CN205238214U - 输钉装置 - Google Patents

输钉装置 Download PDF

Info

Publication number
CN205238214U
CN205238214U CN201520920767.6U CN201520920767U CN205238214U CN 205238214 U CN205238214 U CN 205238214U CN 201520920767 U CN201520920767 U CN 201520920767U CN 205238214 U CN205238214 U CN 205238214U
Authority
CN
China
Prior art keywords
diaphragm
guide rail
chute guide
transverse slat
nail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520920767.6U
Other languages
English (en)
Inventor
谢新华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
WUXI ZHENGYANG MACHINERY Co Ltd
Original Assignee
WUXI ZHENGYANG MACHINERY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUXI ZHENGYANG MACHINERY Co Ltd filed Critical WUXI ZHENGYANG MACHINERY Co Ltd
Priority to CN201520920767.6U priority Critical patent/CN205238214U/zh
Application granted granted Critical
Publication of CN205238214U publication Critical patent/CN205238214U/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chutes (AREA)

Abstract

本实用新型涉及木头托盘加工技术领域,具体为一种输钉装置,其能够方便快捷有序的实现的钉子输送,其包括两个平行布置的第一横板,所述第一横板两端分别固定安装于端部支撑架,两个所述第一横板之间设置有两个对称布置的U形安装架,所述U形安装架包括安装于所述端部支撑架的横条、两个紧靠所述第一横板的第二横板,所述第一横板、第二横板下端分别开有一一对应的凹槽,每个所述凹槽两端分别设置有滑槽导轨,两个所述滑槽导轨之间留有钉子输送间隙,一端的所述滑槽导轨固定安装于所述第一横板底部、另一端的所述滑槽导轨固定安装于所述第二横板底部。

Description

输钉装置
技术领域
本实用新型涉及木头托盘加工技术领域,具体为一种输钉装置。
背景技术
木头托盘是生产中经常要用到的,其具有价格低廉,易加工,成品实用性强等优点,木头托盘一般都是由多块木板钉接而成,而打钉操作对于大多数中小型企业来说都是人工打钉,效率很低,也有采用气动打钉的,但是常见的需要人工一个个输送,效率很低,也有是使用输料槽来进行操作,但是结构过于简单,输送效果和输送效率均不理想。
发明内容
为了解决上述问题,本实用新型提供了一种输钉装置,其能够方便快捷有序的实现的钉子输送。
其技术方案是这样的:一种输钉装置,其特征在于,其包括两个平行布置的第一横板,所述第一横板两端分别固定安装于端部支撑架,两个所述第一横板之间设置有两个对称布置的U形安装架,所述U形安装架包括安装于所述端部支撑架的横条、两个紧靠所述第一横板的第二横板,所述第一横板、第二横板下端分别开有一一对应的凹槽,每个所述凹槽两端分别设置有滑槽导轨,两个所述滑槽导轨之间留有钉子输送间隙,一端的所述滑槽导轨固定安装于所述第一横板底部、另一端的所述滑槽导轨固定安装于所述第二横板底部。
其进一步特征在于,所述凹槽宽度大于所述钉子输送间隙的宽度;
每个所述钉子输送间隙两侧的所述滑槽导轨底部安装有八字形导向板。
采用本实用新型的结构后,每个凹槽两端的滑槽导轨形成的钉子输送间隙为钉子输送导向,方便快捷地实现了钉子的有序输送。
附图说明
图1为本实用新型结构示意图;
图2为本实用新型结构后视图。
具体实施方式
见图1,图2所示,一种输钉装置,其包括两个平行布置的第一横板1,第一横板1两端分别固定安装于端部支撑架2,两个第一横板1之间设置有两个对称布置的U形安装架3,U形安装架3包括安装于端部支撑架2的横条、两个紧靠第一横板1的第二横板4,横条设置在图中固定板9下方,第一横板1、第二横板4下端分别开有一一对应的凹槽5,每个凹槽5两端分别设置有滑槽导轨6,两个滑槽导轨6之间留有钉子输送间隙7,一端的滑槽导轨6固定安装于第一横板1底部、另一端的滑槽导轨6固定安装于第二横板4底部;凹槽5宽度大于钉子输送间隙7的宽度,钉子能够更加顺利输送;每个钉子输送间隙7两侧的滑槽导轨6底部安装有八字形导向板8,起到导向作用。本实用新型中U形安装架3可以更换,其可以调整第二横板的型号尺寸而实现钉子输送间隙7的间距变化。

Claims (3)

1.一种输钉装置,其特征在于,其包括两个平行布置的第一横板,所述第一横板两端分别固定安装于端部支撑架,两个所述第一横板之间设置有两个对称布置的U形安装架,所述U形安装架包括安装于所述端部支撑架的横条、两个紧靠所述第一横板的第二横板,所述第一横板、第二横板下端分别开有一一对应的凹槽,每个所述凹槽两端分别设置有滑槽导轨,两个所述滑槽导轨之间留有钉子输送间隙,一端的所述滑槽导轨固定安装于所述第一横板底部、另一端的所述滑槽导轨固定安装于所述第二横板底部。
2.根据权利要求1所述的一种输钉装置,其特征在于,所述凹槽宽度大于所述钉子输送间隙的宽度。
3.根据权利要求1所述的一种输钉装置,其特征在于,每个所述钉子输送间隙两侧的所述滑槽导轨底部安装有八字形导向板。
CN201520920767.6U 2015-11-18 2015-11-18 输钉装置 Expired - Fee Related CN205238214U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520920767.6U CN205238214U (zh) 2015-11-18 2015-11-18 输钉装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520920767.6U CN205238214U (zh) 2015-11-18 2015-11-18 输钉装置

Publications (1)

Publication Number Publication Date
CN205238214U true CN205238214U (zh) 2016-05-18

Family

ID=55937290

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520920767.6U Expired - Fee Related CN205238214U (zh) 2015-11-18 2015-11-18 输钉装置

Country Status (1)

Country Link
CN (1) CN205238214U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105397882A (zh) * 2015-11-18 2016-03-16 无锡市正阳机械有限公司 一种输钉装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105397882A (zh) * 2015-11-18 2016-03-16 无锡市正阳机械有限公司 一种输钉装置

Similar Documents

Publication Publication Date Title
CN203934885U (zh) 一种收纳架的托架卡扣连接结构
CN205238214U (zh) 输钉装置
CN205085859U (zh) 一种托盘加工治具
CN205240486U (zh) 木料输送装置
CN204209321U (zh) 一种led焊线夹具
CN204106249U (zh) 一种羊用可调式移动手术架
CN105397882A (zh) 一种输钉装置
CN204916916U (zh) 传送带防护压板
CN104526310A (zh) 一种压合装置
CN205112034U (zh) 落钉装置
CN108247799A (zh) 一种床面包裹装置的实施装置
CN208746315U (zh) 一种护角板自动打钉机
CN203699184U (zh) 一种伸缩皮带
CN203211530U (zh) 炼乳自动装箱装置
CN206857657U (zh) 一种用于服装物料输送系统的出站送入装置
CN204339229U (zh) 一种压合装置
CN208743430U (zh) 一种矿用弯轨装置
CN204527862U (zh) 一种布卷包装机上的输出装置
CN203529248U (zh) 贴装托盘交替输送装置
CN105083939A (zh) 饼状食品送料机构
CN202800690U (zh) 弹簧书架
CN204416071U (zh) 一种样板夹
CN208410072U (zh) 一种裁断机的收板装置
CN203565301U (zh) 一种用于玻璃打胶机的传送装置
CN206751309U (zh) 一种高精度环保叉车角形件

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160518

Termination date: 20161118