空气开关8、绝缘监视CT9、通用安装条组件10以及直流进线铜排11,所述进线总空气开关7通过空开接头12接入直流进线铜排11,所述进线总空气开关7安装在第一U型轨13上,所述第一U型轨13固定在空开支架固定板14上,所述进线总空气开关7的下部设有若干个并列设置的支路分支馈出空气开关8,所述进线总空气开关7的下端出线部通过互联铜排15接入各支路分支馈出空气开关8,所述支路分支馈出空气开关8的下部设有绝缘监视CT9,所述绝缘监视CT9安装在CT安装板16上,用于监视各支路分支馈出空气开关8回路绝缘情况,所述进线总空气开关7、支路分支馈出空气开关8、绝缘监视CT9设于与上活动门5相对应的机柜框架1内,所述通用安装条组件10、第二U型轨17、接地铜排18设于与下活动门6相对应的机柜框架1内,即处于下活动门6后方。所述通用安装条组件10用于安装需要现场安装接线但不需要在运行过程中观察显示的器件,所述通用安装条组件10下方设有用于安装固定横向端子排的第二U型轨17,所述机柜框架1的底部设有接地铜排18,提供若干接地端子,即设置在下活动门后方,用于柜内设备、电缆接地,所述直流进线铜排11安装固定在铜排固定条19上,所述直流进线铜排11与铜排固定条19之间设有绝缘子20进行隔离。 Further, the cabinet frame 1 is provided with an incoming main air switch 7, a branch branch feed air switch 8, an insulation monitoring CT9, a universal installation strip assembly 10, and a DC incoming copper bar 11. The incoming main air The switch 7 is connected to the DC incoming line copper bar 11 through the air-opening joint 12, and the incoming main air switch 7 is installed on the first U-shaped rail 13, and the first U-shaped rail 13 is fixed on the air-opening bracket fixing plate 14 Above, the lower part of the main air switch 7 of the incoming line is provided with several side-by-side branch branch feed-in air switches 8, and the lower end of the main air switch 7 of the incoming line is connected to each branch through interconnecting copper bars 15. Branch feed-in air switch 8, the lower part of the branch feed-out air switch 8 is provided with an insulation monitoring CT9, and the insulation monitoring CT9 is installed on the CT mounting plate 16 for monitoring each branch feed-out air switch 8 In the case of circuit insulation, the main incoming line air switch 7, the branch branch feed-in air switch 8, and the insulation monitoring CT9 are arranged in the cabinet frame 1 corresponding to the upper movable door 5, and the general installation strip assembly 10, the second The U-shaped rail 17 and the grounding copper bar 18 are arranged in the cabinet frame 1 corresponding to the lower movable door 6 , that is, behind the lower movable door 6 . The universal installation strip assembly 10 is used to install devices that require on-site installation and wiring but does not need to be observed and displayed during operation. A second U-shaped rail 17 for installing and fixing the horizontal terminal row is provided below the universal installation strip assembly 10. The bottom of the cabinet frame 1 is provided with a grounding copper bar 18, which provides a number of grounding terminals, that is, arranged behind the lower movable door, for grounding equipment and cables in the cabinet, and the DC incoming line copper bar 11 is installed and fixed on the copper bar fixing bar 19, an insulator 20 is provided between the DC incoming copper bar 11 and the copper bar fixing bar 19 for isolation.
进一步的,机柜框架1内设有沿着机柜框架1的高度方向设置的安装立柱,两个安装立柱为一组,对称设置在机柜框架1的两侧,所述安装立柱包括前安装立柱21、后安装立柱22,所述铜排固定条19固定在后安装立柱22上,空开支架固定板14、CT安装板16、通用安装条组件10、第二U型轨17以及接地铜排18固定在前安装立柱21上。 Further, the cabinet frame 1 is provided with installation columns along the height direction of the cabinet frame 1. Two installation columns form a group and are symmetrically arranged on both sides of the cabinet frame 1. The installation columns include front installation columns 21, The rear installation column 22, the copper bar fixing strip 19 is fixed on the rear installation column 22, the open bracket fixing plate 14, the CT mounting plate 16, the universal installation bar assembly 10, the second U-shaped rail 17 and the grounding copper bar 18 are fixed Install on the front column 21.
进一步的,所述机柜框架1内设有垂直线槽23,所述垂直线槽23设置在机柜框架1上异于第二旋转铰链4的一侧,贯穿上部容置区域、下部容置区域,与第二旋转铰链4分列机柜框架1两侧,以方便走线。 Further, the cabinet frame 1 is provided with a vertical wire groove 23, and the vertical wire groove 23 is arranged on the side of the cabinet frame 1 different from the second rotary hinge 4, and runs through the upper accommodation area and the lower accommodation area, The two sides of the cabinet frame 1 are arranged separately with the second rotary hinge 4 to facilitate wiring.
此外,所述机柜框架1的顶部对应于玻璃前门2处设有门楣31,所述机柜框架1异于门楣31的一侧顶部设有墙体支架32,用于贴墙安装时与墙体固定。 In addition, a lintel 31 is provided on the top of the cabinet frame 1 corresponding to the glass front door 2, and a wall bracket 32 is provided on the top of the side of the cabinet frame 1 that is different from the lintel 31, which is used for fixing to the wall when the wall is installed. .
本实用新型提供的前接线前维护的直流分电柜在出厂时即完成固定设备的安装,如空气开关、直流进线铜排、绝缘监视CT等器件,主要分布在上活动门后方,在下活动门后方布置端子排等器件供现场施工接线。屏柜背面贴预制舱壁安装固定,正面接线、维护、运行。现场施工时,打开下活动门,进行端子接线,施工完成后关闭下活动门,对施工区域进行遮挡,正常情况下无需对上活动门后部器件施工。运行时,正常情况下通过玻璃前门观察指示灯、仪表状态,当需要操作时,打开玻璃门,直接操作上活动门区域上的空气开关,无需打开活动门。 The DC power distribution cabinet provided by the utility model, which is maintained before wiring and before leaving the factory, has completed the installation of fixed equipment, such as air switches, DC incoming copper bars, insulation monitoring CTs and other devices, which are mainly distributed behind the upper movable door and moved below. Devices such as terminal blocks are arranged behind the door for on-site construction wiring. The back of the screen cabinet is attached to the prefabricated bulkhead for installation and fixing, and the front is wired, maintained and operated. During on-site construction, open the lower movable door to carry out terminal wiring. After the construction is completed, close the lower movable door to cover the construction area. Under normal circumstances, there is no need to construct the components behind the upper movable door. During operation, under normal circumstances, observe the indicator lights and instrument status through the glass front door. When operation is required, open the glass door and directly operate the air switch on the upper movable door area without opening the movable door.
以上显示和描述了本实用新型的基本原理、主要特征及优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。 The basic principles, main features and advantages of the present utility model have been shown and described above. Those skilled in the art should understand that the utility model is not limited by the above-mentioned embodiments. The above-mentioned embodiments and descriptions only illustrate the principle of the utility model. Without departing from the spirit and scope of the utility model, the utility model The new model also has various changes and improvements, and these changes and improvements all fall within the scope of the claimed utility model. The scope of protection required by the utility model is defined by the appended claims and their equivalents.
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521079037.4U CN205248643U (en) | 2015-12-23 | 2015-12-23 | Preceding wiring front maintenance's direct current divides electric cabinet |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521079037.4U CN205248643U (en) | 2015-12-23 | 2015-12-23 | Preceding wiring front maintenance's direct current divides electric cabinet |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205248643U true CN205248643U (en) | 2016-05-18 |
Family
ID=55947716
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521079037.4U Expired - Fee Related CN205248643U (en) | 2015-12-23 | 2015-12-23 | Preceding wiring front maintenance's direct current divides electric cabinet |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205248643U (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107221850A (en) * | 2017-07-18 | 2017-09-29 | 江苏峰谷源储能技术研究院有限公司 | A kind of DC cabinet |
| CN112117673A (en) * | 2020-09-16 | 2020-12-22 | 许继电气股份有限公司 | Rotating frame cabinet for prefabricated cabin |
| CN115598034A (en) * | 2022-09-27 | 2023-01-13 | 广东粤港澳大湾区国家纳米科技创新研究院(Cn) | Method and system for detecting holes of insulating layer of conductive copper bar through X-ray microscopic imaging |
| CN115656226A (en) * | 2022-09-27 | 2023-01-31 | 广东粤港澳大湾区国家纳米科技创新研究院 | Device and method for detecting defects of insulating layer of conductive copper bar |
-
2015
- 2015-12-23 CN CN201521079037.4U patent/CN205248643U/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107221850A (en) * | 2017-07-18 | 2017-09-29 | 江苏峰谷源储能技术研究院有限公司 | A kind of DC cabinet |
| CN112117673A (en) * | 2020-09-16 | 2020-12-22 | 许继电气股份有限公司 | Rotating frame cabinet for prefabricated cabin |
| CN115598034A (en) * | 2022-09-27 | 2023-01-13 | 广东粤港澳大湾区国家纳米科技创新研究院(Cn) | Method and system for detecting holes of insulating layer of conductive copper bar through X-ray microscopic imaging |
| CN115656226A (en) * | 2022-09-27 | 2023-01-31 | 广东粤港澳大湾区国家纳米科技创新研究院 | Device and method for detecting defects of insulating layer of conductive copper bar |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205248643U (en) | Preceding wiring front maintenance's direct current divides electric cabinet | |
| CN106058702B (en) | A kind of Modular intelligent box-type substation | |
| CN103414114B (en) | Drawer-type intelligent comprehensive low-voltage distribution JP cabinet | |
| CN104779574A (en) | High-low voltage cable branch box | |
| CN101207267B (en) | Miniaturization premounting type transformer substation with safeguard construction | |
| CN110048310A (en) | High voltage direct current intelligent power distribution unit | |
| CN203674573U (en) | Screen cabinet applicable to front wiring of secondary equipment of prefabricated cabin | |
| CN109244898A (en) | A kind of outdoor energy-conserving intelligent type switchgear | |
| CN206135279U (en) | Modular intelligent box -type substation | |
| CN205303963U (en) | Heat dissipation formula block terminal | |
| CN204558895U (en) | A kind of power distribution cabinet | |
| CN207398631U (en) | A kind of secure distribution enclosure box | |
| CN203761060U (en) | Distributed access system | |
| CN101794968A (en) | Double-pole isolating switch cabinet for outdoor direct current 1500 V contact net system | |
| CN204558934U (en) | A kind of fixed low-voltage distribution cabinet | |
| CN204464759U (en) | A cabin-mounted screen for displaying prefabricated cabins before wiring | |
| CN203415825U (en) | Cable branch box | |
| CN205123049U (en) | Secondary cable box | |
| CN203415857U (en) | Economical electrical cabinet | |
| CN204230678U (en) | A kind of outdoor three defending type metal switch cabinet | |
| CN209526362U (en) | A kind of DC charging device become based on underground box | |
| CN207408457U (en) | An indoor electric meter box | |
| CN207052982U (en) | A kind of switch cubicle | |
| CN206693713U (en) | A kind of underground garage distribution busbar | |
| CN205335690U (en) | Automatically controlled cabinet security protection protection device of electric power |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 Termination date: 20211223 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |