CN205238405U - Long straight tube inner wall plastic -coated integrated equipment's special firing equipment - Google Patents
Long straight tube inner wall plastic -coated integrated equipment's special firing equipment Download PDFInfo
- Publication number
- CN205238405U CN205238405U CN201521111450.4U CN201521111450U CN205238405U CN 205238405 U CN205238405 U CN 205238405U CN 201521111450 U CN201521111450 U CN 201521111450U CN 205238405 U CN205238405 U CN 205238405U
- Authority
- CN
- China
- Prior art keywords
- straight tube
- long straight
- gas
- shower nozzle
- revolving stage
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Coating Apparatus (AREA)
Abstract
The utility model discloses a long straight tube inner wall plastic -coated integrated equipment's special firing equipment, including supporting long straight tube spare and promoting rotatory initiative revolving stage (31) and passive revolving stage (33), initiative revolving stage (31) and passive revolving stage (33) through the bottom slide arrange straight slide rail (34) in on, slide rail (34) middle part is located be provided with between initiative revolving stage (31) and passive revolving stage (33) heating system (32), a plurality of gas heating element that heating system (32) set up for the interval, each gas heating element includes gas supply pipe and open/close valve door that gas flame shower nozzle and rear portion are connected. The utility model discloses burner nozzle control mechanism, but straight tube gas burner nozzle adopts flip structure, through upset self -closing or open the burner nozzle valve, improves the security. The utility model discloses can effectively reduce the flame spray nozzle height, according to being processed pipe fitting length control ignition nozzle quantity, save space and be convenient for the operation.
Description
Technical field
The present invention relates to long straight tube coating for inner wall complexes, more particularly, relate to the improvement of firing equipment.
Background technology
On boats and ships for supplying water, the pipeline of fuel feeding, air feed, corrosion resistance is had relatively high expectations, its inwall needsCarry out plastic-coated processing. And for for long straight tube, length reaches 3~12 meters, even longer, its inwallPlastic-coated is difficulty comparatively, needs special equipment to realize.
Summary of the invention
The present invention aimed to provide one long straight pipe firing equipment safely and effectively.
In order to achieve the above object, the invention provides a kind of special heating of long straight tube coating for inner wall complexesEquipment, comprises the active rotation platform and the passive turntable that support long straight pipe and promote rotation; Described active is revolvedTurntable and passive turntable are placed on straight slide rail by bottom slip base; Described slide rail middle part is positioned at described masterBetween moving turntable and passive turntable, be provided with heating system; Described heating system is spaced multipleGas heating assembly, described in each, gas heating assembly comprises gas flame shower nozzle and back-connected air supply pipeLine and opening/shutting valve.
Under optimal way, the shower nozzle of described gas heating assembly is connected in one planar around hinge by bend pipeOn the turnover panel that spindle is rotated, described jointed shaft is arranged in bottom bracket support body, described turnover panel and described bottomOn support support body, be fixed with back-moving spring by link respectively; The rotation of described jointed shaft is provided with bearing.Described jointed shaft has also connected the opening/shutting valve of gas supply line, makes described shower nozzle under erectility, described inOpening/shutting valve is in opening.
In addition, described active rotation platform or passive turntable are provided with in moving process and are hit for described shower nozzleThe collision block falling, and lock described shower nozzle in bumping against the locking mechanism of state.
Operating procedure: 1. according to data input (or calling) console controls such as pipe fitting specification to be processed, lengthProcessing procedure order, 2. equipment is adjusted roller spacing and principal and subordinate wheel spacing, 3. heater mobile terminal turntable automaticallyMove horizontal direction position, makes flame spray head upset roller press duration and degree of heating turnover panel to drive duration and degree of heating upset, extension spring bandMoving movable spring draws pin that valve switch is opened and closes.
Burner noz(zle) controlling organization of the present invention, straight tube fuel gas buring nozzle adopts turning structure, by upsetAutomatically close or open burner noz(zle) valve, security performance is provided. It is high that the present invention can effectively reduce flame-thrower nozzleDegree, greatly reduced equipment overall structure center of gravity, by pipe fitting length control point fire-fighting unrounded number, byControl platform can be realized automated intelligent IGNITION CONTROL, has not only saved space but also convenient operation.
Brief description of the drawings
Fig. 1 is the overall structure schematic side view of the long straight tube coating for inner wall of the present invention complexes.
Fig. 2 is the overall structure schematic top plan view of long straight tube coating for inner wall complexes shown in Fig. 1.
Fig. 3 is the heating equipment special side-looking structural representation in the long straight tube coating for inner wall of the present invention complexes.
Fig. 4 is the plan structure schematic diagram of heating equipment special shown in Fig. 3.
Fig. 5 be in Fig. 3 A-A to gas heating assembly sectional structure schematic diagram.
Fig. 6 applies with the quick capping side-looking in end structural representation.
Fig. 7 is the special coating equipment left part side-looking knot in the long straight tube coating for inner wall of the present invention complexesStructure schematic diagram.
Fig. 8 is special coating equipment left part plan structure schematic diagram shown in Fig. 3.
Fig. 9 is the special coating equipment right side part side-looking knot in the long straight tube coating for inner wall of the present invention complexesStructure schematic diagram.
Figure 10 is the right side of special coating equipment shown in Fig. 3 part plan structure schematic diagram.
Figure 11 is active rotation platform perspective view.
Detailed description of the invention
As illustrated in fig. 1 and 2, the long straight tube coating for inner wall of the present invention complexes comprise that firing equipment 1, painting coverStandby 2, cooling device 3, and for the transloading equipment of long straight pipe movement between three equipment.
As shown in Figures 3 and 4, described firing equipment 1 comprises that supporting the active that also promotion is rotated of long straight pipe revolvesTurntable 31 and passive turntable 33; Described active rotation platform 31 and passive turntable 33 are by bottom slip baseBe placed on straight slide rail 34; Described slide rail 34 middle parts are positioned at described active rotation platform 31 and passive turntable 33Between be provided with heating system 32.
Described heating system 32 is spaced multiple gas heating assembly. Described gas heating assembly comprisesGas supply line, valve that gas flame shower nozzle and described shower nozzle connect. Specifically as shown in Figure 5, gas heatingAssembly comprises shower nozzle 51, and described shower nozzle is connected in one by bend pipe 52 and planar rotates around jointed shaft 54Turnover panel 53 on, described jointed shaft 54 is arranged in bottom bracket support body, described turnover panel 53 and bottom bracketOn support body, be fixed with back-moving spring 56 by link respectively. The rotation of described jointed shaft 54 is provided with bearing55. In figure, provide the pipe fitting of combustion gas not shown for described shower nozzle 51. In addition, described jointed shaft 54 alsoConnect the valve (not shown) of air feed pipe fitting, in the time that shower nozzle is placed to, valve closing, this shower nozzle can not fireBurn; When shower nozzle uprightly, valve opening, the long straight pipe that shower nozzle flame heating is processed.
As shown in Fig. 7~10, described coating equipment 2 comprises that the left and right sides arranges powder feeder unit, described for powder dressPut and comprise that the quick capping mould for connecting the long straight pipe mouth of pipe, centre bore by capping mould are to describedThe long straight pipe two ends mouth of pipe injects the confession powder rifle of polyethylene powders, and the funnel 71 of powder is provided; Left and right twoThe described powder feeder unit of side arranges respectively bottom Mobile base 72 and sliding rail, and the described powder rifle 73 that supplies is by movingSupport for powder gun carriage 74; In addition described coating equipment 2 also comprises that to be placed in pipe fitting two ends straight for plastic-coated durationActive rotation platform 75 and passive turntable 76 that pipe fitting rotates.
Quick capping mould as shown in Figure 6 adopts middle polyester packing ring and the end steel capping of center drillingAnd short tube integrative-structure design form, capping mould has alignment pin accurately to install and be fixed on flange. Specifically,Capping mould comprises an annular steel end cap 62 fast, and described end cap 62 is attached with the surface that long straight pipe contactsOne deck polyester packing ring 63, described end cap 62 middle part looping pits extend one section to what connect for powder rifle one sideSteel short tube 61, in addition, the described steel end cap 62 of annular and polyester packing ring 63 are upwards spaced apart establishing of weekHave screwed hole, quick bolt assembly 64 for connection has spun in described screwed hole.
Described cooling device 3 comprises the active rotation platform and the passive turntable that support long straight pipe and promote rotation;Described active rotation platform and passive turntable are placed on straight track by bottom slide; Position in described trackBetween described active rotation platform and passive turntable, be provided with the cooling spray cooling system of using.
The active rotation platform of firing equipment 1, coating equipment 2, cooling device 3 and passive turntable can be oneCover, also can arrange respectively. Use when same set of, corresponding three equipment need arranged in a straight line, and establish bottomPut the supporting seat and the track thereof that move for active rotation platform and passive turntable. Wherein, as shown in figure 11,Active rotation platform comprises that two be arranged in parallel and driven respectively the roll wheel assembly 92 of rotation by rear end motor 91; TwoOn the moving-member 93 relatively moving bottom described roll wheel assembly 92 is placed in respectively, thereby be applicable to different tube diametersThe processing of long straight pipe. For firing equipment 1, its active rotation platform and passive turntable are also provided with for lengthThe gas gun bracing frame 94 of the distolateral flange heating of straight pipe and the gas gun assembly arranging.
The above, be only preferably detailed description of the invention of the present invention, but not office of protection scope of the present inventionBe limited to this, any be familiar with those skilled in the art the present invention disclose technical scope in, according to thisThe technical scheme of invention and inventive concept thereof are equal to replaces or changes, and all should be encompassed in protection of the present inventionWithin scope.
Claims (3)
1. a heating equipment special for long straight tube coating for inner wall complexes, is characterized in that, comprises supportLong straight pipe also promotes the active rotation platform (31) and the passive turntable (33) that rotate; Described active rotation platform (31)Be placed on straight slide rail (34) by bottom slip base with passive turntable (33); Described slide rail (34) middle part is positioned atBetween described active rotation platform (31) and passive turntable (33), be provided with heating system (32);
Described heating system (32) is spaced multiple gas heating assembly, gas heating assembly described in eachComprise gas flame shower nozzle and back-connected gas supply line and opening/shutting valve.
2. the heating equipment special of long straight tube coating for inner wall complexes according to claim 1, its featureBe, the shower nozzle (51) of described gas heating assembly is connected in one planar around jointed shaft by bend pipe (52)(54) turnover panel (53) rotating is upper, and described jointed shaft (54) is arranged in bottom bracket support body, described turnover panel (53)With on described bottom bracket support body, be fixed with back-moving spring (56) by link respectively;
The rotation of described jointed shaft (54) is provided with bearing (55); Described jointed shaft (54) has also connected gas supply lineOpening/shutting valve, make described shower nozzle under erectility, described opening/shutting valve is in opening.
3. the heating equipment special of long straight tube coating for inner wall complexes according to claim 1, its featureBe, described active rotation platform (31) or passive turntable (33) are provided with in moving process for described shower nozzle (51)The collision block being knocked down, and lock described shower nozzle (51) in bumping against the locking mechanism of state.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521111450.4U CN205238405U (en) | 2015-12-29 | 2015-12-29 | Long straight tube inner wall plastic -coated integrated equipment's special firing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201521111450.4U CN205238405U (en) | 2015-12-29 | 2015-12-29 | Long straight tube inner wall plastic -coated integrated equipment's special firing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205238405U true CN205238405U (en) | 2016-05-18 |
Family
ID=55937481
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201521111450.4U Active CN205238405U (en) | 2015-12-29 | 2015-12-29 | Long straight tube inner wall plastic -coated integrated equipment's special firing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205238405U (en) |
-
2015
- 2015-12-29 CN CN201521111450.4U patent/CN205238405U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR101247180B1 (en) | Water spray system for coalyard | |
CN104690601B (en) | A kind of line slideway type cooling system controlling organization | |
CN205238405U (en) | Long straight tube inner wall plastic -coated integrated equipment's special firing equipment | |
CN205236267U (en) | Long straight tube inner wall plastic -coated integrated equipment | |
CN205236347U (en) | Long straight tube inner wall plastic -coated integrated equipment's gas heating element | |
CN105903936A (en) | Cooling device for automotive fitting | |
CN219702370U (en) | Steel pipe paint spraying equipment | |
CN107398163A (en) | A kind of scalable and shuttle-type SNCR reducing agent injection apparatus | |
CN206813730U (en) | Spiral controls the storage tank of blanking velocity | |
CN205238401U (en) | Long straight tube inner wall plastic -coated integrated equipment's special revolving stage | |
CN205244730U (en) | Quick closing cap is used to long straight tube inner wall plastic -coated | |
CN206315967U (en) | A kind of spray robot performs device | |
CN205836907U (en) | A kind of aerodynamic automobile jet blower | |
CN207271508U (en) | A kind of automation anticorrosion painting installation of electroplating mold | |
CN208194753U (en) | Semi-automatic small-scale spraying equipment | |
CN209287554U (en) | A kind of injection apparatus and sterilizing equipment decontaminating apparatus | |
CN208679568U (en) | A kind of manipulator for auto parts and components spraying | |
CN201978846U (en) | Painting turnover mechanism for inverter box | |
CN206868489U (en) | A kind of spray equipment for ladle inner wall coating antioxidant | |
CN111544716A (en) | Clinical site anesthesia quantitative spraying device that uses of department of anesthesia | |
CN207407477U (en) | A kind of intelligent humidification equipment for humidifying adjustable angle | |
CN205702371U (en) | A kind of single-axis servo spraying machine | |
CN211803791U (en) | Baking device for pouring ladle | |
CN110252550A (en) | A kind of antirust paint spray equipment | |
CN214657047U (en) | Subway station foundation pit large tracts of land concrete construction storehouse face cooling atomizer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |