CN205245548U - Intelligence hot air system - Google Patents
Intelligence hot air system Download PDFInfo
- Publication number
- CN205245548U CN205245548U CN201521017892.2U CN201521017892U CN205245548U CN 205245548 U CN205245548 U CN 205245548U CN 201521017892 U CN201521017892 U CN 201521017892U CN 205245548 U CN205245548 U CN 205245548U
- Authority
- CN
- China
- Prior art keywords
- heat
- exhaust gas
- waste gas
- wind system
- hot wind
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Solid-Fuel Combustion (AREA)
Abstract
The application discloses intelligence hot air system includes: fire burning furnace, for the heat energy operative installations provides the heat source, including furnace body and heating element, circulating fan, its one end connect in heat energy operative installations, the other end connect in the furnace body, constitute the thermal cycle between furnace body, circulating fan and the heat energy operative installations, tail gas processing apparatus and locating tail gas processing apparatus and fire the draught fan between the burning furnace. The utility model discloses an intelligence hot air system has the advantage of conbustion ratio height, furnace body long service life, exhaust emissions environmental protection.
Description
Technical field
The application relates to a kind of heating equipment, particularly relates to a kind of Intelligent hot wind system.
Background technology
Combustion furnace uses the burnings such as biologic grain, alcohol, natural gas to produce thermal source, through the bar of this equipmentPart conversion, finally uses thermal source to required actual product heating, is mainly used in following field:
1, use heating in spraying baking box, applied temps can reach in 200 DEG C above 400 DEG C, makes productAt streamline. Transient heating, guarantees that baking vanish solidifies;
The heating of the daily life of 2, using, the hot water heatings such as bath center;
3, apply to textile industry:
(1) simple cloth stamp;
(2) wall paper, casement, Villus cloth are scraped slurry, and water washing is crossed in sizing.
4, chemical workshop: sulfuric acid pond, phosphating pond is heated.
Traditional combustion furnace exists that combustion rate is low, body of heater is low, not environmental protection of exhaust emissions service life conventionallyTechnical problem.
Summary of the invention
The purpose of this utility model is to provide a kind of Intelligent hot wind system, of the prior art to overcomeFoot.
For achieving the above object, the utility model provides following technical scheme:
The embodiment of the present application discloses a kind of Intelligent hot wind system, comprising:
Combustion furnace, for heat energy operative installations provides thermal source, comprises body of heater and heating element, described heating element bagDraw together multiple heat-generating units of series connection, each heat-generating units comprise setting up and down one enter hot case and one clearAsh silo, described in enter hot case and be separated into first by demarcation strip and enter hot case and second and enter hot case, described first enters heatBetween case and deashing storehouse, be communicated with many first heat-generating pipes that vertically arrange, described second enters hot case and deashingBetween storehouse, be communicated with many second heat-generating pipes that vertically arrange, described the first heat-generating pipe and the second heat-generating pipeBottom is communicated with by described deashing storehouse, and described second enters first of hot case and adjacent heat-generating units enters hot caseBe communicated with, described deashing storehouse has the guiding sidewall of inclination, and the below in deashing storehouse offers ash-falling hole, and this fallsThe below in ash hole is provided with ash-pit;
Circulating fan, its one end is connected in described heat energy operative installations, and the other end is connected in described body of heater,Between described body of heater, circulating fan and heat energy operative installations, form thermal cycle;
Exhaust gas processing device and be located at the air-introduced machine between described exhaust gas processing device and combustion furnace.
Preferably, in above-mentioned Intelligent hot wind system, the top of described exhaust gas processing device is provided with waste gasImport and purified gas outlet, described exhaust gas inlet is connected with described air-introduced machine, described exhaust gas processing deviceBottom be formed with pond, the top in described pond is provided with range of atomization, this range of atomization is provided with spray equipment,Described spray equipment is connected with outside water circulating pump, between described spray equipment, water circulating pump and pondForm water circulation system, in described exhaust gas processing device, be also provided with active carbon purifying district, this active carbon purifyingDistrict is positioned at described purified gas outlet place, and described exhaust gas processing device interior separation becomes the waste gas of vertical directionDecline passway and waste gas rising passway, institute is passed through in the bottom of described waste gas decline passway and waste gas rising passwayState pond and be communicated with, the top in described waste gas decline space is communicated with described exhaust gas inlet, and described waste gas risesThe top of passage is communicated with described purified gas outlet, and described active carbon purifying district is positioned at described waste gas and risesIn passage, described range of atomization is at least distributed in described waste gas decline passway.
Preferably, in above-mentioned Intelligent hot wind system, on the sidewall of described exhaust gas processing device, also offerThere is clean mouthful.
Preferably, in above-mentioned Intelligent hot wind system, the bottom of described body of heater is provided with anti-cement centrum.
Preferably, in above-mentioned Intelligent hot wind system, the feeding mouth place of described body of heater is provided with feed arrangement,Described feed arrangement comprises with screw feeding bar and vibrating disk.
Preferably, in above-mentioned Intelligent hot wind system, the feeding mouth place of described body of heater is also provided with secondary and joinsAir port.
Preferably, in above-mentioned Intelligent hot wind system, the sidewall of described body of heater is provided with sight burner, shouldSee between burner and the outer wall of described body of heater and be 45 ° of angles.
Preferably, in above-mentioned Intelligent hot wind system, described combustion furnace also comprises igniter, described inIgniter comprises hydraulic oil bag, high-pressure oil pump, 2 refractory ceramics pipes and direct injection oil nozzle, described 2Between individual refractory ceramics pipe and hydraulic oil bag, connect by HTHP line, described direct injection oil nozzle connectsIn described high-pressure oil pump.
Compared with prior art, the utility model has the advantage of: Intelligent hot wind system of the present utility modelHave advantages of that combustion rate is high, body of heater long service life, exhaust emissions environmental protection.
Brief description of the drawings
In order to be illustrated more clearly in the embodiment of the present application or technical scheme of the prior art, below will be to realityThe accompanying drawing of executing required use in example or description of the Prior Art is briefly described, apparently, belowAccompanying drawing in description is only some embodiment that record in the application, for those of ordinary skill in the art, do not paying under the prerequisite of creative work, can also obtain according to these accompanying drawings other accompanying drawing.
Figure 1 shows that the functional-block diagram of Intelligent hot wind system in the utility model specific embodiment;
Figure 2 shows that the structural representation of heating element in the utility model specific embodiment;
Figure 3 shows that the structural representation of exhaust gas processing device in the utility model specific embodiment;
Figure 4 shows that the principle schematic of igniter in the utility model specific embodiment.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, to the technology in the utility model embodimentScheme is described in detail, and obviously, described embodiment is only that the utility model part is implementedExample, instead of whole embodiment. Based on the embodiment in the utility model, ordinary skill peopleThe every other embodiment that member obtains under the prerequisite of not making creative work, belongs to this practicalityNovel protected scope.
Shown in ginseng Fig. 1 and Fig. 2, Intelligent hot wind system, comprising:
Combustion furnace, for heat energy operative installations provides thermal source, comprises body of heater and heating element, and heating element comprises stringMultiple heat-generating units 1 of connection, each heat-generating units 1 comprises that one setting up and down is entered hot case 11 and oneDeashing storehouse 13, enters hot case 11 and is separated into first by demarcation strip and enters hot case 111 and second and enter hot case 112, theOne the first heat-generating pipes 12, the second that enter to be communicated with between hot case 111 and deashing storehouse 13 many vertical settings enterBetween hot case 11 and deashing storehouse 13, be communicated with many second heat-generating pipe 14, the first heat-generating pipes that vertically arrange12 and the bottom of the second heat-generating pipe 14 be communicated with by deashing storehouse 13, second enters hot case 112 and adjacent sending outFirst of hot cell enters hot case and is communicated with, and deashing storehouse has the guiding sidewall of inclination, and the below in deashing storehouse is offeredHave ash-falling hole, the below of this ash-falling hole is provided with ash-pit;
Circulating fan, its one end is connected in heat energy operative installations, and the other end is connected in body of heater, body of heater, followsBetween ring blower fan and heat energy operative installations, form thermal cycle;
Exhaust gas processing device and be located at exhaust gas processing device and combustion furnace between air-introduced machine.
In this technical scheme, flare dripped in one deck cone deashing Cang Chu, flare through heat-generating pipe momentCircle round in heat-generating pipe, dust by drip in deashing storehouse bottom U-shaped fall in ash-pit. The present embodiment arranges 7Individual deashing storehouse, flare, equipment circulation 8 times, guarantees that completing combustion rate reaches more than 95%. This case utilizesThe smooth principle of physics, flare is smooth to centrum deashing storehouse, and wind-force gos up to heat-generating pipe, guarantees wind-forceDo not weaken; Utilize wind-force to drive roundabout, flare surplus energy amasss to fall within dust and U-shapedly falls to depositing in ash-pit,Personnel's cleaning of convenient operation equipment.
Adopt the gravitation object principle that vertically declines, guarantee all heat-generating pipe solids, prevention flare is coldUnder air push, change burnt tube wall, stop up, use laterally longitudinally circulation of wind-force, guarantee that pipe is at instantaneous cooling,The life-span of prolonged boiler. In manufacturing process pipe, outside pipe, distinguished and admirablely separately travel, guarantee that hot blast enters underHeat space. Flare, by air-introduced machine, pulls in heating element inner loop, and tail gas, through water treatment, dischargesIn the Nature.
Said system also tool has the following advantages:
1, can require customized according to client's difference in limited space;
2, without the various waste discharge energy-conserving and environment-protective such as tar, waste water;
3, investment operating cost is low, heating is fast;
4, one-touch startup and shutdown, simple to operate.
Shown in Fig. 3, the top of exhaust gas processing device is provided with exhaust gas inlet 31 and purified gas outlet 32,Exhaust gas inlet 31 is connected with air-introduced machine 33, and the bottom of exhaust gas processing device is formed with pond 34, pondTop is provided with range of atomization 35, and this range of atomization is provided with spray equipment 36, spray equipment 36 and outside circulationWater pump 37 is connected, and between spray equipment 36, water circulating pump 37 and pond 34, forms water circulation system, tailIn Flash Gas Compression Skid System, be also provided with active carbon purifying district 38, this active carbon purifying district 38 is positioned at purified gas outletPlace, exhaust gas processing device interior separation becomes waste gas decline passway 39 and the waste gas rising passway of vertical direction310, the bottom of waste gas decline passway 39 and waste gas rising passway 310 is communicated with by pond, and waste gas declinesThe top in space is communicated with exhaust gas inlet, and the top of waste gas rising passway is communicated with purified gas outlet, livesProperty carbon purifying district is positioned at waste gas rising passway, and range of atomization is at least distributed in waste gas decline passway.
Further, on the sidewall of exhaust gas processing device, also offer clean mouthful 311.
In this technical scheme, waste gas is pumped and is entered in spray column by air-introduced machine by airduct, and waste gas is at towerInside high-speed motion from top to bottom, waste gas fully contacts on range of atomization panel in tower with water, the dirt in waste gasDye material in the process contacting with shower water, fully adsorbed by water, be purified; Waste gas and range of atomizationAfter collision, precipitate is in pond, and gas starts to move from the bottom up, through active carbon purifyingAfter district, harmful substance is by charcoal absorption, and innocuous gas is arranged in atmosphere. In whole waste gas purification mistakeIn journey, equipment is without cleaning, and shower water used can be recycled, easy and simple to handle. This exhaust gas processing deviceAlso tool has the following advantages:
1, utilize charcoal absorption efficiency high, ability is strong;
2, little, the water saving of resistance, economize on electricity, operating cost are low;
3, can process multiple mix waste gas simultaneously;
4, equipment operating is relatively simple, convenient, and maintenance capacity is few, easy operating, management, maintenance, fortuneRow rate is high, adapts to various working environment;
Further, the bottom of body of heater is provided with anti-cement centrum.
In this technical scheme, anti-cement centrum utilizes water, yellow mud, and sand mixes according to certain ratioForm, produce the shape as cone, high temperature resistant.
Further, the feeding mouth place of body of heater is provided with feed arrangement, and feed arrangement comprises with screw feeding barAnd vibrating disk.
In this technical scheme, biomass fuel is layered in hopper equably from charge door or top, passes throughStepper motor and screw feeding bar, deliver in burner hearth biological particles uniformly for its burning. Hopper is adoptedUse smooth inertia, utilize vibrating disk auxiliary, make feed arrangement more smooth and easy.
Further, the feeding mouth place of body of heater is also provided with secondary air distribution outlet.
In this technical scheme, in the process falling at fuel, secondary air distribution outlet supplements certain oxygen, suppliesSuspension combustion. Make biological particles sufficient combustion, fuel availability is high, not over-emitting black exhaust.
Further, the sidewall of body of heater is provided with sight burner, between this sight burner and the outer wall of body of heater, is 45 °Angle.
In this technical scheme, access hole is set on body of heater and sees burner, wherein access hole is arranged on burner hearthBurner hearth centre, be convenient to maintenance personal and bend over to enter burner hearth inside. See burner: convenient operation personnelWatch the situation of fire and biological particles burning. Adopt 310S material, be designed to 45° angle degree and be convenient to seeExamine. Guarantee to observe 60% above fire bars, comprise the glass of resistance to 1200 DEG C of temperature.
Further, be also provided with igniter on body of heater, it is penetrating that blower fan open end is connected with two endsFire-resistant heat transfer jacket, fire-resistant heat transfer jacket is made up of inner sleeve and overcoat, within one week, is provided with helical groove along outer wall of inside race,Heating wire is located in groove, and inner sleeve is sheathed in overcoat. There is inverted tubaeform at the front end of fire-resistant heat transfer jacketOpening. High-tension electricity produces spark, uses high-pressure oil pump to produce vaporific, mutually clashes into burning.
Shown in ginseng Fig. 4, igniter, comprises hydraulic oil bag (dry type pulse intermediate frequency 5kv), hydraulic oilPump (VSC63A5), 2 refractory ceramics pipes 23 and direct injection oil nozzle 24 (2.5mm Dan FusiAtomizer), between hydraulic oil bag and high-temperature ceramic (2800 ° of heatproofs), connect HTHP line 22.In the time of power connection, produce between 5KV pulse voltage electrode and electrode and produce electric arc, high-pressure oil pump spraying fromAnd electric arc is lighted diesel oil, ignition system comprises one, cylinder (20X150), one of T-shaped slide block (150),One of high-pressure oil pipe, atomizer, electrode etc.
In this technical scheme, the basic function of ignition system is in good time according to the job order of engineProvide strong high tension spark to engine. The function embodiment of ignition system is at opportunity and the generation point of ignitingThe intensity of fire spark. The direct current of realizing on car is converted into the high-tension electricity that can produce sufficient intensity spark,Only have the transformer of employing to produce high-tension electricity by the larger ratio of secondary coil and primary coil. Igniting systemAs unification by control primary coil break-make switch, produce the ignition coil of high-tension electricity and high-tension electricity becomeThe spark plug of pilot spark forms. The battery of system provides power supply, is connected and is cut off by cut-off switchElectric current in primary coil will produce the high-tension electricity up to volts up to ten thousand like this in secondary coil. When disconnectedWhen electrical switch closes, in primary coil, have electric current to pass through and current value along with the growth of closing time constantlyRaising, in the time that switch throws open because electromagnetic induction just produces enough voltage also in secondary coilThis voltage is added on spark plug and makes it produce spark ignition gaseous mixture.
Further, the system of this case can realize intelligent control, specifically comprises following several aspect:
1, one-touch startup and shutdown, has reduced manual operation difficulty;
2, full autonomous detection system: can automatic detecting machine device fault, be convenient to on-call maintenance;
3, Canlink (network communication) and Ethernet coordinate, monitor operation conditions whenever and wherever possible;
4, to use 20 cover stepper motors to carry out sectional temperature-controlled for full machine, allows temperature fall into more accurately desired value.
5, system also has automatic protection functions, as: when in normal unexpected power-off in service or maloperationTime system all can the very first time protect equipment.
6, in whole network, all electric (contactor is with beyond relays) are all connected with network, when certainIndividual electric appearance is abnormal or go offline, and system will be controlled this station at once. At the appointed time not yetAgain connected to the network, now system will be sent warning at once.
It should be noted that, in this article, the relational terms such as the first and second grades is only used forAn entity or operation are separated with another entity or operating space, and not necessarily require or implyBetween these entities or operation, there is relation or the order of any this reality. And term " comprises "," comprise " or its any other variant is intended to contain comprising of nonexcludability, thereby make to comprise that one isProcess, method, article or the equipment of row key element not only comprise those key elements, but also comprise do not have brightOther key elements of really listing, or it is intrinsic to be also included as this process, method, article or equipment instituteKey element. In the situation that there is no more restrictions, the key element being limited by statement " comprising ... ",And be not precluded within process, method, article or the equipment that comprises described key element, also exist other identicalKey element.
The above is only the application's detailed description of the invention, it should be pointed out that general for the artLogical technical staff, not departing under the prerequisite of the application's principle, can also make some improvement and profitDecorations, these improvements and modifications also should be considered as the application's protection domain.
Claims (8)
1. an Intelligent hot wind system, is characterized in that, comprising:
Combustion furnace, for heat energy operative installations provides thermal source, comprises body of heater and heating element, described heating element bagDraw together multiple heat-generating units of series connection, each heat-generating units comprise setting up and down one enter hot case and one clearAsh silo, described in enter hot case and be separated into first by demarcation strip and enter hot case and second and enter hot case, described first enters heatBetween case and deashing storehouse, be communicated with many first heat-generating pipes that vertically arrange, described second enters hot case and deashingBetween storehouse, be communicated with many second heat-generating pipes that vertically arrange, described the first heat-generating pipe and the second heat-generating pipeBottom is communicated with by described deashing storehouse, and described second enters first of hot case and adjacent heat-generating units enters hot caseBe communicated with, described deashing storehouse has the guiding sidewall of inclination, and the below in deashing storehouse offers ash-falling hole, and this fallsThe below in ash hole is provided with ash-pit;
Circulating fan, its one end is connected in described heat energy operative installations, and the other end is connected in described body of heater,Between described body of heater, circulating fan and heat energy operative installations, form thermal cycle;
Exhaust gas processing device and be located at the air-introduced machine between described exhaust gas processing device and combustion furnace.
2. Intelligent hot wind system according to claim 1, is characterized in that: described vent gas treatment dressThe top of putting is provided with exhaust gas inlet and purified gas outlet, and described exhaust gas inlet is connected with described air-introduced machine,The bottom of described exhaust gas processing device is formed with pond, and the top in described pond is provided with range of atomization, this atomizationDistrict is provided with spray equipment, and described spray equipment is connected with outside water circulating pump, described spray equipment, followsBetween ring water pump and pond, form water circulation system, in described exhaust gas processing device, be also provided with active carbon purifyingDistrict, this active carbon purifying district is positioned at described purified gas outlet place, described exhaust gas processing device interior separationBecome waste gas decline passway and the waste gas rising passway of vertical direction, described waste gas decline passway and waste gas riseThe bottom of passage is communicated with by described pond, and the top in described waste gas decline space and described exhaust gas inlet connectLogical, the top of described waste gas rising passway is communicated with described purified gas outlet, described active carbon purifying districtBe positioned at described waste gas rising passway, described range of atomization is at least distributed in described waste gas decline passway.
3. Intelligent hot wind system according to claim 2, is characterized in that: described vent gas treatment dressOn the sidewall of putting, also offer clean mouthful.
4. Intelligent hot wind system according to claim 1, is characterized in that: the bottom of described body of heaterBe provided with anti-cement centrum.
5. Intelligent hot wind system according to claim 1, is characterized in that: the pan feeding of described body of heaterMouth place is provided with feed arrangement, and described feed arrangement comprises with screw feeding bar and vibrating disk.
6. Intelligent hot wind system according to claim 5, is characterized in that: the pan feeding of described body of heaterMouth place is also provided with secondary air distribution outlet.
7. Intelligent hot wind system according to claim 1, is characterized in that: the sidewall of described body of heaterBe provided with sight burner, between this sight burner and the outer wall of described body of heater, be 45 ° of angles.
8. Intelligent hot wind system according to claim 1, is characterized in that: described combustion furnace also wrapsDraw together igniter, described igniter comprises hydraulic oil bag, high-pressure oil pump, 2 refractory ceramics pipes and straightSpray formula oil nozzle, connects institute by HTHP line between described 2 refractory ceramics pipes and hydraulic oil bagState direct injection oil nozzle and be connected in described high-pressure oil pump.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521017892.2U CN205245548U (en) | 2015-12-07 | 2015-12-07 | Intelligence hot air system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521017892.2U CN205245548U (en) | 2015-12-07 | 2015-12-07 | Intelligence hot air system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205245548U true CN205245548U (en) | 2016-05-18 |
Family
ID=55944620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521017892.2U Expired - Fee Related CN205245548U (en) | 2015-12-07 | 2015-12-07 | Intelligence hot air system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205245548U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352177A (en) * | 2015-12-07 | 2016-02-24 | 苏州昶胜节能环保科技有限公司 | Intelligent hot-air system |
CN109114559A (en) * | 2017-06-22 | 2019-01-01 | 昆山庚天热能科技有限公司 | A kind of burner air gas premixing autocontrol method |
-
2015
- 2015-12-07 CN CN201521017892.2U patent/CN205245548U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105352177A (en) * | 2015-12-07 | 2016-02-24 | 苏州昶胜节能环保科技有限公司 | Intelligent hot-air system |
CN109114559A (en) * | 2017-06-22 | 2019-01-01 | 昆山庚天热能科技有限公司 | A kind of burner air gas premixing autocontrol method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103791494B (en) | A kind of air-cooled coal dust low NO and using method thereof | |
CN102519034B (en) | Eddy type biomass particle gasification burner | |
CN106402905A (en) | Staged-combustion torch head device | |
CN202057036U (en) | Coal powder air heating furnace | |
CN105202534A (en) | Fresh air pre-heating fuel dust recovery type gasification furnace | |
CN103017176B (en) | Novel thermal cleaning furnace | |
CN104197327A (en) | Alcohol group combustor | |
CN205245548U (en) | Intelligence hot air system | |
CN102225365B (en) | System and method for modulating flue gas with sulfur trioxide | |
CN107796008A (en) | The method for introducing combustibles burning tail cigarette purification flue dust | |
CN103822357A (en) | Horizontal pulverized coal organic heat carrier boiler | |
CN104728864B (en) | High-power adjustable plasma ignition test bed system for pulverized coal boiler | |
CN203771690U (en) | Horizontal coal dust organic heat carrier boiler | |
CN207893771U (en) | Introduce the device of combustibles burning tail cigarette purification flue dust | |
CN105352177A (en) | Intelligent hot-air system | |
CN205977333U (en) | Black cigarette of diesel oil engine purifies and regenerating unit | |
CN212298972U (en) | Device for co-combustion of waste oil, oil sludge and oil residue by coal powder burner of coal-fired power plant | |
CN107300167A (en) | A kind of biomass gasification fired technology of integral type and application | |
CN207962631U (en) | A kind of Cremation Machine dedicated ambient pressure burner | |
CN203231538U (en) | Efficient oxygen-enriched combustion multi-component powder fused salt boiler system | |
CN205102120U (en) | Circulating fluidized bed boiler cold state ignition fuel economizing device | |
CN207334745U (en) | Multi-element material co-combustion stove | |
CN205859973U (en) | A kind of integral biomass steam generator | |
CN104990093A (en) | Intermediate frequency electric pulse type waste gas incinerator | |
CN204786458U (en) | Intermediate frequency electric pulse formula waste gas incinerator |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 Termination date: 20171207 |