CN205237241U - Process anchor clamps of large -scale worm wheel part - Google Patents
Process anchor clamps of large -scale worm wheel part Download PDFInfo
- Publication number
- CN205237241U CN205237241U CN201520916538.7U CN201520916538U CN205237241U CN 205237241 U CN205237241 U CN 205237241U CN 201520916538 U CN201520916538 U CN 201520916538U CN 205237241 U CN205237241 U CN 205237241U
- Authority
- CN
- China
- Prior art keywords
- datum level
- cylinder
- worm gear
- fixture
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jigs For Machine Tools (AREA)
Abstract
The utility model relates to a process anchor clamps of large -scale worm wheel part, characterized in that: including anchor clamps body, adjustment fill up, round bottom seat and prevent round clamp, the special screw rod of drunkenness when processing parts machining, the anchor clamps body has a cylinder of centre bore for the system, has in cylinder top system and fills up with the adjustment that matched with is first to go up the last bellying that reference surface and diameter are lighter than the cylinder diameter, has the boss platform in cylinder bottom system, it has first reference surface to make bottom the boss platform, outside the cylinder between circumferential edge and the boss platform equipartition have the gusset. The advantage is: these anchor clamps reasonable in design, simple structure, convenient to use to being fit for multiple specification worm wheel and using, so can process processing means and the advance process program that facilitates on cutting machine tool for large -scale worm wheel, make manufacturing procedure by numerous change letter, also reduced the processing cost when improving by processing part accuracy and quality, the fund of having practiced thrift has improved efficiency, and can adapt to the batch production of large -scale worm wheel part.
Description
Technical field
The utility model belongs to gear machine manufacture field, particularly relates to a kind of machining large worm gear partFixture.
Background technology
Worm gear part is the vitals of whole gear machine, lathe by worm gear part by drum, main shaft,The important spare parts such as worm screw link together, and complete compulsory exercise, so the direct shadow of the quality of worm gear precisionRing the precision of whole gear machine. Add man-hour, first worm gear will process datum level and datum hole, thenTaking this datum level and datum hole as benchmark, process worm-gear toothing portion by fixture. Due to part to be processedRequired precision is very high, and its upper and lower datum level and lower datum level parallelism error value are less than 0.01mm, tooth portion jointCircle roughness is 1.6, and adjacent circular pitch limit D-value is 0.007mm, and the limit accumulated error value of circular pitch is0.04mm, and be again heavy parts, so adopt traditional diamond-making technique to be difficult to reach designing requirement, causeCannot ensure precision and the quality of part to be processed, thereby cause whole machine tool accuracy not reach designing requirement,So not only affect whole machine tool accuracy, increased processing cost, reduced working (machining) efficiency, but alsoBe difficult to adapt to batch production and the market demand of large-scale worm gear part.
Summary of the invention
The utility model provides one can meet large-scale snail for solving the technical problem existing in known technologyThe required precision of wheel part, increases substantially production efficiency, cuts down finished cost and easy to operate processingThe fixture of large-scale worm gear part.
The technical scheme that the utility model is taked for the technical problem existing in solution known technology is:
The fixture of machining large worm gear part, is characterized in that: comprise chuck body, adjusting pad, round bottomSeat and prevent that part to be processed from adding the round clamp of play in man-hour, bolt special, described chuck body is for being shaped withThe cylinder of centre bore, cylinder top be shaped with match with adjusting pad first on datum level and diameterBe less than the projection portion of cylinder diameter, be shaped with circular bosses in cylinder bottom, be shaped with in circular bosses bottomFirst time datum level, is evenly equipped with gusset between described cylinder circumferential periphery and circular bosses.
The utility model can also adopt following technical scheme:
Described projection portion outside is shaped with and the benchmark cylindrical of placing part to be processed and matching, centreBe shaped with the hole concentric with cylinder centre bore.
Described chuck body first on datum level and first time datum level be the face of being parallel to each other, its depth of parallelismError amount is less than 0.008mm.
The center line of described benchmark cylindrical and datum level on first, first time datum level are vertical mutually, itsError of perpendicularity value is all less than 0.008mm.
Described adjusting pad upper end be provided with match with part to be processed second on datum level, lower end be provided withSecond time datum level that in chuck body first, datum level matches, datum level and second time on described secondDatum level is the face of being parallel to each other, and its parallelism error value is less than 0.008mm.
Described round bottom seat upper end be provided with match with first time datum level of chuck body the 3rd on datum level,Be provided with the 3rd time datum level matching with machining tool workbench in round bottom seat bottom, base on the described the 3rdAccurate face and the 3rd time datum level are the face of being parallel to each other, and its parallelism error value is less than 0.005mm.
Advantage and the good effect that the utlity model has are: because the utility model adopts above-mentioned technical sideCase, this fixture, according to the design feature of part to be processed and required precision, is determined this folder by calculatingThe size of tool and precision are to reach processing request. Because this jig Design is reasonable, simple in structure, userJust, and the use of applicable plurality of specifications worm gear, process and provide just on stock-removing machine so can be large-scale worm gearThe manufacturing process of profit and advanced process program, make manufacturing procedure by numerous change letter, improving part to be processedWhen precision and quality, also reduce processing cost, saved fund, improved efficiency, and can adapt toThe batch production of large-scale worm gear part.
Brief description of the drawings
Fig. 1 is chuck body structural representation of the present utility model;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is clamp working-station schematic diagram of the present utility model;
Fig. 4 is the B-B cutaway view of Fig. 3;
Fig. 5 is adjusting pad structural representation of the present utility model;
Fig. 6 is round bottom holder structure schematic diagram of the present utility model;
Fig. 7 is part to be processed structural representation of the present utility model.
In figure: 1, chuck body; Datum level on 1-1, first; 1-2, projection portion; 1-2-1,Benchmark cylindrical; 1-3, first time datum level; 1-4, circular bosses; 1-5, gusset; 2, adjusting pad;Datum level on 2-1, second; 2-2, second time datum level; 3, worm gear; Datum level on 3-1, the 4th;3-2, worm gear datum hole; 3-3 worm-gear toothing portion; 3-4, pitch circle; 3-5, the 4th time datum level; 4,Round clamp; 5, nut; 6, bolt special; 7, outer six side's screws; 8, packing ring; 9, round bottomSeat; Datum level on 9-1, the 3rd; 9-2, the 3rd time datum level; 10, machining tool workbench.
Detailed description of the invention
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following enforcementExample, and coordinate accompanying drawing to be described in detail as follows:
It should be noted that, unless otherwise clearly defined and limited, term " first ", " second "Deng not representing order installation, do not represent the importance of described parts yet.
Refer to Fig. 1-Fig. 7, the fixture of machining large worm gear part, comprise chuck body 1, adjusting pad 2,Round bottom seat 9 and prevent that part to be processed from adding the round clamp 4 of play in man-hour, bolt special 6, described fixture thisBody is the cylinder that is shaped with centre bore, cylinder top be shaped with match with adjusting pad 2 first on baseAccurate face 1-1 and diameter are less than the 1-2 of projection portion of cylinder diameter, are shaped with it and are linked as in cylinder bottomThe circular bosses 1-4 of one, is shaped with datum level 1-3, described cylinder excircle first time in circular bosses bottomBetween limit and circular bosses, be evenly equipped with gusset 1-5.
In the present embodiment, described projection portion outside is shaped with and places outside the benchmark that part to be processed matchesCircle 1-2-1, centre is shaped with the hole concentric with cylinder centre bore.
In the present embodiment, described chuck body first on datum level and first time datum level for being parallel to each otherFace, its parallelism error value is less than 0.008mm.
In the present embodiment, datum level on the center line of described benchmark cylindrical and first, first time datum level are equalMutually vertical, its error of perpendicularity value is all less than 0.008mm.
In the present embodiment, described adjusting pad 2 upper ends be provided with match with part to be processed second on benchmarkFace 2-1, lower end is provided with the second time datum level 2-2 matching with datum level in chuck body first, described inOn second, datum level and second time datum level are the face of being parallel to each other, and its parallelism error value is less than 0.008mm.
In the present embodiment, described round bottom seat 9 upper ends are provided with matches with first time datum level of chuck bodyDatum level 9-1 on the 3rd, is provided with in round bottom seat bottom the 3rd time benchmark matching with machining tool workbenchFace 9-2, datum level and the 3rd time datum level are the face of being parallel to each other on the described the 3rd, its parallelism error value is littleIn 0.005mm.
In the present embodiment, uniform six the outer six side's screws 7 in described fixture lower end, six packing rings 8.
Operation principle of the present utility model is:
Refer to Fig. 2-Fig. 7, first the 3rd time datum level 9-2 of round bottom seat 9 is placed on to machining tool workDo on platform 10, then first time datum level 1-3 of chuck body 1 is placed on round bottom seat 9 the 3rd onDatum level 9-1 is upper, packs bolt special 6 into, and chuck body and round bottom seat are passed through to outer six side's screws 7, padCircle 8 tightens together, chuck body top (referring to Fig. 4) install successively adjusting pad 2, worm gear 3,Round clamp 4, carries out fasteningly with nut 5, then the 3-3 of machining worm wheel tooth portion is to final size. Due to this folderBenchmark on datum level 1-1 on first time datum level 1-3 of tool and first, second time datum level 2-2 and secondFace 2-1 is the face of being parallel to each other, and its parallelism error value is all less than 0.008mm, the 3rd time datum level 9-2With the 3rd on datum level 9-1 be also the face of being parallel to each other, its parallelism error value is less than 0.005mm, each upper,Lower datum level flatness error value is all less than 0.01mm, and benchmark cylindrical 1-2 center line and first time baseAccurate face is mutually vertical, and its error of perpendicularity value is less than 0.008mm, and this has just ensured the each datum level of this fixtureBetween uniformity and the uniformity between datum hole and datum level, the accumulated error value of fixture itself is fallenTo minimum, thereby ensure the precision of whole fixture. Simultaneously again due to worm gear 3 the 4th on datum level 3-1With the 4th time datum level 3-5 be also the face of being parallel to each other, its parallelism error value is less than 0.01mm, worm gear baseThe fit clearance error amount of accurate hole 3-2 and chuck body benchmark cylindrical is controlled within the scope of 0~0.005mm,The uniformity that this has just ensured worm gear and fixture, makes that accumulated error value between worm gear and fixture is same also fallsTo minimum, thereby make the 3-3 of worm-gear toothing portion processing meet drawing requirement.
The embodiment that the utility model accompanying drawing is described is exemplary, only for explaining the utility model, andCan not be interpreted as restriction of the present utility model.
Claims (6)
1. a fixture for machining large worm gear part, is characterized in that: comprise chuck body, adjusting pad,Round bottom seat and prevent that part to be processed from adding the round clamp of play in man-hour, bolt special, described chuck body isBe shaped with the cylinder of centre bore, cylinder top be shaped with match with adjusting pad first on datum level andDiameter is less than the projection portion of cylinder diameter, is shaped with circular bosses in cylinder bottom, in circular bosses bottomBe shaped with datum level first time, between described cylinder circumferential periphery and circular bosses, be evenly equipped with gusset.
2. the fixture of machining large worm gear part according to claim 1, is characterized in that: described inProjection portion outside is shaped with and the benchmark cylindrical of placing part to be processed and matching, and centre is shaped with and circleThe hole that cylinder centre bore is concentric.
3. the fixture of machining large worm gear part according to claim 1, is characterized in that: described inChuck body first on datum level and first time datum level be the face of being parallel to each other, its parallelism error value is littleIn 0.008mm.
4. the fixture of machining large worm gear part according to claim 2, is characterized in that: described inThe center line of benchmark cylindrical and datum level on first, first time datum level are vertical mutually, its perpendicularity mistakeDifference is all less than 0.008mm.
5. the fixture of machining large worm gear part according to claim 1, is characterized in that: described inAdjusting pad upper end be provided with match with part to be processed second on datum level, lower end is provided with and chuck bodySecond time datum level that on first, datum level matches, datum level and second time datum level are on described secondThe face that is parallel to each other, its parallelism error value is less than 0.008mm.
6. the fixture of machining large worm gear part according to claim 1, is characterized in that: described inRound bottom seat upper end be provided with match with first time datum level of chuck body the 3rd on datum level, at round bottom seatBottom is provided with the 3rd time datum level matching with machining tool workbench, datum level and the on the described the 3rdThree times datum levels are the face of being parallel to each other, and its parallelism error value is less than 0.005mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520916538.7U CN205237241U (en) | 2015-11-17 | 2015-11-17 | Process anchor clamps of large -scale worm wheel part |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520916538.7U CN205237241U (en) | 2015-11-17 | 2015-11-17 | Process anchor clamps of large -scale worm wheel part |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205237241U true CN205237241U (en) | 2016-05-18 |
Family
ID=55936320
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520916538.7U Expired - Fee Related CN205237241U (en) | 2015-11-17 | 2015-11-17 | Process anchor clamps of large -scale worm wheel part |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205237241U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113828956A (en) * | 2021-11-12 | 2021-12-24 | 黄秀芳 | Reciprocating pump gear guard shield welding tool |
-
2015
- 2015-11-17 CN CN201520916538.7U patent/CN205237241U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113828956A (en) * | 2021-11-12 | 2021-12-24 | 黄秀芳 | Reciprocating pump gear guard shield welding tool |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104526431B (en) | Double-layer circular disc tool magazine device | |
CN204353860U (en) | Double-layer circular disc tool magazine device | |
CN203526604U (en) | Linkage adjusting chuck | |
CN203527032U (en) | Hole positioning machining clamp | |
CN201586879U (en) | Gear-hobbing clamp with ball centering | |
CN205237241U (en) | Process anchor clamps of large -scale worm wheel part | |
CN202317304U (en) | Gear hobbing machine spindle capable of processing workpieces with two different bore diameters | |
CN203125130U (en) | Automatic multi-process drilling and tapping all-in-one machine | |
CN203526597U (en) | Center positioning seat of linkage adjustment chuck | |
CN203541753U (en) | Hobbing fixture | |
CN204673332U (en) | A kind of automobile steering device housing cross-drilled hole workpiece machining clamp | |
CN203282012U (en) | Shape cutting machining device for large-specification chain wheel | |
CN204160213U (en) | The special fixture of the irregular tool-post structure part of machining large | |
CN107378133B (en) | Single-row single-tooth broaching machine and method for broaching internal spline of spline sleeve | |
CN203599885U (en) | Tooth surface positioning clamp for bevel gear | |
CN104889699A (en) | Large gear machine tool carriage saddle part machining method | |
CN203076652U (en) | Device for indexing and drilling machining of outer circle of workpiece on drilling machine | |
CN201755675U (en) | Hinge type jig with replaceable jig bushing block | |
CN102357822B (en) | Jig for processing automobile air conditioning die circular cutter | |
CN204770987U (en) | Step sprocket mills tooth frock | |
CN205237240U (en) | Special fixture of processing large gear part | |
CN206065460U (en) | A kind of new centring tongs | |
CN203197410U (en) | Gear hobbing fixture | |
CN203292908U (en) | Shim plate adjusting block for lathing slice flange chuck | |
CN203031147U (en) | Tooth-shaped fixture |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160518 Termination date: 20191117 |