CN205227364U - Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower - Google Patents

Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower Download PDF

Info

Publication number
CN205227364U
CN205227364U CN201521082057.7U CN201521082057U CN205227364U CN 205227364 U CN205227364 U CN 205227364U CN 201521082057 U CN201521082057 U CN 201521082057U CN 205227364 U CN205227364 U CN 205227364U
Authority
CN
China
Prior art keywords
tower
desulfurization
fume extractor
cooling stack
chimney
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201521082057.7U
Other languages
Chinese (zh)
Inventor
赵莉
杨迎哲
祝文强
赵洁
马峰
李亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Original Assignee
Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Northwest Electric Power Design Institute of China Power Engineering Consulting Group filed Critical Northwest Electric Power Design Institute of China Power Engineering Consulting Group
Priority to CN201521082057.7U priority Critical patent/CN205227364U/en
Application granted granted Critical
Publication of CN205227364U publication Critical patent/CN205227364U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Chimneys And Flues (AREA)

Abstract

The utility model discloses an arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower, an arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower, desulfurization dust removal fume extractor includes the desulfurization absorption tower, wet -type electrostatic precipitator and chimney, the desulfurization absorption tower, wet -type electrostatic precipitator and chimney are from up arrange the center at natural draft cooling tower down perpendicularly in proper order, flue gas that the boiler combustion produced passes through during the flue carries the desulfurization absorption tower from the natural draft cooling tower outside, the desulfurization absorption tower arranges at the bottom, and wet electrostatic precipitator arranges at the middle part, and the chimney arranges that the three arranges perpendicularly in intercooling tower center that area is minimum on upper portion, is favorable to arranging of cooling arrangement in the cooling tower, road etc..

Description

The arrangement of a kind of desulfurization and dedusting fume extractor in cooling stack
[technical field]
The utility model relates to the arrangement of desulfuration absorbing tower, wet electrical dust precipitator and chimney, is specifically related to the arrangement of a kind of desulfurization and dedusting fume extractor in cooling stack.
[background technology]
Along with China more and more payes attention to environmental protection, pay special attention to the control of atmosphere pollution, the flue gas of coal-burning power plant is proposed to the requirement of ultra-clean discharge, after desulfuration absorbing tower, add one-level wet electrical dust precipitator is again one of solution.
Power plant desulfurization absorption tower, wet electrical dust precipitator and chimney are usually placed in outside cooling stack, there is application desulfuration absorbing tower or chimney are arranged in cooling stack in recent years, if but desulfuration absorbing tower, wet electrical dust precipitator, chimney are arranged sequentially in indirect cool tower by usual level, floor space is large, smoke canal elbow is many, smoke evacuation resistance is large, and power of fan is large, and then makes station service power consumption rate higher; Three kinds of equipment floor space in tower is large, affects cooling device in tower and arranges; When three kinds of equipment levels are arranged in tower, chimney is not in indirect cool tower center, and this arranged off-centre makes chimney emission increase the corroded area of cooling tower inwall.
[utility model content]
The utility model object is to overcome prior art defect, provides the arrangement of a kind of desulfurization and dedusting fume extractor in cooling stack, reduces investment outlay, reduces station service power consumption rate and plant area's occupation of land.
For achieving the above object, the technical solution adopted in the utility model is:
The arrangement of a kind of desulfurization and dedusting fume extractor in cooling stack, desulfurization and dedusting fume extractor comprises desulfuration absorbing tower, wet electrical dust precipitator and chimney, desulfuration absorbing tower, wet electrical dust precipitator and chimney are arranged vertically on the center of cooling stack from the bottom up successively, and the flue gas that boiler combustion produces is transported to desulfuration absorbing tower from cooling stack outside by flue.
Further, described cooling stack is gravity-flow ventilation indirect dry cooling tower or natural ventilating wet-type crossing current tower.
Further, described air flue horizontal is arranged.
Further, in described flue tower, part is connected to desulfuration absorbing tower, and tower outward part is erected on support, horizontal through cooling stack barrel.
Further, described flue distance ground certain altitude is arranged.
The desulfuration absorbing tower of power plant, wet electrical dust precipitator and chimney are arranged in cooling stack by the utility model, and three kinds of equipment are arranged vertically on tower center by order from low to high; Desulfuration absorbing tower is arranged in the bottom, and wet electric cleaner is arranged in middle part, and chimney is arranged in topmost, and three is arranged vertically within indirect cool tower center, and floor space is minimum, is conducive to the layout of cooling device, road etc. in cooling tower.
Chimney is positioned at centre of cooling column, makes the corroded area of chimney emission to indirect cool tower inwall minimum, saves anti-corrosion material, reduces investment outlay.After being arranged vertically, chimney emission mouth is lifted to higher height, effectively can utilize pressure reduction, and make exhaustion smoke height lifting, Pollutants Diffusion is effective.Flue, from level access desulfuration absorbing tower cooling tower, reduces flue bent pipe, makes flue distance the shortest, reduces smoke evacuation resistance, reduce power of fan, reduce station service power consumption rate.The fresh water (FW) of wet scrubber can enter in desulfuration absorbing tower and reuses by gravity current, reduces pipeline consumption.
[accompanying drawing explanation]
Fig. 1 floor plan of the present utility model
Fig. 2 profile of the present utility model
In figure: 1-cooling stack; 2-broadening platform; 3-radiator or filler; 4-ground; 5-flue; 6-desulfuration absorbing tower; 7-wet electrical dust precipitator; 8-chimney.
[detailed description of the invention]
Below in conjunction with accompanying drawing, the utility model is described in further detail.
See Fig. 1 and Fig. 2, the arrangement of desulfurization and dedusting fume extractor of the present utility model in cooling stack, desulfurization and dedusting fume extractor comprises desulfuration absorbing tower 6, wet electrical dust precipitator 7 and chimney 8, desulfuration absorbing tower 6, wet electrical dust precipitator 7 and chimney 8 are arranged vertically on the center of cooling stack 1 from the bottom up successively, and the flue gas that boiler combustion produces is transported to desulfuration absorbing tower 6 from cooling stack 1 outside by flue 5.
Desulfuration absorbing tower, wet electrical dust precipitator, chimney are arranged vertically within centre of cooling column position by the utility model, save the area, and reduce flue length and turning, reduce station service power consumption rate, reduce the corroded area of inner wall of tower, take up an area in Appropriate application tower.
Further, described cooling stack 1 is gravity-flow ventilation indirect dry cooling tower or natural ventilating wet-type crossing current tower.
Further, in described flue 5 tower, part is connected to desulfuration absorbing tower 6, and tower outward part is erected on support, horizontal through cooling stack barrel, radiator or filler 3 are arranged in cooling tower 1 lower periphery, radiator or sealed by broadening platform 2 between filler 3 top and indirect cool tower 1; Flue 5 is horizontally disposed with, and distance ground 4 certain altitude is arranged.
The utility model discloses a kind of desulfuration absorbing tower, wet electrical dust precipitator and the chimney method for arranging in cooling stack, wet electrical dust precipitator, desulfuration absorbing tower and chimney are arranged in cooling stack center by the method, make flue distance the shortest, in indirect cool tower, floor space is minimum, blast in tower is utilized to discharge fume to greatest extent, save the occupation of land outside tower of wet electrical dust precipitator, desulfuration absorbing tower and chimney, save land area on the whole.Cooling stack comprises gravity-flow ventilation indirect dry cooling tower and natural ventilating wet-type crossing current tower.
Above content is further detailed description of the utility model; can not assert that detailed description of the invention of the present utility model is only limitted to this; for the utility model person of an ordinary skill in the technical field; without departing from the concept of the premise utility; some simple deduction or replace can also be made, all should be considered as belonging to the protection domain of the utility model by submitted to claims determination utility model.

Claims (5)

1. the arrangement of a desulfurization and dedusting fume extractor in cooling stack, it is characterized in that: desulfurization and dedusting fume extractor comprises desulfuration absorbing tower (6), wet electrical dust precipitator (7) and chimney (8), desulfuration absorbing tower (6), wet electrical dust precipitator (7) and chimney (8) are arranged vertically on the center of cooling stack (1) from the bottom up successively, and the flue gas that boiler combustion produces is transported to desulfuration absorbing tower (6) from cooling stack (1) outside by flue (5).
2. the arrangement of desulfurization and dedusting fume extractor according to claim 1 in cooling stack, is characterized in that: described cooling stack (1) is gravity-flow ventilation indirect dry cooling tower or natural ventilating wet-type crossing current tower.
3. the arrangement of desulfurization and dedusting fume extractor according to claim 1 and 2 in cooling stack, is characterized in that: described flue (5) is horizontally disposed with.
4. the arrangement of desulfurization and dedusting fume extractor according to claim 1 and 2 in cooling stack, it is characterized in that: in described flue (5) tower, part is connected to desulfuration absorbing tower (6), tower outward part is erected on support, horizontal through cooling stack barrel.
5. the arrangement of desulfurization and dedusting fume extractor according to claim 1 and 2 in cooling stack, is characterized in that: described flue (5) distance ground certain altitude is arranged.
CN201521082057.7U 2015-12-22 2015-12-22 Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower Active CN205227364U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521082057.7U CN205227364U (en) 2015-12-22 2015-12-22 Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521082057.7U CN205227364U (en) 2015-12-22 2015-12-22 Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower

Publications (1)

Publication Number Publication Date
CN205227364U true CN205227364U (en) 2016-05-11

Family

ID=55902425

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521082057.7U Active CN205227364U (en) 2015-12-22 2015-12-22 Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower

Country Status (1)

Country Link
CN (1) CN205227364U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106178861A (en) * 2016-08-31 2016-12-07 西安西热锅炉环保工程有限公司 A kind of coal-burning power plant's minimum discharge device
CN106215643A (en) * 2016-08-31 2016-12-14 西安西热锅炉环保工程有限公司 A kind of coal-burning power plant's minimum discharge device of band free-standing structure
CN107297126A (en) * 2017-08-09 2017-10-27 武汉龙净环保工程有限公司 Desulfuration absorbing tower enclosed eddy flow flue gas condensing dehumidifier and its dehumanization method
CN108343981A (en) * 2017-01-23 2018-07-31 中国电力工程顾问集团华北电力设计院有限公司 Desulfurizing tower and chimney combined into one apparatus
CN109663428A (en) * 2018-12-29 2019-04-23 中国神华能源股份有限公司 Smoke processing system

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106178861A (en) * 2016-08-31 2016-12-07 西安西热锅炉环保工程有限公司 A kind of coal-burning power plant's minimum discharge device
CN106215643A (en) * 2016-08-31 2016-12-14 西安西热锅炉环保工程有限公司 A kind of coal-burning power plant's minimum discharge device of band free-standing structure
CN108343981A (en) * 2017-01-23 2018-07-31 中国电力工程顾问集团华北电力设计院有限公司 Desulfurizing tower and chimney combined into one apparatus
CN107297126A (en) * 2017-08-09 2017-10-27 武汉龙净环保工程有限公司 Desulfuration absorbing tower enclosed eddy flow flue gas condensing dehumidifier and its dehumanization method
CN109663428A (en) * 2018-12-29 2019-04-23 中国神华能源股份有限公司 Smoke processing system

Similar Documents

Publication Publication Date Title
CN205227364U (en) Arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower
CN104226479A (en) Efficient wet type electric dedusting and purifying device and method for smoke obtained after wet desulphurization
CN206604337U (en) A kind of unpowered blast cap dust arrester
CN201546425U (en) Natural division type exhaust device
CN204509230U (en) A kind of blast furnace gas dry dusting depickling cleaner
CN105258267A (en) Mechanical ventilation device and method for underground stereo garage
CN207169250U (en) A kind of vortex-flow and defrosting device
CN204018028U (en) A kind of high-efficient wet-type electric precipitation purifier of wet-method desulfurized fume
CN203132415U (en) Cooling tower
CN205042607U (en) Wet electrostatic precipitator
CN205517040U (en) Boiler desulfurization dust collector
CN204234208U (en) Wet electrical dust precipitator and drainage arrangement thereof
CN206112973U (en) Horizontal arrangement structure of desulfurization dust removal fume extractor in natural draft cooling tower
CN206027935U (en) Wet -type is hot air blowing system for electrostatic precipitator
CN2782201Y (en) Integrated unit for treating waste gas and dusting
CN204768234U (en) Horizontal dust removal denitration desulphurization unit that streams
CN206008406U (en) A kind of coal-burning power plant's minimum discharge device
CN204107248U (en) A kind of chimney dust collector
CN204201922U (en) Flue gas processing device after a kind of coal boiler
CN207413056U (en) Flue gas dust removal device
CN203771588U (en) Smaze intelligent purifying system during welding of large industrial building
CN202963015U (en) Steel-making secondary high-pressure dust removal device
CN208959598U (en) A kind of flue gas cooling and dehumidifying device of wet desulphurization
CN205360915U (en) Automatic lift haze belt cleaning device
CN205701040U (en) The structure of the vertical wet electrical dust precipitator of a kind of side air-out is arranged

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant