CN205231732U - Net energy -saving control system is joined in marriage to intelligence - Google Patents

Net energy -saving control system is joined in marriage to intelligence Download PDF

Info

Publication number
CN205231732U
CN205231732U CN201521024118.4U CN201521024118U CN205231732U CN 205231732 U CN205231732 U CN 205231732U CN 201521024118 U CN201521024118 U CN 201521024118U CN 205231732 U CN205231732 U CN 205231732U
Authority
CN
China
Prior art keywords
circuit breaker
termination
residual current
earthing isolator
ground connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521024118.4U
Other languages
Chinese (zh)
Inventor
郑建烨
许小猜
吴天笑
刘晓登
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Original Assignee
Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wanshan Mountain Foochow Electric Power Advisory Co Ltd filed Critical Wanshan Mountain Foochow Electric Power Advisory Co Ltd
Priority to CN201521024118.4U priority Critical patent/CN205231732U/en
Application granted granted Critical
Publication of CN205231732U publication Critical patent/CN205231732U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a net energy -saving control system is joined in marriage to intelligence, it includes first circuit breaker, second circuit breaker, third circuit breaker, a residual current protection ware, the 2nd residual current protection ware, first ground connection isolator, second ground connection isolator, surge protector, mends condenser and divide and mend the condenser altogether, a first circuit breaker termination is on the generating line, and another termination is on the neutral conductor, a residual current protection ware is connected with first circuit breaker, the first circuit breaker other end of a first ground connection isolator termination, another the termination load of first ground connection isolator, a second circuit breaker termination is on the generating line, and another termination is on the neutral conductor, the 2nd residual current protection ware is connected with the second circuit breaker, a second ground connection isolator termination second circuit breaker other end, another the termination load of second ground connection isolator, the first end of surge protector connects the generating line, the second termination neutral conductor, third termination ground through a fuse, mend a condenser termination generating line altogether, another termination divides mends the condenser.

Description

Intelligent network distribution energy-saving control system
Technical field
The utility model relates to a kind of intelligent network distribution energy-saving control system.
Background technology
Intelligent network distribution is one of key link of intelligent grid.
Intelligent network distribution by making power distribution network dominate from traditional supplier, unidirectional power supply, the basic operation mode relying on labor management is to user's participations, trend two-way flow, the transformation of supermatic direction.Along with the progress that China DG builds, more and more significantly economic benefit and social benefit will be produced.
TT mode electric power system refers to directly grounded for the metal shell of electric equipment protection system, is called protective earthing system, also claims TT system.First symbol T represents the direct ground connection of neutral point in electric power system; Second symbol T represents that the metal conduction portions that load equipment exposes not connect with electrified body directly connects with the earth, and how ground connection has nothing to do with system.
Summary of the invention
The purpose of this utility model is to provide a kind of intelligent network distribution energy-saving control system.
The utility model realizes by the following technical solutions: a kind of intelligent network distribution energy-saving control system, is characterized in that: comprise the first circuit breaker, the second circuit breaker, the 3rd circuit breaker, the first residual current operated protective device, the second residual current operated protective device, the first earthing isolator, the second earthing isolator, surge protector, mend capacitor and point benefit capacitor altogether; Described first circuit breaker one end is connected on bus, and the other end is connected on the neutral line; Described first residual current operated protective device is connected with the first circuit breaker; The described first earthing isolator one termination first circuit breaker other end, described another terminating load of first earthing isolator; Described second circuit breaker one end is connected on bus, and the other end is connected on the neutral line; Described second residual current operated protective device is connected with the second circuit breaker; The described second earthing isolator one termination second circuit breaker other end, described another terminating load of second earthing isolator; Described surge protector first end connects bus through a fuse, the second termination neutral line, the 3rd end ground connection; The described capacitor one of benefit altogether termination bus, another termination divides benefit capacitor.
In the utility model one embodiment, also comprise the first current transformer be connected with the first earthing isolator other end and the second current transformer be connected with the second earthing isolator other end.
Preferably, the described first to the 3rd circuit breaker is autoreclose breaker.
Compared with prior art, the utility model adopts TT mode electric power system to draw up high-voltage line and low-voltage line connects or between distribution transforming high-low pressure winding, during insulation breakdown, low voltage electric network occurs overvoltage; Certain leakage ability is had to the Lightning Over-voltage of low voltage electric network; Compared with earth-free with low-voltage electrical apparatus shell, when electrical equipment touches shell accident, the voltage to earth of shell can be reduced, thus can alleviate the personal electric shock extent of injury; Because earth current during single-phase earthing is larger, protective device (earth leakage protective device) action message can be made, excise fault in time; Increase residual current operated protective device, when residual current meets or exceeds set-point, the earthing isolator of energy automatic shutoff circuit, ensures Electrical Safety; Reactive power compensation part comprises common benefit capacitor and point benefit capacitor, mends the first switching of capacitor altogether, thus reaches more reasonable, more economical.
Accompanying drawing explanation
Fig. 1 is the electrical schematic diagram of the utility model one embodiment.
Embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is described further.
See Fig. 1, the utility model provides a kind of intelligent network distribution energy-saving control system.This system comprises the first circuit breaker 1QF, the second circuit breaker 2QF, the 3rd circuit breaker 3QF, the first residual current operated protective device, the second residual current operated protective device, the first earthing isolator 1QS, the second earthing isolator 2QS, surge protector, mends capacitor and point benefit capacitor altogether; Described first circuit breaker 1QF mono-end is connected on bus, and the other end is connected on neutral line N; Described first residual current operated protective device is connected with the first circuit breaker 1QF; The described first earthing isolator 1QS mono-termination first circuit breaker 1QF other end, described first another terminating load of earthing isolator 1QS; Described second circuit breaker 2QF mono-end is connected on bus, and the other end is connected on neutral line N; Described second residual current operated protective device is connected with the second circuit breaker 2QF; The described second earthing isolator one termination second circuit breaker 2QF other end, described second another terminating load of earthing isolator 2QS; Described surge protector F first end connects bus through a fuse FU, the second termination neutral line N, the 3rd end ground connection; The described capacitor one of benefit altogether termination bus, another termination divides benefit capacitor.
When residual current meets or exceeds set-point, the earthing isolator of energy automatic shutoff circuit, ensures Electrical Safety.Mend capacitor altogether with point benefit capacitor for this system provides reactive power compensation.When capacitor switching, be first putting into operation of common benefit, put into operation after point benefit, because accomplish three-phase load balance as far as possible during sharing of load, concerning a transformer, can not only with the load of a certain phase, therefore, major part should be common benefit, fraction is a point benefit, such Scheme of Reactive Power Compensation is more reasonable, more economical (point benefit is more expensive than mending altogether), thus reaches energy-conservation effect.
In the utility model one embodiment, also comprise the first current transformer LH1 be connected with the first earthing isolator other end and the second current transformer LH2 be connected with the second earthing isolator other end.Current transformer detects the output current of earthing isolator.
Circuit breaker in the utility model embodiment is electric operating and can automatic reclosing, and when circuit breaks down, after relaying protection makes circuit breaker trip, auto recloser makes circuit breaker again close after short time interval.In most cases, line fault (as thunderbolt, windburn etc.) is temporary, after circuit breaker trip, the insulation property (insulator and air gap) of circuit can be restored, and again overlapping can be successful, this provides for improved the reliability of power system power supply.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection range of the present utility model.

Claims (3)

1. an intelligent network distribution energy-saving control system, is characterized in that: comprise the first circuit breaker, the second circuit breaker, the 3rd circuit breaker, the first residual current operated protective device, the second residual current operated protective device, the first earthing isolator, the second earthing isolator, surge protector, mend capacitor and point benefit capacitor altogether; Described first circuit breaker one end is connected on bus, and the other end is connected on the neutral line; Described first residual current operated protective device is connected with the first circuit breaker; The described first earthing isolator one termination first circuit breaker other end, described another terminating load of first earthing isolator; Described second circuit breaker one end is connected on bus, and the other end is connected on the neutral line; Described second residual current operated protective device is connected with the second circuit breaker; The described second earthing isolator one termination second circuit breaker other end, described another terminating load of second earthing isolator; Described surge protector first end connects bus through a fuse, the second termination neutral line, the 3rd end ground connection; The described capacitor one of benefit altogether termination bus, another termination divides benefit capacitor.
2. intelligent network distribution energy-saving control system according to claim 1, is characterized in that: also comprise the first current transformer be connected with the first earthing isolator other end and the second current transformer be connected with the second earthing isolator other end.
3. intelligent network distribution energy-saving control system according to claim 1, is characterized in that: the described first to the 3rd circuit breaker is autoreclose breaker.
CN201521024118.4U 2015-12-11 2015-12-11 Net energy -saving control system is joined in marriage to intelligence Expired - Fee Related CN205231732U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521024118.4U CN205231732U (en) 2015-12-11 2015-12-11 Net energy -saving control system is joined in marriage to intelligence

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521024118.4U CN205231732U (en) 2015-12-11 2015-12-11 Net energy -saving control system is joined in marriage to intelligence

Publications (1)

Publication Number Publication Date
CN205231732U true CN205231732U (en) 2016-05-11

Family

ID=55906777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521024118.4U Expired - Fee Related CN205231732U (en) 2015-12-11 2015-12-11 Net energy -saving control system is joined in marriage to intelligence

Country Status (1)

Country Link
CN (1) CN205231732U (en)

Similar Documents

Publication Publication Date Title
CN203180518U (en) Intelligent switch arc-extinguishing and overvoltage-protecting device
CN201478821U (en) Overvoltage protector for indirect neutral point-grounding power system in three-phase power grid
CN103280802B (en) Paralleling reactor operation overvoltage managing circuit and managing method of paralleling reactor operation overvoltage managing circuit
CN102290805A (en) Electric arc grounding overvoltage limiting device applied to medium-voltage distribution system
CN208209544U (en) A kind of novel circuit configuration of electric main power connection in power plant
CN205231732U (en) Net energy -saving control system is joined in marriage to intelligence
CN203312809U (en) Operation overvoltage treating circuit for shunt reactor
CN206807004U (en) A kind of grounding transformer of wind power plant
CN202513569U (en) Transformer neutral point overvoltage protector
CN106208723B (en) Voltage-stabilizing energy-saving device
CN108808729A (en) A kind of novel circuit configuration of electric main power connection in power plant
CN204131115U (en) Multifunctional comprehensive circuit protection device
CN203826939U (en) Electricity utilization system applied to high-voltage plant of large and medium-sized thermal power plant
CN103280819B (en) Paralleling reactor compensation loop of transformer substation and compensation method of paralleling reactor compensation loop of transformer substation
CN203660298U (en) 220kV GIS line-outgoing structure
CN201388042Y (en) Central high-voltage switch equal-height cabinet
CN207184045U (en) For under strong thunder and lightning multiple-pulse environment and preventing the distribution box of lightning protection device catching fire
CN203312816U (en) Shunt reactor compensation circuit for substation
CN210224950U (en) Series compensation current limiting device based on spark GAP GAP
CN209046243U (en) A kind of voltage transformer protection device of technological service
CN206471825U (en) A kind of novel efficient extinguishing arc and overvoltage protection
CN210327018U (en) 10kV directly gets 12V equipment protection device
CN204304424U (en) A kind of single-phase earthing superpotential transfer restraint device
CN214227829U (en) Contact net switch ground potential counterattack suppression circuit and device
CN107979057A (en) The line located Insulation Coordination method of shape high voltage DC earthing pole based on place of safety domain method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160511

Termination date: 20211211